Hopper Dryer SHD U
Hopper Dryer SHD U
Hopper Dryer SHD U
Hopper Dryer
5. Trouble-shooting ........................................................................................ 44
Table Index
4(49)
Picture Index
5(49)
Picture 2-32: Clean up the "Euro" Hot Air Recycler .......................................... 35
Picture 3-1: Install Directly on a Moulding Machine .......................................... 36
Picture 3-2: To be used with Hopper Loaders .................................................. 36
6(49)
1. General Description
Model:SHD-300U
7(49)
1.1 Coding Principle
1.2 Feature
l Adopt P.I.D temperature control and LCD
display, with RS485 communication function.
l Overheat protection to ensure reliable
operation.
l 7-day automatic start/stop timer to improve
energy saving.
l Unique design of downblow air pipe can spread
hot air evenly, keeping plastics ary and SHD-80U-HD
temperature. stable to raise drying efficiency. & Floor Stand (optional)
l Models SHD-80U and above have material clearance door to make the
clean more convenient and effective.
l SHD-450U and models below are equipped with stainless steel lining
aluminium base. SHD-600U-750U are equipped with aluminium magnetic
base. SHD-900U and model above are equipped with manual butterfly
valve.
l For SHD-900U models and above, floor stand is standard equipment.
8(49)
All service work should be carried out by a person with technical training or
corresponding professional experience. The manual contains instructions for both
handling and servicing. Chapter 6, which contains service instructions intended for
service engineers. Other chapters contain instructions for the daily operator.
Any modifications of the machine must be approved by SHINI in order to avoid
personal injury and damage to machine. We shall not be liable for any damage
caused by unauthorized change of the machine.
Our company provides excellent after-sales service. Should you have any
problem during using the machine, please contact the company or the local
vendor.
Headquarter and Taipei factory:
Tel: (886) 2 2680 9119
9(49)
1.3 Technical Specifications
1.3.1 Outline Drawing
10(49)
Table 1-2: Specifications 2
Model SHD-U 300U 450U 600U 750U 900U 1200U
Ver. C C C C D D
W2(mm) - - - - - -
W3(mm) - - - - - -
Ver. C C C C D D
11(49)
Model SHD-U 5000U 6000U 7000U 8000U
Ver. C C - C
Blower(Kw) 11 15 18.5 22
12(49)
1.4 Safety Regulations
Note!
Electrical installation should be done by qualified electrician only.
Before connecting to AC Power Source, turn power switch to OFF position.
While AC power source is connected, make sure specifications and
overload protection rating of the power switch are suitable and reliable.
When the machine is under care or maintenance, turn off both power
switch and automatic operation switch.
Danger!
High Voltage!
It is attached to the control box.
Attention!
This mark reminds you to be more careful.
Warning!
High temperature surface may burn hands!
This label should be stick to the shell of electric heating box.
No need for regular inspection because all the electrical parts in the control unit
are fixed tightly!
Attention!
To prevent over-temperature alarm from causing machine shutdown, don't
randomly adjust EGO setting temp.
13(49)
Attention!
For test of SHD-2500U and above models, connect all hot air pipes to
avoid damage of the blower.
Attention!
For test of SHD-2500U and above models, half-open the air-in valve of the
blower to avoid damage of it.
14(49)
2. Structure Characteristics and Working Principle
2.1 Working Principle
In the drying process, hot air with constant temperature is blowed by a blower into
a two-layer insulated hopper to dry the materials. Moisture will be separated out
and taken away by hot air, thus to gain a satisfied drying effect.
15(49)
2.2 Optional Accessories
2.2.1 Heatless Dehumidifying Hot-air Dryer
16(49)
Add "ML" at the end of the model code.
18(49)
Model: SHD-80U+HAR-80U
20(49)
HAR-600U
152 322 76.2 101.6 225 345 450 50
HAR-750U
HAR-900U
152 322 101.6 101.6 225 345 450 50
HAR-1200U
HAR-2500U 200 490 152.4 152.4 340 605 818 240
21(49)
Picture 2-10: Installation of Filter and Dust Collecting Barrel
Picture 2-11: Installation of the Assembly Parts for the Cylinder Filter
22(49)
Picture 2-12: Install "Euro" Hot Air Recycler on Hopper Dryer
23(49)
2.2.6.4 Clean up the "Euro" Hot Air Recycler
1) Loosen the spring clip (1), and take out the dust collecting barrel (4) of the
hot air recycler.
2) Unscrew the butterfly nut (3), and take out the filter (2) then clean it with a
high pressure air jetter.
3) Install the filter in opposite steps.
Model: AIF-80U
25(49)
Picture 2-17: Technical Specifications
2) Technical Specifications
26(49)
2.2.7.2 Working Principle
AIF-U "Euro" blower inlet filter has filter built in to connect the air vent of backup
air inlet of the dryer blower and air vent of filter blower to improve production
quality.
AIF-U "Euro" blower inlet filter has rotary air adjusting aluminum sleeve (A),
customer can unscrew the lockup screw (B) according to practical requirement to
adjust the coming air in the dryer.
27(49)
Picture 2-19: Installation of Filter and Dust Collecting Barrel
Picture 2-20: Installation of the Assembly Parts for the Cylinder Filter
28(49)
Picture 2-21: Install "Euro" Hot Air Recycler on Hopper Dryer
Model: ADC-80U
Picture 2-25: "Euro" Air Filter
Features:
1) Keep the air in the plant clean so can ensure production quality.
