Manual: STPEF0710 and STPEF0912 Jaw Crusher
Manual: STPEF0710 and STPEF0912 Jaw Crusher
Manual: STPEF0710 and STPEF0912 Jaw Crusher
Jaw Crusher
MANUAL
5. Safety production
7. Drawings attachment
-2-
1.Introduction to the crusher
1.1 Application
7 Motor power(kw) 90
Overall dimension
9 2730×2760×2820 mm
(length×width×height)
-3-
List for STPEF0912
Overall dimension
9 4812×4466×3270 mm
(length×width×height)
toggle, pull rod spring, tie rod device, driving device and so on. The
motor drives the swing jaw to swing through triangle belt. Due to
swinging movement of the swing jaw, ores lumps fed into the crushing
-4-
cavity will be broken into pieces under the squeezing pressure and the
bending action, then discharged out of the crusher as soon as the swing
Frame is welded with steel plate and casting steel parts. Front wall and
rear pedestal is made of cast steel and side wall is made of thick steel plate.
They form the frame by slag welding. The stationary jaw plate is installed in
front wall and the liners made of wearable material are fastened onto the
front part of side walls. Crushing cavity is composed of fixed jaw plate,
Swing jaw is made of cast steel. Swing jaw plate is fastened onto the
swing jaw by means of wedge. Two jaw plates can be used interchangeably.
bearings and is suspended into the cavity of main frame. Two bearing
housings are installed on the both sides of the main frame symmetrically.
Eccentric shaft is made of forged alloy steel. Fly wheel and pulley are
fixed on the conical surface of eccentric shaft by keys. The fly wheel and
pulley are fixed at each end of eccentric shaft by means of washers and keys
Toggle is made of cast iron. The front end of the toggle is supported on
the die block which is under the swing jaw; the back end of the toggle
supports on the die block of back pedestal. The shims on the back end of the
pull rod is fixed onto the bottom of swing jaw with pin-shaft, the other end
penetrates into the spring. Spring is supported on the lower part of back
with spring washer and nut to balance the inertia force due to swinging
move ment of swing jaw and to prevent the toggle from falling off.
installation.
3.2 When the crusher is fixed on the foundation, the longitudinal levelness
tolerance of base surface of the frame is not more than 0.5mm/ m, the
3.3 Parts on the frame can just be installed after leveling of the frame
The proper lubrication and suitable tension of the V-belts ensure the m
working normally.
3.5 When checking the crusher, the power source must be cut off and make
3.6 During test running, noload-run must be carried out for the crusher.
-6-
Noload trial can not be less than 2 hours. If there is abnormality in the
abnormalities, and the crusher can be re-started after the failures are
eliminated.
3.7 When on-load test run is carried out, ores should be fille d into the
size of ores fed into the crusher is oversize, ores falling into crushing
very important to prevent large ore lumps and foreign material from
falling into crushing cavity and keep even feeding into the crusher.
stop the crusher immediately, and find out the cause, then eliminate
the defects.
3.9 When the crusher stops, first stop the feeding. After ores in the
3.10 The crusher used a multiple-point grease pump to lubricate each part
adjust the oil supplying quantity of parts which does not need
lubricating to adjust to zero, or to screw out the whole part. Take out
the inner piston, and cover the plug. It is recommended to use valium
toggle can not be over. User can adjust grease quantity of lubricating
system.
3.11 User can change the amount of shims in rear pedestal to adjust the
toggle.
rod of hoisting device extrudes under the action of oil pressure. One
end of piston rod pushes toggle pedestal to move forwards, then insert
pull-rod spring.
3.13 Before installing fly wheel and pulley, shaft and conical surface of
wheel must be coated with grease. Axially four bolts fastened of fly
3.14 When cleaning or changing bearing after the crusher working for a
period, first hang the fly wheel and pulley on wire of crane, then
release axially fixed bolts. Take out washer retainer and install it
reversely. The fly wheel and pulley are departed from conical surface
3.15 When changing jaw plate, concrete should be poured onto the back of
-8-
fixed and swing jaw plate. Pouring layer of concrete should be 5mm
higher than supporting surface of jaw plate. During the initial use of
5. Safety production
5.1 Users can decide operation programme of crusher by the mselves
- 10 -
according to concrete condition.
5.3 For the sake of safety, rotating parts (fly wheel and pulley) of the
5.4 There should not be noises during no-load running of the crusher. If
bearings are normal, and all lubricating parts are lubricated by grease.
7. Drawings attachment
- 12 -
- 14 -