Ata 28
Ata 28
Ata 28
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
DVI 10005-002
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 293
294
522
622
: 293BL 294BR
522KT
622KT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01
01
01
01
___
MEN
ACCESS PLATFORM
ENDO/VIDEO SYSTEM OLYMPUS
INTERFACE TOOLING
TELESCOPIC STICK SUPPORT
_________
MAN-HOURS
IPLEX SA II R
98S57205043
98S57005003
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
JIC
: DEFUELING
: INERTING
: DC AND AC EXTERNAL POWER
SUPPLY
: REMOVAL AND INSTALLATION
OF WING-TO-FUSELAGE
FAIRINGS
: DETAILLED VISUAL
INSPECTION OF FUEL
PUMP HARNESS
: DETAILLED VISUAL
INSPECTION OF HIGH
LEVEL SENSOR
AH
12-11-00-DFG-10000
28-12-00-DAR-10000
24-40-00-EAD-10000
53-93-00-RAI-10000
28-21-71-DVI-10000
28-25-73-DVI-10000
28-10-00
DVI 10005-002
2-400 PAGE
1
MAR 01/15
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
28-10-00
DVI 10005-002
2
MAR15
PUBLICATION
___________
JIC
JIC
: DETAILLED VISUAL
INSPECTION OF FUEL
QUANTITY PROBES
: OPENING AND CLOSING OF
WING BOX ACCES DOORS
OPENING AND CLOSING OF
WING BOX ACCESS DOORS
AH
28-42-72-DVI-10000
57-00-00-OAC-10000
28-10-00
DVI 10005-002
2-400 PAGE
2
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
001
DVI 10005-002
3
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
003
________
INERTING
SEE JOB INSTRUCTION CARD
281200-DAR-10000
004
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
*** CONTINUED ***
AH
28-10-00
DVI 10005-002
2-400 PAGE
3
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
005
DVI 10005-002
4
MAR15
____________________________________
REMOVAL
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
NOTE : REMOVE WING TO FUSELAGE FAIRINGS INDICATED IN THE ACCESS SECTION ON PAGE 1
OF THIS JOB INSTRUCTION CARD.
006
007
008
009
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
OPEN WING BOX ACCESS DOOR AS NECESARY.
010
281000-DVI-00100
281000-DVI-00105
281000-DVI-00110
281000-DVI-00115
*** CONTINUED ***
AH
28-10-00
DVI 10005-002
2-400 PAGE
4
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
DVI 10005-002
5
MAR15
CORRECTLY INSTALLED.
NOT BROKEN,FRAYED OR CORRODED.
NOT IN CONTACT WITH SURROUDING
STRUCTURE.
NOT LOOSEN.
28-10-00
DVI 10005-002
2-400 PAGE
5
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY VIDEO CAMERA
DVI 10005-002
6
MAR15
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
CLOSE THE ACCESS DOORS PREVIOUSLY OPENED.
012
_________________________________________
INSTALLATION
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
NOTE : INSTALL WING TO FUSELAGE FAIRINGS
PREVIOUSLY REMOVED.
R
013
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-10-00
DVI 10005-002
2-400 PAGE
6
MAR 01/15
28-10-00
7
AH
ACCESS PANELS
DVI 10005-002
MAR15
28-10-00
DVI 10005-002
2-400
PAGE
7
MAR 01/15
28-10-00
8
AH
DVI 10005-002
MAR15
28-10-00
DVI 10005-002
2-400
PAGE
8
MAR 01/15
28-10-00
9
AH
DVI 10005-002
MAR15
28-10-00
DVI 10005-002
2-400
PAGE
9
MAR 01/15
28-10-00
10
AH
TYPICAL BRAID
INSTALLATION
DVI 10005-002
MAR15
28-10-00
DVI 10005-002
2-400
PAGE
10
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
DVI 10010-003
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 293
522
622
: 293BL
521AT
621CT
294
294BR
521CT 523BT
623BT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01 ACCES PLATFORM
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
JIC
JIC
: DEFUELING
: INERTING
: OUTBOARD WING LOAD
RELIEF (ENGINES/
PROPELLERS INSTALLED)
: OUTBOARD WING LOAD
RELIEF (PROPELLERS
REMOVED)
: OUTBOARD WING LOAD
RELIEF (ENGINES REMOVED)
: REMOVAL AND INSTALLATION
OF WING-TO-FUSELAGE
FAIRINGS
: DETAILLED VISUAL
INSPECTION OF FUEL
PUMP HARNESS
AH
12-11-00-DFG-10000
28-12-00-DAR-10000
07-20-00-SOG-10010
07-20-00-SOG-10012
07-20-00-SOG-10014
53-93-00-RAI-10000
28-21-71-DVI-10000
28-10-00
DVI 10010-003
2-400 PAGE
1
MAR 01/15
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
28-10-00
DVI 10010-003
2
MAR15
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
: DETAILLED VISUAL
INSPECTION OF HIGH
LEVEL SENSOR
: DETAILLED VISUAL
INSPECTION OF FUEL
QUANTITY PROBES
: REMOVAL AND INSTALLATION
OF CENTER WING
REMOVABLE PANELS
: REMOVAL AND INSTALLATION
OF OUTER WINGS REMOVABLE
PANELS
: JACKING FOR A/C
MAINTENANCE OPERATIONS
AH
28-25-73-DVI-10000
28-42-72-DVI-10000
57-14-12-RAI-10000
57-24-12-RAI-10010
07-11-00-JUP-10000
28-10-00
DVI 10010-003
2-400 PAGE
2
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
001
DVI 10010-003
3
MAR15
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
*** CONTINUED ***
AH
28-10-00
DVI 10010-003
2-400 PAGE
3
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
DVI 10010-003
4
MAR15
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
004
________
INERTING
SEE JOB INSTRUCTION CARD
281200-DAR-10000
005
006
007
28-10-00
DVI 10010-003
2-400 PAGE
4
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
008
DVI 10010-003
5
MAR15
____________________________________
REMOVAL
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
NOTE : REMOVE WING TO FUSELAGE FAIRINGS INDICATED IN THE ACCESS SECTION ON PAGE 1
OF THIS JOB INSTRUCTION CARD.
009
010
011
012
013
____________________________________
REMOVAL
OF OUTER BOX REMOVABLE PANEL
SEE JOB INSTRUCTION CARD
572412-RAI-10010
28-10-00
DVI 10010-003
2-400 PAGE
5
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
014
DVI 10010-003
6
MAR15
281000-DVI-00100
281000-DVI-00105
281000-DVI-00110
281000-DVI-00115
28-10-00
DVI 10010-003
2-400 PAGE
6
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
DVI 10010-003
7
MAR15
016
__________________________________________
INSTALLATION
OF OUTER BOX REMOVABLE PANELS
SEE JOB INSTRUCTION CARD
572412-RAI-10010
017
_________________________________________
INSTALLATION
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
NOTE : INSTALL WING TO FUSELAGE FAIRINGS
PREVIOUSLY REMOVED.
R
018
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIP*** CONTINUED ***
AH
28-10-00
DVI 10010-003
2-400 PAGE
7
MAR 01/15
28-10-00
DETAILED VISUAL
INSPECTION OF FUEL AREA
BY WING PANEL REMOVAL
DVI 10010-003
8
MAR15
MENT.
6. REMOVE PLATFORM.
019
____________________________________
LOWERING
OF AIRCRAFT ONTO ITS WHEELS
SEE JOB INSTRUCTION CARD
071100-JUP-10000
*****
AH
E N D
O F
T E X T
*****
28-10-00
DVI 10010-003
2-400 PAGE
8
MAR 01/15
28-10-00
9
AH
ACCESS PANELS
DVI 10010-003
MAR15
28-10-00
DVI 10010-003
2-400
PAGE
9
MAR 01/15
28-10-00
10
AH
DVI 10010-003
MAR15
28-10-00
DVI 10010-003
2-400
PAGE
10
MAR 01/15
28-10-00
11
AH
DVI 10010-003
MAR15
28-10-00
DVI 10010-003
2-400
PAGE
11
MAR 01/15
28-10-00
12
AH
TYPICAL BRAID
INSTALLATION
DVI 10010-003
MAR15
28-10-00
DVI 10010-003
2-400
PAGE
12
MAR 01/15
28-11-00
CLN 10000-001
1
APR05
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
11-006
11-009
08-032
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
AH
12-24-28-DRN-10000
57-14-12-RAI-10000
57-24-12-RAI-10010
28-21-71-RAI-10000
12-11-00-FLG-10020
28-11-00
CLN 10000-001
2-400 PAGE
1
APR 01/05
28-11-00
001
CLN 10000-001
2
APR05
___________
PREPARATION
1. DEFUELING AND DRAINING OF TANK TO CLEAN.
A. CHECK OF THE CLOSING CROSS FEED VALVE.
- ON PANEL 25VU, MAKE CERTAIN THAT
FUEL/X FEED PUSHBUTTON SWITCH IS
RELEASED.
. FLOWBAR IS CROSSLINE.
- ON PANEL 121VU, OPEN SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKER :
2QE
28-11-00
CLN 10000-001
2-400 PAGE
2
APR 01/05
28-11-00
003
CLN 10000-001
3
APR05
004
____________________________________
REMOVAL
OF OUTER BOX REMOVABLE PANEL
SEE JOB INSTRUCTION CARD
572412-RAI-10010
005
_____________________________
REMOVAL
OF FUEL ELECTRIC PUMP
SEE JOB INSTRUCTION CARD
282171-RAI-10000
006
28-11-00
CLN 10000-001
2-400 PAGE
3
APR 01/05
28-11-00
CLN 10000-001
4
APR05
28-11-00
CLN 10000-001
2-400 PAGE
4
APR 01/05
28-11-00
CLN 10000-001
5
APR05
__________________________________
INSTALLATION
OF FUEL ELECTRIC PUMP
SEE JOB INSTRUCTION CARD
282171-RAI-10000
008
009
__________________________________________
INSTALLATION
OF OUTER BOX REMOVABLE PANELS
SEE JOB INSTRUCTION CARD
572412-RAI-10010
010
________
CLOSE-UP
MAKE CERTAIN THAT ANY TOOLS, EQUIPMENTS OR
PRODUCT HAVE NOT FORGOTTEN.
CLEAN TRACES LEFT ON THE WING.
REMOVE ACCESS PLATFORMS.
ON PANEL 121VU :
REMOVE SAFETY CLIPS AND CLOSE CIRCUIT BREAKER :
2QE.
AFTER THE DELAY RECOMMANDED INTO PREVIOUS JOB
INSTRUCTION CARD, PERFORM REFUELING.
011
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
*****
AH
E N D
O F
T E X T
*****
28-11-00
CLN 10000-001
2-400 PAGE
5
APR 01/05
28-11-00
DVI 10000-001
1
APR05
ZONING DATA
___________
ZONE
: 520
620
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
AH
___
MEN
_________
MAN-HOURS
28-11-00
DVI 10000-001
2-400 PAGE
1
APR 01/05
28-11-00
001
DVI 10000-001
2
APR05
AH
E N D
O F
T E X T
*****
28-11-00
DVI 10000-001
2-400 PAGE
2
APR 01/05
28-11-00
3
AH
DVI 10000-001
APR05
28-11-00
DVI 10000-001
2-400
PAGE
3
APR 01/05
28-11-00
GVI 10000-001
1
MAR11
ZONING DATA
___________
ZONE
: 520
620
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
AH
___
MEN
_________
MAN-HOURS
28-11-00
GVI 10000-001
2-400 PAGE
1
MAR 01/11
28-11-00
001
GVI 10000-001
2
MAR11
AH
E N D
O F
T E X T
*****
28-11-00
GVI 10000-001
2-400 PAGE
2
MAR 01/11
28-11-00
3
AH
GVI 10000-001
MAR11
28-11-00
GVI 10000-001
2-400
PAGE
3
MAR 01/11
28-11-72
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522AZ 522CT
622AZ 622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
98S12003000000
SPARE
: 06 WATER DRAIN
02 WATER DRAIN
281170-01
281170-02
EXPENDABLE
: 08
06
04
03
281170-01
281170-01
281170-02
281170-02
O-RING
NUT
O-RING
NUT
_________
MAN-HOURS
11-004
11-003
04-012
09-019
09-001
09-002
PUBLICATION
___________
JIC
AH
57-00-00-OAC-10000
28-11-72
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-11-72
RAI 10000-001
2
MAR12
PUBLICATION
___________
JIC
JIC
AH
28-12-71-RAI-10000
57-00-00-OAC-10000
28-11-72
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-11-72
001
RAI 10000-001
3
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. CHECK FUEL LEVEL (PERFORM DEFUELING OPERATION IF REQUIRED).
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, TO GAIN ACCESS TO WING
LOWER SURFACE.
4. INSTALL PLATFORM, TO GAIN ACCESS TO WING
UPPER SURFACE.
5. FOR REMOVAL OF THE WATER DRAINS FOLLOWS:
*** CONTINUED ***
AH
28-11-72
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-11-72
RAI 10000-001
4
MAR12
RIB 4 AND 5
5007QL (5008QL)
RIB 5 AND 6
5005QL (5006QL)
RIB 12 AND 13 5003QL (5004QL)
REMOVE ACCESS DOORS 522CT (622CT),AND
522AZ (622AZ) AS DESCRIBED IN PARAGRAPH 3.
6. FOR REMOVAL OF THE WATER DRAINS FOLLOWS:
RIB 23 AND 24 5001QL (5002QL)
REMOVE NACA INTAKE AS DESCRIBED IN
PARAGRAPH 4.
003
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
____________________________
REMOVAL
OF THE NACA INTAKE
SEE JOB INSTRUCTION CARD
281271-RAI-10000.
005
28-11-72
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-11-72
006
RAI 10000-001
5
MAR12
___________________________________________
REMOVAL
OF WATER DRAIN BETWEEN RIB 23 TO 24
REF. FIG. 281172-RAI-00110
1. INTO TANK:
A. REMOVE CAP OF SEALANT (1).
B. REMOVE NUTS (2). DISCARD NUTS.
C. REMOVE SEALANT AROUND THE WATER DRAIN
BASE.
2. REMOVE SCREWS (3).
3. REMOVE WATER DRAIN (4).
4. REMOVE O-RINGS (5) AND (6). DISCARD O-RINGS.
5. CLEAN CARREFULLY SEALANT ON WATER DRAIN AND
INTO TANK WITH MATERIAL 11-003 OR 11-004B.
6. BLANK ORIFICES OF REMOVED EQUIPMENT.
7. PROTECT REMOVED COMPONENT INSTALLATION AREA.
007
28-11-72
RAI 10000-001
2-400 PAGE
5
MAR 01/12
28-11-72
RAI 10000-001
6
MAR12
009
________
CLOSE-UP
1. INSTALL WATER DRAINS FOLLOWS:
RIB 23 AND 24 5001QL (5002QL) AND INSTALL
NACA INTAKE AS DESCRIBED IN PARAGRAPH 11.
2. INSTALL WATER DRAINS FOLLOWS:
RIB 4 AND 5
5007QL (5008QL)
RIB 5 AND 6
5005QL (5006QL)
*** CONTINUED ***
AH
28-11-72
RAI 10000-001
2-400 PAGE
6
MAR 01/12
28-11-72
RAI 10000-001
7
MAR12
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
011
_________________________________
INSTALLATION
OF THE NACA INTAKE
SEE JOB INSTRUCTION CARD
281271-RAI-10000.
012
____________________
CHECK
OF WATER DRAIN
1. PERFORM COMPLETE REFUELLING OF AIRCRAFT.
2. CHECK THAT THERE ARE NO SIGNS OF FUEL
LEAKAGE OR SEEPAGE.
3. PLACE A CONTAINER UNDER THE DRAIN TO BE
CHECKED.
4. MANEUVER WATER DRAIN USING PURGE TOOL.
5. MAKE CERTAIN THAT FUEL FLOWS.
6. RELEASE PRESSURE ON PURGE TOOL.
7. CHECK THAT THERE ARE NO SIGNS OF FUEL
LEAKAGE OR SEEPAGE.
28-11-72
RAI 10000-001
2-400 PAGE
7
MAR 01/12
28-11-72
013
RAI 10000-001
8
MAR12
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-11-72
RAI 10000-001
2-400 PAGE
8
MAR 01/12
28-11-72
9
AH
RAI 10000-001
MAR12
28-11-72
RAI 10000-001
2-400
PAGE
9
MAR 01/12
28-11-72
10
AH
RAI 10000-001
MAR12
28-11-72
RAI 10000-001
2-400
PAGE
10
MAR 01/12
28-12-00
INERTING
DAR 10000-001
1
APR05
ZONING DATA
___________
ZONE
: 522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
___
MEN
_________
MAN-HOURS
02
ELAPSED TIME
GSE
: 02 NITROGEN BOTTLE
01 LP REDUCING VALVE 3 BARS
01 FLEXIBLE HOSE
AH
12-24-28-DRN-10000
28-12-00
DAR 10000-001
2-400 PAGE
1
APR 01/05
28-12-00
INERTING
DAR 10000-001
2
001
APR05
___________________________
PRECAUTIONS
BEFORE INERTING
NOTE : TANK INERTING MUST BE MANDATORILY PERFORMED BEFORE ANY OPERATION IN TANKS
(RISKS OF FIRE OR EXPLOSION).
1. TANK INERTING MUST BE CARRIED OUT IN THE
OPEN AIR OR IN A CORRECTLY VENTILATED HANGAR
ONLY.
- PARK THE AIRCRAFT NEAR THE HANGAR EXIT,
FACING OUTWARDS.
2. THE AIRCRAFT TANKS SHOULD BE COMPLETELY
DRAINED (UNTIL DRY) AS FOLLOWS :
NOTE : DO NOT REMOVE THE NO SMOKING
WARNING NOTICES INSTALLED DURING THE
DRAINING.
002
003
__________________
INERTING
PROCEDURE
REF. FIG. 281200-DAR-00100
NOTE : (1) MAKE CERTAIN THAT CROSS-FEED VALVE
IS CLOSED.
(2) AS INERTING OF BOTH TANKS IS IDENTICAL, ONLY LEFT WING INERTING WILL BE
TREATED.
1. OPEN TANK OVERWING REFUELING CAP.
2. INSERT HOSE IN NACA INTAKE.
*** CONTINUED ***
AH
28-12-00
DAR 10000-001
2-400 PAGE
2
APR 01/05
28-12-00
INERTING
DAR 10000-001
3
APR05
________
CLOSE-UP
1. REMOVE ADHESIVE TAPE, PLASTIC FILM AND
SYNTHETIC FOAM INSTALLED DURING THIS
OPERATION.
2. CHECK FOR FOREIGN BODIES IN NACA INTAKE.
3. REMOVE PLATFORM.
4. REMOVE NO SMOKING WARNING NOTICES.
5. REMOVE NITROGEN BOTTLES.
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****
AH
E N D
O F
T E X T
*****
28-12-00
DAR 10000-001
2-400 PAGE
3
APR 01/05
28-12-00
4
AH
DAR 10000-001
APR05
28-12-00
DAR 10000-001
2-400
PAGE
4
APR 01/05
28-12-71
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
: 522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
97A28002117002
SPARE
: 01 NACA INTAKE
281270-08-310
EXPENDABLE
: 01 SEAL
281270-08-320
AH
_________
MAN-HOURS
09-002
04-001
09-016
28-12-71
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-12-71
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
________________________
REMOVAL
OF NACA INTAKE
REF. FIG. 281271-RAI-00100
1. BY MEANS OF THE TOOL, ACTUATE THE WATER
DRAIN LOCATED AT EXTEMITY OF THE WING AND
CHECK THAT THERE IS NO FUEL IN VENT SURGE
TANK.
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM TO GAIN ACCESS TO WING
LOWER SURFACE.
*** CONTINUED ***
AH
28-12-71
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-12-71
RAI 10000-001
3
MAR12
_________________________________
INSTALLATION
OF THE NACA INTAKE
REF. FIG. 281271-RAI-00100
1. CLEAN WORK AREA.
2. APPLY A COAT OF POLYSULFIDE SEALANT
NO. 09-002 (6)
3. PLACE NACA INTAKE.
ALLOW TO POLYMERISE.
4. REMOVE NACA INTAKE.
FLATTEN THE POLYSULFIDE SEALANT (6).
5. APPLY A COAT OF GREASE NO. 04-001 (8) ON
NACA INTAKE BEARING SURFACE.
6. PLACE NACA INTAKE (1) IN RELATION WITH
CENTERING PIN.
7. CLEAN SEAL (3) GROOVE. INSTALL SEAL AND
MAKE CERTAIN THAT SEAL IS IN CORRECT
POSITION.
8. MAKE CERTAIN THAT INDEX (4) AND (5) ARE IN
FACING.
9. INSTALL AND TIGHTEN SCREWS (2).
TIGHTENING TORQUE: BETWEEN 0.8 AND 0.9 M.DAN
(71 AND 80 LBF.INCH).
10.DO A SEAL WITH SEALANT NO. 09-016 (7)
BETWEEN NACA INTAKE AND STRUCURE.ALLOW TO
POLYMERISE
*** CONTINUED ***
AH
28-12-71
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-12-71
004
RAI 10000-001
4
MAR12
_________________
VISUAL
INSPECTION
MAKE CERTAIN THAT THE LOWER SURFACE BASE OF
NACA INTAKE DOES NOT SHOW DEFORMATION OR
CRACK.
*****
AH
E N D
O F
T E X T
*****
28-12-71
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-12-71
5
AH
NACA INTAKE
RAI 10000-001
MAR12
28-12-71
RAI 10000-001
2-400
PAGE
5
MAR 01/12
28-12-72
OPERATIONAL TEST OF
FLOAT VALVE
OPT 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 523
623
: 523GT
623GT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
PUBLICATION
___________
JIC
AH
57-00-00-OAC-10000
28-12-72
OPT 10000-001
2-400 PAGE
1
MAR 01/12
28-12-72
OPERATIONAL TEST OF
FLOAT VALVE
001
OPT 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL LEVEL IS BELOW LEVEL
OF VENT FLOW VALVE (PERFORM DEFUELLING OPERATION IF REQUIRED).
2. INSTALL WARNING NOTICE PROHIBING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM, TO GAIN ACCESS TO
WING TOP SKIN.
4. REMOVE ACCESS DOOR 523GT (623GT) AS FOLLOWS :
*** CONTINUED ***
AH
28-12-72
OPT 10000-001
2-400 PAGE
2
MAR 01/12
28-12-72
OPERATIONAL TEST OF
FLOAT VALVE
003
OPT 10000-001
3
MAR12
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
____________________________
CHECKING
OF VENT FLOAT VALVE
REF. FIG. 281272-RAI-00100
CHECK FREE MOVEMENT OF VALVE BY EXERTING FINGER
PRESSURE ON FLAP (6).
005
________
CLOSE-UP
INSTALL ACCESS DOOR 523GT (623GT) AS FOLLOWS :
006
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
007
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-12-72
OPT 10000-001
2-400 PAGE
3
MAR 01/12
28-12-72
4
AH
OPT 10000-001
MAR12
28-12-72
OPT 10000-001
2-400
PAGE
4
MAR 01/12
28-12-72
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 523
623
: 523GT
623GT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
281270-08-050
EXPENDABLE
: 02 O-RING
02 O-RING
281270-08-030
281270-08-040
04-002
PUBLICATION
___________
JIC
AH
57-00-00-OAC-10000
28-12-72
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-12-72
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL LEVEL IS BELOW LEVEL
OF VENT FLOW VALVE (PERFORM DEFUELLING OPERATION IF REQUIRED).
2. INSTALL WARNING NOTICE PROHIBING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM, TO GAIN ACCESS TO
WING TOP SKIN.
4. REMOVE ACCESS DOOR 523GT (623GT) AS FOLLOWS :
*** CONTINUED ***
AH
28-12-72
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-12-72
003
RAI 10000-001
3
MAR12
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
___________________________
REMOVAL
OF VENT FLOAT VALVE
REF. FIG. 281272-RAI-00100
1. REMOVE SCREWS (4) AND WASHERS (5) RETAINING
VENT FLOAT VALVE.
2. REMOVE VENT FLOAT VALVE (1).
3. REMOVE AND DISCARD VENT FLOAT VALVE
SEALS (2) AND (3).
4. BLANK ORIFICES OF EQUIPMENT.
5. PROTECT REMOVED COMPONENT INSTALLATION AREA.
005
________________________________
INSTALLATION
OF VENT FLOAT VALVE
REF. FIG. 281272-RAI-00100
1. PREPARATION OF REPLACEMENT COMPONENT.
2. CLEAN BONDING PLATE AND APPLY A THIN FILM
OF GREASE.
NOTE:
BEFORE INSTALLATION OF VALVE,CHECK THAT BONDING
STRAP TERMINAL IS PERPENDICULAR TO THE FLOAT
VALVE BODY AXIS,TO AVOID INTERFERENCE BETWEEN
BONDING STRAP AND VALVE BODY.
ADJUST AS NECESSARY.
3. INSTALL NEW SEALS (2) AND (3) (SEALS MUST
BE LUBRICATED WITH CLEAN FUEL).
4. IMMERSE VENT FLOAT VALVE (1) IN CLEAN FUEL.
*** CONTINUED ***
AH
28-12-72
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-12-72
RAI 10000-001
4
MAR12
____________________________
CHECKING
OF VENT FLOAT VALVE
REF. FIG. 281272-RAI-00100
CHECK FREE MOVEMENT OF VALVE BY EXERTING FINGER
PRESSURE ON FLAP (6).
007
________
CLOSE-UP
INSTALL ACCESS DOOR 523GT (623GT) AS FOLLOWS :
008
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
009
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-12-72
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-12-72
5
AH
RAI 10000-001
MAR12
28-12-72
RAI 10000-001
2-400
PAGE
5
MAR 01/12
28-20-00
CHK 10010-001
1
APR05
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
AH
___
MEN
_________
MAN-HOURS
28-20-00
CHK 10010-001
2-400 PAGE
1
APR 01/05
28-20-00
001
CHK 10010-001
2
APR05
_______________________________________________
CHECK
OF REFUELLING DUCT FOR NO LEAK OR SEEPAGE
REF. FIG. 282000-CHK-00110
1. MAKE SURE THAT THE INNER DUCT IS FULL OF
FUEL.
2. CHECK THAT THERE IS NO LEAKAGE OR SEEPAGE AT
THE LEVEL OF DRAIN HOLE (1).
*****
AH
E N D
O F
T E X T
*****
28-20-00
CHK 10010-001
2-400 PAGE
2
APR 01/05
28-20-00
3
AH
CHK 10010-001
APR05
28-20-00
CHK 10010-001
2-400
PAGE
3
APR 01/05
28-20-00
CHK 10020-002
1
DEC14
ZONING DATA
___________
ACCESS
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
: 01 VALVE
01 SEAL
282520-10
282520-10
25-24-21-OAC-10000
PUBLICATION
___________
JIC
AH
28-20-00
CHK 10020-002
2-400 PAGE
1
DEC 01/14
001
28-20-00
CHK 10020-002
2
DEC14
___________
PREPARATION
1. OPEN LINING PANELS :
242AW; 252AW; 242CW; 252BW; 242AZ; 252AZ
002
003
____________________________
CHECK
OF SHROUDED PIPE VALVE
REF. FIG. 282000-CHK-00125
1. REMOVAL OF SHROUDED PIPE VALVE :
- REMOVE SCREWS (1), WASHERS (3) AND NUTS
(4),
- REMOVE VALVE (5),
- REMOVE GASKET (2).
2. VISUAL INSPECTION OF SHROUDED PIPE VALVE :
- CHECK CONDITION OF EACH COMPONENT OF THE
VALVE :
. HOUSING (7),
. SPRING (8),
. FLAP (6),
. SEAL (10),
. FLANGE (9).
- CHECK CONDITION OF GASKET (2).
3. CLEAN VALVE COMPONENTS WITH A DRY AND CLEAN
CLOTH OR WITH DRY COMPRESSED AIR.
4. INSTALLATION OF THE SHROUDED PIPE VALVE :
- INSTALL GASKET (2) ON VALVE (5)
- INSTALL VALVE (5) AND ATTACH WITH SCREWS
(1), WASHERS (3) AND NUTS (4). TIGHTEN.
*** CONTINUED ***
AH
28-20-00
CHK 10020-002
2-400 PAGE
2
DEC 01/14
28-20-00
CHK 10020-002
3
DEC14
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE LINING PANELS PREVIOUSLY OPENED.
005
AH
E N D
O F
T E X T
*****
28-20-00
CHK 10020-002
2-400 PAGE
3
DEC 01/14
28-20-00
4
AH
CHK 10020-002
DEC14
28-20-00
CHK 10020-002
2-400
PAGE
4
DEC 01/14
28-20-00
DETAILED VISUAL
INSPECTION OF REFUELLING
DUCT
DVI 10000-002
1
DEC14
ZONING DATA
___________
ACCESS
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
25-24-21-OAC-10000
28-20-00
DVI 10000-002
2-400 PAGE
1
DEC 01/14
28-20-00
DETAILED VISUAL
INSPECTION OF REFUELLING
DUCT
001
DVI 10000-002
2
DEC14
___________
PREPARATION
1. OPEN LINING PANELS :
242AW; 252AW; 242CW; 252BW; 242AZ; 252AZ
002
003
_____________________________________________
DETAILED
VISUAL INSPECTION OF REFUELLING DUCT
REF. FIG. 282000-DVI-00100
PERFORM A DETAILED VISUAL INSPECTION OF
REFUELLING DUCT (1) CHECKING THAT ITS COMPLETE
SURFACE IS NOT DAMAGED AND FREE FROM FUEL LEAK.
004
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE LINING PANELS PREVIOUSLY OPENED.
005
AH
E N D
O F
T E X T
*****
28-20-00
DVI 10000-002
2-400 PAGE
2
DEC 01/14
28-20-00
3
AH
REFUELLING DUCT
DVI 10000-002
DEC14
28-20-00
DVI 10000-002
2-400
PAGE
3
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
OPT 10010-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 190
: 192JR 196FS
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-20-00
OPT 10010-001
2-400 PAGE
1
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
001
OPT 10010-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
REF.FIG.:121100-FLG-00100
1. PROVIDE FUEL TANKER ACCORDING TO SELECTED
FUEL QUANTITY.
MAXIMUM PRESSURE: 3.5 BARS (50 PSI).
2. OPEN REFUEL/DEFUEL DOOR 196FS.
*** CONTINUED ***
AH
28-20-00
OPT 10010-001
2-400 PAGE
2
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
OPT 10010-001
3
DEC14
_________________________________
OPERATIONAL
TEST OF VENTING VALVE
REF. FIG. 282000-OPT-00120
NOTE : THIS TEST WILL BE PERFORMED DURING A
REFUELING OR A REPLENISHING (JIC 121100FLG-10020).
1. ON TANKER, STOP REFUELING OR REPLENISHING.
2. PLACE TANKER IN SUCTION FUNCTION
WARNING : MAXIMUM SUCTION IS 0,770 BARS
(11PSI).
