IEE Checklist Report
IEE Checklist Report
IEE Checklist Report
Agricultural/ Recreational
Protected Areas
Others, specify
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Land Tenure / Land tenure / compatibility Obtain appropriate clearances/ permits Regularly monitor
compatibility issue issues: from concerned agencies: presence/absence of
CARP complaints
Disturbance to Existing vegetation in the area: Comply with conditions of DENR/LGU Annual inspection of area
wildlife due to Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ re-vegetated
vegetation clearing
Marshland
Permit Others, specify
Limit land clearing as much as possible
Grassland
Provide temporary fencing for
Mangrove vegetation that will be retained
Wetland Promote restoration of damaged or
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Others, specify destroyed vegetation where possible
(e.g., tree planting);
Provide adequate buffer zone
Others, specify
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Soil/Land Existing soil type in the area: Secondary containment (pls specify : Monitoring of soil
contamination due sandy petroleum fuel content in
to project operations soil and other parameters
and improper clay relevant to the potential
solid/hazardous sandy-loam source of contamination (if
waste disposal Others, specify any, specify):
Building of Structure
and Improper solid
Solid Waste Management
Scheme in the area:
Set-up temporary fence around the Daily inspection of waste
construction area handling including
waste management
leading to:
SLF Implement re-use and recycling of segregation in
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Devaluation of land Wastes Provide receptacles / bins for solid
wastes
Regular inspection of
values landscaping and other
Presence of visually significant
landforms/landscape/structures?
Composting of Organic Wastes beautification activities
Coordinate with the municipal / city Regular monitoring of
Yes waste collectors buffer zones
No Engage third party company for waste Regularly monitor
collection presence/absence of
Implement landscaping and other
complaints from adjacent
property owners
beautification measures
Provide adequate buffer
Others, specify
WATER
Increased siltation Specify nearest water body: Set up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
due to project facilities Drainage/canal systems construction/ operation
activities Ensure strict observance of proper Wastewater treatment
cost
Water quality waste disposal/handling and proper
sanitation including by the contractor
facility (i.e., grease trap,
degradation septic tank, etc.)
and its workers (if any) Regular monitoring of ambient
Others, specify
Provision of wastewater treatment water for the following:
Distance to nearest water body: Parameter Frequency
facility (e.g., septic tank, oil and water
0 to less than 0.5 km separator, etc.) pH Annual
0.5 to 1 km Set up silt trap/settling ponds to Semi-annual
More than 1 km minimize downstream siltation
Quarterly
Provide ring canals around fuelling
Monthly
Size of population using tanks/ motor pool/ maintenance areas
Project Name: ____________________________________________________
Page 5 of 13
Initial Environmental Examination (IEE) Checklist Report for Petroleum Fuel Station Projects
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
receiving surface water: Others, specify TSS Annual
≤ 1,000 persons concentra
tion Semi-annual
>1,000 and ≤ 5,000persons Quarterly
>5,000person Monthly
Classification of nearest water BOD Annual
body : Semi-annual
Freshwater Marine/ coastal Quarterly
water Monthly
AA SA Color Annual
A SB
Semi-annual
B SC
Quarterly
Monthly
C SD
Total Annual
D Coliform
Semi-annual
Current Water Use:
Quarterly
Fishery
Monthly
Tourist Zone / Park
Oil and Annual
Recreational
Grease
Semi-annual
Industrial
Quarterly
Agricultural
Monthly
Total Annual
Distance of project area to the
Petroleu
m Semi-annual
nearest well used: Hydrocar Quarterly
0 to less than 0.5 km
bon / BTX
Monthly
0.5 to 1 km
More than 1 km
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Drinking/Domestic
Industrial
Agricultural
Others, specify
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
AIR / NOISE
Air quality Distance to nearest community: Properly operate and maintain all Regular monitoring for Cost integrated in the
degradation 0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of construction/ operation
Nuisance due to 0.5 to 1 km pumps, generator, etc.) complaints cost
generation of
More than 1 km Install appropriate air pollution control Regular (ocular) inspection of:
obnoxious/unpleasa device/s:
nt odor Is the wind direction blowing
towards the nearest community
Absence of white or black
smoke from vehicles,
most of the year? generator, etc.
