Air System Sizing Summary for DOCUMENTATION ROOM

Project Name: HOSPITAL LOAD CALC 04/01/2024


Prepared by: SALAH 08:17?

Air System Information


Air System Name ............ DOCUMENTATION ROOM Number of zones ............................................................ 1
Equipment Class ......................................... CW AHU Floor Area ................................................................. 56.0 ft²
Air System Type ............................................. SZCAV Location ............................................... Toronto, Ontario

Sizing Calculation Information

Calculation Months .................................. Jan to Dec Zone CFM Sizing ................ Sum of space airflow rates
Sizing Data .............................................. Calculated Space CFM Sizing ............ Individual peak space loads

Central Cooling Coil Sizing Data

Total coil load ........................................................ 2.0 Tons Load occurs at ................................................... Jul 1500
Total coil load ...................................................... 24.5 MBH OA DB / WB .................................................... 87.0 / 71.0 °F
Sensible coil load ................................................ 24.1 MBH Entering DB / WB ............................................ 67.7 / 56.5 °F
Coil CFM at Jul 1500 ......................................... 1294 CFM Leaving DB / WB ............................................. 50.1 / 49.0 °F
Max block CFM .................................................. 1294 CFM Coil ADP .................................................................... 48.1 °F
Sum of peak zone CFM ..................................... 1294 CFM Bypass Factor ......................................................... 0.100
Sensible heat ratio ............................................ 0.983 Resulting RH ................................................................ 50 %
CFM/Ton ........................................................... 632.8 Design supply temp. .................................................. 62.6 °F
ft²/Ton .................................................................. 27.4 Zone T-stat Check .................................................. 1 of 1 OK
BTU/(hr·ft²) ........................................................ 438.1 Max zone temperature deviation ................................. 0.0 °F
Water flow @ 10.1 °F rise ................................... 4.87 gpm

Central Heating Coil Sizing Data

Max coil load ....................................................... 22.1 MBH Load occurs at .................................................. Jan 0800
Coil CFM at Jan 0800 ........................................ 1294 CFM BTU/(hr·ft²) .............................................................. 394.8
Max coil CFM ..................................................... 1294 CFM Ent. DB / Lvg DB ............................................. 48.9 / 65.0 °F
Water flow @ 20.0 °F drop .................................. 2.21 gpm

Supply Fan Sizing Data

Actual max CFM ................................................ 1294 CFM Fan motor BHP ......................................................... 0.00 BHP
Standard CFM ................................................... 1267 CFM Fan motor kW ........................................................... 0.00 kW
Actual max CFM/ft² ........................................... 23.10 CFM/ft² Fan static .................................................................. 0.00 in wg

Outdoor Ventilation Air Data


Design airflow CFM ................................................. 1 CFM CFM/person .............................................................. 0.30 CFM/person
CFM/ft² ................................................................ 0.01 CFM/ft²

Hourly Analysis Program 5.10 Page 1 of 14


Zone Sizing Summary for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

Air System Information


Air System Name ............ DOCUMENTATION ROOM Number of zones ............................................................ 1
Equipment Class ......................................... CW AHU Floor Area ................................................................. 56.0 ft²
Air System Type ............................................. SZCAV Location ............................................... Toronto, Ontario

Sizing Calculation Information

Calculation Months .................................. Jan to Dec Zone CFM Sizing ................ Sum of space airflow rates
Sizing Data .............................................. Calculated Space CFM Sizing ............ Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Load gpm Load gpm Airflow
Zone Name (CFM) (CFM) CFM/ft² (MBH) @ 20.0 °F (MBH) @ 20.0 °F (CFM)
DOCUMENTATION ROOM 1294 1294 23.10 0.0 0.00 0.0 0.00 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (MBH) Cooling Load (MBH) (ft²)
DOCUMENTATION ROOM 4.9 Jul 1500 2.6 56.0

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
DOCUMENTATION ROOM
DOCUMENTATION ROOM 1 4.9 Jul 1500 1294 2.6 56.0 23.10

Hourly Analysis Program 5.10 Page 2 of 14


Ventilation Sizing Summary for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

1. Summary
Ventilation Sizing Method ................................... Sum of Space OA Airflows
Design Ventilation Airflow Rate ..................................................................... 1 CFM

2. Space Ventilation Analysis


Maximum Required Required Required Required Uncorrected
Floor Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (ft²) Occupants (CFM) (CFM/person) (CFM/ft²) (CFM) (% of supply) (CFM)
DOCUMENTATION ROOM
DOCUMENTATION ROOM 1 56.0 2.0 1293.8 0.30 0.00 0.0 0.0 0.6
Totals (incl. Space Multipliers) 1293.8 0.6