3. ON PANEL 5004VU :
A. REFUELING/REFUEL/OFF/DEFUEL SWITCH
ON OFF POSITION.
B. PLACE SURGE/VALVE SWITCH ON OPEN
POSITION.
C. REFUEL/VALVES SWITCHES BEING ON NORM
POSITION.
4. PERFORM SUCTION AT THE TANKER.
5. WHEN FLOW IS AT ZERO, STOP THE SUCTION.
6. ON PANEL 5004VU,
PLACE SURGE/VALVE SWITCH ON SHUT
POSITION.
*** CONTINUED ***
AH
28-20-00
OPT 10010-001
2-400 PAGE
3
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
005
OPT 10010-001
4
DEC14
006
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUALLY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-20-00
OPT 10010-001
2-400 PAGE
4
DEC 01/14
28-20-00
5
AH
PIPE DRAINING
OPT 10010-001
DEC14
28-20-00
OPT 10010-001
2-400
PAGE
5
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
OPT 10010-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 190
: 192JR 196FS
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-20-00
OPT 10010-002
2-400 PAGE
1
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
001
OPT 10010-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
REF.FIG.:121100-FLG-00100
1. PROVIDE FUEL TANKER ACCORDING TO SELECTED
FUEL QUANTITY.
MAXIMUM PRESSURE: 3.5 BARS (50 PSI).
2. OPEN REFUEL/DEFUEL DOOR 196FS.
*** CONTINUED ***
AH
28-20-00
OPT 10010-002
2-400 PAGE
2
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
OPT 10010-002
3
DEC14
_________________________________
OPERATIONAL
TEST OF VENTING VALVE
REF. FIG. 282000-OPT-00120
NOTE : THIS TEST WILL BE PERFORMED DURING A
REFUELING OR A REPLENISHING (JIC 121100FLG-10020).
1. ON TANKER, STOP REFUELING OR REPLENISHING.
2. PLACE TANKER IN SUCTION FUNCTION
WARNING : MAXIMUM SUCTION IS 0,770 BARS
(11PSI).
3. ON PANEL 100QU :
A. REFUELING/REFUEL/OFF/DEFUEL SWITCH
ON OFF POSITION.
B. PLACE SURGE/VALVE SWITCH ON OPEN
POSITION.
C. REFUEL/VALVES SWITCHES BEING ON NORM
POSITION.
4. PERFORM SUCTION AT THE TANKER.
5. WHEN FLOW IS AT ZERO, STOP THE SUCTION.
6. ON PANEL 100QU,
PLACE SURGE/VALVE SWITCH ON SHUT
POSITION.
*** CONTINUED ***
AH
28-20-00
OPT 10010-002
2-400 PAGE
3
DEC 01/14
28-20-00
OPERATIONAL TEST OF
VENTING VALVE
005
OPT 10010-002
4
DEC14
006
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUALLY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-20-00
OPT 10010-002
2-400 PAGE
4
DEC 01/14
28-20-00
5
AH
PIPE DRAINING
OPT 10010-002
DEC14
28-20-00
OPT 10010-002
2-400
PAGE
5
DEC 01/14
28-20-00
OPERATIONAL TEST OF
DOUBLE SKIN FOR FREEDOM
OF AIRSTREM
OPT 10020-002
1
DEC14
ZONING DATA
___________
ACCESS
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
25-24-21-OAC-10000
28-20-00
OPT 10020-002
2-400 PAGE
1
DEC 01/14
28-20-00
OPERATIONAL TEST OF
DOUBLE SKIN FOR FREEDOM
OF AIRSTREM
001
OPT 10020-002
2
DEC14
___________
PREPARATION
1. OPEN LINING PANELS :
242AW; 252AW; 242CW; 252BW; 242AZ; 252AZ
002
003
_____________________________________________
CHECK
OF SHROUDED PIPE FOR FREEDOM OF AIRFLOW
REF. FIG. 282000-CHK-00120
1. PRESS AND LIFT THE FLAP OF THE SHROUDED PIPE
VALVE.
2. PLACE THE END OF THE AIR SUPPLY HOSE UNDER
THE VALVE AND APPLY A PRESSURE OF:
340 MBAR (5 PSI).
3. CHECK THAT AIR FLOWS THROUGH THE DRAIN PORT
ON RIGHT MAIN LANDING GEAR FAIRING.
4. CUT OFF AIR SUPPLY.
5. RELEASE THE FLAP OF THE SHROUDED PIPE VALVE.
004
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. CLOSE LINING PANELS PREVIOUSLY OPENED.
28-20-00
OPT 10020-002
2-400 PAGE
2
DEC 01/14
28-20-00
OPERATIONAL TEST OF
DOUBLE SKIN FOR FREEDOM
OF AIRSTREM
005
OPT 10020-002
3
DEC14
AH
E N D
O F
T E X T
*****
28-20-00
OPT 10020-002
2-400 PAGE
3
DEC 01/14
28-20-00
4
AH
OPT 10020-002
DEC14
28-20-00
OPT 10020-002
2-400
PAGE
4
DEC 01/14
28-20-00
OPT 10030-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 510
610
: 511
611
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
AH
24-40-00-EAD-10000
45-13-00-RDG-10000
45-13-00-RON-10000
28-20-00
OPT 10030-002
2-400 PAGE
1
DEC 01/14
28-20-00
001
OPT 10030-002
2
DEC14
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
002
___________
PREPARATION
1. ON PANEL 4VU :
ON FUEL QUANTITY INDICATOR, CHECK THAT EACH
TANK CONTAINS AT LEAST 500 KG (1102 LBS).
NOTE :1. IF NECESSARY FILL THE TANKS.
2. DO NOT FILL THE TANKS TO HIGH
LEVEL STOP.
2. ON THE ELECTRONIC RACK 90VU:
- REMOVE THE PANEL 222AZ TO HAVE ACCES TO
962VU
- OPEN THE PANEL 121VU TO HAVE ACCES TO
910VU.
003
_________________________________________
READING
THE MAINTENANCE MEMORY OF THE MFC
USING THE PROCEDURE GIVEN BELOW MAKE SURE THAT
THE FAILURES :
- ENGINE 1 FEEDER JET PUMP FAULT
- ENGINE 2 FEEDER JET PUMP FAULT
ARE NOT RECORDED IN THE MAINTENANCE MEMORY OF
THE MFC.
004
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
28-20-00
OPT 10030-002
2-400 PAGE
2
DEC 01/14
28-20-00
005
OPT 10030-002
3
DEC14
006
___________
PREPARATION
USING THE PROCEDURE GIVEN BELOW MAKE SURE THAT
THE FAILURES :
- ENGINE 1 FEEDER JET PUMP FAULT
- ENGINE 2 FEEDER JET PUMP FAULT
ARE RECORDED IN THE MAINTENANCE MEMORY OF THE
MFC.
28-20-00
OPT 10030-002
2-400 PAGE
3
DEC 01/14
28-20-00
007
OPT 10030-002
4
DEC14
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
008
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
009
________
CLOSE-UP
1. ON 962VU (910VU), INSTALL RELAY 155QA
(154QA).
INSTALL THE CORRESPONDING PANELS.
2. ON PANEL 25VU :
-RELEASE FUEL/ENG1/PUMP (FUEL/ENG2/PUMP)
PUSBUTTON SWITCH:
-CHECK THAT:
. RUN LEGEND IS OFF
. OFF LEGEND IS ON.
3. PRESSURIZATION OF FUEL SYSTEM
ON OVERHEAD PANEL 25VU:
-PRESS P/BSW FUEL/ENG1 (2)/PUMP
(ELECTRIC PUMP OPERATING)
.RUN LEGEND ON
.OFF LEGEND OFF.
-CHECK THAT FUEL/ENG1 (2)/FEED LO PR
CAUTION LIGHT IS OFF
NOTE: WHEN SYSTEM IS PRESSURIZED, FUEL FEED
LOW PRESSURE SWITCH 13QA (14QA)
DE-ENERGIZES FUEL/FEED LO PR CAUTION
LIGHT.
*** CONTINUED ***
AH
28-20-00
OPT 10030-002
2-400 PAGE
4
DEC 01/14
28-20-00
OPT 10030-002
5
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
011
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN.
2. INSTALL PANELS IF THEY HAVE BEEN REMOVED
EVENTUALLY.
3. RESTORE AIRCRAFT TO ITS NORMAL CONFIGURATION
*****
AH
E N D
O F
T E X T
*****
28-20-00
OPT 10030-002
2-400 PAGE
5
DEC 01/14
28-20-00
6
AH
OPT 10030-002
DEC14
28-20-00
OPT 10030-002
2-400
PAGE
6
DEC 01/14
28-20-00
OPT 10030-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 510
610
: 511
611
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
JIC
AH
31-63-00-PRO-10000
24-40-00-EAD-10000
45-13-00-RDG-10000
45-13-00-RON-10000
28-20-00
OPT 10030-003
2-400 PAGE
1
DEC 01/14
28-20-00
001
OPT 10030-003
2
DEC14
002
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
003
___________
PREPARATION
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT EACH TANK CONTAINS AT LEAST
500 KG (1102 LBS).
NOTE :1. IF NECESSARY FILL THE TANKS.
2. DO NOT FILL THE TANKS TO HIGH
LEVEL STOP.
2. ON THE ELECTRONIC RACK 90VU:
- REMOVE THE PANEL 222AZ TO HAVE ACCES TO
962VU
- OPEN THE PANEL 121VU TO HAVE ACCES TO
910VU.
004
_________________________________________
READING
THE MAINTENANCE MEMORY OF THE MFC
USING THE PROCEDURE GIVEN BELOW MAKE SURE THAT
THE FAILURES :
*** CONTINUED ***
AH
28-20-00
OPT 10030-003
2-400 PAGE
2
DEC 01/14
28-20-00
OPT 10030-003
3
DEC14
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
006
28-20-00
OPT 10030-003
2-400 PAGE
3
DEC 01/14
28-20-00
OPT 10030-003
4
DEC14
___________
PREPARATION
USING THE PROCEDURE GIVEN BELOW MAKE SURE THAT
THE FAILURES :
- ENGINE 1 FEEDER JET PUMP FAULT
- ENGINE 2 FEEDER JET PUMP FAULT
ARE RECORDED IN THE MAINTENANCE MEMORY OF THE
MFC.
008
_________________________________
READING
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RDG-10000
009
_________________________________
ERASURE
OF MFC MAINTENANCE MEMORY
SEE JOB INSTRUCTION CARD
451300-RON-10000
010
________
CLOSE-UP
1. ON 962VU (910VU), INSTALL RELAY 155QA
(154QA).
INSTALL THE CORRESPONDING PANELS.
2. ON PANEL 25VU :
-RELEASE FUEL/ENG1/PUMP (FUEL/ENG2/PUMP)
PUSBUTTON SWITCH:
-CHECK THAT:
. RUN LEGEND IS OFF
. OFF LEGEND IS ON.
ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
PUMP LEGENDS ARE OFF.
*** CONTINUED ***
AH
28-20-00
OPT 10030-003
2-400 PAGE
4
DEC 01/14
28-20-00
OPT 10030-003
5
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
012
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN.
*** CONTINUED ***
AH
28-20-00
OPT 10030-003
2-400 PAGE
5
DEC 01/14
28-20-00
OPT 10030-003
6
DEC14
AH
E N D
O F
T E X T
*****
28-20-00
OPT 10030-003
2-400 PAGE
6
DEC 01/14
28-20-00
7
AH
OPT 10030-003
DEC14
28-20-00
OPT 10030-003
2-400
PAGE
7
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
24-40-00-EAD-10000
28-21-00
OPT 10000-001
2-400 PAGE
1
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
001
OPT 10000-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
003
__________________________
PREPARATION
OF FUEL SYSTEM
1. ON PANEL 4VU,
ON FUEL QUANTITY INDICATOR, CHECK THAT EACH
TANK CONTAINS 500KG (1102LBS) FUEL MINIMUM.
NOTE : IF REQUIRED, TOP UP TANKS
(J.I.C 121100-FLG-1XXXXX).
28-21-00
OPT 10000-001
2-400 PAGE
2
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
004
OPT 10000-001
3
DEC14
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
REF. FIG. 282100-OPT-00120
1. AIRCRAFT ON GROUND AND ENERGIZED.
ON OVERHEAD PANEL 25VU :
A. P/BSW FUEL/ENG1(2)/PUMP RELEASED
(ELECTRIC PUMP SHUT DOWN)
- RUN LEGEND OFF
- OFF LEGEND ON.
B. FUEL/X FEED PUSHBUTTON SWITCH RELEASED
(CROSSFEED VALVE CLOSED)
- CROSS LINE FLOWBAR (VERTICAL) IS ON.
- ON PANEL 4VU, FUEL/X FEED LEGEND IS
OFF.
C. ON FUEL/ENG1/(2) LP VALVE ANNUNCIATOR
(FUEL LP VALVE OPEN).
- FLOWBAR IS ON.
D. FUEL/ENG1(2)/FEED LO PR CAUTION LIGHTS
ON
- SYSTEM DEPRESSURIZED.
2. PRESSURIZATION OF SYSTEM
ON OVERHEAD PANEL 25VU :
A. PRESS P/BSW FUEL/ENG1(2)/PUMP
(ELECTRIC PUMP OPERATING)
- RUN LEGEND ON
- OFF LEGEND OFF.
B. CHECK THAT FUEL/ENG1(2)/FEED LO PR
CAUTION LIGHT IS OFF.
NOTE : WHEN SYSTEM IS PRESSURIZED,
FUEL FEED LOW PRESSURE
*** CONTINUED ***
AH
28-21-00
OPT 10000-001
2-400 PAGE
3
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
OPT 10000-001
4
DEC14
SWITCH DE-ENERGIZES
FUEL/FEED LO PR CAUTION LIGHT.
3. SYSTEM PRESSURIZATION SHUT DOWN
RELEASE P/BSW FUEL/ENG1(2)/PUMP
- RUN LEGEND OFF.
- OFF LEGEND ON.
- FUEL/ENG1(2) FEED LOW PR CAUTION LIGHT ON.
NOTE: }FEED LOW PRESS} CAUTION LIGHT WILL
REMAIN EXTINGUISHED UNTIL THE FUEL
PRESSURE DROPS BELOW THE TRIGGERING
THRESHOLD.
THERE IS NO REQUIREMENT ON DELAY FOR
}FEED LOW PRESS}CAUTION LIGHT COMES
ILLUMINATED AFTER P/B SW RELEASE.
FOR A QUICK FUEL SYSTEM VERIFICATION:
- RESET C/B FUEL FEED/ENG1(ENG2)
RESETTING C/B ENSURES THAT THE FUEL SYSTEM
IS QUICKLY DEPRESSURIZED THROUGH THE
}MOTIVE FLOW VALVE}.
4. CHECK AFTER ENGINE START
NOTE : THIS CHECK WILL BE PERFORMED DURING
ENGINE RUN UP.
AFTER ENGINE START
ON OVERHEAD PANEL 25VU :
- RUN LEGEND OFF
- OFF LEGEND OFF.
ELECTRIC PUMP IS SHUT DOWN AFTER STARTING
OF MOTOR BY MEANS OF PRESSURE SWITCH
INSTALLED AT OUTLET OF ENGINE
FEEDER TANK JET PUMP.
- FUEL/ENG1(2)/FEED LO PR CAUTION LIGHT OFF.
SYSTEM PRESSURIZED.
28-21-00
OPT 10000-001
2-400 PAGE
4
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
005
OPT 10000-001
5
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
006
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
5. REMOVE ACCESS PLATFORM,(IF NECESSARY).
*****
AH
E N D
O F
T E X T
*****
28-21-00
OPT 10000-001
2-400 PAGE
5
DEC 01/14
28-21-00
6
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-001
DEC14
28-21-00
OPT 10000-001
2-400
PAGE
6
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
24-40-00-EAD-10000
28-21-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
001
OPT 10000-002
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-21-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
003
OPT 10000-002
3
DEC14
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
004
__________________________
PREPARATION
OF FUEL SYSTEM
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT EACH TANK CONTAINS 500KG
(1102LBS) FUEL MINIMUM.
NOTE : IF REQUIRED, TOP UP TANKS
(J.I.C 121100-FLG-1XXXXX).
005
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
REF. FIG. 282100-OPT-00120
REF. FIG. 282000-OPT-00130
1. AIRCRAFT ON GROUND AND ENERGIZED.
A. - ON OVERHEAD PANEL 25VU:
P/BSW FUEL/ENG1(2)/PUMP RELEASED
(ELECTRIC PUMP SHUT DOWN)
. RUN LEGEND OFF
. OFF LEGEND ON.
- ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT ITEM 1 IS DISPLAYED FOR
ENGINE 1(2).
B. - ON OVERHEAD PANEL 25VU:
FUEL/X FEED PUSHBUTTON SWITCH
RELEASED (CROSSFEED VALVE CLOSED)
. CROSS LINE FLOWBAR (VERTICAL) IS ON.
- ON PANEL 4VU, FUEL/X FEED LEGEND IS
OFF.
- ON MFD UPPER WINDOW, IN ENGINE SD PAGE:
. ITEM 7 IS DISPLAYED,
. CROSS LINE FLOWBAR (VERTICAL) APPEARS
C. - ON OVERHEAD PANEL 25VU:
ON FUEL/ENG1/(2) LP VALVE ANNUNCIATOR
*** CONTINUED ***
AH
28-21-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
OPT 10000-002
4
DEC14
28-21-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
28-21-00
OPT 10000-002
5
DEC14
28-21-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
28-21-00
OPERATIONAL TEST OF
FEED LO PRESS
INDICATING SYSTEM
OPT 10000-002
6
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
007
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
5. REMOVE ACCESS PLATFORM,(IF NECESSARY).
*****
AH
E N D
O F
T E X T
*****
28-21-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14
28-21-00
7
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-002
DEC14
28-21-00
OPT 10000-002
2-400
PAGE
7
DEC 01/14
28-21-00
8
AH
FUEL DISTRIBUTION
LEGEND
OPT 10000-002
DEC14
28-21-00
OPT 10000-002
2-400
PAGE
8
DEC 01/14
28-21-61
REMOVAL/INSTALLATION OF
FUEL FEED LOW PRESSURE
SWITCH
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 475
485
: 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
GSE
SPARE
282160-01-020
EXPENDABLE
: 02 SEAL
282160-01-010
: REMOVAL/INSTALLATION OF
COWLS ATTACHED BY BOLTS
: OPERATIONAL TEST OF FUEL
SYSTEM
54-00-00-RAI-10000
PUBLICATION
___________
JIC
JIC
AH
28-21-00-OPT-10000
28-21-61
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-61
REMOVAL/INSTALLATION OF
FUEL FEED LOW PRESSURE
SWITCH
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. POSITION A 4M (13FT.) ACCESS PLATFORM TO
GAIN ACCESS TO ENGINE.
2. MAKE CERTAIN THAT ENG1 (ENG2) FUEL LP VALVES
9QG (10QG) ARE CLOSED.
3. DISPLAY A WARNING NOTICE IN FLIGHT COMPARTMENT TO PROHIBIT ENERGIZATION OF FUEL
SYSTEM.
4. ON PANEL 121VU,
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
*** CONTINUED ***
AH
28-21-61
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-61
REMOVAL/INSTALLATION OF
FUEL FEED LOW PRESSURE
SWITCH
RAI 10000-001
3
MAR15
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
004
________________________________________
REMOVAL
OF FUEL FEED LOW PRESSURE SWITCH
REF. FIG. 282161-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (9).
2. REMOVE FUEL FEED LOW PRESSURE SWITCH (8).
3. REMOVE AND DISCARD SEAL (7).
4. BLANK ORIFICES AND CONNECTOR OF REMOVED
EQUIPMENT.
005
28-21-61
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-61
REMOVAL/INSTALLATION OF
FUEL FEED LOW PRESSURE
SWITCH
006
RAI 10000-001
4
MAR15
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND CLOSE THE FOLLOWING
CIRCUIT BREAKERS :
1QG (2QG), 3QG (4QG), (5QG) AND (6QG).
2. CLOSE ACCESS COWL 475AT(485AT) AS FOLLOWS :
007
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
009
R
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-61
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-61
5
AH
FUEL LP VALVE
RAI 10000-001
MAR15
28-21-61
RAI 10000-001
2-400
PAGE
5
MAR 01/15
28-21-71
DETAILED VISUAL
INSPECTION OF FUEL PUMP
HARNESS
DVI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 293
294
522
622
: 293BL 294BR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
53-93-00-RAI-10000
28-21-71
DVI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-71
DETAILED VISUAL
INSPECTION OF FUEL PUMP
HARNESS
001
DVI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. INSTALL PLATFORM TO GAIN ACCESS TO WING
LOWER SURFACE.
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. OPEN ACCES DOOR 293BL (294BR).
003
____________________________________
REMOVAL
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
*** CONTINUED ***
AH
28-21-71
DVI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-71
DETAILED VISUAL
INSPECTION OF FUEL PUMP
HARNESS
DVI 10000-001
3
MAR15
NOTE : REMOVE WING TO FUSELAGE FAIRINGS INDICATED IN THE ACCESS SECTION ON PAGE 1
OF THIS JOB INSTRUCTION CARD.
004
_______________________________________
DETAILED
VISUAL INSPECTION OF FUEL PUMP
REF. FIG. 282171-RAI-00120
CHECK THAT :
- ELECTRCAL HARNESS IS IN GOOD CONDITION AND
NOT FRAYED, ESPECIALLY AT CONNECTION.
- BONDING STRIPS ARE NOT CORRODED.
- BONDING STRIPS ARE CORRECTLY ATTACHED.
- HARNESS CLAMP IS CORRECTLY INSTALLED.
005
________
CLOSE-UP
CLOSE ACCESS DOOR 293BL (294BR).
006
_________________________________________
INSTALLATION
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
AH
E N D
O F
T E X T
*****
28-21-71
DVI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-71
4
AH
DVI 10000-001
MAR15
28-21-71
DVI 10000-001
2-400
PAGE
4
MAR 01/15
28-21-71
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 293
294
522
622
: 293BL 294BR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
98S28002515000
SPARE
: 01 ELECTRIC PUMP
282170-10
EXPENDABLE
: 02 O-RINGS
282171-01-010
_________
MAN-HOURS
09-018
PUBLICATION
___________
JIC
AH
28-21-00-OPT-10000
28-21-71
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-71
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. INSTALL PLATFORM TO GAIN ACCESS TO WING
LOWER SURFACE.
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. OPEN ACCES DOOR 293BL (294BR).
003
______________________________
DE-ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU,
A. OPEN THE FOLLOWING CIRCUIT BREAKERS :
*** CONTINUED ***
AH
28-21-71
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-71
RAI 10000-001
3
MAR15
________________________
REMOVAL
OF ELECTRIC PUMP
REF. FIG. 282171-RAI-00120
1. DISCONNECT ELECTRICAL CONNECTOR (2) REMOVE
FASTENER (4) FROM RETAINING CLAMP (3).
2. INSTALL CONTAINER TO RECOVER FUEL (FUEL CONTAINED IN PUMP CANISTER).
3. REMOVE ELECTRIC PUMP RETAINING SCREWS (5)
R
R
R
R
R
R
R
R
_____________________________
INSTALLATION
OF ELECTRIC PUMP
REF. FIG. 282171-RAI-00120
PREPARATION OF REPLACEMENT COMPONENT (IF REQUIRED).
*** CONTINUED ***
AH
28-21-71
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-71
RAI 10000-001
4
MAR15
___________________________
ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU
A. REMOVE SAFETY CLIPS
B. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1QA (2QA) AND 3QA (4QA)
007
________
CLOSE-UP
CLOSE ACCESS DOOR 293BL (294BR).
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
*** CONTINUED ***
AH
28-21-71
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-71
RAI 10000-001
5
MAR15
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-71
RAI 10000-001
2-400 PAGE
5
MAR 01/15
28-21-71
6
AH
RAI 10000-001
MAR15
28-21-71
RAI 10000-001
2-400
PAGE
6
MAR 01/15
28-21-72
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 293
522
622
: 293BL
522AB
622AB
294
294BR
522CT
622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
98S28002515000
SPARE
282170-10
282170-10
EXPENDABLE
: 03 SEAL
02 O-RINGS
282170-10
282171-01-010
_________
MAN-HOURS
06-001
04-012
09-018
PUBLICATION
___________
JIC
JIC
AH
57-00-00-OAC-10000
12-11-00-FLG-10020
28-21-72
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-72
RAI 10000-001
2
MAR15
PUBLICATION
___________
JIC
AH
28-21-00-OPT-10000
28-21-72
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-72
001
RAI 10000-001
3
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT TANKS ARE EMPTIES. IF NONE
MAKE A DEFUELLING AND A DRAINING.
(AMM: 121100-DFG-10000 / 122428-DRN-10010).
2. INSTALL A WARNING NOTICE IN FLIGHT COMPARTMENT PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM TO GAIN ACCESS TO WING
LOWER SURFACE.
4. OPEN ACCESS DOORS 293BL (294BR) LOCATED
ON KARMAN.
*** CONTINUED ***
AH
28-21-72
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-72
RAI 10000-001
4
MAR15
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
______________________________
DE-ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU,
A. OPEN THE FOLLOWING CIRCUIT BREAKERS :
1QA (2QA) FUEL/FUEL FEED/ENG1 (2)/
ELEC/PUMP.
3QA (4QA) FUEL/FUEL FEED/ENG1 (2)/
CTL &/CAUTION.
B. INSTALL SAFETY CLIPS.
005
________________________
REMOVAL
OF ELECTRIC PUMP
REF. FIG. 282171-RAI-00120
1. DISCONNECT ELECTRICAL CONNECTOR (2) REMOVE
FASTENER (4) FROM RETAINING CLAMP (3).
2. INSTALL CONTAINER TO RECOVER FUEL (FUEL CONTAINED IN PUMP CANISTER).
3. REMOVE ELECTRIC PUMP RETAINING SCREWS (5)
R
R
R
R
R
R
28-21-72
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-72
R
R
RAI 10000-001
5
MAR15
_________________________________
REMOVAL
OF ELECTRIC PUMP CANISTER
REF. FIG. 282172-RAI-00100
1. REMOVE FASTENERS (2) AND (8) OF CLAMPS (4)
AND (6). REMOVE BONDING STRIPS (3) AND (7).
2. UNSCREW NUTS (1) AND (9). REMOVE PIPE (5).
3. UNSCREW WITH PRECAUTION NUT (20) IN ORDER
TO REMOVE THE RING (17).
4. REMOVE AND DISCARD SEAL (18). REMOVE RING
(19) AND NUT (20).
5. REMOVE SCREWS (14). REMOVE PUMP CANISTER(12)
6. DISCARD SEAL (13).
7. UNSCREW UNION (10); DISCARD SEAL (11).
007
______________________________________
INSTALLATION
OF ELECTRIC PUMP CANISTER
REF. FIG. 282172-RAI-00100
1. PREPARATION OF REPLACEMENT COMPONENT :
A. CHECK CONDITION OF FILTER SCREEN.
B. CHECK THAT VALVE (15) OPERATES CORRECTLY.
*** CONTINUED ***
AH
28-21-72
RAI 10000-001
2-400 PAGE
5
MAR 01/15
28-21-72
RAI 10000-001
6
MAR15
_____________________________
INSTALLATION
OF ELECTRIC PUMP
REF. FIG. 282171-RAI-00120
PREPARATION OF REPLACEMENT COMPONENT (IF REQUIRED).
1. INSTALL TWO NEW SEALS (6).
(SEALS MUST BE PREVIOUSLY LUBRICATED WITH
CLEAN FUEL).
*** CONTINUED ***
AH
28-21-72
RAI 10000-001
2-400 PAGE
6
MAR 01/15
28-21-72
RAI 10000-001
7
MAR15
________
CLOSE-UP
INSTALL ACCESS DOORS 522AB (622AB), 522CT
(622CT) AS FOLLOWS :
010
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
011
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
012
___________________________
ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU
A. REMOVE SAFETY CLIPS
*** CONTINUED ***
AH
28-21-72
RAI 10000-001
2-400 PAGE
7
MAR 01/15
28-21-72
RAI 10000-001
8
MAR15
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
R
014
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-21-72
RAI 10000-001
2-400 PAGE
8
MAR 01/15
28-21-72
9
AH
PUMP CANISTER
RAI 10000-001
MAR15
28-21-72
RAI 10000-001
2-400
PAGE
9
MAR 01/15
28-21-72
10
AH
RAI 10000-001
MAR15
28-21-72
RAI 10000-001
2-400
PAGE
10
MAR 01/15
28-21-73
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522CT
622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
282170-10-250
EXPENDABLE
: 01 O-RING
282170-10-270
57-00-00-OAC-10000
PUBLICATION
___________
JIC
JIC
AH
28-21-00-OPT-10000
28-21-73
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-73
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. CHECK THAT FUEL TANKS ARE DEFUELED OR THAT
FUEL LEVEL IS BELOW FUEL LINE LEVEL.
2. INSTALL A WARNING NOTICE IN FLIGHT COMPARTMENT PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, 3.76 M (12.34 FT), TO GAIN
ACCESS TO WING UPPER SURFACE.
4. REMOVE ACCESS DOOR 522CT (622CT) AS FOLLOWS.
28-21-73
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-73
003
RAI 10000-001
3
MAR15
________________________________
OPENING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTA: OPENING THE ACCESS DOOR 522CT (622CT).
004
__________________________________
REMOVAL
OF THERMAL EXPANSION VALVE
REF. FIG. 282173-RAI-00110
1. REMOVE THERMAL EXPANSION VALVE (1) LOCATED
ALONG ENGINE FEED JET PUMP AXIS.
2. DISCARD THE SEAL (2).
3. BLANK LINES.
4. BLANK ORIFICES OF EQUIPMENT.
5. PROTECT REMOVED COMPONENT INSTALLATION AREA.
005
_______________________________________
INSTALLATION
OF THERMAL EXPANSION VALVE
REF. FIG. 282173-RAI-00110
1. REMOVE BLANKS.
2. PREPARATION OF REPLACEMENT COMPONENT (IF
REQUIRED). IMMERSE REPLACEMENT COMPONENT IN
CLEAN FUEL.
3. CLEAN AND INSPECT COMPONENT INSTALLATION
AREA. MAKE CERTAIN THAT LINE END FITTINGS
ARE IN GOOD CONDITION.
4. INSTALL THE SEAL (2) ON THE VALVE (1).
5. INSTALL THERMAL EXPANSION VALVE (1) ON ITS
LINE AND TIGHTEN.
*** CONTINUED ***
AH
28-21-73
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-73
006
RAI 10000-001
4
MAR15
________
CLOSE-UP
INSTALL ACCESS DOOR 522CT (622CT) AS FOLLOWS :
007
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
CLOSE THE ACCESS DOORS PREVIOUSLY OPENED.
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
009
R
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-73
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-73
5
AH
THERMAL EXPANSION
VALVE
RAI 10000-001
MAR15
28-21-73
RAI 10000-001
2-400
PAGE
5
MAR 01/15
28-21-74
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522CT
622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
282170-10-240
EXPENDABLE
: 02 O-RING
282170-10-080
57-00-00-OAC-10000
PUBLICATION
___________
JIC
JIC
AH
28-21-00-OPT-10000
28-21-74
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-74
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. CHECK THAT FUEL TANKS ARE DEFUELED OR THAT
FUEL LEVEL IS BELOW FUEL LINE LEVEL.
