21 11 51 Rai 10000 002

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

21-11-51 RAI 10000-002

REMOVAL AND INSTALLATION


OF PACK VALVE
1 MAR19

ZONING DATA
___________

ZONE : 191 192


210
ACCESS : 191ML

PREPARATION
___________

PROVISION

WORK : SKILL
_____ ___
MEN _________
MAN-HOURS

ELAPSED TIME :

SPARE : 01 PACK VALVE 211150

PUBLICATION
___________

JIC : PACK VALVE INDICATING 21-10-00-OPT-10000


AND ASSOCIATED CIRCUIT
OPERATIONAL TEST

ALX 21-11-51
RAI 10000-002
2-400 PAGE 1
MAR 01/19
21-11-51 RAI 10000-002
REMOVAL AND INSTALLATION
OF PACK VALVE
2 MAR19

001 ___________
PREPARATION

1. ON PANEL 121VU, OPEN, SAFETY AND TAG CIRCUIT


BREAKERS:

3HB AIR BLEED/COMPT TEMP/SYS 1/PACK &


RECIRC FAN CAUTION
4HB AIR BLEED/COMPT TEMP/SYS 2/PACK &
RECIRC FAN CAUTION
5HB AIR BLEED/COMPT TEMP/SYS 1/TURBO FAN
6HB AIR BLEED/COMPT TEMP/SYS 2/TURBO FAN
7HB AIR BLEED/COMPT TEMP/SYS1/PACK VALVE
8HB AIR BLEED/COMPT TEMP/SYS2/PACK VALVE

2. DISPLAY WARNING NOTICE(S) PROHIBITING


PRESSURIZATION OF PNEUMATIC SYSTEM
AND OPERATION OF AIR CONDITIONING
SYSTEM.

3. REMOVE ACCESS PANEL 191ML.

002 _____________________
REMOVAL OF PACK VALVE

REF. FIG. 211051-RAI-00120

1. DISCONNECT ELECTRICAL CONNECTOR (3).

2. HOLD PACK VALVE (4) AND REMOVE COUPLING.

3. REMOVE PACK VALVE (4).

003 __________________________
INSTALLATION OF PACK VALVE

REF. FIG. 211051-RAI-00120

1. POSITION PACK VALVE (4) BETWEEN DUCTS WITH


ITS ARROW SHOWING THE SAME FLOW DIRECTION
OF ARROW ON DUCT.

2. HOLD PACK VALVE (4) AND INSTALL COUPLINGS.

*** CONTINUED ***

ALX 21-11-51
RAI 10000-002
2-400 PAGE 2
MAR 01/19
21-11-51 RAI 10000-002
REMOVAL AND INSTALLATION
OF PACK VALVE
3 MAR19

3. TIGHTEN COUPLINGS TO 45 LBF.IN (0.5 DAN.M).

4. CONNECT ELECTRICAL CONNECTOR (3).

004 ________
CLOSE UP

1. REMOVE SAFETY CLIPS AND TAG AND CLOSE


CIRCUIT BREAKERS PREVIOUSLY OPENED

2. CLOSE ALL ACCESS DOORS PREVIOUSLY OPENED

3. INSTALL ACCESS DOORS PREVIOUSLY REMOVED

4. REMOVE ALL WARNING NOTICES IN FLIGHT


COMPARTMENT

5. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND


CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.

005 ______________________________
OPERATIONAL TEST OF PACK VALVE

SEE JOB INSTRUCTION CARD


211000-OPT-10000

***** E N D O F T E X T *****

ALX 21-11-51
RAI 10000-002
2-400 PAGE 3
MAR 01/19
21-11-51 RAI 10000-002
4 MAR19

ALX REMOVAL AND INSTALLATION


OF PACK VALVE
21-11-51
RAI 10000-002
2-400 PAGE 4
MAR 01/19