MAAMOURA AND BARAKA DEVELOPMENT PROJECT

Instrumentation
Inspection and Test Plan

Issued for
EX-CO 0 27/01/2009 BF HS MM
construction
Issued for
approval with
EX-CO C 31/10/2009 BF HS MM
comments
implumented
Issued for
EX-CO B 02/10/2009 BF HS MM
approval
Validation Rev. Date Description Prepared by Checked by Approved by Company
Status Approval
Company logo and business name Project name: Company doc. Identification

Maamoura and Baraka 3314.02.DBQB.16012


Development Project Job N

Contractor logo and business name Contractor doc. Identification


‫ﻣﻘﺎﻭﻻﺕ ﺇﻧﺠﺎﺯ ﺍﻟﻤﻨﺸﺂﺕ ﺍﻟﺼﻨﺎﻋﻴﺔ ﻭ ﺍﻟﺒﺘﺮﻭﻟﻴﺔ‬ ITP05 /AR305
Petroleum & Industrial Realisation Contractors Contract N : 500401

Facility Name Location Scale SHEET


Onshore Project Facilities Tazarka – Tunisia n.a. 1/15
Document Title Supersedes N na
Instrumentation Inspection and Test Plan Superseded by N na
Plant Area Plant Unit
n.a. n.a.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 2/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

INDEX

1. Scope..........................................................................................................................................................................3
2. Part Involved & Definitions.................................................................................................................................... 3
3. Involvement Legend and Definitions..................................................................................................................... 3
4. Matrix of Inspections Activities............................................................................................................................. 3
5. ITP LIST: ............................................................................................................................................................... 4
ITP N° IS 01............................................................................................................................................................. 5
ITP N° IS 02............................................................................................................................................................. 6
ITP N° IS 03............................................................................................................................................................. 7
ITP N° IS 04............................................................................................................................................................. 8
ITP N° IS 05............................................................................................................................................................. 9
ITP N° IS 06............................................................................................................................................................. 10
ITP N° IS 07..............................................................................................................................................................11
ITP N° IS 08............................................................................................................................................................. 12/13
6. Attachments.............................................................................................................................................................. 14/15

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 3/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

1- Scope
The scope of this quality Control Plan (QCP) is to define the Instrumentation Installation ,Testing and Calibration Activities in accordance with project requirements, on
Maamoura And Baraka Development Project.

2- Part Involved & Definitions

SubContractor : Etelec
Contractor : Pireco
Client : ENI Tunisia B.V

3- Involvement Legend and Definitions

• H - Mandatory Hold Point For Inspection by full witness of activities .the activities cannot proceed without witness
• W - Witness: Company to be notified in advance prior to starting activity .If company does not attend activity can proceed
• S – Surveillance Inspection of activities ,random check to verify compliance with Project specs.
• R – Review: Verification of compliance with specifications by review of documentations .

4- Matrix of Inspections Activities

• Activity N°
• Process Description
• Quality Inspection Activities
• Specification/ Procedure Reference
• Involvements

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 4/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
• Report Forms

5- ITP LIST:

IS 01 Instument Cables

IS 02 Instrument Fiber Optic Cables

IS 03 Instrument Loop Checking

IS 04 Instrument Fire & Gas

IS 05 Instrument Calibrations

IS 06 Instruments Installation

IS 07 Panels & JB

IS 08 TELECOM

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 5/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 01

TITLE: Instrument Cables

Inspection and Acceptance


Activity Process Description Quality Inspection Activity Specification/ Procedure Reference Subcontractr Pireco
ENI TUNISIA Quality Records
N° B.V
Cable dressing and marking, check for physical

damage after laying
• Check cable size and rating Instrumentation Standard H W W IS 01-01
1 Cable verification during/after laying • Cable installation, glanding, earthing, cable tagging
Details
& identification of termination.
• Insulation resistance after installation
• Check installation details and layout drawings. W W S/R IS 01-02
As per Instrumentation standard
2 Cable tray installation • Earthing.
details

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 6/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 02

TITLE: Instrument Fiber Optic Cables

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

• FOC testing on drum (Testing OTDR)

• FOC testing after installation


W S R IS 02-01
• Check soft sand bedding cable warning tape, Instrumentation Standard
1 Fiber Optic cable Installation
tiles and released for backfilling. Details

• Glanding & Tagging.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 7/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 03