2. INSTALL A WARNING NOTICE IN FLIGHT COMPARTMENT PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, 3.76 M (12.34 FT), TO GAIN
ACCESS TO WING UPPER SURFACE.
4. REMOVE ACCESS DOOR 522CT (622CT) AS FOLLOWS.
28-21-74
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-74
003
RAI 10000-001
3
MAR15
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
_____________________________
REMOVAL
OF VAPOR RELIEF VALVE
1. REMOVE VAPOR RELIEF VALVE (1) LOCATED ALONG
ELECTRIC PUMP AXIS.
DISCARD SEAL (2).
2. BLANK LINES.
3. BLANK ORIFICES OF EQUIPMENT.
005
__________________________________
INSTALLATION
OF VAPOR RELIEF VALVE
REF. FIG. 282174-RAI-00100
1. REMOVE BLANKS.
2. PREPARATION OF REPLACEMENT COMPONENT (IF
REQUIRED). IMMERSE REPLACEMENT COMPONENT
IN CLEAN FUEL.
3. CLEAN AND INSPECT COMPONENT INSTALLATION
AREA. MAKE CERTAIN THAT LINE END FITTINGS
ARE IN GOOD CONDITION.
4. INSTALL VAPOR RELIEF VALVE (1) AND ITS SEAL
(2) ON ITS LINE AND TIGHTEN.
006
________
CLOSE-UP
INSTALL ACCESS DOOR 522CT (622CT) AS FOLLOWS :
007
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
*** CONTINUED ***
AH
28-21-74
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-74
008
RAI 10000-001
4
MAR15
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
009
R
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-74
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-74
5
AH
RAI 10000-001
MAR15
28-21-74
RAI 10000-001
2-400
PAGE
5
MAR 01/15
28-21-75
RAI 10000-001
1
APR05
ZONING DATA
___________
ZONE
: 511
611
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
: 01 O-RING
282170-09
72-00-00-ERU-10030
PUBLICATION
___________
JIC
AH
28-21-75
RAI 10000-001
2-400 PAGE
1
APR 01/05
28-21-75
001
RAI 10000-001
2
APR05
___________
PREPARATION
REF. FIG. 282175-RAI-00100
1. IF THE BUILT-IN TANK CORRESPONDING TO THE
PRESSURE-SWITCH IS FULL, DEFUEL TO LOWLEVEL. (SEE JIC 121100-DEG-10000)
2. ON PANEL 121VU,
OPEN THE CIRCUIT-BREAKER :
3QA (4QA) FUEL/FUEL FEED/ENG1 (ENG2)/CTL
& CAUTION
3. OPEN THE INNER LEADING EDGE 511 (611) AFTER
UNSCREWED THE SCREWS ON THE TOP SKIN.
002
003
28-21-75
RAI 10000-001
2-400 PAGE
2
APR 01/05
28-21-75
RAI 10000-001
3
APR05
005
AH
E N D
O F
T E X T
*****
28-21-75
RAI 10000-001
2-400 PAGE
3
APR 01/05
28-21-75
4
AH
RAI 10000-001
APR05
28-21-75
RAI 10000-001
2-400
PAGE
4
APR 01/05
28-21-77
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522CT
622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
SPARE
282170-09
EXPENDABLE
: 03 SEAL
04 SCREW
282170-09
282100-09
_________
MAN-HOURS
04-012
06-001
PUBLICATION
___________
JIC
JIC
JIC
AH
57-00-00-OAC-10000
28-21-00-OPT-10000
57-00-00-OAC-10000
28-21-77
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-77
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. CHECK THAT FUEL TANKS ARE DEFUELED OR THAT
FUEL LEVEL IS BELOW FUEL LINE LEVEL.
2. INSTALL A WARNING NOTICE IN FLIGHT COMPARTMENT PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, 3.76 M (12.34 FT), TO GAIN
ACCESS TO WING UPPER SURFACE.
4. REMOVE ACCESS DOOR 522CT (622CT) AS FOLLOWS.
28-21-77
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-77
003
RAI 10000-001
3
MAR15
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
_______________________________
REMOVAL
OF ENGINE FEED JET PUMP
REF. FIG. 282177-RAI-00110
1. UNSCREW NUTS (4), (8) AND (10). DISCONNECT
LINES (3) AND (9).
2. UNSCREW NUT (2). LOOSEN NUT (18) AND ROTATE
LINE (1) IN ORDER TO DISCONNECT IT FROM
COUPLING (5).
3. REMOVE SCREW (15), WASHER (16) IN ORDER TO
DISCONNECT BONDING STRIP (17) FROM FEED JET
PUMP.
4. REMOVE THE THREE SCREWS (21), THE THREE
WASHERS (22) OF TRIANGULAR BASE OF LINE
(19).
5. UNSCREW NUT (27) FROM LINE (23).
6. REMOVE TWO SCREWS (13), TWO SCREWS (28).
RECOVER THEIRS WASHERS AND MOVE FEED JET
PUMP (14) BACK IN ORDER TO DISCONNECT LINE
(23). REMOVE THE TWO HALF-SHELLS (24).
DISCARD SEAL (20).
7. REMOVE FEED JET PUMP (14).
8. REMOVE CLIP (26) AND NUT (27). DISCARD SEAL
(25).
9. LOOSEN JAM NUT (6), UNSCREW THEN REMOVE COUPLING (5). DISCARD SEAL (7).
10.REMOVE COUPLING (11). DISCARD SEAL (12).
*** CONTINUED ***
AH
28-21-77
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-77
RAI 10000-001
4
MAR15
____________________________________
INSTALLATION
OF ENGINE FEED JET PUMP
REF. FIG. 282177-RAI-00110
NOTE : CHECK THAT FILTER SCREEN IS CLEAN.
1. REMOVE BLANKING CAPS INSTALLED DURING
REMOVAL.
2. INSTALL NEW SEALS (7) AND (12) ON COUPLINGS
(5) AND (11). (SEALS MUST BE PREVIOUSLY LUBRICATED IN CLEAN FUEL).
3. INSTALL COUPLINGS (5) AND (11) ON FEED JET
PUMP (14). TIGHTEN JAM NUT (6).
4. INSTALL SCREW (27), CLIP (26), SEAL (25)
ON FEED JET PUMP. SEAL (25) MUST BE PREVIOUSLY LUBRICATED IN CLEAN FUEL.
5. COAT THREADS OF LINE (23) AND NUT (27) WITH
DRY LUBRICANT.
6. INSTALL THE TWO HALF-SHELLS (24) AND CONNECT
LINE (23) ON FEED JET PUMP.
7. INSTALL A NEW SEAL (20) ON COUPLING TRIANGULAR BASE (SEAL MUST BE PREVIOUSLY LUBRICATED IN CLEAN FUEL).
8. CLEAN BONDING PLATE OF FEED JET PUMP.
9. POSITION THE ASSEMBLY ON ITS LOCATION TAKING
CARE NOT TO DAMAGE FILTER SCREEN.
10.INSTALL SCREWS AND WASHERS (21), (22) AND
*** CONTINUED ***
AH
28-21-77
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-77
RAI 10000-001
5
MAR15
TIGHTEN.
11.INSTALL THE TWO SCREWS (13) AND TWO SCREWS
(28) WITH THEIRS WASHERS, TIGHTEN.
12.APPLY A THIN FILM OF PURE MINERAL VASELINE
ON BONDING AREAS AND CONNECT BONDING STRIP
(17) BY MEANS OF SCREW (15) AND WASHER (16)
ON FEED JET PUMP (14).
13. INSTALL LINES (3) AND (9). TIGHTEN NUTS (4)
(8) AND (10).
14.ROTATE LINE (1). CONNECT IT TO COUPLING (5).
TIGHTEN NUTS (2) AND (18).
006
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
R
007
________
CLOSE-UP
INSTALL ACCESS DOOR 522CT (622CT) AS FOLLOWS :
008
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
009
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
*** CONTINUED ***
AH
28-21-77
RAI 10000-001
2-400 PAGE
5
MAR 01/15
28-21-77
RAI 10000-001
6
MAR15
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-21-77
RAI 10000-001
2-400 PAGE
6
MAR 01/15
28-21-77
7
AH
RAI 10000-001
MAR15
28-21-77
RAI 10000-001
2-400
PAGE
7
MAR 01/15
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
FUT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 211
522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
98S28003001000
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-21-78
FUT 10000-001
2-400 PAGE
1
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
001
FUT 10000-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
1. ON PANEL 4 VU
ON FUEL QUANTITY INDICATOR, CHECK THAT EACH
TANK CONTAINS BETWEEN 300 AND 700KG (661 AND
1542LBS).
NOTE: IF REQUIRED, TOP UP TANKS.
2. INSTALL PLATFORM TO GAIN ACCESS TO WING
*** CONTINUED ***
AH
28-21-78
FUT 10000-001
2-400 PAGE
2
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
FUT 10000-001
3
DEC14
UNDER SURFACE.
004
_______________________________________
FUNCTIONAL
TEST OF FEEDER TANK JET PUMP
REF. FIG. 282178-FUT-00110
REF. FIG. 282100-OPT-00120
NOTE: PLACE MEASURING TOOL ON WATER DRAIN OF
FEEDER TANK. (THIS DRAIN IS LOCATED NEAR
OF WING FAIRING. BETWEEN RIB4 AND RIB5).
SEE INSTALLATION ON THE ILLUSTRATION.
1. ON FUEL SECTION OF PANEL 25VU.
A. PRESS ENG PUMP PUSHBUTTON SWITCH
- RUN LEGEND COMES ON
- OFF LEGEND GOES OFF
B. CHECK THAT FEED LO PR CAUTION LIGHT IS
OFF.
WARNING: STOP ELECTRIC PUMP IF THE PRESSURE
IS NOT INCREASES AFTER 10MN MAXIMUM.
2. CHECK ON PRESSURE GAGE THAT PRESSURE READ
INCREASES.
- FEEDER TANK JET PUMP OPERATES CORRECTLY.
3. ON FUEL SECTION OF PANEL 25VU, RELEASE
ENG PUMP PUSHBUTTON SWITCH
- RUN LEGEND GOES OFF
- OFF LEGEND COMES ON.
4. UNSCREW THE KNURLED KNOB (5), UNLOCK THE
KNURLED NUT (2), ROTATE THE UNIT (6) AND
REMOVE THE TOOL.
005
28-21-78
FUT 10000-001
2-400 PAGE
3
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
006
FUT 10000-001
4
DEC14
________
CLOSE-UP
1. REMOVE PLATFORM.
2. CLEAN AROUND AIRCRAFT.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
4. REMOVE EXPLOSIMETER.
5. REMOVE SMOKING PROHIBITED WARNING NOTICES.
6. DISCONNECT AIRCRAFT FROM GROUND.
*****
AH
E N D
O F
T E X T
*****
28-21-78
FUT 10000-001
2-400 PAGE
4
DEC 01/14
28-21-78
5
AH
FUT 10000-001
DEC14
28-21-78
FUT 10000-001
2-400
PAGE
5
DEC 01/14
28-21-78
6
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
FUT 10000-001
DEC14
28-21-78
FUT 10000-001
2-400
PAGE
6
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
FUT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 211
522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
98S28003001000
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
28-21-78
FUT 10000-002
2-400 PAGE
1
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
001
FUT 10000-002
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-21-78
FUT 10000-002
2-400 PAGE
2
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
003
FUT 10000-002
3
DEC14
004
___________
PREPARATION
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT EACH TANK CONTAINS BETWEEN 300
AND 700KG (661 AND 1542LBS).
NOTE: IF REQUIRED, TOP UP TANKS.
2. INSTALL PLATFORM TO GAIN ACCESS TO WING
UNDER SURFACE.
005
_______________________________________
FUNCTIONAL
TEST OF FEEDER TANK JET PUMP
REF. FIG. 282178-FUT-00110
REF. FIG. 282100-OPT-00120
NOTE: PLACE MEASURING TOOL ON WATER DRAIN OF
FEEDER TANK. (THIS DRAIN IS LOCATED NEAR
OF WING FAIRING. BETWEEN RIB4 AND RIB5).
SEE INSTALLATION ON THE ILLUSTRATION.
1. ON FUEL SECTION OF PANEL 25VU.
A. PRESS ENG PUMP PUSHBUTTON SWITCH
- RUN LEGEND COMES ON
- OFF LEGEND GOES OFF
B. CHECK THAT FEED LO PR CAUTION LIGHT IS
OFF.
ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
- PUMP LEGENDS ARE ON
- FEED LO PR MESSAGE IS NOT DISPLAYED
WARNING: STOP ELECTRIC PUMP IF THE PRESSURE
IS NOT INCREASES AFTER 10MN MAXIMUM.
*** CONTINUED ***
AH
28-21-78
FUT 10000-002
2-400 PAGE
3
DEC 01/14
28-21-78
FUNCTIONAL TEST OF
FEEDER TANK JET PUMP
FUT 10000-002
4
DEC14
007
________
CLOSE-UP
1. REMOVE PLATFORM.
2. CLEAN AROUND AIRCRAFT.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
4. REMOVE EXPLOSIMETER.
5. REMOVE SMOKING PROHIBITED WARNING NOTICES.
6. DISCONNECT AIRCRAFT FROM GROUND.
*****
AH
E N D
O F
T E X T
*****
28-21-78
FUT 10000-002
2-400 PAGE
4
DEC 01/14
28-21-78
5
AH
FUT 10000-002
DEC14
28-21-78
FUT 10000-002
2-400
PAGE
5
DEC 01/14
28-21-78
6
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
FUT 10000-002
DEC14
28-21-78
FUT 10000-002
2-400
PAGE
6
DEC 01/14
28-21-78
RAI 10010-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522AZ 522CT
622AZ 622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
SPARE
: 01 JET PUMP
282170-10
EXPENDABLE
: 03 SEAL
04 BOLT
04 WASHER
282170-10
282170-10
282170-10
_________
MAN-HOURS
06-001
08-045
04-012
PUBLICATION
___________
JIC
JIC
AH
57-00-00-OAC-10000
28-21-00-OPT-10000
28-21-78
RAI 10010-001
2-400 PAGE
1
MAR 01/15
28-21-78
001
RAI 10010-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL TANKS ARE DEFUELED.
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM 4 M (13 FT), TO GAIN ACCESS
TO WING UPPER SURFACE.
4. REMOVE ACCESS DOORS 522AZ (622AZ) AND 522CT
(622CT) AS FOLLOWS :
28-21-78
RAI 10010-001
2-400 PAGE
2
MAR 01/15
28-21-78
003
RAI 10010-001
3
MAR15
________________________________
OPENING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: OPEN THE ACCESS DOORS INDICATED IN THE
ACCESS SECTION ON PAGE 1 OF THIS
JOB INSTRUCTION CARD.
004
_______________________________
REMOVAL
OF FEEDER TANK JET PUMP
REF. FIG. 282178-RAI-00120
1. RELEASE NUT (5) AT LEVEL OF ELECTRIC PUMP
CANISTER.
2. RELEASE NUT (7), DISCONNECT LINE (6).
3. REMOVE COUPLING (8), DISCARD SEAL (9).
4. RELEASE NUTS (2) AND (14),DISCONNECT LINE
(15)
5. REMOVE COUPLING (13),DISCARD SEAL (12).
6. REMOVE FASTENERS (16).
7. REMOVE FASTENER (4) FROM BONDING STRIP ON
JET PUMP.
8. SIDE TANK, ON NOZZLE ASSY (21), UNSCREW
THREE NUTS (20) AND ONE NUT (18). REMOVE
SCREWS (17) AND (19) WITH THEIRS WASHERS.
9. DISENGAGE LINE (1) FROM JET PUMP (11),
REMOVE JET PUMP.
10 DISCARD SEAL (10).
11.BLANK OFF HOLES OF JET PUMP (11),LINE (1),
ELECTRIC PUMP CANISTER AND TEE COUPLING ON
JET PUMP.
*** CONTINUED ***
AH
28-21-78
RAI 10010-001
2-400 PAGE
3
MAR 01/15
28-21-78
RAI 10010-001
4
MAR15
____________________________________
INSTALLATION
OF FEEDER TANK JET PUMP
REF. FIG. 282178-RAI-00120
1. INSTALL NEW SEAL (10) ON JET PUMP, SEAL MUST
BE PREVIOUSLY IMMERSED IN CLEAN FUEL.
2. INSTALL THE TWO NEW SEALS (9) AND (12)
TIGHTEN BOTH COUPLINGS (8) AND (13) ON JET
PUMP.
3. CLEAN BONDING PLATE OF JET PUMP, AND BONDING
STRIP TERMINAL LUG.
4. APPLY A THIN FILM OF PURE MINERAL VASELINE
ON BONDING AREAS.
5. IMMERSE JET PUMP (11) IN CLEAN FUEL.
6. REMOVE BLANKING CAPS INSTALLED DURING
REMOVAL.
7. INSTALL JET PUMP (11) IN LINE (1).
8. POSITION THE ASSEMBLY ON ITS LOCATION AT RIB
5. INSTALL THREE SCREWS (19) AND ONE SCREW
(17) WITH THEIRS WASHERS. SIDE NOZZLE ASSY
(21) SCREW NUTS (18) AND (20). TIGHTEN.
9. CONNECT LINE (1) BONDING STRIP ON JET PUMP
(11) BY MEANS OF FASTENER (4).
10.TIGHTEN FASTENERS (16) OF LINE (1).
11.INSTALL LINES (6) AND (15), TIGHTEN UNIONS
(2), (5), (7) AND (14).
28-21-78
RAI 10010-001
2-400 PAGE
4
MAR 01/15
28-21-78
006
RAI 10010-001
5
MAR15
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: CLOSE THE ACCESS DOORS OPENED ABOVE.
007
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
008
R
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-78
RAI 10010-001
2-400 PAGE
5
MAR 01/15
28-21-78
6
AH
RAI 10010-001
MAR15
28-21-78
RAI 10010-001
2-400
PAGE
6
MAR 01/15
28-21-78
RAI 10030-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522AZ 522CT
622AZ 622CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
SPARE
282178
282170-16
282170-18
EXPENDABLE
: 01
05
01
05
01
00
282170-16
282170-16
282170-18
282170-18
282170
282170
_________
MAN-HOURS
06-001
PUBLICATION
___________
JIC
JIC
AH
57-00-00-OAC-10000
28-21-00-OPT-10000
28-21-78
RAI 10030-001
2-400 PAGE
1
MAR 01/15
28-21-78
001
RAI 10030-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL TANKS ARE DEFUELED.
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM 4 M (13 FT), TO GAIN ACCESS
TO WING UPPER SURFACE.
4. REMOVE ACCESS DOORS 522AZ (622AZ) AND 522CT
(622CT) AS FOLLOWS :
28-21-78
RAI 10030-001
2-400 PAGE
2
MAR 01/15
28-21-78
003
RAI 10030-001
3
MAR15
________________________________
OPENING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: OPEN THE ACCESS DOORS INDICATED IN THE
ACCESS SECTION ON PAGE 1 OF THIS
JOB INSTRUCTION CARD.
004
005
28-21-78
RAI 10030-001
2-400 PAGE
3
MAR 01/15
28-21-78
RAI 10030-001
4
MAR15
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: CLOSE THE ACCESS DOORS OPENED ABOVE.
007
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*** CONTINUED ***
AH
28-21-78
RAI 10030-001
2-400 PAGE
4
MAR 01/15
28-21-78
008
R
RAI 10030-001
5
MAR15
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-21-78
RAI 10030-001
2-400 PAGE
5
MAR 01/15
28-21-78
6
AH
RAI 10030-001
MAR15
28-21-78
RAI 10030-001
2-400
PAGE
6
MAR 01/15
28-21-79
RAI 10000-001
1
MAR15
ZONING DATA
___________
ZONE
ACCESS
: 475
485
512
612
: 475AT 485AT
512CT
612CT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
282170-13-040
EXPENDABLE
: 02 O-RING
04 O-RING
04 NUT
282170
282160
282160
04-012
06-004
PUBLICATION
___________
JIC
JIC
JIC
: DEFUELING
: REMOVAL/INSTALLATION OF
COWLS ATTACHED BY BOLTS
: OPERATIONAL TEST OF FUEL
SYSTEM
AH
12-11-00-DFG-10000
54-00-00-RAI-10000
28-21-00-OPT-10000
28-21-79
RAI 10000-001
2-400 PAGE
1
MAR 01/15
28-21-79
001
RAI 10000-001
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
______________________________
DE-ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU,
A. OPEN THE FOLLOWING CIRCUIT BREAKERS :
1QA (2QA) FUEL/FUEL FEED/ENG1 (2)/
ELEC/PUMP.
3QA (4QA) FUEL/FUEL FEED/ENG1 (2)/
CTL &/CAUTION.
B. INSTALL SAFETY CLIPS.
28-21-79
RAI 10000-001
2-400 PAGE
2
MAR 01/15
28-21-79
003
RAI 10000-001
3
MAR15
___________
PREPARATION
1. INSTALL WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. INSTALL PLATFORM, 3.13 M (10.26 FT) TO GAIN
ACCESS TO WING LOWER SURFACE.
3. INSTALL PLATFORM, 3.76 M (12.34 FT) TO GAIN
ACCESS TO WING UPPER SURFACE.
4. DEFUELING TANKS AS FOLLOWS:
5. OPEN COWLS 475AT AND 485AT AS FOLLOWS :
004
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
005
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
006
____________________________
REMOVAL
OF MOTIVE FLOW VALVE
REF. FIG. 282179-RAI-00110
1. REMOVE SCREWS AND WASHERS (2) AND (3).
2. REMOVE BONDING LEADS (1) FROM CLAMP (4).
3. UNSCREW UNION (20) AND MOVE BACK ONTO ATTACH
FITTING.
4. SLOWLY MOVE BACK SLEEVE (17) AND REMOVE THE
TWO HALF-JUMPERS (19).
5. CONTINUE TO CAREFULLY MOVE BACK SLEEVE (17)
AGAINST STOP AND REMOVE THE TWO HALF-JUMPERS
*** CONTINUED ***
AH
28-21-79
RAI 10000-001
2-400 PAGE
3
MAR 01/15
28-21-79
RAI 10000-001
4
MAR15
(16).
6. MOVE SPACER(18) BACK TOWARDS SLEEVE TO GAIN
ACCESS TO PIPE FASTENER (24).
7. POSITION CONTAINER UNDER PIPES AND UNSCREW
NUT (24) TO SEPARATE PIPE ASSY (25).
8. DISCONNECT CONNECTOR (10) AND BLANK CONNECTOR RECEPTACLES.
9. REMOVE THE THREE SCREWS (11) AND THE THREE
WASHERS (27).
REMOVE VALVE/PIPE ASSEMBLY,
REMOVE AND DISCARD SEALS (26) AND (12),
(15) AND (21).
10.REMOVE THE FOUR FASTENERS (6) AND (7),
SEPARATE THE MOTIVE FLOW VALVE (13) FROM
PIPE ASSEMBLY.
11.REMOVE AND DISCARD SELF-LOCKING NUTS.
12.REMOVE AND DISCARD SEALS (8) AND (9), RETAIN
SPACER (18).
13.BLANK OPEN PIPE ENDS AND TANK ORIFICE.
14.REMOVE MOTIVE FLOW VALVE (13).
007
_________________________________
INSTALLATION
OF MOTIVE FLOW VALVE
REF. FIG. 282179-RAI-00110
1. REMOVE BLANDING PLUGS.
2. INSTALL TWO NEW SEALS (8) AND (9), COATED
WITH PURE PETROLATUM.
3. MAKE CERTAIN THAT PIPE AND VALVE ASSY BEA*** CONTINUED ***
AH
28-21-79
RAI 10000-001
2-400 PAGE
4
MAR 01/15
28-21-79
RAI 10000-001
5
MAR15
28-21-79
RAI 10000-001
2-400 PAGE
5
MAR 01/15
28-21-79
RAI 10000-001
6
MAR15
___________________________
ENERGIZATION
OF FUEL SYSTEM
1. ON PANEL 121VU
A. REMOVE SAFETY CLIPS
B. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1QA (2QA) AND 3QA (4QA)
009
_______________________________
OPERATIONAL
TEST OF FUEL SYSTEM
SEE JOB INSTRUCTION CARD
282100-OPT-10000
R
010
________
CLOSE-UP
CLOSE COWLS 475AT AND 485AT AS FOLLOWS :
28-21-79
RAI 10000-001
2-400 PAGE
6
MAR 01/15
28-21-79
011
RAI 10000-001
7
MAR15
012
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-21-79
RAI 10000-001
2-400 PAGE
7
MAR 01/15
28-21-79
8
AH
RAI 10000-001
MAR15
28-21-79
RAI 10000-001
2-400
PAGE
8
MAR 01/15
28-23-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 211
510
511
610
611
: 22AZ
521DT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: OPENING AND CLOSING OF
WING BOX ACCES DOORS
AH
24-46-00-EAD-10000
57-00-00-OAC-10000
28-23-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
28-23-00
001
OPT 10000-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
_____________________________________
PREPARATION
OF CROSSFEED VALVE SYSTEM
1. ON PANEL 4VU
ON FUEL QUANTITY INDICATOR, CHECK THAT EACH
TANK CONTAINS 500 KG (1102 LBS).
NOTE : IF REQUIRED, TOP UP TANKS.
2. ON THE ELECTRONIC RACK 90VU:
*** CONTINUED ***
AH
28-23-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
28-23-00
OPT 10000-002
3
DEC14
28-23-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
28-23-00
OPT 10000-002
4
DEC14
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: OPEN THE ACCES DOORS INDICATED IN THE
ACCESS SECTION ON PAGE 1 OF THIS
JOB INSTRUCTION CARD.
006
007
_______________________________
CLOSING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
*** CONTINUED ***
AH
28-23-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
28-23-00
OPT 10000-002
5
DEC14
28-23-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
28-23-00
OPT 10000-002
6
DEC14
010
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
5. REMOVE ACCESS PLATFORM,(IF NECESSARY).
*****
AH
E N D
O F
T E X T
*****
28-23-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14
28-23-00
7
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-002
DEC14
28-23-00
OPT 10000-002
2-400
PAGE
7
DEC 01/14
28-23-00
8
AH
OPT 10000-002
DEC14
28-23-00
OPT 10000-002
2-400
PAGE
8
DEC 01/14
28-23-00
OPT 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 211
510
511
610
611
: 22AZ
521DT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
57-00-00-OAC-10000
28-23-00
OPT 10000-003
2-400 PAGE
1
DEC 01/14
28-23-00
001
OPT 10000-003
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-23-00
OPT 10000-003
2-400 PAGE
2
DEC 01/14
28-23-00
003
OPT 10000-003
3
DEC14
004
_____________________________________
PREPARATION
OF CROSSFEED VALVE SYSTEM
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT EACH TANK CONTAINS 500 KG
(1102 LBS).
NOTE : IF REQUIRED, TOP UP TANKS.
2. ON THE ELECTRONIC RACK 90VU:
- REMOVE THE PANEL 222AZ TO HAVE ACCES TO
962VU.
- OPEN THE PANEL 214CZ TO HAVE ACCES TO
910VU.
005
28-23-00
OPT 10000-003
2-400 PAGE
3
DEC 01/14
28-23-00
OPT 10000-003
4
DEC14
28-23-00
OPT 10000-003
2-400 PAGE
4
DEC 01/14
28-23-00
OPT 10000-003
5
DEC14
28-23-00
OPT 10000-003
2-400 PAGE
5
DEC 01/14
28-23-00
OPT 10000-003
6
DEC14
ENGINE 2
- ON EWD, IN ALERT WINDOW, FUEL FEED LO
PR MESSAGE APPEARS
- MASTER CAUTION LIGHTS FLASH
B. - ON PANEL 25VU, PRESS FUEL/ENG2/PUMP
PUSHBUTTON SWITCH (ELECTRIC PUMP
OPERATING)
. RUN 2 LEGEND COMES ON
. OFF LEGEND GOES OFF
. FEED LO PR2 GOES OFF
. FEED LO PR1 IS ON.
- ON MFD UPPER WINDOW, IN ENGINE SD PAGE
. ITEM 2 IS DISPLAYED FOR ENGINE 2
. FEED LO PR MESSAGE OF ENGINE 2
DISAPPEARS
. FEED LO PR MESSAGE OF ENGINE 1
IS DISPLAYED
- ON EWD, IN ALERT WINDOW, FUEL FEED LO
PR MESSAGE REMAINS DISPLAYED.
C. - ON PANEL 25VU, PRESS FUEL/X FEED
PUSHBUTTON SWITCH
. FLOWBAR IS IN LINE
. RUN 2 LEGEND ON
. RUN 1 LEGEND REMAINS OFF
. FEED LO PR2 LIGHT IS OFF
. FEED LO PR1 LIGHT GOES OFF
- ON MFD UPPER WINDOW, IN ENGINE SD PAGE
. FUEL CROSSFEED VALVE FLOWBAR IS
IN LINE
. ITEM 2 IS DISPLAYED FOR ENGINE 2
. ITEM 1 IS DISPLAYED FOR ENGINE 1
. FEED LO PR MESSAGE OF ENGINE 2
IS NOT DISPLAYED
. FEED LO PR MESSAGE OF ENGINE 1
DISAPPEARS
- ON MFD, IN TEMPORARY SELECTION WINDOW,
FUEL X FEED MESSAGE IS DISPLAYED
- ON EWD, IN ALERT WINDOW, FUEL FEED LO
PR MESSAGE DISAPPEARS.
*** CONTINUED ***
AH
28-23-00
OPT 10000-003
2-400 PAGE
6
DEC 01/14
28-23-00
OPT 10000-003
7
DEC14
28-23-00
OPT 10000-003
2-400 PAGE
7
DEC 01/14
28-23-00
OPT 10000-003
8
DEC14
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: OPEN THE ACCES DOORS INDICATED IN THE
ACCESS SECTION ON PAGE 1 OF THIS
JOB INSTRUCTION CARD.
008
009
_______________________________
CLOSING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: CLOSE THE ACCES DOORS OPENED ABOVE.
28-23-00
OPT 10000-003
2-400 PAGE
8
DEC 01/14
28-23-00
010
OPT 10000-003
9
DEC14
28-23-00
OPT 10000-003
2-400 PAGE
9
DEC 01/14
28-23-00
OPT 10000-003
10
DEC14
012
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
5. REMOVE ACCESS PLATFORM,(IF NECESSARY).
*****
AH
E N D
O F
T E X T
*****
28-23-00
OPT 10000-003
2-400 PAGE
10
DEC 01/14
28-23-00
11
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-003
DEC14
28-23-00
OPT 10000-003
2-400
PAGE
11
DEC 01/14
28-23-00
12
AH
OPT 10000-003
DEC14
28-23-00
OPT 10000-003
2-400
PAGE
12
DEC 01/14
28-23-00
13
AH
FUEL DISTRIBUTION
LEGEND
OPT 10000-003
DEC14
28-23-00
OPT 10000-003
2-400
PAGE
13
DEC 01/14
28-23-71
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 521
: 521DT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
: 01 CROSSFEED VALVE
282370-06-070
EXPENDABLE
: 01
01
01
04
04
282370-06-050
282370-06-060
282370-06-030
282370-06-020
282370-06-010
SEAL
CIRCLIP
SEAL
WASHER
SCREW
PUBLICATION
___________
JIC
JIC
JIC
AH
57-00-00-OAC-10000
28-23-00-OPT-10000
57-00-00-OAC-10000
28-23-71
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-23-71
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL TANKS ARE DEFUELED
UNDER CROSSFEED VALVE.
2. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, 3,8 M ( (13 FT) TO GAIN
ACCESS TO WING UPPER SURFACE.
4. ON PANEL 121VU.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKER:
2QE FUEL/FUEL FEED/XFEED
*** CONTINUED ***
AH
28-23-71
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-23-71
RAI 10000-001
3
MAR12
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
__________________________
REMOVAL
OF CROSSFEED VALVE
REF. FIG. 282371-RAI-00120
1. DISCONNECT ELECTRICAL CONNECTOR (7).
2. DISCONNECT BONDING STRIP.
3. DISCONNECT LINE (3).
4. REMOVE SEAL (2) AND BUSH (8),DISCARD
SEAL (2).
5. REMOVE SCREWS (4), WASHERS (5) RETAINING
CROSSFEED VALVE.
6. REMOVE CROSSFEED VALVE (1).
7. REMOVE AND DISCARD SEAL (6).
8. CAP OPEN LINE ENDS AND CONNECTOR ON REMOVED
EQUIPMENT.
9. PROTECT REMOVED COMPONENT INTERFACE AS WELL
AS ADJACENT AREA.
005
_______________________________
INSTALLATION
OF CROSSFEED VALVE
REF. FIG. 282371-RAI-00120
1. CLEAN BONDING PLATE AND APPLY A FILM OF
GREASE.
2. INSTALL CIRCLIP (8).
*** CONTINUED ***
AH
28-23-71
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-23-71
RAI 10000-001
4
MAR12
007
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND CLOSE CIRCUIT
BREAKER 2QE.
2. INSTALL ACCESS DOOR 521DT AS FOLLOWS :
008
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
009
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
*** CONTINUED ***
AH
28-23-71
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-23-71
RAI 10000-001
5
MAR12
AH
E N D
O F
T E X T
*****
28-23-71
RAI 10000-001
2-400 PAGE
5
MAR 01/12
28-23-71
6
AH
CROSSFEED VALVE
RAI 10000-001
MAR12
28-23-71
RAI 10000-001
2-400
PAGE
6
MAR 01/12
28-23-72
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 521
: 521DT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
GSE
SPARE
282370-06-080
EXPENDABLE
: 01 PACKING
282371-01-070
57-00-00-OAC-10000
PUBLICATION
___________
JIC
JIC
AH
28-23-00-OPT-10000
28-23-72
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-23-72
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL TANKS ARE DEFUELED
UNDER CROSSFEED VALVE.
2. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. INSTALL PLATFORM, 3,8 M ( (13 FT) TO GAIN
ACCESS TO WING UPPER SURFACE.
4. ON PANEL 121VU.
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKER:
2QE FUEL/FUEL FEED/XFEED
*** CONTINUED ***
AH
28-23-72
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-23-72
RAI 10000-001
3
MAR12
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
___________________________________
REMOVAL
OF CROSSFEED VALVE ACTUATOR
REF. FIG. 282372-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (2).
2. UNSCREW SCREWS RETAINING CLAMP AND REMOVE
CLAMP (3).
3. CAREFULLY REMOVE CROSSFEED VALVE ACTUATOR
(1) AND THE SAIL (4).
4. BLANK CROSSFEED VALVE ACTUATOR (1) END FITTING AND ELECTRICAL CONNECTOR.
5. BLANK CROSSFEED VALVE BODY END FITTING.
005
________________________________________
INSTALLATION
OF CROSSFEED VALVE ACTUATOR
REF. FIG. 282372-RAI-00100
1. CLEAN AND INSPECT COMPONENT INTERFACE AND/OR
ADJACENT AREA.
2. REMOVE BLANKING PLUG FROM CROSSFEED VALVE
ACTUATOR (1).
3. INSTALL ACTUATOR (1) ON CROSSFEED VALVE.
4. INSTALL SEAL (4),CLAMP (3) AND SCREW, RIB 2
SIDE. TIGHTEN.
5. CHECK FOR CORRECT CONDITION OF ELECTRICAL
CONNECTOR.
*** CONTINUED ***
AH
28-23-72
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-23-72
RAI 10000-001
4
MAR12
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND CLOSE CIRCUIT
BREAKER 2QE.
2. INSTALL ACCESS DOOR 521DT AS FOLLOWS :
007
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
009
AH
E N D
O F
T E X T
*****
28-23-72
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-23-72
5
AH
RAI 10000-001
MAR12
28-23-72
RAI 10000-001
2-400
PAGE
5
MAR 01/12
28-24-00
FUT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
400
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
EXPENDABLE
: 00 SNAP WIRE
01 GUARANTEE SEAL
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: OPENING AND CLOSING OF
HINGED ENGINE COWLS
AH
24-46-00-EAD-10000
54-00-00-OAC-10000
28-24-00
FUT 10000-002
2-400 PAGE
1
DEC 01/14
28-24-00
001
FUT 10000-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
28-24-00
FUT 10000-002
2-400 PAGE
2
DEC 01/14
28-24-00
FUT 10000-002
3
DEC14
28-24-00
FUT 10000-002
2-400 PAGE
3
DEC 01/14
28-24-00
4WE
005
FUT 10000-002
4
DEC14
___________
PREPARATION
1. ON UPPER CENTER INSTRUMENT PANEL 4VU, ON
FUEL QUANTITY INDICATOR, CHECK THAT EACH
FUEL TANK CONTAINS 500 KG (1102LBS) FUEL
MINIMUM.
NOTE : IF REQUIRED, TOP UP FUEL TANKS.
2. OPEN COWL 435AL(445AL) AS FOLLOWS
006
___________________________________
OPENING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
007
_______________
FUNCTIONAL
TEST
REF. FIG. 261200-OPT-00100
1. ON PANEL 20VU
PULL ENG 1(2) FIRE HANDLE
- ON PANEL 25VU, CROSS LINE FLOWBAR OF FUEL
ENG 1(2) LP VALVE LIGHT COMES ON.
- INSTALL WARNING NOTICE PROHIBITING ITS
OPERATION.
REF. FIG. 282400-FUT-00100
2. AT ENGINE
- INSTALL CONTAINER BELOW UNIONS (2), (3).
- LOOSEN UNIONS (2) AND (3).
- DISCONNECT LINE (1).
REF. FIG. 282100-OPT-00120
3. ON PANEL 25VU
A. PRESS FUEL/ENG1 (2)/PUMP PUSHBUTTON
*** CONTINUED ***
AH
28-24-00
FUT 10000-002
2-400 PAGE
4
DEC 01/14
28-24-00
FUT 10000-002
5
DEC14
28-24-00
FUT 10000-002
2-400 PAGE
5
DEC 01/14
28-24-00
FUT 10000-002
6
DEC14
_______________________________________________
ENERGIZATION
OF SYSTEMS ACTUATED BY FIRE-HANDLE
REMOVE SAFETY TAGS.
1. ON PANEL 21VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 3KF(4KF).
2. ON PANEL 121VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1HA(2HA)
3. ON PANEL 122VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1WE(2WE), 3WE(4WE), 1WD(2WD), 3WD(4WD)
5WD(6WD),1DM,28DM,33PU,19XU(20XU).
4. ON PANEL 129VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKER :
- 1KF(2KF).
009
28-24-00
FUT 10000-002
2-400 PAGE
6
DEC 01/14
28-24-00
010
FUT 10000-002
7
DEC14
___________________________________
CLOSING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
011
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES
4. REMOVE EXPLOSIMETER.
5. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-24-00
FUT 10000-002
2-400 PAGE
7
DEC 01/14
28-24-00
8
AH
FUT 10000-002
DEC14
28-24-00
FUT 10000-002
2-400
PAGE
8
DEC 01/14
28-24-00
9
AH
FUT 10000-002
DEC14
28-24-00
FUT 10000-002
2-400
PAGE
9
DEC 01/14
28-24-00
10
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
FUT 10000-002
DEC14
28-24-00
FUT 10000-002
2-400
PAGE
10
DEC 01/14
28-24-00
FUT 10000-003
1
DEC14
ZONING DATA
___________
ZONE
: 210
400
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
EXPENDABLE
: 00 SNAP WIRE
01 GUARANTEE SEAL
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
54-00-00-OAC-10000
28-24-00
FUT 10000-003
2-400 PAGE
1
DEC 01/14
28-24-00
001
FUT 10000-003
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-24-00
FUT 10000-003
2-400 PAGE
2
DEC 01/14
28-24-00
003
FUT 10000-003
3
DEC14
004
28-24-00
FUT 10000-003
2-400 PAGE
3
DEC 01/14
28-24-00
FUT 10000-003
4
DEC14
ENG FIRE/EXTING
L BTL SQUIBS
ENG FIRE/EXTING
R BTL/SQUIBS
ENG FIRE/EXTING
L BTL SQUIBS
ENG FIRE/EXTING
R BTL SQUIBS
3WE
4WE
006
___________
PREPARATION
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT EACH FUEL TANK CONTAINS 500 KG
(1102LBS) FUEL MINIMUM.
NOTE : IF REQUIRED, TOP UP FUEL TANKS.
2. OPEN COWL 435AL(445AL) AS FOLLOWS
007
___________________________________
OPENING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
008
_______________
FUNCTIONAL
TEST
REF. FIG. 261200-OPT-00100
1. ON PANEL 20VU
PULL ENG 1(2) FIRE HANDLE
- ON PANEL 25VU, CROSS LINE FLOWBAR OF FUEL
*** CONTINUED ***
AH
28-24-00
FUT 10000-003
2-400 PAGE
4
DEC 01/14
28-24-00
FUT 10000-003
5
DEC14
28-24-00
FUT 10000-003
2-400 PAGE
5
DEC 01/14
28-24-00
FUT 10000-003
6
DEC14
28-24-00
FUT 10000-003
2-400 PAGE
6
DEC 01/14
28-24-00
009
FUT 10000-003
7
DEC14
_______________________________________________
ENERGIZATION
OF SYSTEMS ACTUATED BY FIRE-HANDLE
REMOVE SAFETY TAGS.
1. ON PANEL 21VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 3KF(4KF).
2. ON PANEL 121VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1HA(2HA)
3. ON PANEL 122VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1WE(2WE), 3WE(4WE), 1WD(2WD), 3WD(4WD)
5WD(6WD),1DM,28DM,33PU,19XU(20XU).
4. ON PANEL 129VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKER :
- 1KF(2KF).
010
011
___________________________________
CLOSING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
012
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*** CONTINUED ***
AH
28-24-00
FUT 10000-003
2-400 PAGE
7
DEC 01/14
28-24-00
FUT 10000-003
8
DEC14
AH
E N D
O F
T E X T
*****
28-24-00
FUT 10000-003
2-400 PAGE
8
DEC 01/14
28-24-00
9
AH
FUT 10000-003
DEC14
28-24-00
FUT 10000-003
2-400
PAGE
9
DEC 01/14
28-24-00
10
AH
FUT 10000-003
DEC14
28-24-00
FUT 10000-003
2-400
PAGE
10
DEC 01/14
28-24-00
11
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
FUT 10000-003
DEC14
28-24-00
FUT 10000-003
2-400
PAGE
11
DEC 01/14
28-24-00
FUT 10010-001
1
APR05
ZONING DATA
___________
ZONE
ACCESS
: 400
470
480
: 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
MECHANIC
_________
MAN-HOURS
02
ELAPSED TIME
GSE
: 01 NITROGEN BOTTLE
01 PRESS GAUGE (0 TO 5 BAR)
01 ENGINE ACCESS PLATFORM
AH
11-004
05-001
08-004
28-24-00
FUT 10010-001
2-400 PAGE
1
APR 01/05
28-24-00
001
FUT 10010-001
2
APR05
_______
WARNING
1. MAKE CERTAIN THAT NOBODY WORK ON FUEL SYSTEM
AND ON ENGINES.
2. ONLY USE EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
3. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
4. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND WORKING AREA.
002
___________
PREPARATION
1. INSTALL PLATFORM TO GAIN ACCESS TO PANEL
475AT (485AT).
2. REMOVE AFT UPPER ENGINE COWLS 475AT (485AT)
AS FOLLOWS :
003
_____________________________________________
REMOVAL
OF AFT UPPER ENGINE COWL 475AT(485AT)
REF. FIG. 540000-RAI-00130
1. REMOVE SCREWS (31) AND (32).
2. REMOVE COWL.
3. CLEAN THE MATING FACE WITH NON METALLIC TOOL
AND SOLVENT MAT. N11-004B
004
_________________________________
LEAKAGE
TEST OF DOUBLE WALL TUBES
REF. FIG. 282400-FUT-00110
NOTA : AS THE LEAKAGE TEST IS IDENTICAL FOR
BOTH ENGINES, ONLY ONE TYPICAL TEST WILL
BE DESCRIBED.
1. UNSCREW COUPLINGS (1), (3), (4) AND (6).
*** CONTINUED ***
AH
28-24-00
FUT 10010-001
2-400 PAGE
2
APR 01/05
28-24-00
FUT 10010-001
3
APR05
28-24-00
FUT 10010-001
2-400 PAGE
3
APR 01/05
28-24-00
FUT 10010-001
4
APR05
________
CLOSE-UP
1. REMOVE SMOKING PROHIBITED WARNING NOTICES.
2. REMOVE ACCESS PLATFORM.
3. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
*****
AH
E N D
O F
T E X T
*****
28-24-00
FUT 10010-001
2-400 PAGE
4
APR 01/05
28-24-00
5
AH
LEAKAGE TEST
FUT 10010-001
APR05
28-24-00
FUT 10010-001
2-400
PAGE
5
APR 01/05
28-24-00
6
AH
FUT 10010-001
APR05
28-24-00
FUT 10010-001
2-400
PAGE
6
APR 01/05
28-24-00
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
433
443
475
485
: 435AL 445AL 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
EXPENDABLE
: 00 SNAP-WIRE
01 GUARANTEE SEAL
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: REMOVAL/INSTALLATION OF
COWLS ATTACHED BY BOLTS
AH
24-46-00-EAD-10000
54-00-00-RAI-10000
28-24-00
OPT 10000-002
2-400 PAGE
1
DEC 01/14
28-24-00
001
OPT 10000-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
28-24-00
OPT 10000-002
2-400 PAGE
2
DEC 01/14
28-24-00
OPT 10000-002
3
DEC14
28-24-00
OPT 10000-002
2-400 PAGE
3
DEC 01/14
28-24-00
4WE
005
OPT 10000-002
4
DEC14
___________
PREPARATION
1. POSITION A 3.8 M (13FT) PLATFORM TO GAIN
ACCESS TO ENGINE.
2. REMOVE ACCESS DOOR 475AT (485AT) AS FOLLOWS.
006
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
007
_________________________________
OPERATIONAL
TEST OF FUEL LP VALVE
REF. FIG 282100-OPT-00120
REF. FIG 261200-OPT-00100
REF. FIG 282161-RAI-00100
1. TEST OF LP FUEL FIRE SHUT OFF CONTROL SYSTEM
- CHECK THAT ENG 1(2) FIRE HANDLES 7WD AND
8WD ARE PUSHED.
2. ON CIRCUIT BREAKER PANEL 121VU, OPEN THE
FOLLOWING CIRCUIT BREAKER :
3QG(4QG)
FUEL/LP VALVES/ENG1(2)/MOTOR 2
3. ON PANEL 20VU:
A. LOWER THE FIRE HANDLE, PULL DOWN THE
LOCKING HOLD-PLATE (SNAP-WIRE IS BREAKED)
PULL ENG 1 (2) FIRE HANDLE.
- ON FUEL/ENG 1 (2)/LP VALVE ANNUNCIATOR,
CROSS LINE FLOWBAR COMES ON.
B. ON ACTUATOR, CHECK THAT MECHANICAL INDEX
IS IN }F} POSITION (CLOSED)
C. PUSH ENG1 (2) FIRE HANDLE 7WD (8WD)
- ON FUEL/ENG 1(2) LP VALVE ANNUNCIATOR,
*** CONTINUED ***
AH
28-24-00
OPT 10000-002
2-400 PAGE
4
DEC 01/14
28-24-00
OPT 10000-002
5
DEC14
_______________________________________________
ENERGIZATION
OF SYSTEMS ACTUATED BY FIRE-HANDLE
REMOVE SAFETY TAGS.
1. ON PANEL 21VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 3KF(4KF).
2. ON PANEL 121VU:
*** CONTINUED ***
AH
28-24-00
OPT 10000-002
2-400 PAGE
5
DEC 01/14
28-24-00
OPT 10000-002
6
DEC14
________
CLOSE
UP
INSTALL ACCESS DOOR 475AT (485AT) AS FOLLOWS.
010
011
012
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
*** CONTINUED ***
AH
28-24-00
OPT 10000-002
2-400 PAGE
6
DEC 01/14
28-24-00
OPT 10000-002
7
DEC14
AH
E N D
O F
T E X T
*****
28-24-00
OPT 10000-002
2-400 PAGE
7
DEC 01/14
28-24-00
8
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-002
DEC14
28-24-00
OPT 10000-002
2-400
PAGE
8
DEC 01/14
28-24-00
9
AH
OPT 10000-002
DEC14
28-24-00
OPT 10000-002
2-400
PAGE
9
DEC 01/14
28-24-00
10
AH
FUEL LP VALVE
OPT 10000-002
DEC14
28-24-00
OPT 10000-002
2-400
PAGE
10
DEC 01/14
28-24-00
OPT 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
433
443
475
485
: 435AL 445AL 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
EXPENDABLE
: 00 SNAP-WIRE
01 GUARANTEE SEAL
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
54-00-00-RAI-10000
28-24-00
OPT 10000-003
2-400 PAGE
1
DEC 01/14
28-24-00
001
OPT 10000-003
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-24-00
OPT 10000-003
2-400 PAGE
2
DEC 01/14
28-24-00
003
OPT 10000-003
3
DEC14
004
28-24-00
OPT 10000-003
2-400 PAGE
3
DEC 01/14
28-24-00
OPT 10000-003
4
DEC14
006
ENG FIRE/EXTING
L BTL SQUIBS
ENG FIRE/EXTING
R BTL/SQUIBS
ENG FIRE/EXTING
L BTL SQUIBS
ENG FIRE/EXTING
R BTL SQUIBS
___________
PREPARATION
1. POSITION A 3.8 M (13FT) PLATFORM TO GAIN
ACCESS TO ENGINE.
2. REMOVE ACCESS DOOR 475AT (485AT) AS FOLLOWS.
007
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
008
_________________________________
OPERATIONAL
TEST OF FUEL LP VALVE
REF.
REF.
REF.
REF.
FIG.
FIG.
FIG.
FIG.
261200-OPT-00100
282100-OPT-00120
282161-RAI-00100
282000-OPT-00130
28-24-00
OPT 10000-003
2-400 PAGE
4
DEC 01/14
28-24-00
OPT 10000-003
5
DEC14
28-24-00
OPT 10000-003
2-400 PAGE
5
DEC 01/14
28-24-00
OPT 10000-003
6
DEC14
_______________________________________________
ENERGIZATION
OF SYSTEMS ACTUATED BY FIRE-HANDLE
REMOVE SAFETY TAGS.
1. ON PANEL 21VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 3KF(4KF).
2. ON PANEL 121VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1HA(2HA)
3. ON PANEL 122VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1WE(2WE), 3WE(4WE), 1WD(2WD), 3WD(4WD)
5WD(6WD),1DM,28DM,33PU,19XU(20XU).
4. ON PANEL 129VU:
A. CLOSE THE FOLLOWING CIRCUIT BREAKER :
- 1KF(2KF).
28-24-00
OPT 10000-003
2-400 PAGE
6
DEC 01/14
28-24-00
010
OPT 10000-003
7
DEC14
________
CLOSE
UP
INSTALL ACCESS DOOR 475AT (485AT) AS FOLLOWS.
011
012
013
_______________________
CLOSE-UP
OF FUEL SYSTEM
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. DISCONNECT AIRCRAFT FROM GROUND.
3. REMOVE SMOKING PROHIBITED WARNING NOTICES.
4. REMOVE EXPLOSIMETER.
5. REMOVE ACCESS PLATFORM,(IF NECESSARY).
*****
AH
E N D
O F
T E X T
*****
28-24-00
OPT 10000-003
2-400 PAGE
7
DEC 01/14
28-24-00
8
AH
FUEL DISTRIBUTION
OPERATIONAL TEST
OPT 10000-003
DEC14
28-24-00
OPT 10000-003
2-400
PAGE
8
DEC 01/14
28-24-00
9
AH
OPT 10000-003
DEC14
28-24-00
OPT 10000-003
2-400
PAGE
9
DEC 01/14
28-24-00
10
AH
FUEL LP VALVE
OPT 10000-003
DEC14
28-24-00
OPT 10000-003
2-400
PAGE
10
DEC 01/14
28-24-00
11
AH
FUEL DISTRIBUTION
LEGEND
OPT 10000-003
DEC14
28-24-00
OPT 10000-003
2-400
PAGE
11
DEC 01/14
28-24-00
OPT 10010-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
435
445
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01 STEP LADDER
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-24-00
OPT 10010-001
2-400 PAGE
1
DEC 01/14
28-24-00
001
OPT 10010-001
2
DEC14
_______
WARNING
1. COMPLY WITH SAFETY INSTRUCTIONS OF ELECTRICAL POWER SUPLLY CHAPTER.
2. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND WORKING AREA.
3. ONLY USE EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
002
___________
PREPARATION
1. MAKE CERTAIN THAT ALL CIRCUIT BREAKERS ARE
CLOSED.
2. ENERGIZE THE AIRCRAFT AS FOLLOWS :
3. OPEN ENGINE COWLS 445AL AND 435AL.
003
004
________________
OPERATIONAL
TEST
REF. FIG. 282400-OPT-00100
REF. FIG. 282400-FUT-00100
NOTE : THIS TEST IS PERFORMED TO CHECK ENGINE
FEED LP VALVE FOR LEAKAGE.
NOTE : AS LEAKAGE TEST OF ENGINE FEED LP VALVE
IS IDENTICAL ON EACH ENGINE, ONLY ONE
TYPICAL TEST WILL BE DESCRIBED.
1. ON UPPER PANEL 25VU, PRESS PUSHBUTTON SWITCH
FUEL/ENG1 (2)/PUMP
- RUN LEGEND ON
*** CONTINUED ***
AH
28-24-00
OPT 10010-001
2-400 PAGE
2
DEC 01/14
28-24-00
OPT 10010-001
3
DEC14
006
________
CLOSE
UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
2. PLACE THE AIRCRAFT IN THE INITIAL CONFIGURATION.
*****
AH
E N D
O F
T E X T
*****
28-24-00
OPT 10010-001
2-400 PAGE
3
DEC 01/14
28-24-00
4
AH
OPT 10010-001
DEC14
28-24-00
OPT 10010-001
2-400
PAGE
4
DEC 01/14
28-24-00
5
AH
OPT 10010-001
DEC14
28-24-00
OPT 10010-001
2-400
PAGE
5
DEC 01/14
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 475
485
: 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
SPARE
282460-01-100
282460-01-040
EXPENDABLE
: 01
01
01
02
04
282460-01-030
282160-05-050
282160-05-060
282160-05
282160-05-110
O-RING
O-RING
O-RING
O-RING
O-RING
_________
MAN-HOURS
04-012
06-001
PUBLICATION
___________
JIC
JIC
: REMOVAL/INSTALLATION OF
COWLS ATTACHED BY BOLTS
: OPERATIONAL TEST OF
FUEL LP VALVE
AH
54-00-00-RAI-10000
28-24-00-OPT-10000
28-24-61
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT THERE IS NO FUEL IN FUEL
TANKS FOR REMOVAL OF FUEL LP VALVE (MECHANIC
AL PART).
2. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. ON PANEL 121VU,
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
1QG(2QG) FUEL/FUEL LP VALVES/ENG1(2)/MOTOR 1
3QG(4QG) FUEL/FUEL LP VALVES/ENG1(2)/MOTOR 2
*** CONTINUED ***
AH
28-24-61
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
3
MAR12
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
004
005
________________________
REMOVAL
OF FUEL LP VALVE
REF. FIG. 282461-RAI-00100
NOTE : AS REMOVAL OF COUPLINGS B IS IDENTICAL, ONLY ONE TYPICAL REMOVAL WILL BE
TREATED. NEVERTHELESS, IN ORDER TO
FACILITATE REMOVAL OF FUEL LP VALVE, IT
IS NECESSARY TO DISCONNECT SIMULTANEOUSLY BOTH COUPLINGS B.
*** CONTINUED ***
AH
28-24-61
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
4
MAR12
_____________________________
INSTALLATION
OF FUEL LP VALVE
REF. FIG. 282461-RAI-00100
1. REMOVE BLANKING CAPS INSTALLED DURING
REMOVAL.
2. INSTALL NEW SEALS (5), (6) AND (8). (SEALS
MUST BE PREVIOUSLY LUBRICATED WITH CLEAN
FUEL).
*** CONTINUED ***
AH
28-24-61
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
5
MAR12
28-24-61
RAI 10000-001
2-400 PAGE
5
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
6
MAR12
008
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND CLOSE THE FOLLOWING
CIRCUIT BREAKERS :
1QG (2QG), 3QG (4QG), (5QG) AND (6QG).
2. CLOSE ACCESS COWL 475AT(485AT) AS FOLLOWS :
009
010
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*** CONTINUED ***
AH
28-24-61
RAI 10000-001
2-400 PAGE
6
MAR 01/12
28-24-61
REMOVAL/INSTALLATION OF
FUEL LP VALVE
RAI 10000-001
7
MAR12
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
011
_________________________________
OPERATIONAL
TEST OF FUEL LP VALVE
SEE JOB INSTRUCTION CARD
282400-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-24-61
RAI 10000-001
2-400 PAGE
7
MAR 01/12
28-24-61
8
AH
FUEL LP VALVE
RAI 10000-001
MAR12
28-24-61
RAI 10000-001
2-400
PAGE
8
MAR 01/12
28-24-61
9
AH
FUEL LP VALVE
RAI 10000-001
MAR12
28-24-61
RAI 10000-001
2-400
PAGE
9
MAR 01/12
28-24-62
REMOVAL/INSTALLATION OF
FUEL LP VALVE ACTUATOR
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 475
485
: 475AT 485AT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
GSE
SPARE
282460-01-040
: REMOVAL/INSTALLATION OF
COWLS ATTACHED BY BOLTS
: OPERATIONAL TEST OF
FUEL LP VALVE
54-00-00-RAI-10000
PUBLICATION
___________
JIC
JIC
AH
28-24-00-OPT-10000
28-24-62
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-24-62
REMOVAL/INSTALLATION OF
FUEL LP VALVE ACTUATOR
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. POSITION A 4M (13FT.) ACCESS PLATFORM TO
GAIN ACCESS TO ENGINE.
2. MAKE CERTAIN THAT ENG1 (ENG2) FUEL LP VALVES
9QG (10QG) ARE CLOSED.
3. DISPLAY A WARNING NOTICE IN FLIGHT COMPARTMENT TO PROHIBIT ENERGIZATION OF FUEL
SYSTEM.
4. ON PANEL 121VU,
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
*** CONTINUED ***
AH
28-24-62
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-24-62
REMOVAL/INSTALLATION OF
FUEL LP VALVE ACTUATOR
RAI 10000-001
3
MAR12
____________________________________________
REMOVAL
OF AFT UPPER COWL ATTACHED BY BOLTS.
SEE JOB INSTRUCTION CARD
540000-RAI-10000
004
005
28-24-62
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-24-62
REMOVAL/INSTALLATION OF
FUEL LP VALVE ACTUATOR
RAI 10000-001
4
MAR12
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND CLOSE THE FOLLOWING
CIRCUIT BREAKERS :
1QG (2QG), 3QG (4QG), (5QG) AND (6QG).
2. CLOSE ACCESS COWL 475AT(485AT) AS FOLLOWS :
007
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
009
_________________________________
OPERATIONAL
TEST OF FUEL LP VALVE
SEE JOB INSTRUCTION CARD
282400-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-24-62
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-24-62
5
AH
FUEL LP VALVE
RAI 10000-001
MAR12
28-24-62
RAI 10000-001
2-400
PAGE
5
MAR 01/12
28-25-51
REMOVAL/INSTALLATION OF
REFUEL/DEFUEL VALVE IN
LANDING GEAR FAIRING
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 196
614
: 196ES
614AB
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
SPARE
: 01 REFUELING VALVE
EXPENDABLE
: 01 SEAL
AH
___
MEN
_________
MAN-HOURS
28-25-51
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-25-51
REMOVAL/INSTALLATION OF
REFUEL/DEFUEL VALVE IN
LANDING GEAR FAIRING
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. ON PANEL 121 VU
OPEN FOLLOWING CIRCUIT BREAKER :
2QU
FUEL/FUELLING CTL & IND
2. REMOVE PANEL 196ES.
003
___________________________________
REMOVE
OF REFUELING DEFUELING VALVE
REF. FIG. 282551-RAI-00100
1. REMOVE FASTENER (5) OF THE RETAINING CABLE
OF BLANKING CAP (6).
*** CONTINUED ***
AH
28-25-51
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-25-51
REMOVAL/INSTALLATION OF
REFUEL/DEFUEL VALVE IN
LANDING GEAR FAIRING
RAI 10000-001
3
MAR12
_________________________________________
INSTALLATION
OF REFUELING DEFUELING VALVE
REF. FIG. 282551-RAI-00100
1. INSTALL NEW SEAL (7) ON PIPING FLANGE (1).
2. INSTALL REFUELING VALVE (4) ON ITS LOCATION.
3. SCREW THE SCREWS (3) WITH WASHERS (2).
4. CONNECT RETAINING CABLE OF BLANKING CAP (6)
BY MEANS FASTENER (5).
005
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS.
