57 14 12 Rai 10000 002
57 14 12 Rai 10000 002
57 14 12 Rai 10000 002
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK : SKILL
_____ ___
MEN _________
MAN-HOURS
MECHANIC 02
ELAPSED TIME :
VQ 57-14-12
RAI 10000-002
2-400 PAGE 1
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 2 MAR19
PUBLICATION
___________
VQ 57-14-12
RAI 10000-002
2-400 PAGE 2
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 3 MAR19
001 _______
WARNING
VQ 57-14-12
RAI 10000-002
2-400 PAGE 3
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 4 MAR19
AIRCRAFT CONFIGURATION.
005 ________
INERTING
006 ___________
PREPARATION
007 _________________
REMOVAL OF PANELS
VQ 57-14-12
RAI 10000-002
2-400 PAGE 4
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 5 MAR19
NOTE:
- INSTALL FASTENERS ON TOOLS BOARD
AND MAKE SURE THIS ONE IS COMPLETE.
- SCREWS ARE DIFFERENT LENGTHS,
IDENTIFY THEM.
- IF SCREWS ARE DIFFICULT TO REMOVE,
USE GSE 98S57002500000.
- DISCARD DAMAGED SCREWS AND CLEAN THE
OTHERS WITH SOLVENT MAT 11-003.
VQ 57-14-12
RAI 10000-002
2-400 PAGE 5
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 6 MAR19
008 ___________________
SURFACE PREPARATION
REF.FIG. 571412-RAI-00110
571412-RAI-00120
571412-RAI-00130
VQ 57-14-12
RAI 10000-002
2-400 PAGE 6
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 7 MAR19
6. REPAIR OF SEALING.
A. ON PANEL.
VQ 57-14-12
RAI 10000-002
2-400 PAGE 7
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 8 MAR19
B. ON BOX.
009 _______
CAUTION
010 ______________________
INSTALLATION OF PANELS
VQ 57-14-12
RAI 10000-002
2-400 PAGE 8
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 9 MAR19
2. AT RIB 13.
VQ 57-14-12
RAI 10000-002
2-400 PAGE 9
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 10 MAR19
011 ________________________________
OPENING OF WING BOX ACCESS DOORS
012 _________________________
SEALANT SMOOTHING AT RIB4
013 ________________________________
CLOSING OF WING BOX ACCESS DOORS
VQ 57-14-12
RAI 10000-002
2-400 PAGE 10
MAR 01/19
57-14-12 RAI 10000-002
REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS 11 MAR19
014 _________________
BLANKING OF CELLS
015 ________
CLOSE-UP
***** E N D O F T E X T *****
VQ 57-14-12
RAI 10000-002
2-400 PAGE 11
MAR 01/19
57-14-12 RAI 10000-002
12 MAR19
VQ REMOVABLE PANEL
ATTACHMENTS
57-14-12
RAI 10000-002
2-400 PAGE 12
MAR 01/19
57-14-12 RAI 10000-002
13 MAR19
VQ REPAIR OF SEALING ON
PANEL
57-14-12
RAI 10000-002
2-400 PAGE 13
MAR 01/19
57-14-12 RAI 10000-002
14 MAR19
VQ REPAIR OF SEALING ON
BOX
57-14-12
RAI 10000-002
2-400 PAGE 14
MAR 01/19
57-14-12 RAI 10000-002
15 MAR19