TITLE: Instrument Loop Checking

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

1 Controls transmitter loops Loop components check Project Specification


W W S/R IS 03-01

2 Temperature loops Loop components check Project Specification


W W S/R IS 03-01

Shut down/blow down valve W W S/R IS 03-02


3 Loop components check Project Specification
loops

W W S/R IS 03-03
4 Control valve loops Loop components check Project Specification

W W S/R IS 03-01
5 Switch controller loops Loop components check Project Specification

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 8/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 04

TITLE: Instrument Fire & Gas

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

Installation of Fire & Gas Instrumentation Standard W S S IS 04-01


1 control panel Visual inspection
Details

Instrumentation Standard
2 Fire & Gas devices installation Installation Inspection
Details W S S IS 04-02

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 9/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 05

TITLE: Instrument Calibrations

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

Bench calibration of Specification Data Sheet


1 Test
Transmitters/Transducers/gauges W S R IS 05-01

W S R IS 05-02
Specification Data Sheet
2 Bench calibration of switches Test

Bench calibration of pressure relief Specification Data Sheet W S R IS 05-03


5 valves. Test

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 10/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
TP N° IS 06

TITLE: Instruments Installation

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

• Visual inspection IS 06-01


Instruments installation and Instrumentation Standard W S R
1 • Earthing checking
support • Cable connections Details

Impulse tube/air pipe and air Instrumentation Standard W W R IS 06-02


• Visual inspection
2 Leak test 15 minutes
tubing • Details
• Visual inspection IS 06-03
Instrumentation Standard W S R
3 Control valve installation check • Earthing cheking & Cable connections.
Details

Safety relief valve SRV installation Instrumentation Standard W S R IS 06-04


4 Visual inspection
check Details
• Visual inspection IS 06-05
Instrumentation Standard W S R
5 ESDV/BDV installation check • Earthing cheking & Cable connections.
Details

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 11/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 07

TITLE: Panels & JB

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

• Visual inspection.
1
JB Installation • Earthing cheking & Cable connections. Drawing Details W S S IS 07-01

• Visual inspection.
• Earthing cheking & Cable connections.
• Location & Label Verification. W S S IS 07-02
• Mounting & Fixing of Devices are Correct and
Panel/Cabinet/Console
2 Support Secured. Drawing Details
Installation • Cable connections & Terminations are Complete
(Power & Control).
• Cable Insulation Resistance & Continuity to be
cheked.

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 12/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

ITP N° IS 08

TITLE: Telecom

Specification/ Procedure Inspection and Acceptance


Activity Process Description Quality Inspection Activity Subcontract ENI TUNISIA Quality Records
N° Reference r
Pireco
B.V

• Location and labels verification IS 08-01


W S R
• Mounting and fixing of devices are correct and
support secured
• Cable connections and terminations are complete
Communication Cabinets &
1 (power and control Drawing Details
Consoles • Cable insulation resistance and
• Continuity are checked
• Earthing

• Location and labels verification IS 08-02


W S R
• Mounting and fixing of devices are correct and
support secured
• Cable connections and terminations are complete
2 PA Speakers (power and control Drawing Details
• Cable insulation resistance and
• Continuity are checked
• Earthing

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 13/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
• Location and labels verification IS 08-03
W S R
• Mounting and fixing of devices are correct and
support secured
• Cable connections and terminations are complete
3 Telephone & Fax Machine (power and control Drawing Details
• Cable insulation resistance and
• Continuity are checked
• Earthing

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 14/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305

6- Attachment:

- IS 01-01

- IS 01-02

- IS 02-01

- IS 03-01

- IS 03-02

- IS 03-03

- IS 04-01

- IS 04-02

- IS 05-01

- IS 05-02

- IS 05-03

- IS 05-04

- IS 05-05

- IS 06-01
This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
INSPECTION AND TEST PLAN

INSTRUMENTATION
Sheet 15/15
CLIENT DOC N°: 3314.02.DBQB.16012 CONTRACT N°:500401
PIRECO DOC N°:ITP05/AR305 REV:0 AR305
- IS 06-02

- IS 06-03

- IS 06-04

- IS 06-05

- IS 07-01

- IS 07-02

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENT CABLES INSTALLATION

IS 01-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref ………………………………………………………………………………
Volt …..................... Type ...............................................................................................
From .................................................................. To ........................................................

No. ITEMS TO BE CHECKED Results Remarks

1 Verify correct type, size, colour code and tag.


2 Check dressing / cleating
3 Check cable for damage
4 Check cable / core for correct identification / tagging.
5 Cable terminated correctly / complete with correct lugs and crimp
6 Continuity check
7 Glanding / Locknuts correctly installed.
8 Check Armour / Screen correctly made off
9 Confirm cable routing and segregation is correct.
500v megger test
10 Core to earth Core to core Core to screen Screen to armour

Min. Insulation Resistance = 10 megohms


Gland type From To
11

12 Haz. Area Cert Details


13 Cable mechanically protected
Check armor continuity / earthing is maintained by the correct use of
14
serrated washers and / or earth tags
15 Measure gland body to earth continuity (Max 0.1 Ω) Ω
Make (Test equipment) Model Serial No Calibration Expiry Date

17

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT PROJECT
Cables Tray Installation Report

IS 01-02

Equipment Tag N°.: Report N°:

Manufacturer:

Location: Date:

Item Inspection Activities Acc. Rej.

Tray/rack conduits and fittings are checked for quality and


1
conformance to specification

2 All cable tray supports secured

3 Fabrication cuts will be painted as specification

Sharp edge of cable tray rack/conduits to be file and painted to protect


4
the cable

5 Expansion joints fitted where specified

6 Earth installation and continuity satisfactory

7 Cables tray supported at correct intervals

8 No excess pressure on cable tray supports

9 Entry points to building and field end made good

10 Cable tray/rack/conduits installed as per design and layout drawing

11 Pull ropes are installed to facilitate cable pulling where applicable

12 Cable tray/ladder labelled in accordance with contract drawings

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS & TRANSMITTER,
CONTROLLER LOOP CHECK SHEET
IS 03-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................

Model Serial N° ........................................................


.............................................................
‰ INSTRUMENT SUPPLIED AS PER REQUISITION/DATA SHEET.
‰ INSTRUMENT UNDAMAGED.
SIMULATED INPUT FCS/ IPS READING
Rising Falling
INSTUMENT TEST

% Span Actual
Actual % Span Error % Actual % Span Error % Local Display
0
25
50
75
100
LOW LOW LOW HIGH HIGH HIGH
ALARM
(FCS/
IPS)

‰ CONTROL MODE-PROPORTIONAL ‰ INTEGRAL ‰ DERIVATIVE


CONTROLLER
VERIFICATIO

‰ ON-OFF ‰ DIFF. GAP ‰ AUTO/MANUAL CORRECT


‰ CONTROLLER ALIGNMENT CORRECT
N

CONTROL ACTION ‰ DIRECT ‰ REVERSE DIFF. GAP %


VALVE ACTION ‰ LINEAR ‰ SPLIT
AUTOMATIC TEMPERATURE CORRECTION RANGE
CORRECTION

SG/DENSITY CORRECTION SETTING


ZERO ELEVATION/SUPPRESSION SETTING
THERMOCOUPLE BURN-OUT DRIVES ‰ UPSCALE ‰ DOWNSCALE

ANCILLARY EQUIPMENT LIST:

TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SHUT DOWN/BLOW DOWN VALVE LOOP
CHECK
IS 03-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................

Model Serial N° ........................................................


.............................................................
‰ VALVE SUPPLIED AS PER REQUISITION/DATA SHEET.
‰ VALVE UNDAMAGED.

ON-OFF CONTROLLER
CONTROLLER

ON on Increase ON on Decrease
Control Action Time Delay = Time Delay =
Diff. Gap = %

VALVE RESPONSE UPON VALVE AIR SUPPLY/SIGNAL


OPEN/CLOSE/STAYS PUT
FAILURE TO OPEN/CLOSE
Min to Max
STROKING TIME: SEC. ‰ YES ‰ NO
(Close to Open)
Max to Min
STROKING TIME: SEC. ‰ YES ‰ NO
(Open to Close)
ANCILLARY EQUIPMENT LIST:

SOLENOIDS:
LIMIT SWITCHES(OPEN& CLOSE):
PARTIAL STROKE PANEL:
PNEUMATIC AIR VOLUME TANK:
GENERAL CONTROL VALVE CLASSIFICATION: SETTINGS:

‰ CONTROL ‰ DEPRESSURIZING
LOCK-UP DEVICE ‰ YES ‰ NO
‰ ON/OFF ‰ SEQUENTIAL CONTROL
POSITION SWITCHES : ‰ OPEN ‰ CLOSED
‰ SAFEGUARDING ‰ COMPRESSOR RECYCLING

TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE LOOP INSPECTION
IS 03-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................

