Start-up Cleanup

Commissioning Capability Center

13 December 2023
Content:

 Requirement of Clean-up Operation

 Clean-up Methodology

 Prerequisites for Start-up Clean-up.

 Stepwise Start-up Clean-up Operation

2
Requirement of Clean-up Operation

 Supercritical units have once through boilers without the drum and therefore blowing
out of impurities (silica, iron etc.) is not possible.

 Stringent Feedwater quality requirements are to be met to prevent possibilities of


concentration and deposition of impurities on boiler tubes inner surface impeding heat
transfer which ultimately results into tube failures.

 To meet the Feedwater quality requirements pre-boiler and boiler system undergoes
the clean up operation during start up.

 Basic purpose of start-up clean-up is to reduce the Turbidity, iron, silica, cation
conductivity & oxygen contents in feed water & finally in steam.
Clean-up Methodology

Clean-up Operation

Pre-Boiler Clean-up Boiler Clean-up Heater Drain


Clean-up

Condensate Clean-up Boiler Cold Clean-up LP Heater Drain


LP System Clean-up Boiler Hot Clean-up Clean-up
HP System Clean-up (Covered Under Boiler HP Heater Drain
Island) Clean-up

4
Clean-up Methodology
Clean-up Operation

Clean-up Blow Clean-up Recirculation

- Water is blown out to drain - Water is circulated back to


until required water quality is condenser via CPU until
achieved required water quality is
achieved
- Adequate quantity of water is
required for hotwell make-up - Make-up is not required

5
Prerequisites for Start-up clean-up
 CW and ACW system

 CCW system

 Turbine oil system

 Condenser Vacuum Pumps

 CST & DM water storage tank

 Gen seal oil system


Stepwise Start-up Clean-up Operation
SH 3 HPBP LPBP
RH 2

HPT IPT LPT LPT LPT LPT GEN


SH 2 Make-Up
RH 1
Water
Vacuum Condenser
SH 1 Pump in
Service
HT HT DM Water
Deaerator CEP in WL Quick Fill
WL
M in Service Service
W W
M
S S Aux
D HP 8A Steam Auxiliary
LX HP 8B M M M
T Steam LP 4 LP 3
BP Condenser
CEP

M
Drain Pit

M
Sampling
M

BCP BFP in
M

M
Service Point
LP 2

M
WW Heaters in
BR DEAERATOR Bypass

M
HP 7A HP 7B Mode CPU in
Service

M
CDL CDL CDL
FX LP 1
ECO

M
C C C
Heaters
T T P P P

M
Service

M
FX S S S

M
1 2 3 CPU in
HP 6A Bypass
HP 6B
Mode

M
GSC

M
M
M
M

Sampling
M

Point M
M

WDC Sampling

M
M
Point

M
Sampling
Point M ATM
FLASH
TANK

Condensate
LP
LP Heater
Condensate
Heater Clean
Line
Line UP
Cleanup
Cleanup
Boiler
LP
HP
LP Heater
Condensate
Heater Line
line
Line Clean
Cleanup
Clean
CleanUPup
Cleanup Up Click Here Blowdown
Recirculation
Condenser Bottom
Recirculation
Blow Blow Pit
Blow Recirculation
(LP
(CPU
(MDBFP
(CPU
heater
Recirculation
Blow
(LPBlow
heater
Bypass
inin
in Service)
in Bypass)
Mode)
Service)
Service)
LP Heater drain Clean up Blow
EXT FROM LP -2TH
EXT FROM LP-4TH EXT FROM LP-5TH EXT FROM LP-6TH

VENT TO CONDENSER

LPH LPH LPH2 LPH1


DEAERATOR
4 3 A/B A/B
GSC

Sampling
CPU
Point

M
VACCUM CEP
DRAIN
TANK
LP Flash Tank

CONDENSER
ATM HOTWELL
FLASH
TANK
Item Iron*2 (μgFe/l)

Judgement Criteria ≦500


LP Heater drain Clean up Recirculation
EXT FROM LP -2TH
EXT FROM LP-4TH EXT FROM LP-5TH EXT FROM LP-6TH