2. INSTALL PANEL 196ES.
3. ON PANEL 121 VU
CLOSE FOLLOWING CIRCUIT BREAKER :
2QU
FUEL/FUELLING CTL & IND
006
____________________________
CHECK
OF REFUEL/DEFUEL VALVE
1. DURING REFUELING OR DEFUELING OPERATION,
CARRY OUT THE FOLLOWING :
A. CHECK REFUEL/DEFUEL VALVE FOR CORRECT
OPERATION
B. LEAKAGE CHECK.
*****
AH
E N D
O F
T E X T
*****
28-25-51
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-25-51
4
AH
REFUEL/DEFUEL VALVE
RAI 10000-001
MAR12
28-25-51
RAI 10000-001
2-400
PAGE
4
MAR 01/12
28-25-52
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
282580
24-31-00-EAD-10000
PUBLICATION
___________
JIC
AH
28-25-52
RAI 10000-001
2-400 PAGE
1
DEC 01/14
28-25-52
001
RAI 10000-001
2
DEC14
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
002
___________
PREPARATION
1. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS:
1QT FUEL/FCU CHAN1
2QT FUEL/FCU CHAN2
2QU FUEL/FUELING CTL & IND
2. OPEN ACCESS DOOR 192JR.
003
__________________________________
REMOVAL
OF REFUELING CONTROL PANEL
REF. FIG. 282552-RAI-00100
1. UNLOOSE THE SCREWS (2) SECURING THE
REFUELING CONTROL PANEL (1).
2. EXTRACT THE REFUELING CONTROL PANEL (1).
3. UNPLUG THE ELECTRICAL CONNECTOR (3).
4. PUT BLANKING CAP ON THE ELECTRICAL
CONNECTOR.
*** CONTINUED ***
AH
28-25-52
RAI 10000-001
2-400 PAGE
2
DEC 01/14
28-25-52
004
RAI 10000-001
3
DEC14
_______________________________________
INSTALLATION
OF REFUELING CONTROL PANEL
REF. FIG. 282552-RAI-00100
1. REMOVE BLANKING CAP FROM ELECTRICAL
CONNECTOR (3).
2. PLUG IN ELECTRICAL CONNECTOR TO THE
REFUELING CONTROL PANEL (1).
3. INSERT THE REFUELING CONTROL PANEL IN
THE PANEL STRUCTURE.
4. TIGHTEN SCREWS (2) TO SECURE
REFUELING CONTROL PANEL (1).
005
________
CLOSE-UP
1. ON PANEL 121VU REMOVE SAFETY CLIPS AND
TAGS AND CLOSE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
006
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
007
FUNCTIONAL TEST OF
__________________
REFUELING CONTROL PANEL
_______________________
(RCP)
_____
CHECK THAT VALUES ARE THE SAME :
- ON ENGINE SECONDARY PAGE (MFD UPPER WINDOW),
- AND ON REFUELING CONTROL PANEL 100QU.
008
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
28-25-52
RAI 10000-001
2-400 PAGE
3
DEC 01/14
28-25-52
009
RAI 10000-001
4
DEC14
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS
OF EQUIPMENT.
2. CLOSE ACCESS DOOR PREVIOUSLY OPENED.
*****
AH
E N D
O F
T E X T
*****
28-25-52
RAI 10000-001
2-400 PAGE
4
DEC 01/14
28-25-52
5
AH
RAI 10000-001
DEC14
28-25-52
RAI 10000-001
2-400
PAGE
5
DEC 01/14
28-25-71
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 290
: 295BL 296CR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
SPARE
: 01 REFUEL VALVE
282570-30-070
EXPENDABLE
: 01
01
01
02
06
282570-32-050
282570-28-040
282570-28-050
282570-30-060
282570-30-030
SEAL
SEAL
SEAL
SEALS
WASHERS
_________
MAN-HOURS
04-012
PUBLICATION
___________
JIC
JIC
AH
53-93-00-RAI-10000
12-11-00-FLG-10020
28-25-71
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-25-71
001
RAI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. RELEASE FOLLOWING CIRCUIT BREAKER :
2QU
FUEL/FUELING/CTL & IND.
2. REMOVE PANELS 295 BL AND 296 CR, BY USING
THE PROCEDURE DESCRIBED BELOW:
003
____________________________________
REMOVAL
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
28-25-71
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-25-71
004
RAI 10000-001
3
MAR12
________________________________________
REMOVAL
OF FUEL REFUELING VALVE ASSEMBLY
REF.FIG 282571 RAI 00100
1. REMOVE CLAMPS (4) OF PIPE (3).
2. UNSCREW NUT (15), PUSH BACK (3).
3. DISCONNECT ELECTRICAL CONNECTORS (5).
4. REMOVE FASTENERS (7) OF THE ADAPTER FLANGE
(8).
5. UNSCREW NUT (9), PUSH BACK PIPE (10) AND
REMOVE ADAPTER (8).
6. DISCARD SEALS (6) AND (11).
7. REMOVE FASTENERS (12).
8. REMOVE FUEL REFUEL/DEFUEL VALVE ASSEMBLY.
9. DISCARD SEALS (13) AND (14).
005
28-25-71
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-25-71
RAI 10000-001
4
MAR12
________
CLOSE
UP
1. MAKE CERTAIN WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENTS.
2. CLOSE FOLLOWING CIRCUIT BREAKER :
- 2QU FUEL/FUELING/CTL 2IND.
3. INSTALL PANELS 295BL AND 296 CR :
- SEE JOB INSTRUCTION CARD 539300 RAI 10000.
007
_________________________________________
INSTALLATION
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
*** CONTINUED ***
AH
28-25-71
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-25-71
RAI 10000-001
5
MAR12
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
*****
AH
E N D
O F
T E X T
*****
28-25-71
RAI 10000-001
2-400 PAGE
5
MAR 01/12
28-25-71
6
AH
FUEL REFUEL/DEFUEL
VALVE ASSEMBLY
RAI 10000-001
MAR12
28-25-71
RAI 10000-001
2-400
PAGE
6
MAR 01/12
28-25-71
RAI 10010-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 290
614
: 295BL 296CR
614AB
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
282571-01
EXPENDABLE
: 02 O-RING
04 SREW
04 WASHER
282571-01
282571-01
282571-01
53-93-00-RAI-10000
PUBLICATION
___________
JIC
JIC
AH
12-11-00-FLG-10020
28-25-71
RAI 10010-001
2-400 PAGE
1
MAR 01/12
28-25-71
001
RAI 10010-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. RELEASE FOLLOWING CIRCUIT BREAKER :
2QU
FUEL/FUELING/CTL & IND.
2. REMOVE PANELS 295 BL AND 296 CR, BY USING
THE PROCEDURE DESCRIBED BELOW:
003
____________________________________
REMOVAL
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
28-25-71
RAI 10010-001
2-400 PAGE
2
MAR 01/12
28-25-71
004
RAI 10010-001
3
MAR12
______________________________
REMOVAL
OF REFUEL/DEFUEL VALVE
REF. FIG.282571-RAI-00110
1. DISCONNECT ELECTRICAL CONNECTOR (7).
2. REMOVE THE FOUR SCREWS (6) AND WASHERS (5).
3. REMOVE REFUEL/DEFUEL VALVE (4) FROM BODY
(1).
4. REMOVE 0-RINGS (2) AND (3) FROM THEIR RESPECTIVE GROOVE.
5. INSTALL PROTECTIVE PLUGS.
005
006
________
CLOSE
UP
1. MAKE CERTAIN WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENTS.
*** CONTINUED ***
AH
28-25-71
RAI 10010-001
2-400 PAGE
3
MAR 01/12
28-25-71
RAI 10010-001
4
MAR12
_________________________________________
INSTALLATION
OF WING-TO-FUSELAGE FAIRINGS
SEE JOB INSTRUCTION CARD
539300-RAI-10000
008
____________________________
CHECK
OF REFUEL/DEFUEL VALVE
1. DURING REFUELING OR DEFUELING OPERATION,
CARRY OUT THE FOLLOWING :
A. CHECK REFUEL/DEFUEL VALVE FOR CORRECT
OPERATION
B. LEAKAGE CHECK.
009
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
*****
AH
E N D
O F
T E X T
*****
28-25-71
RAI 10010-001
2-400 PAGE
4
MAR 01/12
28-25-71
5
AH
ELECTROVALVE
REFUEL/DEFUEL
RAI 10010-001
MAR12
28-25-71
RAI 10010-001
2-400
PAGE
5
MAR 01/12
28-25-73
DETAILED VISUAL
INSPECTION OF HIGH
LEVEL SENSOR
DVI 10000-001
1
MAR12
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: REMOVAL/INSTALLATION OF
HIGH LEVEL SENSOR
AH
28-25-73-RAI-10000
28-25-73
DVI 10000-001
2-400 PAGE
1
MAR 01/12
28-25-73
DETAILED VISUAL
INSPECTION OF HIGH
LEVEL SENSOR
001
DVI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
NOTE:
REMOVE HIGH LEVEL SENSOR WITHOUT DISCONNECT
ELECTRICAL CONNECTOR AND CLAMPS.
003
____________________________
REMOVAL
OF HIGH LEVEL SENSOR
SEE JOB INSTRUCTION CARD
282573-RAI-10000
004
28-25-73
DVI 10000-001
2-400 PAGE
2
MAR 01/12
28-25-73
DETAILED VISUAL
INSPECTION OF HIGH
LEVEL SENSOR
DVI 10000-001
3
MAR12
CHECK THAT :
- WIRES ARE NOT BROKEN ESPECIALLY AT
CONNECTION.
005
_________________________________
INSTALLATION
OF HIGH LEVEL SENSOR
SEE JOB INSTRUCTION CARD
282573-RAI-10000
006
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-25-73
DVI 10000-001
2-400 PAGE
3
MAR 01/12
28-25-73
4
AH
DVI 10000-001
MAR12
28-25-73
DVI 10000-001
2-400
PAGE
4
MAR 01/12
28-25-73
FUT 10000-001
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-25-73
FUT 10000-001
2-400 PAGE
1
DEC 01/14
28-25-73
001
FUT 10000-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
1. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. POSITION ACCESS PLATFORM.
28-25-73
FUT 10000-001
2-400 PAGE
2
DEC 01/14
28-25-73
004
FUT 10000-001
3
DEC14
_____________________________________
FUNCTIONAL
TEST OF HIGH LEVEL SENSORS
REF. FIG. 282573-FUT-00120
1. CHECK CORRECT OPERATION OF HIGH LEVEL
SENSORS.
A. ON REFUELING PANEL 5004VU:
(1)PLACE REFUELING/REFUEL/OFF/DEFUEL
SWITCH IN REFUEL POSITON.
(2)PLACEREFUELING/REFUEL VALVE/LH AND RH
SWITCHES IN OPEN POSITION
- REFUELING/VALVE LH/RH OPEN LIGHTS
COME ON.
- HIGH LEVEL/TANK1 AND TANK2 LIGHTS
ARE OFF.
NOTE : IN THE OPPOSITE CASE PERFORM A
PARTIAL DEFUELING.
(AMM: 121128-DFG-10000).
B. REFUEL, BY TANK, ABOVE MAXIMUM VALUE OF
2500 KG (5500 LBS) OR 3180 LITERS
(840.7 US GALLONS FOR A DENSITY = 0,785):
ON PANEL 5004VU:
(1)HIGH LEVEL/TANK1 AND TANK2 LIGHTS
COME ON.
(2)VALVE LH/RH OPEN LIGHTS ARE OFF.
- REFUELING VALVE ARE CLOSED.
C. ON FUEL TANKER INDICATOR:
- POINTER AT ZERO.
D. ON REFUELING PANEL 5004VU:
(1)PLACE REFUELING/REFUEL/OFF/DEFUEL
SWITCH IN OFF POSITION.
(2)PLACE REFUELING/REFUEL VALVE/LH AND
*** CONTINUED ***
AH
28-25-73
FUT 10000-001
2-400 PAGE
3
DEC 01/14
28-25-73
FUT 10000-001
4
DEC14
006
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUALLY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-25-73
FUT 10000-001
2-400 PAGE
4
DEC 01/14
28-25-73
5
AH
DEFUEL/REFUEL PANEL
FUT 10000-001
DEC14
28-25-73
FUT 10000-001
2-400
PAGE
5
DEC 01/14
28-25-73
FUT 10000-002
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
28-25-73
FUT 10000-002
2-400 PAGE
1
DEC 01/14
28-25-73
001
FUT 10000-002
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-25-73
FUT 10000-002
2-400 PAGE
2
DEC 01/14
28-25-73
003
FUT 10000-002
3
DEC14
004
___________
PREPARATION
1. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. POSITION ACCESS PLATFORM.
005
_____________________________________
FUNCTIONAL
TEST OF HIGH LEVEL SENSORS
REF. FIG. 282573-FUT-00120
1. CHECK CORRECT OPERATION OF HIGH LEVEL
SENSORS.
A. ON REFUELING CONTROL PANEL 100QU
(1)PLACE REFUELING/REFUEL/OFF/DEFUEL
SWITCH IN REFUEL POSITON.
(2)PLACEREFUELING/REFUEL VALVE/LH(RH)
SWITCHES IN OPEN POSITION
- REFUELING/VALVE OPEN/LH(RH) LIGHTS
COME ON.
- HIGH LEVEL/LH(RH) LIGHTS ARE OFF.
NOTE : IN THE OPPOSITE CASE PERFORM A
PARTIAL DEFUELING.
(AMM: 121128-DFG-10000).
B. REFUEL, BY TANK, ABOVE MAXIMUM VALUE OF
2500 KG (5500 LBS) OR 3180 LITERS
(840.7 US GALLONS FOR A DENSITY = 0,785):
ON REFUELING CONTROL PANEL 100QU
(1)HIGH LEVEL/LH (RH) LIGHTS COME ON.
(2)VALVE OPEN/LH(RH) LIGHTS ARE OFF.
*** CONTINUED ***
AH
28-25-73
FUT 10000-002
2-400 PAGE
3
DEC 01/14
28-25-73
FUT 10000-002
4
DEC14
007
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUALLY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-25-73
FUT 10000-002
2-400 PAGE
4
DEC 01/14
28-25-73
5
AH
DEFUEL/REFUEL PANEL
FUT 10000-002
DEC14
28-25-73
FUT 10000-002
2-400
PAGE
5
DEC 01/14
28-25-73
RAI 10000-002
1
MAR12
ZONING DATA
___________
ZONE
: 523
623
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
282570-14-070
EXPENDABLE
: 02 WASHERS
02 SCREWS
282570-14-070
282570-14-050
28-12-71-RAI-10000
PUBLICATION
___________
JIC
JIC
AH
28-25-73-FUT-10000
28-25-73
RAI 10000-002
2-400 PAGE
1
MAR 01/12
28-25-73
001
RAI 10000-002
2
MAR12
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
*** CONTINUED ***
AH
28-25-73
RAI 10000-002
2-400 PAGE
2
MAR 01/12
28-25-73
RAI 10000-002
3
MAR12
____________________________
REMOVAL
OF THE NACA INTAKE
SEE JOB INSTRUCTION CARD
281271-RAI-10000.
004
_________________________________
REMOVAL
OF FUEL HIGH LEVEL SENSOR
REF. FIG. 282573-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTOR (4).
2. REMOVE SCREWS (2) AND WASHERS (3)
3. REMOVE HIGH LEVEL SENSOR (1).
005
______________________________________
INSTALLATION
OF FUEL HIGH LEVEL SENSOR
REF. FIG. : 282573-RAI-00100
1. INSTALL HIGH LEVEL SENSOR (1) ON ITS SUPPORT
FASTEN IT BY MEANS OF SREWS (2) AND WASHERS
(3).
2. CONNECT ELECTRICAL CONNECTOR (4).
006
_________________________________
INSTALLATION
OF THE NACA INTAKE
SEE JOB INSTRUCTION CARD
281271-RAI-10000.
007
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
*** CONTINUED ***
AH
28-25-73
RAI 10000-002
2-400 PAGE
3
MAR 01/12
28-25-73
RAI 10000-002
4
MAR12
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
008
_____________________________________
FUNCTIONAL
TEST OF HIGH LEVEL SENSORS
SEE JOB INSTRUCTION CARD
282573-FUT-10000
*****
AH
E N D
O F
T E X T
*****
28-25-73
RAI 10000-002
2-400 PAGE
4
MAR 01/12
28-25-73
5
AH
RAI 10000-002
MAR12
28-25-73
RAI 10000-002
2-400
PAGE
5
MAR 01/12
28-25-74
RAI 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 520
523
620
623
: 523GT
623GT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
EXPENDABLE
: 04 SEAL
_________
MAN-HOURS
28-25-74
09-019
05-027
05-027
PUBLICATION
___________
JIC
AH
57-00-00-OAC-10000
28-25-74
RAI 10000-003
2-400 PAGE
1
DEC 01/14
28-25-74
001
RAI 10000-003
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. INSTALL PLATFORM, TO GAIN ACCESS TO TOP
SKIN.
003
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: OPEN THE ACCES DOORS INDICATED IN THE
ACCESS SECTION ON PAGE 1 OF THIS
*** CONTINUED ***
AH
28-25-74
RAI 10000-003
2-400 PAGE
2
DEC 01/14
28-25-74
RAI 10000-003
3
DEC14
______________________
REMOVAL
OF CAP SNAP ON
REF.FIG.:282574-RAI-00100
1. REMOVE THE FUEL CAP(2) LOCATED ON WING UPPER
SURFACE:
- BY MEANS OF SCREWDRIVER LOOSE THE
SCREW (1) (4/5 TURNS)
- PRESS AND UNSCREW THE CAP (2) A QUARTER
OF TURN,THEN RELEASE IT.
2. DISCARD THE SEAL (3).
005
_____
CHECK
REF.FIG. 282574-RAI-00100
1. REMOVE THE SCREW (1) FROM FUEL TANK CAP (2)
2. VISUALLY CHECK THE SCREW (1) AND THE CAP (2)
FOR ABSENCE OF CORROSION.
3. BY MEANS OF A PAINTBRUSH AND FUEL AS SOLVENT
CLEAN THE SCREW (1) AND THE CAP (2).
4. BE CAREFUL TO CLEAN REFUELLING FILTER (4)
THE WING ORIFICE COLLAR AND THE REFUELLING
PANEL.
5. CHECK THE PARTS FOR ABSENCE OF CORROSION.
IF ANY DAMAGED IS DETECTED PERFORM FOLLOWING
OPERATION:
A. REMOVE SCREW (6) AND FLANGE (7)
B. REMOVE AND DISCARD SEAL (5)
- FOR INDEEP INVESTIGATION REFER TO ATR MANUAL
CPCICF CHAPT.2 GENERALITY AND
*** CONTINUED ***
AH
28-25-74
RAI 10000-003
2-400 PAGE
3
DEC 01/14
28-25-74
RAI 10000-003
4
DEC14
___________________________
INSTALLATION
OF CAP SNAP ON
REF.FIG. 282574-RAI-00100
1. LUBRICATE THE SCREW (1) BY CLEAN FUEL AND
REINSTALL IT ON FUEL CAP (2).
2. INSTALL THE NEW SEAL (3)
3. INSTALL THE FUEL CAP (2) BY PRESSING AND
TURNING IT A QUARTER OF TURN.
4. BY MEANS OF A SCREWDRIVER,TIGHTEN THE SCREW
(1) (4/5 TURNS) TO LOCK THE CAP (2).
NOTE: THE CAP MUST BE FLUSH WITH THE WING
UPPER SURFACE.
4. MAKE CERTAIN THAT WORKING AREA IS CLEAN.
5. APPLY A SEALBEAD OF PR (09-019) BETWEEN THE
EDGE OF FUEL TANK ACCESS AND THE EDGE OF
REFUELLING PANEL (5).
WAIT UNTIL THE PR IS TACK FREE, THEN APPLY
DINITROL AV15 (05-027P) OR AV30 (05-027N)
ON THE ENTIRE SURFACE OF THE FUEL TANK
CAP (2) AND THE REFUELLING PANEL (5).
28-25-74
RAI 10000-003
2-400 PAGE
4
DEC 01/14
28-25-74
007
RAI 10000-003
5
DEC14
_______________________________
CLOSING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
NOTE: CLOSE THE ACCES DOORS OPENED ABOVE.
008
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-25-74
RAI 10000-003
2-400 PAGE
5
DEC 01/14
28-25-74
6
AH
OVERWING REFUELING
FILTER
RAI 10000-003
DEC14
28-25-74
RAI 10000-003
2-400
PAGE
6
DEC 01/14
28-41-71
RAI 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
531
: 531AB
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELECTRIC
___
MEN
_________
MAN-HOURS
01
01
ELAPSED TIME
GSE
SPARE
284170
EXPENDABLE
: 01 SEAL
284170
57-54-20-OAC-10000
PUBLICATION
___________
JIC
JIC
AH
12-11-00-FLG-10020
28-41-71
RAI 10000-002
2-400 PAGE
1
DEC 01/14
28-41-71
001
RAI 10000-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. MAKE CERTAIN THAT LEFT TANK IS DEFUELLED
(DEFUEL IF NECESSARY, REF. JIC 121100-DFG10000).
2. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
3. POSITION ACCESS PLATFORM 3 M (10 FT) TO
GAIN ACCESS TO WING LOWER SURFACE.
28-41-71
RAI 10000-002
2-400 PAGE
2
DEC 01/14
28-41-71
003
RAI 10000-002
3
DEC14
_______________________________________
OPENING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
JIC : 575420-OAC-10000
OPEN TRAILING EDGES MENTIONED IN ACCESS
SECTION OF JOB CARD PAGE 1.
004
005
__________________________________
REMOVAL
OF FUEL TEMPERATURE SENSOR
REF. FIG. 284171-RAI-00100
1. DISCONNECT CONNECTOR (1).
2. INSTALL BLANKING CAPS ON CONNECTORS (1) AND
(2).
3. UNSAFETY SENSOR (3), UNSCREW AND REMOVE.
4. DISCARD SEAL (4).
5. BLANK BARED ORIFICE ON FEEDER TANK.
006
_______________________________________
INSTALLATION
OF FUEL TEMPERATURE SENSOR
1. REMOVE BLANKING PLUG INSTALLED ON FEEDER
TANK ORIFICE.
2. CHECK THAT AREA IS CLEAN.
*** CONTINUED ***
AH
28-41-71
RAI 10000-002
2-400 PAGE
3
DEC 01/14
28-41-71
RAI 10000-002
4
DEC14
008
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
009
28-41-71
RAI 10000-002
2-400 PAGE
4
DEC 01/14
28-41-71
RAI 10000-002
5
DEC14
011
_______________________________________
CLOSING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
JIC : 575420-OAC-10000
CLOSE TRAILING EDGES PREVIOUSLY OPENED.
012
________
CLOSE-UP
1. REMOVE ACCESS PLATFORM.
2. REMOVE NO SMOKING NOTICES.
3. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
4. DISCONNECT AIRCRAFT FROM GROUND.
*****
AH
E N D
O F
T E X T
*****
28-41-71
RAI 10000-002
2-400 PAGE
5
DEC 01/14
28-41-71
6
AH
RAI 10000-002
DEC14
28-41-71
RAI 10000-002
2-400
PAGE
6
DEC 01/14
28-41-71
7
AH
RAI 10000-002
DEC14
28-41-71
RAI 10000-002
2-400
PAGE
7
DEC 01/14
28-41-81
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
AH
24-40-00-EAD-10000
28-41-81
RAI 10000-001
2-400 PAGE
1
DEC 01/14
28-41-81
001
RAI 10000-001
2
DEC14
___________
PREPARATION
1. ON PANEL 120VU, OPEN, SAFETY AND TAG CIRCUIT
BREAKER
2QL
FUEL/TK TEMP IND
2. ON PANEL 25VU,
REMOVE FUEL TEMPERATURE INDICATOR (1QL) BY
USING BELOW PROCEDURE:
002
28-41-81
RAI 10000-001
2-400 PAGE
2
DEC 01/14
28-41-81
003
RAI 10000-001
3
DEC14
004
___________________________________________
ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
005
28-41-81
RAI 10000-001
2-400 PAGE
3
DEC 01/14
28-41-81
RAI 10000-001
4
DEC14
______________________________________________
DE-ENERGIZATION
OF AIRCRAFT AC AND DC NETWORKS
SEE JOB INSTRUCTION CARD
244000-EAD-10000
*****
AH
E N D
O F
T E X T
*****
28-41-81
RAI 10000-001
2-400 PAGE
4
DEC 01/14
28-41-81
5
AH
FLIGHT COMPARTMENT
EQUIPMENT
RAI 10000-001
DEC14
28-41-81
RAI 10000-001
2-400
PAGE
5
DEC 01/14
28-42-00
FUT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 190
210
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
: DEFUELING
: REFUELING
AH
24-46-00-EAD-10000
12-11-00-DFG-10000
12-11-00-FLG-10020
28-42-00
FUT 10000-002
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10000-002
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
1. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. POSITION ACCESS PLATFORM.
28-42-00
FUT 10000-002
2-400 PAGE
2
DEC 01/14
004
28-42-00
FUT 10000-002
3
DEC14
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
005
28-42-00
FUT 10000-002
2-400 PAGE
3
DEC 01/14
28-42-00
FUT 10000-002
4
DEC14
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
007
008
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUALLY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10000-002
2-400 PAGE
4
DEC 01/14
28-42-00
5
AH
DEFUEL/REFUEL PANEL
FUT 10000-002
DEC14
28-42-00
FUT 10000-002
2-400
PAGE
5
DEC 01/14
28-42-00
FUT 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 190
210
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
12-11-00-DFG-10000
12-11-00-FLG-10020
28-42-00
FUT 10000-003
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10000-003
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-00
FUT 10000-003
2-400 PAGE
2
DEC 01/14
28-42-00
003
FUT 10000-003
3
DEC14
004
___________
PREPARATION
1. INSTALL WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. POSITION ACCESS PLATFORM.
005
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
006
28-42-00
FUT 10000-003
2-400 PAGE
3
DEC 01/14
28-42-00
FUT 10000-003
4
DEC14
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
008
009
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
*** CONTINUED ***
AH
28-42-00
FUT 10000-003
2-400 PAGE
4
DEC 01/14
28-42-00
FUT 10000-003
5
DEC14
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10000-003
2-400 PAGE
5
DEC 01/14
28-42-00
6
AH
DEFUEL/REFUEL PANEL
FUT 10000-003
DEC14
28-42-00
FUT 10000-003
2-400
PAGE
6
DEC 01/14
28-42-00
FUT 10010-002
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01
01
01
01
___
MEN
CAPACITANCE METER
FUEL QTY PROBE TEST SET
INTERFACE CABLE
INTERFACE CABLE
_________
MAN-HOURS
PSD40-1
PSD40-555-1
PSD40-555-2
PUBLICATION
___________
JIC
AH
28-42-81-RAI-10000
28-42-00
FUT 10010-002
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10010-002
2
DEC14
___________
PREPARATION
1. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS :
1QT FUEL/FQI/L TANK
2QT FUEL/FQI/R TANK
3. POSITION CAPACITANCE METER AND INTERFACE
SET IN THE CABIN.
002
__________________________________
REMOVAL
OF FUEL QUANTITY INDICATOR
SEE JOB INSTRUCTION CARD
284281-RAI-10000
003
28-42-00
FUT 10010-002
2-400 PAGE
2
DEC 01/14
28-42-00
FUT 10010-002
3
DEC14
_______________________________________
INSTALLATION
OF FUEL QUANTITY INDICATOR
SEE JOB INSTRUCTION CARD
284281-RAI-10000
005
28-42-00
FUT 10010-002
2-400 PAGE
3
DEC 01/14
28-42-00
FUT 10010-002
4
DEC14
- READ ON INDICATOR
- DETERMINED ACCORDING TO CAPACITIES
ARE CLOSE TO FUEL QUANTITY ESTIMATED
BY DRIPSTRICK.
NOTE: TOLERANCE: +/- 200 KG FOR EACH SIDE.
*****
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10010-002
2-400 PAGE
4
DEC 01/14
28-42-00
5
AH
FUEL QUANTITY
INDICATING
FUT 10010-002
DEC14
28-42-00
FUT 10010-002
2-400
PAGE
5
DEC 01/14
28-42-00
6
AH
CHART OF KG/PF
CORRESPONDENCE
FUT 10010-002
DEC14
28-42-00
FUT 10010-002
2-400
PAGE
6
DEC 01/14
28-42-00
FUT 10010-003
1
DEC14
ZONING DATA
___________
ZONE
: 210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01
01
01
01
AH
___
MEN
CAPACITANCE METER
FUEL QTY PROBE TEST SET
INTERFACE CABLE
ADAPTOR
_________
MAN-HOURS
PSD40-1
PSD40-555-1
98S28005002-000
28-42-00
FUT 10010-003
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10010-003
2
DEC14
___________
PREPARATION
1. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. ON PANEL 121VU,
A. OPEN THE FOLLOWING CIRCUIT BREAKERS:
1QT FUEL/FCU CHAN 1
2QT FUEL/FCU CHAN 2
2QU FUEL/FUELING CTL & IND
B. INSTALL SAFETY CLIPS.
3. PROVIDE CAPACITANCE METER AND INTERFACE SET.
4. BEFORE UNDERTAKING MAINTENANCE WORK ON THE
AIRCRAFT, DISPLAY WARNING NOTICES
PROHIBITING OPERATION ON THE LANDING GEAR.
002
28-42-00
FUT 10010-003
2-400 PAGE
2
DEC 01/14
28-42-00
FUT 10010-003
3
DEC14
28-42-00
FUT 10010-003
2-400 PAGE
3
DEC 01/14
28-42-00
FUT 10010-003
4
DEC14
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10010-003
2-400 PAGE
4
DEC 01/14
28-42-00
5
AH
FUEL QUANTITY
INDICATING
FUT 10010-003
DEC14
28-42-00
FUT 10010-003
2-400
PAGE
5
DEC 01/14
28-42-00
6
AH
CHART OF KG/PF
CORRESPONDENCE
FUT 10010-003
DEC14
28-42-00
FUT 10010-003
2-400
PAGE
6
DEC 01/14
28-42-00
FUT 10020-001
1
DEC14
ZONING DATA
___________
ZONE
: 500
600
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
GSE
98S12003000000
EXPENDABLE
: 01 O-RING
05 SCREW
284270
284270
07-11-00-JUP-10000
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
AH
08-21-00-PRO-10000
24-46-00-EAD-10000
12-11-00-DFG-10000
28-42-72-RAI-10000
28-42-00
FUT 10020-001
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10020-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________________
AIRCRAFT
JACKING UP
SEE JOB INSTRUCTION CARD
071100-JUP-10000
003
_______________
QUICK
LEVELLING
SEE JOB INSTRUCTION CARD
082100-PRO-10000
004
28-42-00
FUT 10020-001
2-400 PAGE
2
DEC 01/14
28-42-00
005
FUT 10020-001
3
DEC14
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
006
___________________
ADDITIONAL
DRAINING
REF. FIG. 122428-DRN-00100
ON RIGHT AND LEFT TANKS
- AT EACH WATER DRAIN, DRAIN FUEL UNTIL FLOW
CEASES, USING TOOL 98S12003000000
- REMOVE FUEL QUANTITY PROBES WITHOUT
DISCONNECT THEM, AND LAY THEM ON THE WING
UPPER SURFACE WITH THE PROCEDURE HERE BELOW.
007
______________________________
REMOVAL
OF FUEL QUANTITY PROBE
SEE JOB INSTRUCTION CARD
284272-RAI-10000
008
__________________________________________
FUNCTIONAL
TEST OF FUEL QUANTITY INDICATOR
REF. FIG. 284200-FUT-00120
1. ON WING UPPER SURFACE,
A. WHEN FUEL QUANTITY PROBES ARE DRY (FUEL
TANK EMPTY),
- CHECK THAT COCKPIT FUEL QUANTITY
INDICATOR DISPLAY 0.