Yes Regularly monitor for
No presence/absence of
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Control vehicle speed to lessen complaints
suspension of road dust Regular monitoring for
Conduct water spraying to suppress obnoxious odor
dust sources and minimize discomfort
to nearby residents
Control vehicle speed to lessen
suspension of road dust
Use covered vehicles to deliver
materials that may generate dust
Regular clean-up and good
housekeeping practices
Use of environment-friendly deodorizer
or odor masking substances
Spraying natural / microbial
disinfectants
Provide adequate buffer and/or planting
of trees
Others, specify
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Nuisance due to Properly operate and maintain all noise Regular monitoring for Cost integrated in the
noise generation sources (e.g., vehicles, pumps, presence/absence of construction/ operation
generator, etc.) complaints cost
Install, when applicable, the appropriate Regular monitoring of
noise control device/s (e.g., mufflers, buffer zones
silencer, sound barriers, etc.)
Implement appropriate operating hours
Provide adequate buffer and/or planting
of trees
Others, specify
Gas Emission Regular and efficient maintenance of Monitor for gas leak
mechanical equipment
PEOPLE
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Displacement of Size of population of host
barangay:
Provide relocation/disturbance Regular monitoring for
residents including compensation packages presence/absence of
indigenous people (if ≤ 1,000 persons Prioritize local residents for complaints
any) in the project
>1,000 and ≤ employment Regular coordination with
site and within its
vicinity
5,000persons Promptly pay local taxes and other LGU
financial obligations Others, specify
Enhanced
>5,000person
employment and/or Indigenous People
livelihood Size: Regular coordination with LGU
opportunities Prior consultation and coordination to
Reduced minimize disruption of daily domestic
activities IP rights and cultural practices
employment and/or
livelihood Ensure participation of IPs in
opportunities consultations and dialogues and
Increased revenues Classification of host barangay:
consider IP rights and cultural practices
in the provision of relocation/
for LGU
Urban disturbance compensation packages
Disruption/Competiti
Rural Provide appropriate traffic/warning
on in delivery of
public services signs, lighting, etc.
(e.g., education,
Employment/Livelihood
Opportunity within the host
Others, specify
peace and order,
municipality
etc.)
Enhanced delivery
High
of public services Low
(e.g., education, Description :
peace and order,
etc.)
Increase in traffic
volume and
worsening of traffic
flow
Available services within/near
the host barangay:
Schools (e.g.
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
elementary, high school,
college)
Health facilities (e.g.,
clinics, hospitals, etc.)
Peace and order (e.g.,
police outpost, Brgy.
Tanod, etc.)
Recreation and sports
facilities
Others, specify
Destruction/disturban Physical Cultural resources Implement appropriate protocols based Regular coordination with
ce of physical cultural within the vicinity of the project on NM, NHCP, NCAA and LGU NM, NHCP, NCAA and
resources. site: guidelines including those for chance LGU
( if project site has finds (if any). Specify:
been identified to have
such by NM, NHCP,
NCAA and LGUs)
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
Impacts on Source of risks Regular coordination with LGU Regular monitoring for Cost integrated in the
community health Explosive substances: Provide appropriate warning signs, presence/absence of construction/ operation
and safety lighting and barricades, whenever complaints cost
practicable Regular monitoring of
Safety Risks
Observe proper housekeeping buffer zones
Fire
Explosion
Provide on-site medical services for Regular coordination with
LGU
any emergency.
Release of toxic Flammable substances: Participate in public awareness
Regular submission of
materials reports to concerned
programs on health and safety
Structural failure Implement appropriate safety programs
agency
Oil spills
Others, specify