05 51 10 Dvi 10000 001
05 51 10 Dvi 10000 001
05 51 10 Dvi 10000 001
INSPECTION AFTER
HARD LANDING
1 SEP19
ZONING DATA
___________
ZONE : 210
700
PREPARATION
___________
PROVISION
WORK : SKILL
_____ ___
MEN _________
MAN-HOURS
ELAPSED TIME :
PUBLICATION
___________
ALX 05-51-10
DVI 10000-001
2-400 PAGE 1
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
2 SEP19
PUBLICATION
___________
ALX 05-51-10
DVI 10000-001
2-400 PAGE 2
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
3 SEP19
PUBLICATION
___________
ALX 05-51-10
DVI 10000-001
2-400 PAGE 3
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
4 SEP19
001 _______________________
HARD LANDING DEFINITION
002 ____________________________________
CAUTION - LANDING GEAR SPECIFICITIES
ALX 05-51-10
DVI 10000-001
2-400 PAGE 4
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
5 SEP19
004 ___________
PREPARATION
005 _________________
EXTERNAL CLEANING
006 _________________
INTERNAL CLEANING
ALX 05-51-10
DVI 10000-001
2-400 PAGE 5
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
6 SEP19
007 ===============================================
_______________________________________________
=
_______________________________________________
RESTRICTED INSPECTION =
===============================================
_______________________________________________
008 _________________________
GENERAL VISUAL INSPECTION
1. INSPECTION
PERFORM A GENERAL VISUAL INSPECTION OF
THE FOLLOWING ZONES :
D. CONTROL SURFACES
CHECK OPERATION OF ALL CONTROL SURFACES
(13) AND THEIR CONTROLS. CHECK OVER
ALX 05-51-10
DVI 10000-001
2-400 PAGE 6
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
7 SEP19
(2)NOSE GEAR
(A)CHECK THAT NOSE GEAR STRUCTURE
AND STRUCTURE TO WHICH NOSE GEAR
IS ATTACHED ARE NOT DEFORMED.
(B)CHECK THAT THE WHEELS, AND
ESPECIALLY THE RIM BEADS (12), ARE
FREE FROM CRACKS AND DEFORMATION.
(C)CHECK NOSE WHEEL STEERING ACTUA-
TING SYSTEM FOR EXCESSIVE PLAY.
(D)VISUALLY CHECK DRAG BRACE AND ITS
ATTACHMENT TO BARREL. CHECK FOR
CORRECT ALIGNMENT.
ALX 05-51-10
DVI 10000-001
2-400 PAGE 7
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
8 SEP19
009 __________________________
DETAILED VISUAL INSPECTION
010 ______________________________________________
DETAILED VISUAL INSPECTION OF FRAMES 25 AND 27
013 ===============================================
_______________________________________________
=
_______________________________________________
EXTENDED INSPECTION =
===============================================
_______________________________________________
014 ___________
MEASUREMENT
ALX 05-51-10
DVI 10000-001
2-400 PAGE 8
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
9 SEP19
015 ____________________
INSPECTION (GENERAL)
- WINGS
- STABILIZERS
- NACELLES
- FUSELAGE
- EQUIPMENT/FURNISHING
016 _______________________________
DETAILED INSPECTION OF THE WING
017 ________________________________
FUNCTIONAL CHECK OF FLAP CONTROL
018 ___________________________
DVI ON WING SUPPORT FITTING
ALX 05-51-10
DVI 10000-001
2-400 PAGE 9
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
10 SEP19
019 _______________________________________
VISUAL INSPECTION OF SHEAR WEB AT RIB 2
020 _______________________________________
DVI ON UPPER LUG AREA (WING ATTACHMENT)
ALX 05-51-10
DVI 10000-001
2-400 PAGE 10
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
11 SEP19
030 ______________________________________
DETAILED INSPECTION OF THE STABILIZERS
031 _______________________________
DETAILED INSPECTION OF NACELLES
ALX 05-51-10
DVI 10000-001
2-400 PAGE 11
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
12 SEP19
034 ________________________________________
VISUAL INSPECTION OF ENGINE SHOCK MOUNTS
036 ___________________________________________
PRATT-&-WHITNEY SPECIFIC ENGINE INSPECTIONS
ALX 05-51-10
DVI 10000-001
2-400 PAGE 12
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
13 SEP19
037 _______________________________
DETAILED INSPECTION OF FUSELAGE
038 ____________________________________________
DETAILED INSPECTION OF EQUIPMENT/FURNISHINGS
039 ______________________
JACKING UP OF AIRCRAFT
041 ________________________
NORMAL RETRACTION OF L/G
ALX 05-51-10
DVI 10000-001
2-400 PAGE 13
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
14 SEP19
042 _______________________
NORMAL EXTENSION OF L/G
043 ______________________________
REMOVAL OF MLG WHEEL/TIRE ASSY
044 ______________________________
REMOVAL OF NLG WHEEL/TIRE ASSY
045 ___________________________________________
DETAILED VISUAL INSPECTION OF LANDING GEARS
ALX 05-51-10
DVI 10000-001
2-400 PAGE 14
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
15 SEP19
048 ___________________________________________
INSTALLATION OF SERVICEABLE WHEEL/TIRE ASSY
049 ___________________________________
INSTALLATION OF NLG WHEEL/TIRE ASSY
050 ____________________________________
LOWERING OF AIRCRAFT ONTO ITS WHEELS
051 __________________________________
FUNCTIONAL TEST OF STEERING SYSTEM
ALX 05-51-10
DVI 10000-001
2-400 PAGE 15
SEP 01/19
05-51-10 DVI 10000-001
INSPECTION AFTER
HARD LANDING
16 SEP19
052 ________
CLOSE-UP
***** E N D O F T E X T *****
ALX 05-51-10
DVI 10000-001
2-400 PAGE 16
SEP 01/19
05-51-10 DVI 10000-001
17 SEP19