2) 100% avoid the dust discharging.
30(49)
3) Economical and less space occupation, can work on the original "Euro"
hopper dryer.
4) Beautiful appearance, optimal structure and especially easy for
installation.
32(49)
Picture 2-27: Installation of Filter and Dust Collecting Barrel
Picture 2-28: Installation of the Assembly Parts for the Cylinder Filter
33(49)
Picture 2-29: Install "Euro" Hot Air Recycler on Hopper Dryer
35(49)
3. Installation Testing
3.1 Machine Location
3.1.1 Install Directly on a Moulding Machine
36(49)
3.2 Power Connectors
1) Make sure voltage and frequency of the power source comply with those
indicated on the manufacture's plate, which is attached to the machine.
2) Power cable and earth connections should conform with local regulations.
3) Use independent power cable and ON / OFF switch. The cable's size
should not smaller than those applied in the control box.
4) The power cable connection terminals should be tightened securely.
5) The machine requires a 3-phase 4-wire power source, connect the power
lead (L1, L2, L3) to the live wires, and the earth (PE) to the ground.
6) Power supply requirements:
Main power voltage: ± 5%
Main power frequency: ± 2%
7) Specific power supply specifications please refer to the schematic model.
37(49)
4. Application and Operation
4.1 Control Panel
38(49)
4.1.4 PID Setting
1) Press both “Menu” and “Down” keys for 3 seconds, it shows “P”
(proportion) setting;
2) Press "Enter" key, the set value will flash, then press “Up”or “Down” key to
increase or decrease the value.
3) Press "Enter" key to confirm the input value.
4) Press “Up” key again and again, it displays “I” (integral time ) and “D”
(differential time) setting accordingly.
5) Repeat above step 2 and step 3, input and confirm related parameters.
6) Press “Menu” key, it returns operation menu.
Notes: The PID parameter will directly influence the effect of
temperature control, please be careful to set the value.
Parameters Codes Factory Default
Proportion P 40
Integral time I 120
Differential time D 20
Over-temp alarm OTP 15℃
Control cycle HCLE 15
39(49)
Blower delay FDLY 180
Temp. unit UNIT ℃
40(49)
communication address of hopper 1 is 1, communication
address of hopper 1 is 2, and so on.
3) Press “Setup” key, the set value flickers, then press “Up”or “Down” key to
increase or decrease the value.
4) Press "Enter" key to confirm the input value;
5) Press “Up” key again and again, it displays “Baud” and “PAR” settings, (as
below )
6) Repeat step 3 and step 4, then confirm the related input parameters.
7) Press “Menu” key to return operation menu.
41(49)
4.1.8 Operation Flow
SV
Rang:0-200℃
100C 100C Default:90℃
OFF7 ON 7 ALPH
LOCK Sun. off time Sun. start Control coefficient
SV setting lock 00:00=OFF time Rang:0~100
00:00=OFF Preset value:50
Rang: YES– NO
Default:NO
BIAS M Exit
Temp. correction
AT Rang:-99~100℃
Self-tuning Preset value:0
Rang: YES– NO
Default:NO M stands for:
RJC Menu key
PC Temp. △/▽stands for:
Rang: 0~100℃ Up/Down key
temp.read only
42(49)
4.1.9 Wrong Codes Remark
43(49)
5. Trouble-shooting
Symptom Possible causes Actions taken
The rotating direction
Exchange two of the electrical
of blower fan is not as Blower phase-reversal
wires
indicated.
Blower can not be 1. Motor failures 1. Repair or replace
started. 2. Failures of contactor 2. Replace or reset
1. Tripping of overload relay 1. Check or replace
The blower and heater 2. Problems of transformer 2. Check or replace
can not work. 3. Fuse melted 3. Check or replace
4. Troubles of power 4. Check for anti-phase
1. Lead bridge of heater 1. Check or replace
2. Problems of contactor 2. Check or replace
The blower can work,
3. Heater problems 3. Check or replace
but heater can not.
4. Temp. controller problems(No output) 4. Check or replace
5. Thermocouple problems 5. Replace thermocouple
1. Poor connection of heater 1. Check or place lead bridge and
The blower is working, 2. Short circuit of overheat protector or heater
but drying temperature tripping off 2. Repair or reset
will not increase. 3. Phase shortage of contactor 3. Repair or replace
4. Temp. controller damaged. 4. Replace temp. controller
The blower can work, 1. Hot air pipe jammed 1. Cleaning
but the temp. Is too 2. Errors or problems of the temp. 2. Replace temp. controller or
high. controller adjust the knob
Note: Main switch must be turned "OFF" when checking or replacing the
components of the machine.
44(49)
6. Maintenance and Repair
SHD-20U~1200U
45(49)
SHD-1500U~8000U
46(49)
SHD-40U~80U-HD
47(49)
6.1 Blower
1) Clean inner and outer parts (especially at blower inlet) of the blower
periodically.
2) Remove the dusts on leaves of the fan.
Electrical Installation
Voltage: V Hz
Fuse melt current: 1 Phase A 3 Phase A
Check phase sequence of the power supply.
Check the rotating direction of the blower.
48(49)
6.2.6 Half-yearly Checking
49(49)