Cable Ladder Installation

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Project: J17082 Employer: ITP Ref No.

ITP-E

Engineer: Contractor: Date: August / 23

PO# 201902600 NEGEMCO Job No.: JV19-016 Rev: 00


Project: Aqaba Screening Project task 5 of APC storing
Inspection test Plan for Instrument and Power cable laddder installation
Inspected By 1- APC Submitted By Amin Mohammad/Eyad N. A
1- APC QCP Approval
2- DAR Date
Flow metter installation 2- DAR Al-Handeseh
3- NEGEMCO ( )- Approved without Comment
4- Vendor ( )- Approved With Comment- Proceed
5- Third party ( )- Not Approved-Resubmitted
Control Activities
V- Verify
H- Hold Point
w- Witness
Item Activity Description Inspection/Test method Referance standard P- Patrol Point Verification Documentati
T- testing
R-Review
N/A- Not App
APC DAR NEG TH.P VEN
1 Documentation
1_1 HSE Plan Document review HSE Policy R R H N/A N/A Project requirment
1_2 Related Installation insturuction Document review Vendor Procedure R R H N/A N/A Vendor Procedure
2 Execution

2_1 Visual Inspection of Cable ladder visual inspection Project Requirement R R H N/A N/A Visual report

Check the right size of cable ladder


Project Requirements,
2_2 is to be installed in the required visual inspection Electtrical Drawing R R H N/A N/A Visual Report
location and elevation.
Check that proper type of support is
2_3 visual inspection Specification R R H N/A N/A Visual Report
used.
Check the right spacing between
2_4 Inspection Guage Specification R R H N/A N/A Visual Report
supports.
Use proper jointing fitting as per
2_5 approved submittals. visual inspection Specification R R H N/A N/A Visual Report

Use proper supporting channels as


2_6 visual inspection Specification R R H N/A N/A visual report
specified.
check tightness of supports clamps Project Requirement and
2_7 visual inspection R R H N/A N/A Test Report
and rods in the structue specifidation
Check tightnes of supporting
2_8 channels on supporting fitting or on visual inspection Project Requirement and R R H N/A N/A Test Report
specifidation
structure.

Check the earhting of the cable Project Requirement and


2_10 laddder is connected as specified. visual inspection specifidation R R H N/A N/A Visual Report

Check that expansion joint are


installed on run not exceeding 27 Project Requirement and
2_11 m. and whrere it crosses struture visual inspection specifidation R R H N/A N/A Visual Report
expansion joint.

Assure that cable ladder sections


2_12 which are cut are treated with visual inspection Project Requirement and R R H N/A N/A Visual Report
specifidation
glavanizion and epoxy paint coat.

Check that cable ladders are Project Requirement and


2_13 visual inspection R R H N/A N/A Visual Report
labeled as per the APC Standard. specifidation
ITP-E-01

ust / 23 /2020

00

Eyad N. Abu Adi

cumentation

uirment
ocedure

port

eport
eport

eport

eport

port

port

port

eport

eport

eport

eport
CABLE TRAY INSTALLATION DOCUMENT NUMBERING:
INSPECTION CHECK LIST

Project: Aqaba Screening Project task 5 of APC storing Contractor:NEGMCO

Employer: ARAB POTASH COMPANY (APC) SYSTEM/SUBSYSTEM No:

EQUIPMENT NO:

DESCRIPTION:

REPORT No:

SL Nº ITEM DESCRIPTION ACCEPTED REJECTED N//A

1 Cable Tray Size & Type as per Approved Drawing

2 Cable Tray Route and Location as per Approved Drawing

3 Support Installed Level, Alignment and Spacing as per Specification and Drawing

4 Spacing from Hot Pipes and Hot Surface Maintained

5 Grounding Jumper Installed

6 Cable Tray Earthing is Completed

7 Expansion Joints Fitted where Required

8 Cable Tray Installation Should Not Disturbed any other Utilities

9 Cable Tray Installation Neat & Evently Spaced

10 Any Mechanical Damage for Cable Tray / Trunking

11 All Rough Edges Filed Smooth and Paint Touch is Completed

12 Protection Cap Provided for Cable Tray Edges

13 Cut Ends Touched Up with Zinc Rich Paint

14 Identification & Tagging Complete

15 Bolt and Nut Properly Fixed

16 Cable Tray Cover Installed

REMARKS:

WITNESSED / CONTRACTOR
ENGINEER (DAR) EMPLOYER APC (IF REUIRED)
REVIEWED BY: (NEGMCOM)

SIGNATURE:

PRINT NAME:

DATE: