331402DBQB16012 0
331402DBQB16012 0
331402DBQB16012 0
Instrumentation
Inspection and Test Plan
Issued for
EX-CO 0 27/01/2009 BF HS MM
construction
Issued for
approval with
EX-CO C 31/10/2009 BF HS MM
comments
implumented
Issued for
EX-CO B 02/10/2009 BF HS MM
approval
Validation Rev. Date Description Prepared by Checked by Approved by Company
Status Approval
Company logo and business name Project name: Company doc. Identification
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 2/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
INDEX
1. Scope..........................................................................................................................................................................3
2. Part Involved & Definitions.................................................................................................................................... 3
3. Involvement Legend and Definitions..................................................................................................................... 3
4. Matrix of Inspections Activities............................................................................................................................. 3
5. ITP LIST: ............................................................................................................................................................... 4
ITP N° IS 01............................................................................................................................................................. 5
ITP N° IS 02............................................................................................................................................................. 6
ITP N° IS 03............................................................................................................................................................. 7
ITP N° IS 04............................................................................................................................................................. 8
ITP N° IS 05............................................................................................................................................................. 9
ITP N° IS 06............................................................................................................................................................. 10
ITP N° IS 07..............................................................................................................................................................11
ITP N° IS 08............................................................................................................................................................. 12/13
6. Attachments.............................................................................................................................................................. 14/15
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 3/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
1- Scope
The scope of this quality Control Plan (QCP) is to define the Instrumentation Installation ,Testing and Calibration Activities in accordance with project requirements, on
Maamoura And Baraka Development Project.
SubContractor : Etelec
Contractor : Pireco
Client : ENI Tunisia B.V
• H - Mandatory Hold Point For Inspection by full witness of activities .the activities cannot proceed without witness
• W - Witness: Company to be notified in advance prior to starting activity .If company does not attend activity can proceed
• S – Surveillance Inspection of activities ,random check to verify compliance with Project specs.
• R – Review: Verification of compliance with specifications by review of documentations .
• Activity N°
• Process Description
• Quality Inspection Activities
• Specification/ Procedure Reference
• Involvements
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 4/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
• Report Forms
5- ITP LIST:
IS 01 Instument Cables
IS 05 Instrument Calibrations
IS 06 Instruments Installation
IS 07 Panels & JB
IS 08 TELECOM
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 5/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 01
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 6/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 02
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 7/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 03
W W S/R IS 03-03
4 Control valve loops Loop components check Project Specification
W W S/R IS 03-01
5 Switch controller loops Loop components check Project Specification
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 8/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 04
Instrumentation Standard
2 Fire & Gas devices installation Installation Inspection
Details W S S IS 04-02
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 9/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 05
W S R IS 05-02
Specification Data Sheet
2 Bench calibration of switches Test
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 10/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
TP N° IS 06
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 11/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 07
• Visual inspection.
1
JB Installation • Earthing cheking & Cable connections. Drawing Details W S S IS 07-01
• Visual inspection.
• Earthing cheking & Cable connections.
• Location & Label Verification. W S S IS 07-02
• Mounting & Fixing of Devices are Correct and
Panel/Cabinet/Console
2 Support Secured. Drawing Details
Installation • Cable connections & Terminations are Complete
(Power & Control).
• Cable Insulation Resistance & Continuity to be
cheked.
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 12/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
ITP N° IS 08
TITLE: Telecom
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 13/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
• Location and labels verification IS 08-03
W S R
• Mounting and fixing of devices are correct and
support secured
• Cable connections and terminations are complete
3 Telephone & Fax Machine (power and control Drawing Details
• Cable insulation resistance and
• Continuity are checked
• Earthing
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 14/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
6- Attachment:
- IS 01-01
- IS 01-02
- IS 02-01
- IS 03-01
- IS 03-02
- IS 03-03
- IS 04-01
- IS 04-02
- IS 05-01
- IS 05-02
- IS 05-03
- IS 05-04
- IS 05-05
- IS 06-01
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN
INSTRUMENTATION
Sheet 15/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
- IS 06-02
- IS 06-03
- IS 06-04
- IS 06-05
- IS 07-01
- IS 07-02
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENT CABLES INSTALLATION
IS 01-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref ………………………………………………………………………………
Volt …..................... Type ...............................................................................................