VENT TO CONDENSER

LPH LPH LPH2 LPH1


DEAERATOR
4 3 A/B A/B
GSC

CPU

M
M

VACCUM CEP
DRAIN
TANK

LP Flash Tank

CONDENSER
ATM
FLASH
TANK
HOTWELL

Item Iron (μgFe/l)

Judgement Criteria ≦50


LP Heater drain Clean up Recirculation
EXT FROM LP -2TH
EXT FROM LP-4TH EXT FROM LP-5TH EXT FROM LP-6TH

VENT TO CONDENSER

LPH LPH LPH2 LPH1


DEAERATOR
4 3 A/B A/B
GSC

CPU

M
M

VACCUM CEP
DRAIN
TANK

LP Flash Tank

ATM CONDENSER
FLASH
TANK HOTWELL
Item Iron (μgFe/l)

Judgement Criteria ≦50


HP Heater drain Clean up Blow

VENT FROM
HPH

DEAERATOR
EXT FROM EXT FROM EXT FROM
HP HP IP

TO FLASH
TO ECON HPH-8 HPH-7 HPH-6 TANK

BFP M DRAIN TO DEAERATOR

VENT TO COND

M
HP FLASH TANK
CONDENSER

DRAIN TO COND Item Iron*2 (μgFe/l) ATM


FLASH
Judgement Criteria ≦500 TANK
HP Heater drain Clean up Recirculation

VENT FROM
HPH

DEAERATOR
EXT FROM EXT FROM EXT FROM
HP HP IP

TO FLASH
TO ECON HPH-8 HPH-7 HPH-6 TANK

BFP M DRAIN TO DEAERATOR

VENT TO COND

M
HP FLASH TANK
CONDENSER
ATM
FLASH
DRAIN TO COND TANK

Item Iron (μgFe/l)

Judgement Criteria ≦50


HP Heater drain Clean up Recirculation

VENT FROM
HPH

DEAERATOR
EXT FROM EXT FROM EXT FROM
HP HP IP

TO FLASH
TO ECON HPH-8 HPH-7 HPH-6 TANK

BFP M DRAIN TO DEAERATOR

VENT TO COND

M
HP FLASH TANK
CONDENSER
ATM
FLASH
DRAIN TO COND TANK

Item Iron (μgFe/l)

Judgement Criteria ≦50


HP Heater drain Clean up Recirculation

VENT FROM
HPH

DEAERATOR
EXT FROM EXT FROM EXT FROM
HP HP IP

TO FLASH
TO ECON HPH-8 HPH-7 HPH-6 TANK

BFP M DRAIN TO DEAERATOR

VENT TO COND

M
HP FLASH TANK
CONDENSER
ATM
FLASH
DRAIN TO COND TANK

Item Iron (μgFe/l)

Judgement Criteria ≦50


Judgment Criteria:
Clean-up Operation-Startup Condition
Boiler Shutdown Time Water Separator Inlet Temperature (WDS)
START
CONDITION (hr) (Deg C)
HOT < 10 260 < T <=340
WARM 10 ~ 50 210 < T <=260
COLD > 50 T < 210

1 2~ 4 5~ 7 8,9 10 ~ 12 13 14 15

LP Heater HP Heater
STEPS Condenser Condensate LP line HP line Boiler Cold Boiler Hot Drain Clean Drain Clean
Bottom Blow Clean up Clean up Clean up Clean up Clean up up (steam up (steam
side) side)
START
CONDITION

Blow Blow Recir Blow Recir Blow Recir. Blow Recir Recir Blow Blow

HOT V.K × × × × 〇 × × × × × 〇 〇
V.K × × × × 〇 × × × × × 〇 〇
WARM
Remarks :
V.B V.K ‥‥‥‥
△ 〇 〇Vacuum
Condenser 〇 Keep〇 × ○
〇 ‥‥‥‥
× Required
× × 〇 〇
V.K V.B
× ‥‥‥‥ × Condenser
× Vacuum
× 〇Broken
〇 〇 ×‥‥‥‥
〇 〇Not Required
〇 〇 〇
V.B △
COLD
‥‥‥‥
△ 〇Carry out
〇 when 〇 the 〇water out
〇 of Condenser
〇 〇 and Condenser
〇 〇water quality
〇 exceed 〇
the value (Turbidity ≻ 3)
Thank you