Implementation
of
Environment Management Plan
Targeted Group:
CMU & Contractor Engineers
Punjab State Road Sector Project, PRBDB 1
Periodic Maintenance Work Roads, PSRSP –
Environment Component
Project Background
Feasibility Study – Screening
Scoping
EMP Implementation
“Environment
Management Plan is a
Tool”
safety specifications
Cl. C.4.3.1 Noise Pollution: Noise from Vehicles, Plants and Equipments
Plants and equipment used in construction shall strictly conform to the
MoEF/CPCB/PPCB noise standards.
Vehicles and equipment used in construction will be fitted with exhaust silencers.
Limits of noise emission for construction equipment shall not exceed 75 dB.
No Construction activity near (100 m) sensitive areas between 9.00 pm to 6.00
am.
Social Component
Engineering Environment
Component Component