This Generic IEE Checklist Report shall be used as the interim pro-forma EIA
Report requirement for projects types where a customized IEE Checklist Report
Form has not yet been developed but are required IEE Checklist Report Form or
IEE Report per the Revised Procedural Manual for DAO 2003-30
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if
any, following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and
affected areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization
Scheme (PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO
2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces
provided or otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes
with check marks () are automatically required. Use additional sheets if necessary
and indicate this in the appropriate space.
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use PRS 92 datum, otherwise specify datum
used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
Drainage system
(Please list facilities by module/grouping. Use additional sheets if needed)
1.3 UTILITIES/REQUIREMENTS (Operation Phase):
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Measures
Power/Electricity KWh
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
LAND
Consistency with land Current land use w/in 1km radius See attached proof of compatibility with land
use (as per zoning ordinance): use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
___________________
Disturbance to wildlife Existing vegetation in the area: Compliance with conditions of DENR/LGU Annual inspection of area Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA Permit replanted/ revegetated construction /operation cost
clearing Marshland Limit land clearing as much as possible
Grassland
Provide temporary fencing for vegetation
Mangrove
that will be retained
Wetland
Others, specify Promote restoration of damaged or
____________________ destroyed vegetation where possible (e.g., tree
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
planting);
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
steep (>18%) topsoil set aside for later use and allow Regular inspection for new ____________
Soil Erosion maximum re-use of spoils eroded areas near the site
Construction during dry season Others, specify
Stabilization of embankment with grasses ___________
or other soil cover
Others, specify
____________
Is the project site located in an area Compliance with the DENR Administrative
identified by Order No. 2003-30 and DENR
MGB/PAGASA/PHIVOLCS as Administrative Order No. 2000-28,
hazard prone? Implementing Guidelines on Engineering
Yes Geological and Geo-hazard Assessment
(EGGA).
No
Soil/Land contamination Existing soil type in the area: Implementation of the Ecological Solid Daily inspection of Cost integrated in the
due to improper solid
waste disposal
sandy Waste Management Plan (ESWMP) waste/recycling bins for
segregation
construction /operation cost
clay
sandy-loam Set-up temporary fence around the Daily inspection for presence
construction area
Others, specify
of mixed garbage in the facility
____________ Implement re-use and recycling of waste Weekly inspection of waste
materials accumulated
Implement proper segregation, collection
and disposal of domestic wastes in designated Others, specify
areas _____________
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Increased siltation due Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality Strictly require the contractor and its workers Water treatment facility (i.e.,
degradation Distance to nearest/receiving water to observe proper waste disposal and proper grease trap, septic tank, etc.)
Others, specify body: sanitation
Quarterly monitoring of the
___________________ 0 to less than 0.5 km
Strictly observe proper waste handling and following:
0.5 to 1 km disposal pH
More than 1 km TSS concentration
Provision of wastewater treatment facility
If nearest/receiving water body is (e.g. septic tank, oil and water separator, etc.) BOD
fresh water, specify classification: Set up silt trap/stilling ponds to minimize Total Coliform
AA downstream siltation Color
A Provision of three-chambered septic tank Oil and Grease
B
for domestic sewage
C
Provide ring canals around fuelling tanks/
motorpool/ maintenance areas
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
D Others, specify
___________
Others, specify
Others, specify
_____________________
_________________
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of complaints construction/ operation cost
0.5 to 1 km etc)
Regular (ocular) inspection of:
More than 1 km Install when applicable, the appropriate air
Absence of white or black
pollution control device/s
smoke from vehicles,
Strictly enforce good housekeeping heavy equipment and
practices generator
Control vehicle speed to lessen Presence of truck cover
suspension of road dust during deliveries
Conduct water spraying to suppress dust
sources and minimize discomfort to nearby
residents
Use covered vehicles to deliver materials
that may generate dust
Other, specify
___________________
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise Regularly monitor Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of complaints construction/ operation cost
0.5 to 1 km etc)
More than 1 km Install when applicable, the appropriate Regular monitoring of buffer
zones
noise control device/s (e.g., mufflers,
silencer, sound barriers, etc.)
Implement appropriate operating hours
Provide adequate buffer and/or planting of
trees
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Others, specify
______________________
PEOPLE
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
Attach drawing/plan of waste water treatment facility (with dimensions and
descriptions)
Attach drawing/plan of air pollution source and control installations (with
dimensions and descriptions)
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to
the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising
from any misrepresentation or failure to state material information in this IEE
Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.