Hourly Analysis Program 5.10 Page 3 of 14


Air System Design Load Summary for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 87.0 °F / 71.0 °F HEATING OA DB / WB -4.0 °F / -5.3 °F
Sensible Latent Sensible Latent
ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window & Skylight Solar Loads 0 ft² 0 - 0 ft² - -
Wall Transmission 141 ft² 1100 - 141 ft² 2060 -
Roof Transmission 65 ft² 560 - 65 ft² 508 -
Window Transmission 0 ft² 0 - 0 ft² 0 -
Skylight Transmission 0 ft² 0 - 0 ft² 0 -
Door Loads 0 ft² 0 - 0 ft² 0 -
Floor Transmission 56 ft² 0 - 56 ft² 0 -
Partitions 141 ft² 620 - 141 ft² 0 -
Ceiling 56 ft² 246 - 56 ft² 0 -
Overhead Lighting 560 W 1911 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 2 490 410 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4928 410 - 2567 0
Zone Conditioning - 4670 410 - 2444 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 1294 CFM 0 - 1294 CFM 0 -
Ventilation Load 1 CFM 12 16 1 CFM 41 14
Supply Fan Load 1294 CFM 0 - 1294 CFM 0 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 4682 426 - 2485 14
Central Cooling Coil - 24108 427 - 0 0
Central Heating Coil - -19425 - - 2485 -
>> Total Conditioning - 4682 427 - 2485 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program 5.10 Page 4 of 14


Zone Design Load Summary for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

DOCUMENTATION ROOM DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 87.0 °F / 71.0 °F HEATING OA DB / WB -4.0 °F / -5.3 °F
OCCUPIED T-STAT 66.2 °F OCCUPIED T-STAT 60.8 °F
Sensible Latent Sensible Latent
ZONE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window & Skylight Solar Loads 0 ft² 0 - 0 ft² - -
Wall Transmission 141 ft² 1100 - 141 ft² 2060 -
Roof Transmission 65 ft² 560 - 65 ft² 508 -
Window Transmission 0 ft² 0 - 0 ft² 0 -
Skylight Transmission 0 ft² 0 - 0 ft² 0 -
Door Loads 0 ft² 0 - 0 ft² 0 -
Floor Transmission 56 ft² 0 - 56 ft² 0 -
Partitions 141 ft² 620 - 141 ft² 0 -
Ceiling 56 ft² 246 - 56 ft² 0 -
Overhead Lighting 560 W 1911 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 2 490 410 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4928 410 - 2567 0

Hourly Analysis Program 5.10 Page 5 of 14


Space Design Load Summary for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

TABLE 1.1.A. Component Loads For Space "DOCUMENTATION ROOM" In Zone "DOCUMENTATION ROOM"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 87.0 °F / 71.0 °F HEATING OA DB / WB -4.0 °F / -5.3 °F
OCCUPIED T-STAT 66.2 °F OCCUPIED T-STAT 60.8 °F
Sensible Latent Sensible Latent
SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window & Skylight Solar Loads 0 ft² 0 - 0 ft² - -
Wall Transmission 141 ft² 1100 - 141 ft² 2060 -
Roof Transmission 65 ft² 560 - 65 ft² 508 -
Window Transmission 0 ft² 0 - 0 ft² 0 -
Skylight Transmission 0 ft² 0 - 0 ft² 0 -
Door Loads 0 ft² 0 - 0 ft² 0 -
Floor Transmission 56 ft² 0 - 56 ft² 0 -
Partitions 141 ft² 620 - 141 ft² 0 -
Ceiling 56 ft² 246 - 56 ft² 0 -
Overhead Lighting 560 W 1911 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 2 490 410 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0% / 0% 0 0 0% 0 0
>> Total Zone Loads - 4928 410 - 2567 0

TABLE 1.1.B. Envelope Loads For Space "DOCUMENTATION ROOM" In Zone "DOCUMENTATION ROOM"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(ft²) (BTU/(hr·ft²·°F)) Coeff. (BTU/hr) (BTU/hr) (BTU/hr)
S EXPOSURE
WALL 64 0.225 - 439 - 935
E EXPOSURE
WALL 77 0.225 - 661 - 1125
H EXPOSURE
ROOF 65 0.121 - 560 - 508

Hourly Analysis Program 5.10 Page 6 of 14


Hourly Air System Design Day Loads for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