Model Serial N° ........................................................


.............................................................
‰ VALVE SUPPLIED AS PER REQUISITION/DATA SHEET
‰ VALVE UNDAMAGED

CONTROLLER ( REGULATORY)

Control Action Direct Reversed


Control Algorithm Proportional Integral Derivative
CONTROLLER VERIFICATION

Control Parameters K= TI= TD=


Output Limit setting: High = Low =
Set Point Limit
High = Low =
Setting:
On Transmitter Failure:
Control shed to:
Controller output goes to:
Controller mode changes to:

CONTROLLER ( ON-OFF/GAP )

Control Action ON on Increase ON on Decrease


Time Delay = Time Delay =
Diff. Gap = %
Valve Action ‰ Linear ‰ Split
VALVE RESPONSE UPON VALVE AIR SUPPLY/SIGNAL
OPEN/CLOSE/STAYS PUT
FAILURE TO OPEN/CLOSE

Controller
Output Positionner Valve Position
(FCS AO)
VALVE CALIBRATION CHECK

Input Position feedback


(mA) IF, Output Rising Falling (AI to FCS)
% Span
APPLIE (PSI) Rising Falling
S Actual % Error Actual % Error Rising
0
25
50
75
100
Min to Max
STROKING TIME: Sec. ‰ YES ‰ NO
(Close to Open)

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE LOOP INSPECTION
IS 03-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Manufacturer ………………………………………………………………………………
Inst Loop N° ................................................................................................................................

Model Serial N° ........................................................


.............................................................
Max to Mix
STROKING TIME: Sec. ‰ YES ‰ NO
(Open to Close)

ANCILLARY EQUIPMENT LIST:

SOLENOIDS:
LIMIT SWITCHES(OPEN& CLOSE):
POSITION FEED BACK Tx:
PNEUMATIC AIR VOLUME TANK:

GENERAL CONTROL VALVE CLASSIFICATION : SETTINGS:

‰ CONTROL ‰ DEPRESSURIZING
‰ ON/OFF ‰ SEQUENTIAL CONTROL LOCK-UP DEVICE ‰ YES ‰ NO

‰ SAFEGUARDING ‰ COMPRESSOR RECYCLING POSITION SWITCHES ‰ OPEN ‰ CLOSED

TEST EQUIPMENT
SERIAL N° CERTIFICATION EXPIRY DATE
DESCRIPTION

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
FIRE&GAS PANEL INSTALLATION
IS 04-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of Check Result
Panel supplied, complies with Data Sheet
1

Panel correctly installed, bolted and fastened as per Project Drawings


2

Base dimensions, location and cable entries as per Project Drawings


3

Exterior, paint work and door locks undamaged and interior clean
4

Nameplates and tagging correct as per Project Drawings


5

Dust seals undamaged and unused gland entries plugged correctly


6

Earth straps, earth bars and connections installed correctly as per Project Drawings
7

Internal cards, modules and terminals undamaged & installed correctly as per Project Drawings
8

System cables installed, supported and tagged correctly as per Project Drawings
9

Data Highway correctly installed and supported


10

Multi-Core Cables installed, clamped, terminated and tagged correctly as per Project Drawings
11

Multi-Core Cables earth and continuity checks completed and certified


12

Power supply and associated cables installed as per Project Drawings


13

Fire, Gas or Smoke Detection Equipment (if applicable) installed as per Project Drawings
14

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
UV&IR FLAME /GAS/SMOKE DETECTORS/
THERMOSENSITIVE CABLE INSTALLATION
IS 04-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of Check Result
1. General Instruments Installation Checks
1.1 Installation and location according to drawing specification and hook-up details.
1.2 Instrument location accessible.
1.3 Instrument tag fitted.
1.4 Check area classification conformance
1.5 Bench calibration and check of equipment.
1.6 Sunshade provided if required on electronic type instruments
1.7 E.O.L resistor fitted (where required)
2. Supports
2.1 Fabrication according to standard drawing.
2.2 Painting correct and complete.
2.3 Installation rigid and secure.
2.4 All bolts and clamps tightened
3. Cable Connection
3.1 Cable routing and support as per specification.
3.2 Cable gland size and type correct.
3.3 Cable termination and identification
3.4 Cable tested
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
BENCH CALIBRATION
TRANSMITTER/GAUGE
IS 05-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
‰ INSTRUMENT SUPPLIED AS PER REQUISITION/DATA SHEET

‰ INSTRUMENT UNDAMAGED

Cali Input Reading or Output


brati
on Rising Falling
Che
ck: % Span ENG’G Unit’s
Actual % Span % Error Actual % Span % Error

25

50

75

100

Test Equipment Description Serial N° Certification Expiry Date

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SWITCH BENCH TEST CALIBRATION
IS 05-02
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................