B. INSTAL FUEL QUANTITY PROBES PREVIOUSLY
REMOVED (REF. JIC. 284272-RAI-10000).
2. CALIBRATION
A. PERFORM A CALIBRATION FROM 0 TO 400 KG
OF FUEL PER TANK, BY UPLIFTING FUEL BY
*** CONTINUED ***
AH
28-42-00
FUT 10020-001
2-400 PAGE
3
DEC 01/14
28-42-00
FUT 10020-001
4
DEC14
LEFT TANK
RIGHT TANK
___________________________________________
QTY
QTY
QTY
(A)
(B)
(A-B)
(B)
(A-B)
________________________________________
100 KG
________________________________________
200 KG
________________________________________
300 KG
________________________________________
400 KG
________________________________________
009
010
____________________________________
LOWERING
OF AIRCRAFT ONTO ITS WHEELS
SEE JOB INSTRUCTION CARD
071100-JUP-10000
011
________
CLOSE-UP
REF.FIG. 284272-RAI-00100
1. ON PANEL 4VU, CHECK THAT FUEL QUANTITY
INDICATED ON }FQI} IS IN ACCORDANCE WITH THE
FUEL QUANTITY INTO TANKS.
*** CONTINUED ***
AH
28-42-00
FUT 10020-001
2-400 PAGE
4
DEC 01/14
28-42-00
FUT 10020-001
5
DEC14
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10020-001
2-400 PAGE
5
DEC 01/14
28-42-00
6
AH
FUT 10020-001
DEC14
28-42-00
FUT 10020-001
2-400
PAGE
6
DEC 01/14
28-42-00
7
AH
DRAINAGE SYSTEM
FUT 10020-001
DEC14
28-42-00
FUT 10020-001
2-400
PAGE
7
DEC 01/14
28-42-00
8
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
FUT 10020-001
DEC14
28-42-00
FUT 10020-001
2-400
PAGE
8
DEC 01/14
28-42-00
FUT 10020-002
1
DEC14
ZONING DATA
___________
ZONE
: 500
600
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
GSE
98S12003000000
EXPENDABLE
: 01 O-RING
05 SCREW
284270
284270
31-63-00-PRO-10000
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
JIC
AH
07-11-00-JUP-10000
08-21-00-PRO-10000
24-46-00-EAD-10000
12-11-00-DFG-10000
28-42-72-RAI-10000
28-42-00
FUT 10020-002
2-400 PAGE
1
DEC 01/14
28-42-00
001
FUT 10020-002
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-00
FUT 10020-002
2-400 PAGE
2
DEC 01/14
28-42-00
003
FUT 10020-002
3
DEC14
___________________
AIRCRAFT
JACKING UP
SEE JOB INSTRUCTION CARD
071100-JUP-10000
004
_______________
QUICK
LEVELLING
SEE JOB INSTRUCTION CARD
082100-PRO-10000
005
006
_________
DEFUELING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
007
___________________
ADDITIONAL
DRAINING
REF. FIG. 122428-DRN-00100
ON RIGHT AND LEFT TANKS
- AT EACH WATER DRAIN, DRAIN FUEL UNTIL FLOW
CEASES, USING TOOL 98S12003000000
- REMOVE FUEL QUANTITY PROBES WITHOUT
DISCONNECT THEM, AND LAY THEM ON THE WING
UPPER SURFACE WITH THE PROCEDURE HERE BELOW.
008
______________________________
REMOVAL
OF FUEL QUANTITY PROBE
SEE JOB INSTRUCTION CARD
284272-RAI-10000
28-42-00
FUT 10020-002
2-400 PAGE
3
DEC 01/14
009
28-42-00
FUT 10020-002
4
DEC14
___________________________________________
FUNCTIONAL
TEST OF FUEL QUANTITY INDICATION
REF. FIG. 284200-FUT-00120
1. ON WING UPPER SURFACE,
A. WHEN FUEL QUANTITY PROBES ARE DRY (FUEL
TANK EMPTY),
- CHECK THAT ON MFD UPPER WINDOW, IN
ENGINE SD PAGE, THE FUEL QUANTITY
INDICATION DISPLAY 0.
B. INSTAL FUEL QUANTITY PROBES PREVIOUSLY
REMOVED (REF. JIC. 284272-RAI-10000).
2. CALIBRATION
A. PERFORM A CALIBRATION FROM 0 TO 400 KG
(880 LBS ) OF FUEL PER TANK, BY UPLIFTING
FUEL BY 100 KG (220 LBS) INCREMENTS,
ALTERING LEFT AND RIGHT TANK FUEL
FILLING.
B. CHECK THAT AT EACH INCREMENT THE
DIFFERENCE (QTY INTRODUCED-QTY INDICATED)
REMAINS POSITIVE OR EQUAL TO 0.
___________________________________
LEFT TANK
RIGHT TANK
___________________________________________
QTY
QTY
QTY
(A)
(B)
(A-B)
(B)
(A-B)
________________________________________
100 KG
(220 LBS)
________________________________________
200 KG
(440 LBS)
________________________________________
300 KG
(660 LBS)
28-42-00
FUT 10020-002
2-400 PAGE
4
DEC 01/14
28-42-00
FUT 10020-002
5
DEC14
________________________________________
400 KG
(880 LBS)
________________________________________
010
011
____________________________________
LOWERING
OF AIRCRAFT ONTO ITS WHEELS
SEE JOB INSTRUCTION CARD
071100-JUP-10000
012
________
CLOSE-UP
REF.FIG. 284272-RAI-00100
1. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CHECK THAT FUEL QUANTITY INDICATED IS IN
ACCORDANCE WITH THE QUANTITY CONTENTS
INTO TANKS.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
REMOVE ACCESS PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-00
FUT 10020-002
2-400 PAGE
5
DEC 01/14
28-42-00
6
AH
DRAINAGE SYSTEM
FUT 10020-002
DEC14
28-42-00
FUT 10020-002
2-400
PAGE
6
DEC 01/14
28-42-00
7
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
FUT 10020-002
DEC14
28-42-00
FUT 10020-002
2-400
PAGE
7
DEC 01/14
28-42-00
TST 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
210
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-42-00
TST 10000-001
2-400 PAGE
1
DEC 01/14
28-42-00
001
TST 10000-001
2
DEC14
002
__________________________________________
DE-ENERGIZATION
OF FUEL QUANTITY INDICATOR
1. ON PANEL 121VU
A. OPEN THE FOLLOWING CIRCUIT BREAKERS :
- 1 QT(2QT) FUEL/FQI/NORM PWR SUPPLY/L
(R) TANK.
- 2QU
FUEL/FUELLING/CTL & IND.
003
_______________________________
TEST
OF FUEL QUANTITY INDICATOR
REF. FIG. 282573-FUT-00120
1. ON REFUELING PANEL 5004VU
A. PLACE
- REFUELING/REFUEL/OFF/DEFUEL SWITCH 4QU
IN OFF POSITION
- REFUELING/REFUEL VALVE/L(R) SWITCH 5QU
(6QU) IN SHUT POSITION.
B. PRESS REFUELING/FQI TEST PUSHBUTTON
SWITCH AND THEN RELEASE, NO DISPLAY.
2. ON PANEL 121VU,
A. CLOSE CIRCUIT BREAKERS 1QT (2QT).
B. ON PANEL 4VU, LEFT (RIGHT) FUEL QUANTITY
INDICATOR 3QT READS FUEL QUANTITY REMAINING IN TANK CONCERNED.
3. ON PANEL 121VU
A. OPEN CIRCUIT BREAKERS 1QT (2QT).
*** CONTINUED ***
AH
28-42-00
TST 10000-001
2-400 PAGE
2
DEC 01/14
28-42-00
TST 10000-001
3
DEC14
QUANTITY INDICATOR
SWITCH
QUANTITY INDICATOR
L (R) COMES ON.
28-42-00
TST 10000-001
2-400 PAGE
3
DEC 01/14
28-42-00
TST 10000-001
4
DEC14
7. ON PANEL 121VU
A. OPEN CIRCUIT BREAKERS 1QT (2QT).
B. ON PANEL 4VU, FUEL QUANTITY INDICATOR 3QT
DOES NOT GIVE ANY READING.
004
_______________________________________
ENERGIZATION
OF FUEL QUANTITY INDICATOR
1. ON PANEL 121VU
A. CLOSE THE FOLLOWING CIRCUIT BREAKERS :
- 1QT, 2QT, 2QU.
005
AH
E N D
O F
T E X T
*****
28-42-00
TST 10000-001
2-400 PAGE
4
DEC 01/14
28-42-00
5
AH
DEFUEL/REFUEL PANEL
TST 10000-001
DEC14
28-42-00
TST 10000-001
2-400
PAGE
5
DEC 01/14
28-42-72
DETAILED VISUAL
INSPECTION OF FUEL
QUANTITY PROBES
DVI 10000-001
1
MAR12
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: REMOVAL/INSTALLATION OF
FUEL QUANTITY PROBE
AH
28-42-72-RAI-10000
28-42-72
DVI 10000-001
2-400 PAGE
1
MAR 01/12
28-42-72
DETAILED VISUAL
INSPECTION OF FUEL
QUANTITY PROBES
001
DVI 10000-001
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
REMOVE FUEL QUANTITY PROBES WITHOUT DISCONNECT
ELECTRICAL CONNECTOR AND WITHOUT REMOVING
CLAMPS.
PAY ATTENTION TO ELECTRICAL HARNESS USING THE
PROCEDURE HERE BELOW.
003
______________________________
REMOVAL
OF FUEL QUANTITY PROBE
SEE JOB INSTRUCTION CARD
284272-RAI-10000
28-42-72
DVI 10000-001
2-400 PAGE
2
MAR 01/12
28-42-72
DETAILED VISUAL
INSPECTION OF FUEL
QUANTITY PROBES
004
DVI 10000-001
3
MAR12
005
___________________________________
INSTALLATION
OF FUEL QUANTITY PROBE
SEE JOB INSTRUCTION CARD
284272-RAI-10000
006
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-72
DVI 10000-001
2-400 PAGE
3
MAR 01/12
28-42-72
4
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
DVI 10000-001
MAR12
28-42-72
DVI 10000-001
2-400
PAGE
4
MAR 01/12
28-42-72
FUT 10000-003
1
MAR15
ZONING DATA
___________
ZONE
: 210
522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01
01
01
01
01
01
EXPENDABLE
: 01 O-RING
05 SCREW
284270
284270
57-54-20-OAC-10000
_________
MAN-HOURS
PSD60-2R
PSD40-556YYY
PSD40-556ZZZ
PSD40-555-1
PSD40-555-2
PUBLICATION
___________
JIC
JIC
AH
28-42-81-RAI-10000
28-42-72
FUT 10000-003
2-400 PAGE
1
MAR 01/15
28-42-72
001
FUT 10000-003
2
MAR15
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
28-42-72
FUT 10000-003
2-400 PAGE
2
MAR 01/15
28-42-72
003
FUT 10000-003
3
MAR15
___________
PREPARATION
1. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS :
1QT FUEL/FQI/L TANK
2QT FUEL/FQI/R TANK
3. PROVIDE ACCESS PLATFORM 4M (13FT) FOR
ACCESS TO WING UPPER SURFACE.
4. PROVIDE FUEL QUANTITY TEST SET AND INTERFACE CABLES.
004
___________________________________________
OPENING
OF LOWER SURFACE WING TRAILING EDGE
SEE JOB INSTRUCTION CARD
575420-OAC-10000
005
28-42-72
FUT 10000-003
2-400 PAGE
3
MAR 01/15
28-42-72
FUT 10000-003
4
MAR15
- OXIDATION
- CORRECT CONNECTION OF LOCKING SYSTEM.
- REMOVE, IF NECESSARY, THE ELECTRICAL
FUSE INSTALLED ON REAR SPAR CONNECTORS
006
__________________________________
FUNCTIONAL
TEST OF PROBES ON WINGS
REF. FIG. 284272-FUT-00120
1. DISCONNECT CONNECTOR 501VC (600VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 1: INTERFACE CABLE -556YYY)
- CHECK THAT PROBE (A) VALUE IS 8.5 +/0.8 PF, AND RECONNECT CONNECTOR.
2. DISCONNECT CONNECTOR 503VC (602VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 2: INTERFACE CABLE -556ZZZ)
- CHECK THAT PROBE (B) VALUE IS 12.9 +/0.5 PF, AND RECONNECT CONNECTOR.
3. DISCONNECT CONNECTOR 505VC (604VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 3: INTERFACE CABLE -556ZZZ)
- CHECK THAT PROBE (C) VALUE IS 51.4 +/0.5 PF, AND RECONNECT CONNECTOR.
4. DISCONNECT CONNECTOR 507VC (606VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 4: INTERFACE CABLE -556ZZZ)
- CHECK THAT PROBE (D) VALUE IS 18.7 +/0.5 PF, AND RECONNECT CONNECTOR.
5. DISCONNECT CONNECTOR 511VC (610VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 5: INTERFACE CABLE -556ZZZ)
- CHECK THAT PROBE (E) VALUE IS 38.65 +/0.5 PF, AND RECONNECT CONNECTOR.
6. DISCONNECT CONNECTOR 551VC (650VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 6: INTERFACE CABLE -556ZZZ)
*** CONTINUED ***
AH
28-42-72
FUT 10000-003
2-400 PAGE
4
MAR 01/15
28-42-72
FUT 10000-003
5
MAR15
- CHECK THAT PROBE (F) VALUE IS 14.5 +/0.5 PF, AND RECONNECT CONNECTOR.
007
_______________________________________
CLOSING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
575420-OAC-10000
008
__________________________________
REMOVAL
OF FUEL QUANTITY INDICATOR
SEE JOB INSTRUCTION CARD
284281-RAI-10000
009
________________________
FUNCTIONAL
TEST IN CABIN
REF. FIG. 284272-FUT-00100
1. REMOVE PROTECTIVE CAPS INSTALLED ON
CONNECTORS (2)(3)(7)(8) AND RECEPTACLE (5).
2.TOTAL CAPACITANCE MEASUREMENT (LEFT TANK):
A. CONNECT THE COAXIAL CABLE (8) AND THE
MULTIPIN PLUG (3) ON SET TEST BY USING
CABLE 555-1.
B. PERFORM THE MEASUREMENT OF TOTAL
SYSTEM CAPACITANCE:
NOTE: THE CAPACITANCE VALUE MUST BE INCLUDED
BETWEEN 143.2 PF AND 148 PF
C. DISCONNECT THE COAXIAL CABLE AND THE
MULTIPIN PLUG FROM SET TEST.
3.TOTAL CAPACITANCE MEASUREMENT (RIGHT TANK):
A. CONNECT THE COAXIAL CABLE (7) AND THE
MULTIPIN PLUG (2) ON SET TEST BY USING
CABLE 555-2.
B. PERFORM THE MEASUREMENT OF TOTAL
SYSTEM CAPACITANCE:
NOTE: THE CAPACITANCE VALUE MUST BE INCLUDED
BETWEEN 143.2 PF AND 148 PF
C. DISCONNECT THE COAXIAL CABLE AND THE
MULTIPIN PLUG OF THE FROM SET TEST.
*** CONTINUED ***
AH
28-42-72
FUT 10000-003
2-400 PAGE
5
MAR 01/15
28-42-72
010
FUT 10000-003
6
MAR15
_______________________________________
INSTALLATION
OF FUEL QUANTITY INDICATOR
SEE JOB INSTRUCTION CARD
284281-RAI-10000
011
__________________________________
RE-INSTALLATION
OF PROBES ON TANKS
REF.FIG. 284272-RAI-00100
R
R
R
R
________
CLOSE-UP
1. REMOVE WARNING NOTICE.
2. ON PANEL 121VU, REMOVE SAFETY CLIPS AND TAGS
AND CLOSE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
3. REMOVE ACCESS PLATFORM AND MAKE CERTAIN
THAT WORKING AREA IS CLEAN AND CLEAR OF
TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
013
28-42-72
FUT 10000-003
2-400 PAGE
6
MAR 01/15
28-42-72
FUT 10000-003
7
MAR15
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10000-003
2-400 PAGE
7
MAR 01/15
28-42-72
8
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
FUT 10000-003
MAR15
28-42-72
FUT 10000-003
2-400
PAGE
8
MAR 01/15
28-42-72
9
AH
FUEL QUANTITY
INDICATING
FUT 10000-003
MAR15
28-42-72
FUT 10000-003
2-400
PAGE
9
MAR 01/15
28-42-72
FUT 10000-004
1
MAR15
ZONING DATA
___________
ZONE
: 522
622
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01
01
01
01
01
01
EXPENDABLE
: 01 O-RING
05 SCREW
284270
284270
31-63-00-PRO-10000
_________
MAN-HOURS
PSD60-2R
PSD40-556YYY
PSD40-556ZZZ
PSD40-555-1
98S28005002-000
PUBLICATION
___________
JIC
JIC
AH
57-54-20-OAC-10000
28-42-72
FUT 10000-004
2-400 PAGE
1
MAR 01/15
28-42-72
001
FUT 10000-004
2
MAR15
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-72
FUT 10000-004
2-400 PAGE
2
MAR 01/15
28-42-72
003
FUT 10000-004
3
MAR15
004
___________
PREPARATION
1. DISPLAY WARNING NOTICE IN FLIGHT COMPARTMENT
PROHIBITING ENERGIZATION OF FUEL SYSTEM.
2. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS :
1QT FUEL/FCU CHAN 1
2QT FUEL/FCU CHAN 2
2QU FUEL/FUELING CTL & IND
3. PROVIDE ACCESS PLATFORM 4M (13FT) FOR
ACCESS TO WING UPPER SURFACE.
4. PROVIDE FUEL QUANTITY TEST SET AND
INTERFACE CABLES.
5. BEFORE UNDERTAKING MAINTENANCE WORK ON THE
AIRCRAFT, DISPLAY WARNING NOTICES
PROHIBITING OPERATION ON THE LANDING GEAR.
005
___________________________________________
OPENING
OF LOWER SURFACE WING TRAILING EDGE
SEE JOB INSTRUCTION CARD
575420-OAC-10000
28-42-72
FUT 10000-004
2-400 PAGE
3
MAR 01/15
28-42-72
006
FUT 10000-004
4
MAR15
007
__________________________________
FUNCTIONAL
TEST OF PROBES ON WINGS
REF. FIG. 284272-FUT-00120
1. DISCONNECT CONNECTOR 501VC (600VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 1: INTERFACE CABLE -556YYY)
- CHECK THAT PROBE (A) VALUE IS 8.5 +/0.8 PF, AND RECONNECT CONNECTOR.
2. DISCONNECT CONNECTOR 503VC (602VC) LOCATED
AT THE REAR OF WINGS AND CONNECT FUEL TEST
SET (PROBE 2: INTERFACE CABLE -556ZZZ)
- CHECK THAT PROBE (B) VALUE IS 12.9 +/0.5 PF, AND RECONNECT CONNECTOR.
3. DISCONNECT CONNECTOR 505VC (604VC) LOCATED
*** CONTINUED ***
AH
28-42-72
FUT 10000-004
2-400 PAGE
4
MAR 01/15
28-42-72
FUT 10000-004
5
MAR15
_______________________________________
CLOSING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
575420-OAC-10000
009
________________________
FUNCTIONAL
TEST IN CABIN
1. OPEN THE NLG DOORS 713/714 AND THE FORWARD
AVIONIC DOOR 811.
2. DISCONNECT CONNECTORS B1 AND B2 FROM
FCU PLUGS B1 AND B2.
3. TOTAL CAPACITANCE MEASUREMENT (LEFT TANK):
A. CONNECT THE CONNECTOR B1 ON SET TEST BY
USING ADAPTOR 98S28005002-000 AND
CABLE 555-1.
B. PERFORM THE MEASUREMENT OF TOTAL SYSTEM
*** CONTINUED ***
AH
28-42-72
FUT 10000-004
2-400 PAGE
5
MAR 01/15
28-42-72
FUT 10000-004
6
MAR15
CAPACITANCE:
NOTE: THE CAPACITANCE VALUE MUST BE
INCLUDED BETWEEN 143.2 PF AND
148 PF
C. DISCONNECT CABLE 555-1 AND ADAPTOR
98S28005002-000 FROM CONNECTOR B1.
4. TOTAL CAPACITANCE MEASUREMENT (RIGHT TANK):
A. CONNECT THE CONNECTOR B2 ON SET TEST BY
USING ADAPTOR 98S28005002-000 AND
CABLE 555-1.
B. PERFORM THE MEASUREMENT OF
TOTAL SYSTEM CAPACITANCE:
NOTE: THE CAPACITANCE VALUE MUST BE
INCLUDED BETWEEN 143.2 PF AND
148 PF
C. DISCONNECT CABLE 555-1 AND ADAPTOR
98S28005002-000 FROM CONNECTOR B2.
5. CONNECT CONNECTORS B1 AND B2 ON FCU
PLUGS B1 AND B2.
6. INSTALL THE FORWARD AVIONIC COMPARTMENT
DOOR AND CHECK THAT THE SEAL DOOR IS
CORRECTLY PLACED.
7. CLOSE THE NOSE LANDING GEAR DOORS 713/714.
010
__________________________________
RE-INSTALLATION
OF PROBES ON TANKS
REF.FIG. 284272-RAI-00100
R
R
R
R
28-42-72
FUT 10000-004
2-400 PAGE
6
MAR 01/15
28-42-72
011
FUT 10000-004
7
MAR15
________
CLOSE-UP
1. REMOVE WARNING NOTICE.
2. ON PANEL 121VU, REMOVE SAFETY CLIPS AND TAGS
AND CLOSE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
3. REMOVE ACCESS PLATFORM AND MAKE CERTAIN
THAT WORKING AREA IS CLEAN AND CLEAR OF
TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
012
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10000-004
2-400 PAGE
7
MAR 01/15
28-42-72
8
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
FUT 10000-004
MAR15
28-42-72
FUT 10000-004
2-400
PAGE
8
MAR 01/15
28-42-72
9
AH
FUEL QUANTITY
INDICATING
FUT 10000-004
MAR15
28-42-72
FUT 10000-004
2-400
PAGE
9
MAR 01/15
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
FUT 10005-002
1
MAR12
ZONING DATA
___________
ZONE
: 530
630
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
GSE
: 01 MULTIMETER
___
MEN
_________
MAN-HOURS
00
PUBLICATION
___________
JIC
AH
57-54-20-OAC-10000
28-42-72
FUT 10005-002
2-400 PAGE
1
MAR 01/12
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
001
FUT 10005-002
2
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. INSTALL WARNING NOTICE PROHIBITING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
2. NOTE FUEL QUANTITY IN LH AND RH TANKS
INDICATED BY THE COCKPIT FUEL QTY INDICATOR
FUEL QTY
L.TK: ______________
R.TK: ______________
3. INSTALL PLATFORM TO GAIN ACCESS TO TRAILING
EDGE RH (LH).
*** CONTINUED ***
AH
28-42-72
FUT 10005-002
2-400 PAGE
2
MAR 01/12
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
003
FUT 10005-002
3
MAR12
___________________________________________
OPENING
OF LOWER SURFACE WING TRAILING EDGE
SEE JOB INSTRUCTION CARD
575420-OAC-10000
004
005
_________________________________
CHECK
OF FUEL QUANTITY INDICATION
NOTE THE FUEL QUANTITY IN LH AND RH TANKS
INDICATED BY THE COCKPIT FUEL QTY INDICATOR
AND VERIFY THE CONSISTENCY WITH VALUES NOTED
DURING THE PREPARATION OF THIS TEST.
28-42-72
FUT 10005-002
2-400 PAGE
3
MAR 01/12
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
006
FUT 10005-002
4
MAR12
_______________________________________
CLOSING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
575420-OAC-10000
007
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEM
OF EQUIPMENT.
2. CHECK FOR CORRECT CLOSURE THE PANEL
PREVIOUSLY OPENED.
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
*****
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10005-002
2-400 PAGE
4
MAR 01/12
28-42-72
5
AH
FUT 10005-002
MAR12
28-42-72
FUT 10005-002
2-400
PAGE
5
MAR 01/12
28-42-72
6
AH
TABLE VALUES OF
ELECTRICAL FUSE
FUT 10005-002
MAR12
28-42-72
FUT 10005-002
2-400
PAGE
6
MAR 01/12
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
FUT 10005-003
1
DEC14
ZONING DATA
___________
ZONE
: 530
630
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
MECHANIC
ELAPSED TIME
GSE
: 01 MULTIMETER
___
MEN
_________
MAN-HOURS
00
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
57-54-20-OAC-10000
28-42-72
FUT 10005-003
2-400 PAGE
1
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
001
FUT 10005-003
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-72
FUT 10005-003
2-400 PAGE
2
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
003
FUT 10005-003
3
DEC14
___________
PREPARATION
1. INSTALL WARNING NOTICE PROHIBITING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
2. ON MFD UPPER WINDOW, IN ENGINE SECONDARY SD
PAGE, NOTE FUEL QUANTITY IN LH AND RH TANKS
FUEL QTY
L.TK: ______________
R.TK: ______________
3. INSTALL PLATFORM TO GAIN ACCESS TO TRAILING
EDGE RH (LH).
004
___________________________________________
OPENING
OF LOWER SURFACE WING TRAILING EDGE
SEE JOB INSTRUCTION CARD
575420-OAC-10000
005
28-42-72
FUT 10005-003
2-400 PAGE
3
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FUEL GAGE
ELECTRICAL FUSE
FUT 10005-003
4
DEC14
_________________________________
CHECK
OF FUEL QUANTITY INDICATION
ON MFD UPPER WINDOW, IN ENGINE SECONDARY SD
PAGE, NOTE THE FUEL QUANTITY IN LH AND RH TANKS
AND VERIFY THE CONSISTENCY WITH VALUES NOTED
DURING THE PREPARATION OF THIS TEST.
007
_______________________________________
CLOSING
OF LOWER SURFACE TRAILING EDGES
SEE JOB INSTRUCTION CARD
575420-OAC-10000
008
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEM
OF EQUIPMENT.
2. CHECK FOR CORRECT CLOSURE THE PANEL
PREVIOUSLY OPENED.
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
*****
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10005-003
2-400 PAGE
4
DEC 01/14
28-42-72
5
AH
FUT 10005-003
DEC14
28-42-72
FUT 10005-003
2-400
PAGE
5
DEC 01/14
28-42-72
6
AH
TABLE VALUES OF
ELECTRICAL FUSE
FUT 10005-003
DEC14
28-42-72
FUT 10005-003
2-400
PAGE
6
DEC 01/14
28-42-72
FUT 10010-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
400
: 435AL 445AL
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
01 CONTAINER, 5L (1,3 USGAL)
01 DRAIN TOOL WITH A/C PUMP
_________
MAN-HOURS
98S28003002000
PUBLICATION
___________
JIC
JIC
JIC
JIC
AH
07-11-00-JUP-10000
08-22-00-PRO-10000
24-46-00-EAD-10000
54-00-00-OAC-10000
28-42-72
FUT 10010-003
2-400 PAGE
1
DEC 01/14
28-42-72
001
FUT 10010-003
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________________
AIRCRAFT
JACKING UP
SEE JOB INSTRUCTION CARD
071100-JUP-10000
003
________________
PRECISE
LEVELING
SEE JOB INSTRUCTION CARD
082200-PRO-10000
004
28-42-72
FUT 10010-003
2-400 PAGE
2
DEC 01/14
28-42-72
005
FUT 10010-003
3
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
006
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
___________
PREPARATION
1. INSTALL ACCESS PLATFORM AT LOWER SURFACE.
2. OPEN COWLS OF LEFT (RIGHT) ENGINE 435AL
(445AL) AS FOLLOWS:
007
___________________________________
OPENING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
008
TRANSFERING/DRAINING FUEL
_________________________
BY AIRCRAFT ELECTRIC PUMP
_________________________
REF. FIG. 284272-FUT-00110.
1. MAKE SURE THAT THE TOTAL FUEL QUANTITY IN
TANKS IS LESS THAN 2200 KG (4840 LB). IN
EACH TANK, FUEL MINIMAL QUANTITY MUST BE
UPPER TO 200 KG (441 LB). TO OBTAIN DESIRED
QUANTITY, USE DESCRIBED PROCEDURE IN JOB
INSTRUCTION CARD (AMM): 121100-DFG-10000.
2. ON PANEL 25VU, MAKE SURE THAT FUEL/X FEED
FLOWBAR IS CROSS LINE.
3. CHECK LEFT SIDE LOW LEVEL SYSTEM:
A. UNSCREW UNION (3) AND DISENGAGE LINE
(2) FROM LEFT ENGINE FUEL HEATER.
*** CONTINUED ***
AH
28-42-72
FUT 10010-003
2-400 PAGE
3
DEC 01/14
28-42-72
FUT 10010-003
4
DEC14
28-42-72
FUT 10010-003
2-400 PAGE
4
DEC 01/14
28-42-72
FUT 10010-003
5
DEC14
___________________________________
CLOSING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
28-42-72
FUT 10010-003
2-400 PAGE
5
DEC 01/14
28-42-72
010
FUT 10010-003
6
DEC14
____________________________________
LOWERING
OF AIRCRAFT ONTO ITS WHEELS
SEE JOB INSTRUCTION CARD
071100-JUP-10000
011
012
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10010-003
2-400 PAGE
6
DEC 01/14
28-42-72
7
AH
FUT 10010-003
DEC14
28-42-72
FUT 10010-003
2-400
PAGE
7
DEC 01/14
28-42-72
FUT 10010-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 210
400
: 435AL 445AL
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELAPSED TIME
GSE
: 01 ACCESS PLATFORM
01 CONTAINER, 5L (1,3 USGAL)
01 DRAIN TOOL WITH A/C PUMP
_________
MAN-HOURS
98S28003002000
PUBLICATION
___________
JIC
JIC
JIC
JIC
JIC
AH
31-63-00-PRO-10000
07-11-00-JUP-10000
08-22-00-PRO-10000
24-46-00-EAD-10000
54-00-00-OAC-10000
28-42-72
FUT 10010-004
2-400 PAGE
1
DEC 01/14
28-42-72
001
FUT 10010-004
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-72
FUT 10010-004
2-400 PAGE
2
DEC 01/14
28-42-72
003
FUT 10010-004
3
DEC14
___________________
AIRCRAFT
JACKING UP
SEE JOB INSTRUCTION CARD
071100-JUP-10000
004
________________
PRECISE
LEVELING
SEE JOB INSTRUCTION CARD
082200-PRO-10000
005
006
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
007
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
___________
PREPARATION
1. INSTALL ACCESS PLATFORM AT LOWER SURFACE.
2. OPEN COWLS OF LEFT (RIGHT) ENGINE 435AL
(445AL) AS FOLLOWS:
008
___________________________________
OPENING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
28-42-72
FUT 10010-004
2-400 PAGE
3
DEC 01/14
009
28-42-72
FUT 10010-004
4
DEC14
TRANSFERING/DRAINING FUEL
_________________________
BY AIRCRAFT ELECTRIC PUMP
_________________________
REF. FIG. 284272-FUT-00110.