DESIGN MONTH: JULY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (°F) (CFM) (MBH) (MBH) (MBH) (MBH) (MBH) (MBH) (MBH) (MBH)
0000 70.4 1294 24.0 24.4 19.9 0.0 0.0 0.0 0.0 0.0
0100 69.4 1294 24.0 24.5 20.0 0.0 0.0 0.0 0.0 0.0
0200 68.4 1294 24.0 24.5 20.1 0.0 0.0 0.0 0.0 0.0
0300 67.6 1294 24.0 24.5 20.2 0.0 0.0 0.0 0.0 0.0
0400 67.0 1294 24.0 24.5 20.2 0.0 0.0 0.0 0.0 0.0
0500 66.8 1294 24.0 24.5 20.3 0.0 0.0 0.0 0.0 0.0
0600 67.2 1294 24.0 24.5 20.3 0.0 0.0 0.0 0.0 0.0
0700 68.2 1294 24.0 24.5 20.2 0.0 0.0 0.0 0.0 0.0
0800 70.0 1294 24.0 24.5 20.1 0.0 0.0 0.0 0.0 0.0
0900 72.7 1294 24.0 24.4 19.9 0.0 0.0 0.0 0.0 0.0
1000 75.7 1294 24.1 24.5 20.0 0.0 0.0 0.0 0.0 0.0
1100 79.1 1294 24.0 24.5 19.6 0.0 0.0 0.0 0.0 0.0
1200 82.4 1294 24.1 24.5 19.7 0.0 0.0 0.0 0.0 0.0
1300 84.8 1294 24.1 24.5 19.5 0.0 0.0 0.0 0.0 0.0
1400 86.4 1294 24.1 24.5 19.4 0.0 0.0 0.0 0.0 0.0
1500 87.0 1294 24.1 24.5 19.4 0.0 0.0 0.0 0.0 0.0
1600 86.4 1294 24.1 24.5 19.4 0.0 0.0 0.0 0.0 0.0
1700 85.0 1294 24.1 24.5 19.5 0.0 0.0 0.0 0.0 0.0
1800 82.8 1294 24.0 24.5 19.4 0.0 0.0 0.0 0.0 0.0
1900 80.1 1294 24.0 24.5 19.5 0.0 0.0 0.0 0.0 0.0
2000 77.5 1294 24.0 24.5 19.6 0.0 0.0 0.0 0.0 0.0
2100 75.3 1294 24.0 24.5 19.7 0.0 0.0 0.0 0.0 0.0
2200 73.3 1294 24.0 24.5 19.8 0.0 0.0 0.0 0.0 0.0
2300 71.6 1294 24.0 24.5 19.9 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program 5.10 Page 7 of 14


Hourly Zone Loads for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

ZONE: DOCUMENTATION ROOM


DESIGN MONTH: JULY
ZONE TERMINAL TERMINAL ZONE
OA ZONE ZONE SENSIBLE ZONE COOLING HEATING HEATING
TEMP TEMP RH AIRFLOW LOAD COND COIL COIL UNIT
Hour (°F) (°F) (%) (CFM) (BTU/hr) (BTU/hr) (BTU/hr) (BTU/hr) (BTU/hr)
0000 70.4 66.9 50 1293.8 4149.5 4084.4 0.0 0.0 0.0
0100 69.4 66.9 50 1293.8 4069.2 4003.1 0.0 0.0 0.0
0200 68.4 66.8 50 1293.8 3993.3 3926.6 0.0 0.0 0.0
0300 67.6 66.8 50 1293.8 3922.4 3855.3 0.0 0.0 0.0
0400 67.0 66.8 50 1293.8 3857.0 3789.8 0.0 0.0 0.0
0500 66.8 66.8 50 1293.8 3802.8 3735.7 0.0 0.0 0.0
0600 67.2 66.8 50 1293.8 3802.3 3735.7 0.0 0.0 0.0
0700 68.2 66.8 50 1293.8 3869.2 3803.7 0.0 0.0 0.0
0800 70.0 66.8 50 1293.8 3995.6 3931.9 0.0 0.0 0.0
0900 72.7 66.8 50 1293.8 4169.6 4103.6 0.0 0.0 0.0
1000 75.7 67.6 50 1293.8 4365.0 4086.1 0.0 0.0 0.0
1100 79.1 66.9 50 1293.8 4557.2 4467.6 0.0 0.0 0.0
1200 82.4 67.7 50 1293.8 4723.4 4437.4 0.0 0.0 0.0
1300 84.8 67.7 50 1293.8 4844.1 4571.4 0.0 0.0 0.0
1400 86.4 67.7 50 1293.8 4910.3 4645.6 0.0 0.0 0.0
1500 87.0 67.7 50 1293.8 4928.0 4670.1 0.0 0.0 0.0
1600 86.4 67.7 50 1293.8 4901.9 4650.1 0.0 0.0 0.0
1700 85.0 67.7 50 1293.8 4833.7 4587.2 0.0 0.0 0.0
1800 82.8 66.9 50 1293.8 4726.0 4667.4 0.0 0.0 0.0
1900 80.1 66.9 50 1293.8 4596.7 4532.4 0.0 0.0 0.0
2000 77.5 66.9 50 1293.8 4492.4 4426.6 0.0 0.0 0.0
2100 75.3 66.9 50 1293.8 4409.2 4342.3 0.0 0.0 0.0
2200 73.3 66.9 50 1293.8 4322.1 4254.5 0.0 0.0 0.0
2300 71.6 66.9 50 1293.8 4234.4 4166.3 0.0 0.0 0.0

