SOP For Final Disposal of Solid Hazardous Waste in The Engineered Cells in Al Dhafra Landfill
SOP For Final Disposal of Solid Hazardous Waste in The Engineered Cells in Al Dhafra Landfill
SOP For Final Disposal of Solid Hazardous Waste in The Engineered Cells in Al Dhafra Landfill
PREPARED BY
1 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
Table of Contents
1. Introduction ............................................................................................................................................. 3
2. General Responsibilities of the Environmental Service Providers ................................................................ 3
3. Legal Framework ...................................................................................................................................... 4
4. Tadweer Technical Guidelines & Standard Operating Procedures ............................................................... 5
5. Scope and requirements of solid hazardous waste disposal ....................................................................... 5
6. Accepted waste and waste acceptance criteria .......................................................................................... 7
7. Mechanism for the disposal of specific solid Hazardous Waste at the hazardous solid waste cells ............... 9
8. Waste reception procedure ..................................................................................................................... 10
9. Contact Details ....................................................................................................................................... 11
10. Annex ................................................................................................................................................. 12
2 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
1. Introduction
Tadweer (The Center of Waste Management -Abu Dhabi) constructed three engineered
hazardous solid waste cells and three hazardous liquid waste cells in Al Dhafra landfill
area.
These cells came as a permanent and quick solution for the tremendous hazardous waste
being generated in the Emirate of Abu Dhabi as more sustainable treatment facilities are
planned to be constructed in the Emirate very soon.
This SOP has been developed while taking into consideration Law No (17) for the year
2008 regarding establishing the Center of Waste Management, law No (21) for the year
2005 on waste management in the Emirate of Abu Dhabi, Decree No. (41) of 2017 issued
by the Executive Council of the Emirate of Abu Dhabi on tariff charges for the cost of
hazardous wastes disposal, as well as in line with Abu Dhabi vision 2030, international
standards and best applicable practices in waste management field.
Tadweer (The Center of Waste Management -Abu Dhabi) is starting the operation of
Three (3) new-engineered cells dedicated for Solid Hazardous waste located at Al Dhafra
Landfill.
3 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
3. Legal Framework
Listed below are the main legislative requirements related to the Hazardous Waste
within the Emirate of Abu Dhabi . All the requirements listed within these documents
shall be adhered to, however compliance with this document and those referenced
within, shall ensure compliance with the requirements stated within the legal standards
listed below:
1 Federal Cabinet Resolution No. (39) of 2006 on Banning the Import and Production
of Asbestos;
2 Federal Law No (24) for the year 1999 on the Protection and the Development of the
Environment;
3 Federal Law No. (28) of 2001 Regarding the Establishment of the emirates authority
for standards and Meteorology;
4 Federal Regulation for Handling Hazardous Materials, Hazardous Wastes and
Medical Wastes, issued by Cabinet Decree No. 37 of 2001;
5 Law No (21) for the year 2005 on Waste Management in the Emirate of Abu Dhabi;
6 Decree No 17 of 2008 Establishing the Centre of Waste Management – Abu Dhabi;
7 Decree 2G24 of 2009 for Tariff System of the Waste in the Emirates of Abu Dhabi;
8 Decree No 42 of 2009 Requirements of the Abu Dhabi Emirate Environment, Health
and Safety Management System (EHSMS) Regulatory Framework;
9 Centre of Waste Management Board of Directors Decree No 1/2010 for Waste
Tracking System;
10 Basel Convention Protocol for Liability and Compensation on the Control of Trans
boundary Movement of Hazardous Wastes and their Disposal (Texts and Annexes);
11 Decree No. (41) of 2017 issued by the Executive Council of the Emirate of Abu Dhabi
on tariff charges for the cost of hazardous wastes disposal.
12 ADOT-57 and ADOT-58 Abu Dhabi Quality & Conformity Council – Hazardous waste
Handler and Operator Conformity Scheme.
4 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
5 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
2. Fees charges will be payable as a gate fee for a minimum charge of 1 ton, in case
less than 1 ton, and in case of more than one ton it will be approximated to the
higher tonnage.
3. Cost fees of hazardous solid waste disposal shall be levied through Aber system at
Al Dhafra Landfill gates.
The ESP will be charged based on per ton of specific solid Hazardous Waste as specified in the
following table:
6 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
4- The official working hours in the cell will be from 9:00 am to 4:00 pm, except on
Fridays and Saturdays.
5- Before any disposal, ESP shall contact Hazardous waste cells operator to inform
about expected date and time for the disposal of Tadweer previously approved
hazardous waste.
The following list includes the hazardous wastes (solid) that could be received at the
engineered cells at Al-Dhafra Landfill if complying with the laboratory analysis limits in
Directive 1999/31/EC and as per Annex 1 of this SOP.
7 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
14. Insecticide and Pesticide Empty Containers* Environmentally Depressurized Cans Compacted, Covered
and sealed in jumbo bags.
16. Alkali Solids Stabilization Treatment Required
17. Acidic Solids Stabilization Treatment Required
17. Organo-Chloride other than pesticide Stabilization Treatment Required
18. Spent Catalyst Stabilization Treatment Required
TADWEER will not receive the following Hazardous Waste in the Solid Hazardous Waste
Landfill.
8 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
9 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
10 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
9. Contact Details
*Timings to receive specific solid Hazardous Waste at Tadweer approved facility are as
follows: Sunday to Thursday from 9:00 am to 04:00 pm and no specific solid
Hazardous Waste shall be received on Friday and Saturday.
*Timings are subjected to change and Tadweer has right to change timings at any time
without prior notice.
11 of 12 | P a g e
SOP for Final Disposal of Solid Hazardous waste in the Engineered cells in Al Dhafra landfill
10. Annex
12 of 12 | P a g e