1. MAKE SURE THAT THE TOTAL FUEL QUANTITY IN
TANKS IS LESS THAN 2200 KG (4840 LB). IN
EACH TANK, FUEL MINIMAL QUANTITY MUST BE
UPPER TO 200 KG (441 LB). TO OBTAIN DESIRED
QUANTITY, USE DESCRIBED PROCEDURE IN JOB
INSTRUCTION CARD (AMM): 121100-DFG-10000.
2. ON PANEL 25VU, MAKE SURE THAT FUEL/X FEED
FLOWBAR IS CROSS LINE.
ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
CROSSFEED VALVE IS CLOSED AND FLOWBAR
IS CROSS LINE.
3. CHECK LEFT SIDE LOW LEVEL SYSTEM:
A. UNSCREW UNION (3) AND DISENGAGE LINE
(2) FROM LEFT ENGINE FUEL HEATER.
B. INSTALL END FITTING (4) OF THE TOOL
98S28003002000 ON LINE (2).
MAKE SURE THAT HOSE ASSEMBLY (5) IS CORRECTLY CONNECTED TO END FITTING (4).
ON RIGHT WING, INSTALL HOSE (7) INTO THE
REFUEL GRAVITY PORT (8). IF NECESSARY,
ADD A PIECE OF HOSE.
THIS PROCEDURE PERMITS TO PERFORM FUEL
TRANSFER FROM ONE TANK TO THE ANOTHER.
C. OPEN VALVE (6) OF TOOL.
(1)ON PANEL 25VU, PRESS ENG 1(2)/PUMP
PUSHBUTTON SWITCH. RUN LEGEND COMES
- RUN LEGEND COMES ON.
- THE RELATED PUMP OPERATES.
ON MFD UPPER WINDOW, IN ENGINE SD PAGE
- ENG 1(2) ELECTRIC PUMP IS RUN.
(2)ON MFD UPPER WINDOW, IN ENGINE SD PAGE
WHEN FEEDER TANK IS DISPLAY IN AMBER:
*** CONTINUED ***
AH
28-42-72
FUT 10010-004
2-400 PAGE
4
DEC 01/14
28-42-72
FUT 10010-004
5
DEC14
28-42-72
FUT 10010-004
2-400 PAGE
5
DEC 01/14
28-42-72
FUT 10010-004
6
DEC14
INHIBIT WARNINGS.
G. REMOVE HOSE (7) FROM REFUEL GRAVITY PORT.
NOTE: PLACE END OF TUBE INTO A CONTAINER
TO DRAIN THE FUEL FROM HOSES (5)
AND (7) OF TOOL.
WHEN HOSES ARE EMPTY, DISCONNECT END (4)
AND REMOVE TOOL.
H. LOOSEN. BUT DO NOT UNSCREW UNION (1).
INSTALL UNION (3) ON ENGINE FUEL HEATER.
CAUTION :
SIMULTANEOUSLY INSTALL UNIONS (1) AND (3)
THE INSTRUCTIONS BELOW MUST BE OBSERVED
TO INSTALL LINE (2):
- DO NOT TIGHTEN ONE UNION ONLY.
- MANUALLY SCREW BOTH UNIONS SIMULTANEOUSLY AND CHECK THAT LINE IS NOT
TWISTED.
- TIGHTEN UNIONS.
4. CHECK OF RIGHT LOW LEVEL SYSTEM:
DO THE SAME TEST AGAIN BUT CONNECT TOOL
TO RIGHT ENGINE FUEL HEATER LINE.
010
___________________________________
CLOSING
OF LEFT LATERAL HINGED COWL
SEE JOB INSTRUCTION CARD
540000-OAC-10000
011
____________________________________
LOWERING
OF AIRCRAFT ONTO ITS WHEELS
SEE JOB INSTRUCTION CARD
071100-JUP-10000
012
28-42-72
FUT 10010-004
2-400 PAGE
6
DEC 01/14
28-42-72
013
FUT 10010-004
7
DEC14
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10010-004
2-400 PAGE
7
DEC 01/14
28-42-72
8
AH
FUT 10010-004
DEC14
28-42-72
FUT 10010-004
2-400
PAGE
8
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
FUT 10020-003
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-42-72
FUT 10020-003
2-400 PAGE
1
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
001
FUT 10020-003
2
DEC14
___________
PREPARATION
REF. FIG. 284272-FUT-00140
NOTE 1:
AVOID TO START THE ENGINE 1 AND 2 AS WELL AS
THE FUEL ELECTRICAL PUMPS 1 AND 2 AT LEAST
THIRTY MINUTES OR MORE BEFORE TO PERFORM THE
TEST.
NOTE 2:
IF TEST IS NOT STATISFACTORY, WAIT OVERNIGHT
TO ALLOW THE FEED FUEL TANK TO EMPTY,THEN
REPEAT THE TEST.
1. ON OVERHEAD PANEL 25VU CHECK THAT THE
FOLLOWING PUSH-BOTTON SWITCHES ARE PRESSED:
6UA1
6UA2
7UA1
7UA2
002
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
003
28-42-72
FUT 10020-003
2-400 PAGE
2
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
FUT 10020-003
3
2.
3.
4.
5.
6.
7.
8.
9.
DEC14
________
CLOSE-UP
REF. FIG. 284272-FUT-00140
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEUS ITEMS OF
EQUIPEMENTS.
28-42-72
FUT 10020-003
2-400 PAGE
3
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
005
FUT 10020-003
4
DEC14
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10020-003
2-400 PAGE
4
DEC 01/14
28-42-72
5
AH
FUNCTIONAL TEST OF FE
EDER TANK LOW LEVEL
SENSOR
FUT 10020-003
DEC14
28-42-72
FUT 10020-003
2-400
PAGE
5
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
FUT 10020-004
1
DEC14
ZONING DATA
___________
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
28-42-72
FUT 10020-004
2-400 PAGE
1
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
001
FUT 10020-004
2
DEC14
002
___________
PREPARATION
REF. FIG. 284272-FUT-00140
NOTE 1:
AVOID TO START THE ENGINE 1 AND 2 AS WELL AS
THE FUEL ELECTRICAL PUMPS 1 AND 2 AT LEAST
THIRTY MINUTES OR MORE BEFORE TO PERFORM THE
TEST.
NOTE 2:
IF TEST IS NOT STATISFACTORY, WAIT OVERNIGHT
TO ALLOW THE FEED FUEL TANK TO EMPTY,THEN
REPEAT THE TEST.
1. ON OVERHEAD PANEL 25VU CHECK THAT THE
FOLLOWING PUSH-BOTTON SWITCHES ARE PRESSED:
6UA1
6UA2
7UA1
7UA2
003
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
28-42-72
FUT 10020-004
2-400 PAGE
2
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
004
FUT 10020-004
3
DEC14
2.
3.
4.
5.
6.
7.
8.
28-42-72
FUT 10020-004
2-400 PAGE
3
DEC 01/14
28-42-72
FUNCTIONAL TEST OF
FEEDER TANK LOW LEVEL
SENSOR
FUT 10020-004
4
DEC14
________
CLOSE-UP
REF. FIG. 284272-FUT-00140
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEUS ITEMS OF
EQUIPEMENTS.
006
AH
E N D
O F
T E X T
*****
28-42-72
FUT 10020-004
2-400 PAGE
4
DEC 01/14
28-42-72
5
AH
FUNCTIONAL TEST OF FE
EDER TANK LOW LEVEL
SENSOR
FUT 10020-004
DEC14
28-42-72
FUT 10020-004
2-400
PAGE
5
DEC 01/14
28-42-72
OPT 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
210
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
: DC AND AC CONSTANT
FREQUENCY EXTERNAL POWER
SUPPLY
AH
24-46-00-EAD-10000
28-42-72
OPT 10000-001
2-400 PAGE
1
DEC 01/14
28-42-72
001
OPT 10000-001
2
DEC14
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
003
___________
PREPARATION
1. ON RIGHT MAIN LANDING GEAR FAIRING
OPEN REFUELING PANEL ACCESS DOOR (5004VU).
2. PROVIDE EMPTY FUEL TANKER.
28-42-72
OPT 10000-001
2-400 PAGE
2
DEC 01/14
28-42-72
004
OPT 10000-001
3
DEC14
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
005
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
____________________________________
FUNCTIONAL
TEST OF LOW LEVEL SENSORS
REF. FIG. 282573-FUT-00120
1. ON PANEL 121VU,
CHECK THAT THE FOLLOWING CIRCUIT BREAKERS
ARE CLOSED :
2QU
FUEL/FUEL FUELING/CTL & IND
1QT(2QT) FUEL/FQI/L (R) TANK
1QA(2QA) FUEL/FUEL FEED/ENG1(2)/ELEC
PUMP
3QA(4QA) FUEL/FUEL FEED/ENG1(2)/CTL &
CAUTION.
2. ON REFUELING PANEL 5004VU:
A. PLACE REFUELING/REFUEL/OFF/DEFUELSWITCH
4QU IN DEFUEL POSITION.
B. PLACE REFUELING/REFUEL VALVE/LH(RH)
SWITCH 5QU (6QU) IN OPEN POSITION.
C. REFUELING/LH (RH) VALVE/OPEN LIGHT
151QU(150QU) COMES ON.
D. DEFUEL APPROPRIATE TANK UNTIL LOW LEVEL
THRESHOLD OF 160 KG (352LBS).
(AMM: 121100-DFG-10000).
3. ON PANEL 4VU (COCKPIT), ON FUEL QUANTITY
*** CONTINUED ***
AH
28-42-72
OPT 10000-001
2-400 PAGE
3
DEC 01/14
28-42-72
OPT 10000-001
4
DEC14
INDICATOR:
A. LO LVL CAUTION LIGHT COMES ON,
. ON CREW ALERTING PANEL FUEL LIGHT
COMES ON
. ON PANELS 3VU AND 5VU, MASTER CAUTION
LIGHTS COME ON
. INGLE CHIME SOUNDS.
- SHUT DOWN DEFUELING OPERATION.
- INHIBE ALARMS.
B. THE VALUE INDICATED IS: 160 KG (352 LBS)
4. ON PANEL 5004VU:
A. PLACE REFUELING/REFUEL/OFF/DEFUELSWITCH
4QU IN OFF POSITION.
B. PLACE 5QU(6QU) SWITCH ON NORM POSITION.
C. REFUELING/LH (RH) VALVE/OPEN LIGHT GOES
OFF.
5. REPEAT THE SAME CHECK FOR OTHER TANK.
006
007
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUAL*** CONTINUED ***
AH
28-42-72
OPT 10000-001
2-400 PAGE
4
DEC 01/14
28-42-72
OPT 10000-001
5
DEC14
LY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-42-72
OPT 10000-001
2-400 PAGE
5
DEC 01/14
28-42-72
6
AH
DEFUEL/REFUEL PANEL
OPT 10000-001
DEC14
28-42-72
OPT 10000-001
2-400
PAGE
6
DEC 01/14
28-42-72
OPT 10000-002
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
210
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
___
MEN
_________
MAN-HOURS
PUBLICATION
___________
JIC
JIC
AH
31-63-00-PRO-10000
24-46-00-EAD-10000
28-42-72
OPT 10000-002
2-400 PAGE
1
DEC 01/14
28-42-72
001
OPT 10000-002
2
DEC14
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
28-42-72
OPT 10000-002
2-400 PAGE
2
DEC 01/14
28-42-72
003
OPT 10000-002
3
DEC14
004
___________
PREPARATION
1. ON RIGHT MAIN LANDING GEAR FAIRING
OPEN REFUELING PANEL ACCESS DOOR (5004VU).
2. PROVIDE EMPTY FUEL TANKER.
005
______________________
CHECK
OF MFC OPERATION
1. ON PANEL 25VU, CHECK THAT THE FOLLOWING
PUSHBUTTON SWITCHES ARE PRESSED
(OFF LEGENDS ARE OFF):
6UA1
6UA2
7UA1
7UA2
006
MFC/1B/FAULT/OFF
MFC/2B/FAULT/OFF
MFC/1A/FAULT/OFF
MFC/2A/FAULT/OFF
____________________________________
FUNCTIONAL
TEST OF LOW LEVEL SENSORS
REF. FIG. 282573-FUT-00120
1. ON REFUELING PANEL 100QU:
A. PLACE REFUELING/REFUEL/OFF/DEFUELSWITCH
IN DEFUEL POSITION.
B. PLACE REFUELING/REFUEL VALVE/LH(RH)
SWITCH IN OPEN POSITION.
C. REFUELING/LH (RH) VALVE/OPEN LIGHT
COMES ON.
D. DEFUEL APPROPRIATE TANK UNTIL LOW LEVEL
THRESHOLD OF 160 KG (352LBS).
*** CONTINUED ***
AH
28-42-72
OPT 10000-002
2-400 PAGE
3
DEC 01/14
28-42-72
OPT 10000-002
4
DEC14
(AMM: 121100-DFG-10000).
2. A. . ON EWD, IN ALERT WINDOW, FUEL LO LVL
MESSAGE APPEARS.
. MASTER CAUTION LIGHTS FLASH.
. SINGLE CHIME SOUNDS.
- SHUT DOWN DEFUELING OPERATION.
- INHIBE ALARMS.
B. ON MFD UPPER WINDOW, IN ENGINE SD PAGE,
THE VALUE INDICATED IS: 160KG (352LBS)
3. ON PANEL 100QU:
A. PLACE REFUELING/REFUEL/OFF/DEFUELSWITCH
IN OFF POSITION.
B. PLACE REFUELING/REFUEL VALVE/LH(RH)
SWITCH ON NORM POSITION.
C. REFUELING/LH (RH) VALVE/OPEN LIGHT GOES
OFF.
4. REPEAT THE SAME CHECK FOR OTHER TANK.
007
008
________
CLOSE-UP
1. DISCONNECT COUPLING (IF TRANSFER PERFORMED).
2. DISCONNECT EQUIPOTENTIAL CONNECTION BETWEEN
THE TANKER AND THE AIRCRAFT (IF REQUIRED).
3. CLOSE REFUEL/DEFUEL DOOR 196FS (EVENTUALLY).
4. CLOSE REFUELING PANEL DOOR 192JR (EVENTUAL*** CONTINUED ***
AH
28-42-72
OPT 10000-002
2-400 PAGE
4
DEC 01/14
28-42-72
OPT 10000-002
5
DEC14
LY).
5. REMOVE FUEL TANKER FROM WORKING AREA (IF
USED).
6. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEMS OF
EQUIPMENT.
7. REMOVE SMOKING PROHIBITED WARNING NOTICES.
*****
AH
E N D
O F
T E X T
*****
28-42-72
OPT 10000-002
2-400 PAGE
5
DEC 01/14
28-42-72
6
AH
DEFUEL/REFUEL PANEL
OPT 10000-002
DEC14
28-42-72
OPT 10000-002
2-400
PAGE
6
DEC 01/14
28-42-72
RAI 10000-003
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522BT 522DT 522ET 523CT 523DT 523FT
622BT 622DT 622ET 623CT 623DT 623FT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
SPARE
: 01
01
01
01
01
01
PROBE
PROBE
PROBE
PROBE
PROBE
PROBE
EXPENDABLE
: 02
02
03
02
02
02
02
02
01
01
02
02
NUT
NUT
CLAMP
CLAMP
CLAMP
CLAMP
O-RING
O-RING
O-RING
O-RING
NUT
NUT
AH
___
MEN
RIB
RIB
RIB
RIB
RIB
RIB
4/5
5/6
14/15
18/19
9/10
21/22
_________
MAN-HOURS
284270-01-030
284270-01-040
284270-02-030
284270-02-040
284270-03-030
284270-05-030
284270-03-070
284270-05-090
284270-01
284270-02
284270-03
284270-05
284270-01-020
284270-02-020
284270-03-020
284270-05-020
284270-01-090
284270-02-090
28-42-72
RAI 10000-003
2-400 PAGE
1
DEC 01/14
28-42-72
RAI 10000-003
2
DEC14
PUBLICATION
___________
JIC
AH
28-42-00-FUT-10000
28-42-72
RAI 10000-003
2-400 PAGE
2
DEC 01/14
28-42-72
001
RAI 10000-003
3
DEC14
_________
PRINCIPLE
ALL LH AND RH WING PROBES ALLOW TO MESURE
FUEL QUANTITY.
NEVERTHELESS, ON AIRCRAFT EQUIPPED WITH NAS
(NEW AVIONIC SUITE), THE FIRST PROBE CLOSER
TO FUSELAGE (EACH SIDE) ALLOWS TO MESURE
EITHER FUEL QUANTITY AND TEMPERATURE.
002
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
003
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
*** CONTINUED ***
AH
28-42-72
RAI 10000-003
2-400 PAGE
3
DEC 01/14
28-42-72
RAI 10000-003
4
DEC14
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL LEVEL IS BELOW THE
LEVEL OF WORKING AREA.
(PERFORM DEFUELLING OPERATION IF NECESSARY)
2. INSTALL WARNING NOTICE PROHIBITING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM TO GAIN ACCESS TO
THE WING UPPER SIDE.
005
28-42-72
RAI 10000-003
2-400 PAGE
4
DEC 01/14
28-42-72
RAI 10000-003
5
DEC14
WIRING TO THE
5. REMOVE PROBE.
6. REMOVE AND DISCARD PROBE SEAL (3).
7. BLANK EQUIPMENT CONNECTORS.
8. PROTECT REMOVED COMPONENT INTERFACE AS WELL
AS ADJACENT AREA.
NOTE : -TAKE ALL NECESSARY PRECAUTIONS TO
ENSURE THAT ELECTRICAL HARNESSES DO
NOT FALL INTO TANK.
-CHECK AGGREGATION STATE OF FIXED
PLUG (EXTERNAL LEAKAGE MARK) OF TANK
REAR PARTITION.
006
28-42-72
RAI 10000-003
2-400 PAGE
5
DEC 01/14
28-42-72
RAI 10000-003
6
DEC14
28-42-72
RAI 10000-003
2-400 PAGE
6
DEC 01/14
28-42-72
008
RAI 10000-003
7
DEC14
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-72
RAI 10000-003
2-400 PAGE
7
DEC 01/14
28-42-72
8
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
RAI 10000-003
DEC14
28-42-72
RAI 10000-003
2-400
PAGE
8
DEC 01/14
28-42-72
9
AH
WIRE INSTALLATION
ON PROBES
RAI 10000-003
DEC14
28-42-72
RAI 10000-003
2-400
PAGE
9
DEC 01/14
28-42-72
RAI 10000-004
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522BT 522DT 522ET 523CT 523DT 523FT
622BT 622DT 622ET 623CT 623DT 623FT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
SPARE
: 01
01
01
01
01
01
PROBE
PROBE
PROBE
PROBE
PROBE
PROBE
EXPENDABLE
: 02
02
03
02
02
02
02
02
01
01
02
02
NUT
NUT
CLAMP
CLAMP
CLAMP
CLAMP
O-RING
O-RING
O-RING
O-RING
NUT
NUT
AH
___
MEN
RIB
RIB
RIB
RIB
RIB
RIB
4/5
5/6
14/15
18/19
9/10
21/22
_________
MAN-HOURS
284270-01-030
284270-01-040
284270-02-030
284270-02-040
284270-03-030
284270-05-030
284270-03-070
284270-05-090
284270-01
284270-02
284270-03
284270-05
284270-01-020
284270-02-020
284270-03-020
284270-05-020
284270-01-090
284270-02-090
28-42-72
RAI 10000-004
2-400 PAGE
1
DEC 01/14
28-42-72
RAI 10000-004
2
DEC14
PUBLICATION
___________
JIC
AH
28-42-00-FUT-10000
28-42-72
RAI 10000-004
2-400 PAGE
2
DEC 01/14
28-42-72
001
RAI 10000-004
3
DEC14
_________
PRINCIPLE
ALL LH AND RH WING PROBES ALLOW TO MESURE
FUEL QUANTITY.
NEVERTHELESS, ON AIRCRAFT EQUIPPED WITH NAS
(NEW AVIONIC SUITE), THE FIRST PROBE CLOSER
TO FUSELAGE (EACH SIDE) ALLOWS TO MESURE
EITHER FUEL QUANTITY AND TEMPERATURE.
002
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
003
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
*** CONTINUED ***
AH
28-42-72
RAI 10000-004
2-400 PAGE
3
DEC 01/14
28-42-72
RAI 10000-004
4
DEC14
___________
PREPARATION
1. MAKE CERTAIN THAT FUEL LEVEL IS BELOW THE
LEVEL OF WORKING AREA.
(PERFORM DEFUELLING OPERATION IF NECESSARY)
2. INSTALL WARNING NOTICE PROHIBITING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM TO GAIN ACCESS TO
THE WING UPPER SIDE.
005
28-42-72
RAI 10000-004
2-400 PAGE
4
DEC 01/14
28-42-72
RAI 10000-004
5
DEC14
WIRING TO THE
5. REMOVE PROBE.
6. REMOVE AND DISCARD PROBE SEAL (3).
7. BLANK EQUIPMENT CONNECTORS.
8. PROTECT REMOVED COMPONENT INTERFACE AS WELL
AS ADJACENT AREA.
NOTE : -TAKE ALL NECESSARY PRECAUTIONS TO
ENSURE THAT ELECTRICAL HARNESSES DO
NOT FALL INTO TANK.
-CHECK AGGREGATION STATE OF FIXED
PLUG (EXTERNAL LEAKAGE MARK) OF TANK
REAR PARTITION.
006
28-42-72
RAI 10000-004
2-400 PAGE
5
DEC 01/14
28-42-72
RAI 10000-004
6
DEC14
28-42-72
RAI 10000-004
2-400 PAGE
6
DEC 01/14
28-42-72
008
RAI 10000-004
7
DEC14
009
010
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
*** CONTINUED ***
AH
28-42-72
RAI 10000-004
2-400 PAGE
7
DEC 01/14
28-42-72
RAI 10000-004
8
DEC14
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
*****
AH
E N D
O F
T E X T
*****
28-42-72
RAI 10000-004
2-400 PAGE
8
DEC 01/14
28-42-72
9
AH
TYPICAL REM/INSTALLATION
OF FUEL QUANTITY OR FUEL
TEMP/QUANTITY PROBE
RAI 10000-004
DEC14
28-42-72
RAI 10000-004
2-400
PAGE
9
DEC 01/14
28-42-72
10
AH
WIRE INSTALLATION
ON PROBES
RAI 10000-004
DEC14
28-42-72
RAI 10000-004
2-400
PAGE
10
DEC 01/14
28-42-72
RAI 10010-002
1
DEC14
ZONING DATA
___________
ZONE
: 530
630
540
640
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELECTRIC
___
MEN
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 02 SEAL
284270
EXPENDABLE
: 00 SAFETY WIRE
00 MASTINOX
Z2CN18-10
6856K
: DEFUELLING
: REFUELING
AH
12-11-00-DFG-10000
12-11-00-FLG-10020
28-42-72
RAI 10010-002
2-400 PAGE
1
DEC 01/14
28-42-72
001
RAI 10010-002
2
DEC14
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
002
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
2
DEC 01/14
28-42-72
RAI 10010-002
3
DEC14
__________
DEFUELLING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
NOTE: THIS OPERATION IS TO BE PERFORMED ONLY
FOR REMOVAL OF DOORS LOCATED IN FUEL
AREA.
004
___________
PREPARATION
NOTE:THE FOLLOWING PROCEDURE IS THE SAME FOR
ALL THE FUEL QUANTITY PROBE HARNESS
1.MAKE CERTAIN THAT FUEL TANK(S) IS (ARE)
EMPTY.
2. INSTALL WARNING NOTICE PROHIBING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM,TO GAIN ACCESS TO
WING TOP SKIN AND TO WING REAR SPAR LH (RH).
4. IN ZONE 530-540/630-640 OPEN ACCESS DOOR
RELATED TO THE HARNESS NEEDS TO BE CHANGED.
005
______________________________
REMOVAL
OF FUEL QUANTITY PROBE
REF.FIG. 284272-RAI-00110
ON THE UPPER WING PANEL
1. REMOVE SCREWS (4) RETAINING FUEL QUANTITY
PROBE.
2. BY MEANS OF THE EXTRACT HOLE (6) SLIGHTLY
LIFT FUEL QUANTITY PROBE.
3. UNSCREW AND REMOVE:SCREW(7) WASHER(8) NUT(9)
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
3
DEC 01/14
28-42-72
RAI 10010-002
4
DEC14
______________________________________
REMOVAL
OF FUEL QUANTITY PROBE HARNESS
REF.FIG. 284272-RAI-00120
ON WING REAR SPAR:
1. IDENTIFY THE FUEL QUANTITY PROBE HARNESS
THAT NEEDS TO BE CHANGED (I.E. 501VC, 503VC
505VC....).
2. LOOSEN THE NUT ELECTRICAL PLUG (16) WITHOUT
REMOVE IT.
3. UNSCREW THE BOLT (10) REMOVE THE WASHER (11)
REMOVE THE BRACKET (12).
4. DISASSEMBLY THE ELECTRICAL PLUG (14) FROM
THE BRACKET (12).
5. DISCARD THE SEAL (13).
6. SMOOTLY PULL OUT THE CABLE FROM ITS METALIC
CONDUIT UNTIL THE CONNECTION ROPE/CABLE,
COMES OUT.
7. DISCONNECT THE ROPE FROM THE CABLE AVOIDING
TO DAMAGE THE COAXIAL CONNECTOR.
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
4
DEC 01/14
28-42-72
007
RAI 10010-002
5
DEC14
___________________________________________
INSTALLATION
OF FUEL QUANTITY PROBE HARNESS
REF.FIG. 284272-RAI-00120
ON WING REAR SPAR SIDE:
1. LUBRIFICATE WITH CLEAN FUEL, INSTALL AND
HOLD THE NEW SEAL (13) ON THE BRACKET (12).
2. PUT ON THE NEW HARNESS AND ASSEMBLY THE
ELECTRICAL PLUG (14) BY NUT (16) ON
BRAKET (12).TIGHTEN FOLLOWING THE VALUES
SHOWED IN THE FIGURE.
3. INSTALL SAFETY WIRE (15) (IF INSTALLED).
4. TIE THE ROPE TO THE CABLE,PAY ATTENTION
TO THE COAXIAL CONNECTOR(S)
ON UPPER WING PANEL:
1. BY MEANS OF THE ROPE, SMOOTLY PULL IN THE
HARNESS WHILE,ON WING REAR SPAR SIDE,
HELP THE ELECTRICAL CABLE TO SLOW DOWN
INTO FUEL TANK THEN INTO METALIC CONDUIT.
2. PULL OUT THE HARNESS UNTIL THE CONNECTION
ROPE/CABLE COMES OUT AND THE BRACKET (12)IS
IN ITS CORRECT POSITION TO BE ASSEMBLIED.
3. DISCONNECT THE ROPE FROM THE HARNESS.
MAKE CERTAIN THAT COAXIAL CONNECTOR(S)
IS IN GOOD CONDITION.
REF ITEM 003 STEP 5.
4. MARK THE POSITION OF THE LOWEST TYRAP ON THE
NEW HARNESS USING THE OLD ONE.
5. SECURE THE HARNESS TO AVOID IT FALL INTO
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
5
DEC 01/14
28-42-72
RAI 10010-002
6
DEC14
FUEL TANK.
ON WING REAR SPAR:
6. INSTALL BRACKET (12) BY MEANS OF BOLT (10)
AND WASHER (11).
TIGHTEN BY A TORQUE VALUE OF:
0.40 - 0.50 MDAN (35,4 - 44,2 LBS.IN.)
008
___________________________________
INSTALLATION
OF FUEL QUANTITY PROBE
REF. FIG. 284272-RAI-00110
ON UPPER WING PANEL:
1. REMOVE CAPS AND/OR PROTECTION FROM FUEL
QUANTITY PROBE.
2. INSTALL NEW SEAL (3),PREVIOUSLY LUBRIFICATED
WITH CLEAN FUEL,ON FUEL QUANTITY PROBE.
3. INSTALL CLAMP (5) AND(10),TO FIX THE HARNESS
TO PROBE, BY MEANS OF SCREW (7), WASHER (8),
AND NUT (9).
4. ALIGN FUEL QUANTITY PROBE AND HARNESS TYRAP
MARK AND FIX WITH A TYRAP.
COIL HARNESS OVER THE TYRAP AND FIX WITH
SOME OTHER TYRAPS IN ORDER TO AVOID THE
HARNESS CHAFING IN FUEL TANK.
5. CHECK THAT ELECTRICAL CONNECTOR(S) IS(ARE)
IN GOOD CONDITION.
6. CONNECT THE COAXIAL PLUG(S) TO THE FUEL
QUANTITY PROBE.
7. CLEAN PROBE BONDING PLATE AND APPLY A SLIGHT
FILM OF MASTINOX 6856K
8. INSTALL FUEL QUANTITY PROBE BY MEANS OF
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
6
DEC 01/14
28-42-72
RAI 10010-002
7
DEC14
________
CLOSE-UP
1. CLOSE ACCESS PANEL PREVIOUSLY OPENED.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEM OF
EQUIPMENT.
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
5. PARK THE A/C ON A FLAT PLACE OF PARKING AREA
010
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
011
________________________________
TEST
OF FUEL QUANTITY INDICATION
REF. FIG. 284272-TST-00130
A. BY MEANS OF REFUELLING OPERATION AND THE
TABLE IN THE FIGURE, CHECK THE CORRECT
FUEL QUANTITY INDICATION.
B. PERFORM A CALIBRATION FROM 0 TO 500 KG
(1100 LBS) FILLING BOTH THE FUEL TANKS BY
STEP OF 100KG (220LBS).
IN THE COCKPIT
ON THE FUEL QUANTITY INDICATOR:
C. FOR EACH STEP, CHECK THAT THE DIFFERENCE:
QUANTITY INTRODUCED-QUANTITY INDICATED
REMAINS POSITIVE OR EQUAL TO 0.
D. CHECK THAT LOW LEVEL INDICATION GOESOFF WHEN
*** CONTINUED ***
AH
28-42-72
RAI 10010-002
2-400 PAGE
7
DEC 01/14
28-42-72
RAI 10010-002
8
DEC14
AH
E N D
O F
T E X T
*****
28-42-72
RAI 10010-002
2-400 PAGE
8
DEC 01/14
28-42-72
9
AH
RENOVAL/INSTALLATION OF
FUEL QUANTITY PROBE
RAI 10010-002
DEC14
28-42-72
RAI 10010-002
2-400
PAGE
9
DEC 01/14
28-42-72
10
AH
REMOVAL/INSTALLATION OF
FUEL QTY PROBE HARNESS
RAI 10010-002
DEC14
28-42-72
RAI 10010-002
2-400
PAGE
10
DEC 01/14
28-42-72
11
AH
RAI 10010-002
DEC14
28-42-72
RAI 10010-002
2-400
PAGE
11
DEC 01/14
28-42-72
RAI 10010-003
1
DEC14
ZONING DATA
___________
ZONE
: 530
630
540
640
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
ELECTRIC
_________
MAN-HOURS
01
ELAPSED TIME
SPARE
: 02 SEAL
284270
EXPENDABLE
: 00 SAFETY WIRE
00 MASTINOX
Z2CN18-10
6856K
AH
31-63-00-PRO-10000
12-11-00-DFG-10000
12-11-00-FLG-10020
28-42-72
RAI 10010-003
2-400 PAGE
1
DEC 01/14
28-42-72
001
RAI 10010-003
2
DEC14
002
_______
WARNING
WARNING C.D.C.C.L.
CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION
THE FOLLOWING PROCEDURE IS APPLIED TO
A FUEL SYSTEM ITEM THAT IS IN THE CATEGORY
KNOWN AS A CRITICAL DESIGN CONFIGURATION
CONTROL LIMITATION.
CDCCL IDENTIFIES AN ITEM THAT CAN BE SOURCE OF
A POSSIBLE FUEL TANK IGNITION.
YOU MUST KEEP ALL CDCCL ITEMS IN THE APPROVED
CONFIGURATION.
DAMAGE,WEAR OR CHANGES TO A CDCCL ITEM CAN
CAUSE A POSSIBLE FUEL TANK EXPLOSION.
003
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
2
DEC 01/14
28-42-72
RAI 10010-003
3
DEC14
__________
DEFUELLING
SEE JOB INSTRUCTION CARD
121100-DFG-10000
NOTE: THIS OPERATION IS TO BE PERFORMED ONLY
FOR REMOVAL OF DOORS LOCATED IN FUEL
AREA.
005
___________
PREPARATION
NOTE:THE FOLLOWING PROCEDURE IS THE SAME FOR
ALL THE FUEL QUANTITY PROBE HARNESS
1.MAKE CERTAIN THAT FUEL TANK(S) IS (ARE)
EMPTY.
2. INSTALL WARNING NOTICE PROHIBING OPERATION
OF FUEL SYSTEM IN FLIGHT COMPARTMENT.
3. INSTALL ACCESS PLATFORM,TO GAIN ACCESS TO
WING TOP SKIN AND TO WING REAR SPAR LH (RH).
4. IN ZONE 530-540/630-640 OPEN ACCESS DOOR
RELATED TO THE HARNESS NEEDS TO BE CHANGED.
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
3
DEC 01/14
28-42-72
006
RAI 10010-003
4
DEC14
______________________________
REMOVAL
OF FUEL QUANTITY PROBE
REF.FIG. 284272-RAI-00110
ON THE UPPER WING PANEL
1. REMOVE SCREWS (4) RETAINING FUEL QUANTITY
PROBE.
2. BY MEANS OF THE EXTRACT HOLE (6) SLIGHTLY
LIFT FUEL QUANTITY PROBE.
3. UNSCREW AND REMOVE:SCREW(7) WASHER(8) NUT(9)
CLAMPS(5) AND (10).
4. DISCONNECT PLUG(S) FROM CONNECTOR(S) (2).
5. REMOVE THE HARNESS FROM THE PROBE,IN THE
SAME TIME MARK THE LOWEST TYRAP POSITION ON
FUEL QTY PROBE AND HARNESS.RECORD THE LENGTH
OF THE HARNESS COILED TO THE PROBE.
6. PROTECT THE FUEL QUANTITY PROBE TO AVOID ANY
DAMAGE AND/OR CONTAMINATION.
7. TIE THE ROPE TO THE DISCONNECTED PLUG(S).
007
______________________________________
REMOVAL
OF FUEL QUANTITY PROBE HARNESS
REF.FIG. 284272-RAI-00120
ON WING REAR SPAR:
1. IDENTIFY THE FUEL QUANTITY PROBE HARNESS
THAT NEEDS TO BE CHANGED (I.E. 501VC, 503VC
505VC....).
2. LOOSEN THE NUT ELECTRICAL PLUG (16) WITHOUT
REMOVE IT.
3. UNSCREW THE BOLT (10) REMOVE THE WASHER (11)
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
4
DEC 01/14
28-42-72
RAI 10010-003
5
DEC14
___________________________________________
INSTALLATION
OF FUEL QUANTITY PROBE HARNESS
REF.FIG. 284272-RAI-00120
ON WING REAR SPAR SIDE:
1. LUBRIFICATE WITH CLEAN FUEL, INSTALL AND
HOLD THE NEW SEAL (13) ON THE BRACKET (12).
2. PUT ON THE NEW HARNESS AND ASSEMBLY THE
ELECTRICAL PLUG (14) BY NUT (16) ON
BRAKET (12).TIGHTEN FOLLOWING THE VALUES
SHOWED IN THE FIGURE.
3. INSTALL SAFETY WIRE (15) (IF INSTALLED).
4. TIE THE ROPE TO THE CABLE,PAY ATTENTION
TO THE COAXIAL CONNECTOR(S)
ON UPPER WING PANEL:
1. BY MEANS OF THE ROPE, SMOOTLY PULL IN THE
HARNESS WHILE,ON WING REAR SPAR SIDE,
HELP THE ELECTRICAL CABLE TO SLOW DOWN
INTO FUEL TANK THEN INTO METALIC CONDUIT.
2. PULL OUT THE HARNESS UNTIL THE CONNECTION
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
5
DEC 01/14
28-42-72
RAI 10010-003
6
DEC14
___________________________________
INSTALLATION
OF FUEL QUANTITY PROBE
REF. FIG. 284272-RAI-00110
ON UPPER WING PANEL:
1. REMOVE CAPS AND/OR PROTECTION FROM FUEL
QUANTITY PROBE.
2. INSTALL NEW SEAL (3),PREVIOUSLY LUBRIFICATED
WITH CLEAN FUEL,ON FUEL QUANTITY PROBE.
3. INSTALL CLAMP (5) AND(10),TO FIX THE HARNESS
TO PROBE, BY MEANS OF SCREW (7), WASHER (8),
AND NUT (9).
4. ALIGN FUEL QUANTITY PROBE AND HARNESS TYRAP
MARK AND FIX WITH A TYRAP.
COIL HARNESS OVER THE TYRAP AND FIX WITH
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
6
DEC 01/14
28-42-72
RAI 10010-003
7
DEC14
________
CLOSE-UP
1. CLOSE ACCESS PANEL PREVIOUSLY OPENED.
2. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS AND MISCELLANEOUS ITEM OF
EQUIPMENT.
3. REMOVE ACCESS PLATFORM.
4. REMOVE WARNING NOTICE IN FLIGHT COMPARTMENT.
5. PARK THE A/C ON A FLAT PLACE OF PARKING AREA
011
_________
REFUELING
SEE JOB INSTRUCTION CARD
121100-FLG-10020
012
________________________________
TEST
OF FUEL QUANTITY INDICATION
1. BY MEANS OF REFUELLING OPERATION, CHECK
THE CORRECT FUEL QUANTITY INDICATION.
2. PERFORM A CALIBRATION FROM 0 TO 500 KG
(1100 LBS) FILLING BOTH THE FUEL TANKS BY
*** CONTINUED ***
AH
28-42-72
RAI 10010-003
2-400 PAGE
7
DEC 01/14
28-42-72
RAI 10010-003
8
DEC14
AH
E N D
O F
T E X T
*****
28-42-72
RAI 10010-003
2-400 PAGE
8
DEC 01/14
28-42-72
9
AH
RENOVAL/INSTALLATION OF
FUEL QUANTITY PROBE
RAI 10010-003
DEC14
28-42-72
RAI 10010-003
2-400
PAGE
9
DEC 01/14
28-42-72
10
AH
REMOVAL/INSTALLATION OF
FUEL QTY PROBE HARNESS
RAI 10010-003
DEC14
28-42-72
RAI 10010-003
2-400
PAGE
10
DEC 01/14
28-42-81
REMOVAL/INSTALLATION OF
FUEL QUANTITY INDICATOR
RAI 10000-002
1
DEC14
ZONING DATA
___________
ZONE
: 120
210
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
: 01 INDICATOR
284280-01-030
28-42-00-TST-10000
PUBLICATION
___________
JIC
AH
28-42-81
RAI 10000-002
2-400 PAGE
1
DEC 01/14
28-42-81
REMOVAL/INSTALLATION OF
FUEL QUANTITY INDICATOR
001
RAI 10000-002
2
DEC14
___________
PREPARATION
REF. FIG. 284272-FUT-00100
ON PANEL 121VU,
OPEN, SAFETY AND TAG THE FOLLOWING CIRCUIT
BREAKERS :
1QT
FUEL/FQI/L TANK
2QT
FUEL/FQI/R TANK
ITEM OF EQUIPMENT CONCERNED BY THE REMOVAL/
INSTALLATION PROCEDURE IS LOCATED ON LOWER
LEFT SECTION OF UPPER CENTER INSTRUMENT
PANEL 4VU.
002
28-42-81
RAI 10000-002
2-400 PAGE
2
DEC 01/14
28-42-81
REMOVAL/INSTALLATION OF
FUEL QUANTITY INDICATOR
RAI 10000-002
3
DEC14
004
________
CLOSE-UP
1. ON PANEL 121VU,
REMOVE SAFETY CLIPS AND TAGS AND CLOSE
CIRCUIT BREAKERS: 1QT,2QT
005
_______________________________
TEST
OF FUEL QUANTITY INDICATOR
SEE JOB INSTRUCTION CARD
284200-TST-10000
28-42-81
RAI 10000-002
2-400 PAGE
3
DEC 01/14
28-42-81
REMOVAL/INSTALLATION OF
FUEL QUANTITY INDICATOR
006
RAI 10000-002
4
DEC14
____________________________________
CROSSCHECK
OF FUEL QUANTITY ON BOARD
REF.FIG.284281-CHK-00100
REF.FIG.284281-CHK-00110
CHECK CHOERENCE OF FUEL QUANTITY INDICATED ON
THE FQI AND THE PHYSICAL QUANTITY IN THE
TANKS BY MEAN OF DRIPSTICKS.
SEE JOB INSTRUCTION CARD:
12-11-28 CHK 10000
CONVERT VOLUME OBTAINED THROUGH DRIPSTICK IN
WEIGHT BY MEAN OF CONVERSION TABLE OF FIGURES
TAKING INTO ACCOUNT FUEL DENSITY OF THE DAY.
*****
AH
E N D
O F
T E X T
*****
28-42-81
RAI 10000-002
2-400 PAGE
4
DEC 01/14
28-42-81
5
AH
FLIGHT COMPARTMENT
EQUIPMENT
RAI 10000-002
DEC14
28-42-81
RAI 10000-002
2-400
PAGE
5
DEC 01/14
28-42-81
6
AH
FUEL QUANTITY
INDICATING
RAI 10000-002
DEC14
28-42-81
RAI 10000-002
2-400
PAGE
6
DEC 01/14
28-42-81
7
AH
VOLUME/WEIGHT CROSSCHECK
OF FUEL QUANTITY
RAI 10000-002
DEC14
28-42-81
RAI 10000-002
2-400
PAGE
7
DEC 01/14
28-42-81
8
AH
VOLUME/WEIGHT CROSSCHECK
OF FUEL QUANTITY
RAI 10000-002
DEC14
28-42-81
RAI 10000-002
2-400
PAGE
8
DEC 01/14
28-42-82
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
284280-060-010
24-31-00-EAD-10000
PUBLICATION
___________
JIC
AH
28-42-82
RAI 10000-001
2-400 PAGE
1
DEC 01/14
28-42-82
001
RAI 10000-001
2
DEC14
___________
PREPARATION
1. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS:
1QT FUEL/FQI LH TANK
2QT FUEL/FQI RH TANK
2QU FUEL/FUELLING CTL & IND
2. OPEN REFUELING PANEL ACCESS DOOR 192JR.
002
__________________________
REMOVE
OF PROTECTIVE COVER
REF. FIG. 284282-RAI-00100
1. REMOVE SCREWS (6) SECURING THE PROTECTIVE
COVER (4).
2. REMOVE THE PROTECTIVE COVER (4) WITH THE
FIXING SUPPORT (5) OF PROTECTIVE COVER DOOR.
003
004
28-42-82
RAI 10000-001
2-400 PAGE
2
DEC 01/14
28-42-82
RAI 10000-001
3
DEC14
NECTORS (3).
2. PLUG IN ELECTRICAL CONNECTORS TO THE FUEL
QUANTITY REPEATER INDICATOR (1).
3. INSERT THE INDICATOR IN THE PANEL STRUCTURE
4. TIGHTEN SCREWS (2).
005
________________________________
INSTALLATION
OF PROTECTIVE COVER
REF. FIG. 284282-RAI-00100
1. INSTALL THE PROTECTIVE COVER (4) WITH THE
FIXING SUPPORT (5).
2. TIGHTEN SCREWS (6).
006
________
CLOSE-UP
1. ON PANEL 121VU REMOVE SAFETY CLIPS AND
TAGS AND CLOSE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
007
_________________________________
ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
008
_______________
FUNCTIONAL
TEST
1. CHECK THAT:
ON PANEL 4VU, ON FUEL QUANTITY INDICATOR
(3QT)
ON PANEL 5004VU, ON FUEL QUANTITY REPEATER
(6QT)
THE VALUES ARE IDENTICAL.
28-42-82
RAI 10000-001
2-400 PAGE
3
DEC 01/14
28-42-82
009
RAI 10000-001
4
DEC14
____________________________________
DE-ENERGIZING
OF SYSTEM FROM BATTERY
SEE JOB INSTRUCTION CARD
243100-EAD-10000
010
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS
OF EQUIPMENT.
2. CLOSE ACCESS DOOR PREVIOUSLY OPENED.
*****
AH
E N D
O F
T E X T
*****
28-42-82
RAI 10000-001
2-400 PAGE
4
DEC 01/14
28-42-82
5
AH
RAI 10000-001
DEC14
28-42-82
RAI 10000-001
2-400
PAGE
5
DEC 01/14
28-42-83
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 192
: 192JR
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
SPARE
AH
___
MEN
_________
MAN-HOURS
284280-065-010
28-42-83
RAI 10000-001
2-400 PAGE
1
DEC 01/14
28-42-83
001
RAI 10000-001
2
DEC14
___________
PREPARATION
1. ON PANEL 121VU, OPEN, SAFETY AND TAG THE
FOLLOWING CIRCUIT BREAKERS:
1QT FUEL/FQI LH TANK
2QT FUEL/FQI RH TANK
2QU FUEL/FUELLING CTL & IND
2. OPEN REFUELING PANEL ACCESS DOOR 192JR.
002
__________________________
REMOVE
OF PROTECTIVE COVER
REF. FIG. 284283-RAI-00100
1. REMOVE SCREWS (6) SECURING THE PROTECTIVE
COVER (4).
2. REMOVE THE PROTECTIVE COVER (4) WITH THE
FIXING SUPPORT (5) OF PROTECTIVE COVER DOOR.
003
_______
REMOVAL
REF. FIG. 284283-RAI-00100
1. UNLOOSE THE SCREWS (2) SECURING THE FUEL
QUANTITY PRESELECTOR (1).
2. EXTRACT THE PRESELECTOR (1).
3. UNPLUG THE ELECTRICAL CONNECTOR (3).
4. PUT BLANKING CAP ON THE ELECTRICAL CONNECTOR.
004
____________
INSTALLATION
REF. FIG. 284283-RAI-00100
1. REMOVE BLANKING CAP FROM ELECTRICAL CONNECTOR (3).
*** CONTINUED ***
AH
28-42-83
RAI 10000-001
2-400 PAGE
2
DEC 01/14
28-42-83
RAI 10000-001
3
DEC14
________________________________
INSTALLATION
OF PROTECTIVE COVER
REF. FIG. 284283-RAI-00100
1. INSTALL THE PROTECTIVE COVER (4) WITH THE
FIXING SUPPORT (5).
2. TIGHTEN SCREWS (6).
006
________
CLOSE-UP
1. ON PANEL 121VU REMOVE SAFETY CLIPS AND
TAGS AND CLOSE CIRCUIT BREAKERS PREVIOUSLY
OPENED.
007
_______________
FUNCTIONAL
TEST
1. WHEN REFUELING, CHECK THAT ELECTROVALVES
CLOSE AT THE VALUE DISPLAYED ON PRESELECTOR.
2. VERIFY THE SAME VALUES ON THE BOTH FUEL
QUANTITY INDICATORS 3QT (4VU) AND 6QT
(5004VU).
008
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN
AND CLEAR OF TOOLS AND MISCELLANEOUS ITEMS
OF EQUIPMENT.
2. CLOSE ACCESS DOOR PREVIOUSLY OPENED.
*****
AH
E N D
O F
T E X T
*****
28-42-83
RAI 10000-001
2-400 PAGE
3
DEC 01/14
28-42-83
4
AH
PRESELECTOR
RAI 10000-001
DEC14
28-42-83
RAI 10000-001
2-400
PAGE
4
DEC 01/14
28-42-84
RAI 10000-001
1
DEC14
ZONING DATA
___________
ZONE
ACCESS
: 214
: 0811
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
___
MEN
_________
MAN-HOURS
ELAPSED TIME
SPARE
284210
31-63-00-PRO-10000
PUBLICATION
___________
JIC
JIC
AH
52-41-00-OPT-10000
28-42-84
RAI 10000-001
2-400 PAGE
1
DEC 01/14
28-42-84
001
RAI 10000-001
2
DEC14
002
___________
PREPARATION
1. ON PANEL 120VU,
A. OPEN
1QT
2QT
2QU
____________________________
REMOVAL
OF FUEL CONTROL UNIT
REF. FIG. 284284-RAI-00100
1. DISCONNECT ELECTRICAL CONNECTORS FROM
FUEL CONTROL UNIT (1) AND INSTALL PROTECTIVE CAP.
2. INSTALL PREOTECTIVE CAP ON THE FUEL CONTROL
*** CONTINUED ***
AH
28-42-84
RAI 10000-001
2-400 PAGE
2
DEC 01/14
28-42-84
RAI 10000-001
3
DEC14
UNIT (1).
3. REMOVE SCREWS (2) AND WASHERS (3).
4. REMOVE FUEL CONTROL UNIT (1).
004
_________________________________
INSTALLATION
OF FUEL CONTROL UNIT
REF. FIG. 284284-RAI-00100
1. INSTALL THE CONTROL UNIT (1).
2. INSTALL WASHERS (3) AND SCREWS (2) AND
TIGHTEN SCREWS.
3. REMOVE PROTECTIVE CAPS.
4. CONNECT ELECTRICAL CONNECTORS (TO FUEL
CONTROL UNIT).
005
________
CLOSE-UP
1. MAKE CERTAIN THAT WORKING AREA IS CLEAN AND
CLEAR OF TOOLS OR MISCELLANEOUS ITEM OF
EQUIPMENT.
2. INSTALL THE FORWARD AVIONIC COMPARTMENT
DOOR AND CHECK THAT THE SEAL DOOR IS
CORRECTLY PLACED.
3. CLOSE THE NOSE LANDING GEAR DOORS 713/714.
4. CLOSE CIRCUIT BREAKERS PREVIOUSLY OPENED.
006
_____________________________________
OPERATIONAL
TEST OF FUEL CONTROL UNIT
ON MFD UPPER WINDOW, IN ENGINE SECONDARY SD
PAGE, VERIFY THAT THE FUEL QUANTITIES MATCH
WITH THE EXPECTED VALUES.
28-42-84
RAI 10000-001
2-400 PAGE
3
DEC 01/14
28-42-84
007
RAI 10000-001
4
DEC14
____________________________________
CROSSCHECK
OF FUEL QUANTITY ON BOARD
REF.FIG.284281-CHK-00100
REF.FIG.284281-CHK-00110
CHECK COHERENCE OF FUEL QUANTITY INDICATED ON
MFD UPPER WINDOW, IN ENGINE SECONDARY PAGE AND
THE PHYSICAL QUANTITY IN THE TANK BY MEAN OF
DRIPSTICKS.
SEE JOB INSTRUCTION CARD:
12-11-28 CHK 10000
CONVERT VOLUME OBTAINED THROUGH DRIPSTICK IN
WEIGHT BY MEAN OF CONVERSION TABLE OF FIGURES
TAKING INTO ACCOUNT FUEL DENSITY OF THE DAY.
008
__________________________________________
OPERATIONAL
TEST OF FWD COMPT DOOR WARNING
SEE JOB INSTRUCTION CARD
524100-OPT-10000
*****
AH
E N D
O F
T E X T
*****
28-42-84
RAI 10000-001
2-400 PAGE
4
DEC 01/14
28-42-84
5
AH
RAI 10000-001
DEC14
28-42-84
RAI 10000-001
2-400
PAGE
5
DEC 01/14
28-42-84
6
AH
VOLUME/WEIGHT CROSSCHECK
OF FUEL QUANTITY
RAI 10000-001
DEC14
28-42-84
RAI 10000-001
2-400
PAGE
6
DEC 01/14
28-42-84
7
AH
VOLUME/WEIGHT CROSSCHECK
OF FUEL QUANTITY
RAI 10000-001
DEC14
28-42-84
RAI 10000-001
2-400
PAGE
7
DEC 01/14
28-43-71
RAI 10000-001
1
MAR12
ZONING DATA
___________
ZONE
ACCESS
: 522
622
: 522AZ 522BB 522CT 523CT 523GT
622AZ 622BB 622CT 623CB 623GT
PREPARATION
___________
PROVISION
WORK
: SKILL
_____
ELAPSED TIME
GSE
: 01 FUEL TANKER
01 ACCESS PLATFORM 3M (10FT)
SPARE
: 02 INDICATOR-MANUAL MAGNETIC
02 INDICATOR-MANUAL MAGNETIC
284370-01
284370-02
EXPENDABLE
: 10
08
02
10
08
02
08
284370-01
284370-01
284370-01
284370-02
284370-02
284370-02
284370-02
O-RING
NUT
SCREW
O-RING
NUT
SCREW
PROTECTIVE CAP
AH
___
MEN
_________
MAN-HOURS
11-004
11-003
04-012
09-019
09-001
09-002
28-43-71
RAI 10000-001
2-400 PAGE
1
MAR 01/12
28-43-71
RAI 10000-001
2
MAR12
PUBLICATION
___________
JIC
AH
57-00-00-OAC-10000
28-43-71
RAI 10000-001
2-400 PAGE
2
MAR 01/12
28-43-71
001
RAI 10000-001
3
MAR12
_______________________________
FUEL
SYSTEM SAFETY REQUIREMENTS
1. PRESENCE OF SAFETY PERSONNEL.
2. INSTALL EXPLOSIMETER IN FIRE RISK AREA (IN
CASE OF PARTIAL OR COMPLETE REFUELING), IN
ACCORDANCE WITH OPERATOR}S NATIONAL
REQUIREMENTS.
3. INSTALL SMOKING PROHIBITED WARNING NOTICES
AROUND FIRE RISK AREA (IN CASE OF PARTIAL OR
COMPLETE REFUELING), IN ACCORDANCE WITH
OPERATOR}S NATIONAL REQUIREMENTS.
4. PERFORM EQUIPOTENTIAL CONNECTION BETWEEN THE
TANKER AND THE AIRCRAFT (IN CASE OF FUEL
TRANSFER ONLY).
5. USE ONLY EXPLOSION PROOF INSPECTION LIGHTS
WHEN PERFORMING WORK.
6. COMPLY WITH SAFETY INSTRUCTIONS OF
ELECTRICAL POWER SUPPLY CHAPTER.
7. ANY SPILLED FUEL MUST BE ABSORBED AND DRIED.
002
___________
PREPARATION
1. INSTALL PLATFORM, 3.13 M (10.26 FT), TO GAIN
ACCESS TO WING LOWER SURFACE AND PLATFORM
3.76 M (12.34 FT), TO GAIN ACCESS TO WING
UPPER SURFACE.
2. DEFUEL COMPLETELY INTO TANKER.
(SEE JOB INST CARD: 121100-DFG-10000)
3. INSTALL WARNING NOTICE PROHIBITING OPERATION
OF FUEL SYSTEM.
4. FOR INTERNAL MAGNETIC INDICATOR:
- REMOVE ACCESS DOORS 522CT (622CT), 522AZ
*** CONTINUED ***
AH
28-43-71
RAI 10000-001
2-400 PAGE
3
MAR 01/12
28-43-71
RAI 10000-001
4
MAR12
(622AZ)
FOR EXTERNAL MAGNETIC INDICATOR:
- REMOVE ACCESS DOORS 523HT (623HT), 523GT
(623GT)
USE THE POCEDURE OF WING ACCESS DOORS AS
FOLLOWS :
003
_______________________________
OPENING
OF WING BOX ACCES DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
004
005
28-43-71
RAI 10000-001
2-400 PAGE
4
MAR 01/12
28-43-71
RAI 10000-001
5
MAR12
28-43-71
RAI 10000-001
2-400 PAGE
5
MAR 01/12
28-43-71
RAI 10000-001
6
MAR12
008
________
CLOSE-UP
INSTALL ACCESS DOORS 522AZ (622AZ), 522CT
(622CT) AND 523GT (623GT) AS FOLLOWS :
28-43-71
RAI 10000-001
2-400 PAGE
6
MAR 01/12
28-43-71
009
RAI 10000-001
7
MAR12
________________________________
CLOSING
OF WING BOX ACCESS DOORS
SEE JOB INSTRUCTION CARD
570000-OAC-10000
010
________
CLOSE-UP
1. DISCONNECT AIRCRAFT FROM TANKER.
(IF IT HAS BEEN INSTALLED).
2. REMOVE SMOKING PROHIBITED WARNING NOTICES.
3. REMOVE EXPLOSIMETER.
4. REMOVE WARNING NOTICE PROHIBITING ENERGIZATION OF FUEL SYSTEM FROM FLIGHT COMPARTMENT.
5. CHECK THAT WORKING AREA IS CLEAN AND CLEAR
OF TOOLS AND MISCELLANEOUS ITEMS OF EQUIPMENT.
6. REMOVE PLATFORM.
011
______________________________________
CHECKING
OF MANUAL MAGNETIC INDICATORS
1. REFUEL FUEL TANK CONCERNED BY REMOVAL OF MANUAL MAGNETIC INDICATOR.
2. CHECK THAT THERE IS NO LEAKAGE AT LEVEL OF
SEALS.
*****
AH
E N D
O F
T E X T
*****
28-43-71
RAI 10000-001
2-400 PAGE
7
MAR 01/12
28-43-71
8
AH
MANUAL MAGNETIC
INDICATOR BETWEEN
RIB 5 AND 6
RAI 10000-001
MAR12
28-43-71
RAI 10000-001
2-400
PAGE
8
MAR 01/12
28-43-71
9
AH
MANUAL MAGNETIC
INDICATOR BETWEEN
RIB 21 AND 22
RAI 10000-001
MAR12
28-43-71
RAI 10000-001
2-400
PAGE
9
MAR 01/12
12 - MAR 01/15
28-10-00-DVI-10005-002
28-10-00-DVI-10010-003
28-21-61-RAI-10000-001
28-21-71-DVI-10000-001
28-21-71-RAI-10000-001
28-21-72-RAI-10000-001
28-21-73-RAI-10000-001
28-21-74-RAI-10000-001
28-21-77-RAI-10000-001
28-21-78-RAI-10010-001
28-21-78-RAI-10030-001
28-21-79-RAI-10000-001
28-42-72-FUT-10000-003
28-42-72-FUT-10000-004
AH
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
MINOR
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
INFORMATION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ADDITION
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
051 TO 062
063 TO 065
12
PAGE
1
MAR 01/15
PAGE
1 TO
10 MAR/15
ALL
1 TO
12 MAR/15
ALL
1 TO
5 APR/05
ALL
1 TO
3 APR/05
ALL
1 TO
3 MAR/11
ALL
1 TO
10 MAR/12
ALL
1 TO
1 TO
4 APR/05
5 MAR/12
ALL
ALL
1 TO
4 MAR/12
ALL
1 TO
5 MAR/12
ALL
1 TO
3 APR/05
ALL
1 TO
4 DEC/14
ALL
1 TO
3 DEC/14
ALL
1 TO
5 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
4 DEC/14
ALL
REVISION NO 12 - MAR/15
1
MAR/15
PAGE
1 TO
6 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
6 DEC/14
51 TO
62
1 TO
8 DEC/14
63 TO
65
1 TO
5 MAR/15
ALL
1 TO
4 MAR/15
ALL
1 TO
6 MAR/15
ALL
1 TO
10 MAR/15
ALL
1 TO
5 MAR/15
ALL
1 TO
5 MAR/15
ALL
1 TO
4 APR/05
ALL
1 TO
7 MAR/15
ALL
1 TO
6 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
6 MAR/15
ALL
1 TO
6 MAR/15
ALL
1 TO
8 MAR/15
ALL
REVISION NO 12 - MAR/15
R
R
R
R
R
R
R
R
AH
2
MAR/15
PAGE
1 TO
8 DEC/14
51 TO
62
1 TO
13 DEC/14
63 TO
65
1 TO
6 MAR/12
ALL
1 TO
5 MAR/12
ALL
1 TO
10 DEC/14
51 TO
62
1 TO
11 DEC/14
63 TO
65
1 TO
6 APR/05
ALL
1 TO
10 DEC/14
51 TO
62
1 TO
11 DEC/14
63 TO
65
1 TO
5 DEC/14
ALL
1 TO
9 MAR/12
ALL
1 TO
5 MAR/12
ALL
1 TO
4 MAR/12
ALL
1 TO
5 DEC/14
63 TO
1 TO
6 MAR/12
ALL
1 TO
5 MAR/12
ALL
1 TO
4 MAR/12
ALL
REVISION NO 12 - MAR/15
65
3
MAR/15
PAGE
1 TO
5 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
5 MAR/12
ALL
1 TO
6 DEC/14
ALL
1 TO
7 DEC/14
51 TO
62
1 TO
5 DEC/14
51 TO
62
1 TO
5 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
6 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
8 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
5 DEC/14
51 TO
62
1 TO
4 MAR/12
ALL
1 TO
9 MAR/15
51 TO
62
1 TO
9 MAR/15
63 TO
65
1 TO
6 MAR/12
51 TO
54 TO
58 TO
52
56
62
REVISION NO 12 - MAR/15
4
MAR/15
PAGE
1 TO
6 DEC/14
63 TO
65
1 TO
7 DEC/14
51 TO
62
1 TO
8 DEC/14
63 TO
65
1 TO
5 DEC/14
51 TO
62
1 TO
5 DEC/14
63 TO
65
1 TO
6 DEC/14
51 TO
62
1 TO
6 DEC/14
63 TO
65
1 TO
9 DEC/14
51 TO
62
1 TO
10 DEC/14
63 TO
65
1 TO
11 DEC/14
51 TO
62
1 TO
10 DEC/14
63 TO
65
1 TO
8 DEC/14
51 TO
62
1 TO
5 DEC/14
51 TO
62
1 TO
4 DEC/14
51 TO
62
1 TO
7 DEC/14
63 TO
65
1 TO
9 MAR/12
ALL
REVISION NO 12 - MAR/15
AH
5
MAR/15