‰ INSTRUMENT SUPPLIED AS PER REQUISITION/DATA SHEET

‰ INSTRUMENT UNDAMAGED

Calibration Point 1 Point 2 Point 3


Switch Point
Check Set Reset Set Reset Set Reset

Input Value

Operating Value

Error %

Corrections: ‰ S.G/DENSITY CORRECTION SETTING

‰ THERMOCOUPLE BURN-OUT DRIVES ‰ UPSCALE ‰ DOWNSCALE

Test Equipment Description Serial N° Certification Expiry Date

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PRESSURE RELIEF VALVE BENCH TEST
CALIBRATION
IS 05-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
DATA
VENDOR CALIBRATION MANUAL N°:
CALIBRATION/TEST PROCEDURE N°:
DATA SHEET N°: Rev:
BALANCED/CONVENTIONAL/PILOT OPERATED:
ORIFICE SIZE:
SERIAL N°: SPRING N°:

TEST EQUIPMENT: SERIAL N°:

TEST DETAILS
PROPOSED TEST DATE TEST MEDIUM TEMP
ACTUAL TEST DATE DURATION OF TEST

DESIGN PRESSURE SEAT LIFT PRESSURE

TEST PRESSURE REQUIRED RE-SEAT PRESSURE

TEST MEDIUM BUBBLE LEAK RATE

COMMENTS:

TESTED LABEL
DATA SHEET ATTACHED
AFFIXED
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS IMPULSE LINE PRESSURE
TEST
IS 06-02
Location …………………………………………………………………………………
PID N° .............................................................................................................
Instrument Impulse Lines connected to the following Instruments are correctly installed as per
Project HOOK-UP and PEFS Drawings and have been Pressure Tested at 1.5 times Operating
Pressure
Instrument Tag
P&ID N° Test Pressure Seal Pot Fitted Line Drained & Clean

TEST EQUIPMENT DESCRIPTION SERIAL N° CERTIFICATION EXPIRY DATE

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
CONTROL VALVE INSTALLATION
IS 06-03
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result

1 Control valve and accessories supplied, comply with data sheet

2 Control valve bench test calibration completed and certified

Control valve and accessories correctly installed and supported as per


3
project drawings
Control valve, handwheel and positioner are accessible and clear of
4
obstruction
5 Cables installed, tagged, glanded and terminated as per project drawings

6 Cable continuity and megger tests completed and certified

7 Spare cable entries plugged correctly

8 Earthing in accordance with project specifications

Nameplates and tagging correct and properly installed as per project


9
drawings
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
SAFETY RELIEF VALVES (SRV)
INSTALLATION
IS 06-04
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................

Item Description of check Result

1 Check mechanical damage and manufacture as per data sheet


2 Instrument location and by-pass arrangement are as per P&ID
3 Free access provided for maintenance and operations
4 Pneumatic line(s) correctly installed (If applicable)
5 Flange connections have correct gasket
6 Flange bolts are tightened
7 Installation position and direction of flow are correct
8 Clearance for valve removal provided
9 Instrument protected against environment
10 Seat Leak Tests or Puping test
11 As built
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
ESDV/BDV VALVE INSTALLATION
IS 06-05
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Valve and accessories supplied, comply with data sheet

2 Valve pre-installation check completed and certified

3 Valve and accessories correctly installed and supported as per


project drawings
4 Valve, hand wheel and position switches are accessible and clear
of obstruction
5 Signal and supply lines correctly installed and supported as per
project drawings
6 Signal and supply lines tested and certified

