21 11 51 Rai 10000 002
21 11 51 Rai 10000 002
21 11 51 Rai 10000 002
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK : SKILL
_____ ___
MEN _________
MAN-HOURS
ELAPSED TIME :
PUBLICATION
___________
ALX 21-11-51
RAI 10000-002
2-400 PAGE 1
MAR 01/19
21-11-51 RAI 10000-002
REMOVAL AND INSTALLATION
OF PACK VALVE
2 MAR19
001 ___________
PREPARATION
002 _____________________
REMOVAL OF PACK VALVE
003 __________________________
INSTALLATION OF PACK VALVE
ALX 21-11-51
RAI 10000-002
2-400 PAGE 2
MAR 01/19
21-11-51 RAI 10000-002
REMOVAL AND INSTALLATION
OF PACK VALVE
3 MAR19
004 ________
CLOSE UP
005 ______________________________
OPERATIONAL TEST OF PACK VALVE
***** E N D O F T E X T *****
ALX 21-11-51
RAI 10000-002
2-400 PAGE 3
MAR 01/19
21-11-51 RAI 10000-002
4 MAR19