From .................................................................. To ........................................................
17
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT PROJECT
Cables Tray Installation Report
IS 01-02
Manufacturer:
Location: Date:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS & TRANSMITTER,
CONTROLLER LOOP CHECK SHEET
IS 03-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................
% Span Actual
Actual % Span Error % Actual % Span Error % Local Display
0
25
50
75
100
LOW LOW LOW HIGH HIGH HIGH
ALARM
(FCS/
IPS)
TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SHUT DOWN/BLOW DOWN VALVE LOOP
CHECK
IS 03-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................
ON-OFF CONTROLLER
CONTROLLER
ON on Increase ON on Decrease
Control Action Time Delay = Time Delay =
Diff. Gap = %
SOLENOIDS:
LIMIT SWITCHES(OPEN& CLOSE):
PARTIAL STROKE PANEL:
PNEUMATIC AIR VOLUME TANK:
GENERAL CONTROL VALVE CLASSIFICATION: SETTINGS:
CONTROL DEPRESSURIZING
LOCK-UP DEVICE YES NO
ON/OFF SEQUENTIAL CONTROL
POSITION SWITCHES : OPEN CLOSED
SAFEGUARDING COMPRESSOR RECYCLING
TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE LOOP INSPECTION
IS 03-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................
CONTROLLER ( REGULATORY)
CONTROLLER ( ON-OFF/GAP )
Controller
Output Positionner Valve Position
(FCS AO)
VALVE CALIBRATION CHECK
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE LOOP INSPECTION
IS 03-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................
SOLENOIDS:
LIMIT SWITCHES(OPEN& CLOSE):
POSITION FEED BACK Tx:
PNEUMATIC AIR VOLUME TANK:
CONTROL DEPRESSURIZING
ON/OFF SEQUENTIAL CONTROL LOCK-UP DEVICE YES NO
TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
FIRE&GAS PANEL INSTALLATION
IS 04-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of Check Result
Panel supplied, complies with Data Sheet
1
Exterior, paint work and door locks undamaged and interior clean
4
Earth straps, earth bars and connections installed correctly as per Project Drawings
7
Internal cards, modules and terminals undamaged & installed correctly as per Project Drawings
8
System cables installed, supported and tagged correctly as per Project Drawings
9
Multi-Core Cables installed, clamped, terminated and tagged correctly as per Project Drawings
11
Fire, Gas or Smoke Detection Equipment (if applicable) installed as per Project Drawings
14
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
UV&IR FLAME /GAS/SMOKE DETECTORS/
THERMOSENSITIVE CABLE INSTALLATION
IS 04-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of Check Result
1. General Instruments Installation Checks
1.1 Installation and location according to drawing specification and hook-up details.
1.2 Instrument location accessible.
1.3 Instrument tag fitted.
1.4 Check area classification conformance
1.5 Bench calibration and check of equipment.
1.6 Sunshade provided if required on electronic type instruments
1.7 E.O.L resistor fitted (where required)
2. Supports
2.1 Fabrication according to standard drawing.
2.2 Painting correct and complete.
2.3 Installation rigid and secure.
2.4 All bolts and clamps tightened
3. Cable Connection
3.1 Cable routing and support as per specification.
3.2 Cable gland size and type correct.
3.3 Cable termination and identification
3.4 Cable tested
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
BENCH CALIBRATION
TRANSMITTER/GAUGE
IS 05-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
INSTRUMENT SUPPLIED AS PER REQUISITION/DATA SHEET
INSTRUMENT UNDAMAGED
25
50
75
100
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SWITCH BENCH TEST CALIBRATION
IS 05-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
INSTRUMENT UNDAMAGED
Input Value
Operating Value
Error %
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PRESSURE RELIEF VALVE BENCH TEST
CALIBRATION
IS 05-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
DATA
VENDOR CALIBRATION MANUAL N°:
CALIBRATION/TEST PROCEDURE N°:
DATA SHEET N°: Rev:
BALANCED/CONVENTIONAL/PILOT OPERATED:
ORIFICE SIZE:
SERIAL N°: SPRING N°:
TEST DETAILS
PROPOSED TEST DATE TEST MEDIUM TEMP
ACTUAL TEST DATE DURATION OF TEST
COMMENTS:
TESTED LABEL
DATA SHEET ATTACHED
AFFIXED
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS IMPULSE LINE PRESSURE
TEST
IS 06-02
Location …………………………………………………………………………………
PID N° .............................................................................................................