Hourly Analysis Program 5.10 Page 8 of 14


System Psychrometrics for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

July DESIGN COOLING DAY, 1500

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°F) (lb/lb) (CFM) (ppm) (BTU/hr) (BTU/hr)
Ventilation Air Inlet 87.0 0.01293 1 400 12 16
Vent - Return Mixing Outlet 67.7 0.00733 1294 1165 - -
Central Cooling Coil Outlet 50.1 0.00726 1294 1165 24108 427
Central Heating Coil Outlet 64.3 0.00726 1294 1165 19425 -
Supply Fan Outlet 64.3 0.00726 1294 1165 0 -
Cold Supply Duct Outlet 64.3 0.00726 1294 1165 - -
Zone Air - 67.7 0.00733 1294 1166 4670 410
Return Plenum Outlet 67.7 0.00733 1294 1166 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.058 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4650.0 BTU/(hr-CFM)
Site Altitude = 568.0 ft

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (BTU/hr) Mode (BTU/hr) (°F) (CFM) (ppm) (BTU/hr) (BTU/hr)
DOCUMENTATION ROOM 4928 Cooling 4670 67.7 1294 1166 0 0

Hourly Analysis Program 5.10 Page 9 of 14


System Psychrometrics for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°F) (lb/lb) (CFM) (ppm) (BTU/hr) (BTU/hr)
Ventilation Air Inlet -4.0 0.00032 1 400 -41 -14
Vent - Return Mixing Outlet 60.2 0.00519 1294 800 - -
Central Cooling Coil Outlet 60.2 0.00519 1294 800 0 0
Central Heating Coil Outlet 62.0 0.00519 1294 800 2485 -
Supply Fan Outlet 62.0 0.00519 1294 800 0 -
Cold Supply Duct Outlet 62.0 0.00519 1294 800 - -
Zone Air - 60.2 0.00519 1294 800 -2444 0
Return Plenum Outlet 60.2 0.00519 1294 800 0 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.080; At site altitude = 1.058 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746.6; At site altitude = 4650.0 BTU/(hr-CFM)
Site Altitude = 568.0 ft

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (BTU/hr) Mode (BTU/hr) (°F) (CFM) (ppm) (BTU/hr) (BTU/hr)
DOCUMENTATION ROOM -2567 Heating -2444 60.2 1294 800 0 0

Hourly Analysis Program 5.10 Page 10 of 14


Hourly Air System Design Day Loads for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

Data for July

Total Cooling Total Heating


25

20
Load ( MBH )

15

10

0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Hour of Day

Hourly Analysis Program 5.10 Page 11 of 14


Hourly Zone Design Day Loads for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

Zone: DOCUMENTATION ROOM


Data for July

Zone Sensible Zone Conditioning


5000

4500

4000

3500

3000
BTU/hr

2500

2000

1500

1000

500

0
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Hour of Day

Hourly Analysis Program 5.10 Page 12 of 14


System Psychrometrics for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

Location: Toronto, Ontario


Altitude: 568.0 ft.
Data for: July DESIGN COOLING DAY, 1500
0.020
1. Outdoor Air
2. Mixed Air
3. Central Cooling Coil Outlet
4. Central Heating Coil Outlet 0.018
5. Supply Fan Outlet
6. Room Air
0.016

Specific Humidity ( lb/lb )


1
0.014

0.012

0.010

3 45 26 0.008

0.006

0.004

0.002

0.000
30 40 50 60 70 80 90 100
Temperature ( °F )

Hourly Analysis Program 5.10 Page 13 of 14


System Psychrometrics for DOCUMENTATION ROOM
Project Name: HOSPITAL LOAD CALC 04/01/2024
Prepared by: SALAH 08:17?

Location: Toronto, Ontario


Altitude: 568.0 ft.
Data for: WINTER DESIGN HEATING
0.020
1. Outdoor Air
2. Mixed Air
3. Central Heating Coil Outlet
4. Supply Fan Outlet 0.018
5. Room Air

0.016

Specific Humidity ( lb/lb )


0.014

0.012

0.010

0.008

2 5 34 0.006

0.004

0.002

0.000
30 40 50 60 70 80 90 100
Temperature ( °F )

Hourly Analysis Program 5.10 Page 14 of 14