7 Cables installed, tagged, glanded and terminated as per project


drawings
8 Cable continuity and megger tests completed and certified

9 Spare cable entries plugged correctly

10 Earthing in accordance with project specifications

11 Nameplates and tagging correct and properly installed as per


project drawings
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
JB INSTALLATION
IS 07-01
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Nameplates and tagging correct as per project drawings & as per
data sheet.
2 Junction box suitable for area classification & IP rating as
specified.
3 Junction box correctly installed, bolted and fastened as per
project drawings
4 Terminals undamaged, installed and numbered correctly as per
project drawings
5 Exterior, paint, cover undamaged and interior clean
6 Cover seals undamaged and unused cable entries plugged
correctly
7 Earth straps, earth bars and connections installed correctly as
per project drawings
8 Field/multi-core cables installed, clamped, terminated and
marked correctly as per project drawings
9 All spare cores terminated and identified.
10 All cable glands installed correctly.
11 Heater and air conditioning unit installed correctly.
12 Alarm legends and instruments tag plates are corrects.
13 Segregation between power, I.S. and non I.S. is correct.
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PANEL/CABINET/CONSOLE
INSTALLATION
IS 07-02
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Panel/cabinet/console supplied, complies with data sheet
Panel/cabinet/console correctly installed, bolted and fastened as per project
2
drawings
3 Base dimensions, location and cable entries as per project drawings
4 Exterior, paint work and door locks undamaged and interior clean
5 Nameplates and tagging correct as per project drawings
6 Dust seals undamaged and unused gland rntries plugged correctly
Earth straps, earth bars and connections installed correctly as per project
7
drawings
Internal cards, modules and terminals undamaged & installed correctly as per
8
project drawings
9 System cables installed, supported and tagged correctly as per project drawings
10 Data highway correctly installed and supported
Multi-Core cables installed, clamped, terminated and tagged correctly as per
11
project drawings
12 Multi-Core cables earth and continuity checks completed and certified
13 Power supply and associated cables installed as per project drawings
14 Heater/air conditioning unit installed correctly as per project drawings
Fire, gas or smoke detection equipment (if applicable) installed as per project
15
drawings
NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
INSTRUMENTS INSTALLATION
IS 06-01
Data Sheet ……………………………………. System No ……………………..
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
PID N° .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................
Item Description of check Result
1 Instrument and accessories supplied, comply with data sheet

2 Bench test calibration completed and certified

3 Instrument and accessories correctly installed and supported as per project drawings

4 Instrument is accessible and clear of obstruction

5 Impulse, hydraulic and pneumatic lines correctly installed and supported as per project drawings

6 Impulse, hydraulic and pneumatic lines tested and certified

7 Cable tray, conduit and trunking installed and supported correctly as per project drawings

8 Cables installed, clamped, tagged, glanded and terminated as per project drawings

9 Cable continuity and megger tests completed and certified

10 Spare cable/process entries plugged correctly

11 Instrument earthed in accordance with project specifications

12 Orifice plate (where applicable) correct as per data sheet and installed as per project drawings

13 Thermowell (where applicable) correct as per data sheet and installed as per project drawings

14 Nameplates and tagging correct as per project drawings

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
COMMUNICATION CABINETS & CONSOLES
INSTALLATION
IS 08-01
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................

Item Description of check Result

Check tag number/nameplate


1

All equipment installed in cabinets/consoles


2

No visible damage to equipment


3

Field cables terminated correctly


4

Cabinet/console mounted in correct position


5

Multiple power incomers terminated correctly


6

Cable testing
7

Earthing correct
8

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
PA SPEAKERS INSTALLATION
IS 08-02
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................

Item Description of check Result

1 Check tag number/nameplate

2 Check speakers and beacons location as per drawing

3 All fixtures and fittings installed and secured

4 No physical damage to installed item

5 Cable entries and terminations correct

6 Glanding correct

7 Check cleanliness

8 Cable testing

9 Earthing correct

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa

This document is property of Eni Tunisia B.V. who will safeguard its rights according to the civil and penal provision of the law.
Project:
MAAMOURA AND BARAKA DEVELOPMENT
PROJECT
TELEPHONES & FAX MACHINES
INSTALLATION
IS 08-03
Location …………………………………………………………………………………
Equipment Description …………………………………… Tag No. …………………….
Drawing Ref .............................................................................................................
Manufacturer ………………………………………………………………………………
Model Serial N° ........................................................
.............................................................

Item Description of check Result

1 Check tag number/nameplate

2 Check telephones and integrated telephone & fax machine locations

3 Hazardous area phones mounted correctly

4 No physical damage to installed item

5 Cable entries and terminations correct (hazardous area phones only)

6 Glanding correct (hazardous area phones only)

Check RJ-11 connector has been terminated correctly at the phone and
7
at the wall gland plate (standard phones)

8 Telephone cables and wall plates installed correctly

9 Cable testing

10 Check earthing (hazardous area phone only)

NOTE:

Inspection Performed by Inspection Accepted by


Date Date
Name Name
Company Company
Visa Visa