Instrument Impulse Lines connected to the following Instruments are correctly installed as per
Project HOOK-UP and PEFS Drawings and have been Pressure Tested at 1.5 times Operating
Pressure
Instrument Tag
P&ID N° Test Pressure Seal Pot Fitted Line Drained & Clean
N°
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE INSTALLATION
IS 06-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SAFETY RELIEF VALVES (SRV)
INSTALLATION
IS 06-04
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
ESDV/BDV VALVE INSTALLATION
IS 06-05
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Valve and accessories supplied, comply with data sheet
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
JB INSTALLATION
IS 07-01
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Nameplates and tagging correct as per project drawings & as per
data sheet.
2 Junction box suitable for area classification & IP rating as
specified.
3 Junction box correctly installed, bolted and fastened as per
project drawings
4 Terminals undamaged, installed and numbered correctly as per
project drawings
5 Exterior, paint, cover undamaged and interior clean
6 Cover seals undamaged and unused cable entries plugged
correctly
7 Earth straps, earth bars and connections installed correctly as
per project drawings
8 Field/multi-core cables installed, clamped, terminated and
marked correctly as per project drawings
9 All spare cores terminated and identified.
10 All cable glands installed correctly.
11 Heater and air conditioning unit installed correctly.
12 Alarm legends and instruments tag plates are corrects.
13 Segregation between power, I.S. and non I.S. is correct.
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PANEL/CABINET/CONSOLE
INSTALLATION
IS 07-02
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Panel/cabinet/console supplied, complies with data sheet
Panel/cabinet/console correctly installed, bolted and fastened as per project
2
drawings
3 Base dimensions, location and cable entries as per project drawings
4 Exterior, paint work and door locks undamaged and interior clean
5 Nameplates and tagging correct as per project drawings
6 Dust seals undamaged and unused gland rntries plugged correctly
Earth straps, earth bars and connections installed correctly as per project
7
drawings
Internal cards, modules and terminals undamaged & installed correctly as per
8
project drawings
9 System cables installed, supported and tagged correctly as per project drawings
10 Data highway correctly installed and supported
Multi-Core cables installed, clamped, terminated and tagged correctly as per
11
project drawings
12 Multi-Core cables earth and continuity checks completed and certified
13 Power supply and associated cables installed as per project drawings
14 Heater/air conditioning unit installed correctly as per project drawings
Fire, gas or smoke detection equipment (if applicable) installed as per project
15
drawings
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS INSTALLATION
IS 06-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Instrument and accessories supplied, comply with data sheet
3 Instrument and accessories correctly installed and supported as per project drawings
5 Impulse, hydraulic and pneumatic lines correctly installed and supported as per project drawings
7 Cable tray, conduit and trunking installed and supported correctly as per project drawings
8 Cables installed, clamped, tagged, glanded and terminated as per project drawings
12 Orifice plate (where applicable) correct as per data sheet and installed as per project drawings
13 Thermowell (where applicable) correct as per data sheet and installed as per project drawings
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
COMMUNICATION CABINETS & CONSOLES
INSTALLATION
IS 08-01
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Cable testing
7
Earthing correct
8
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PA SPEAKERS INSTALLATION
IS 08-02
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
6 Glanding correct
7 Check cleanliness
8 Cable testing
9 Earthing correct
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
TELEPHONES & FAX MACHINES
INSTALLATION
IS 08-03
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Check RJ-11 connector has been terminated correctly at the phone and
7
at the wall gland plate (standard phones)
9 Cable testing
NOTE:
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.