3.1. Electrical Wiring Control Panel
3.1. Electrical Wiring Control Panel
3.1. Electrical Wiring Control Panel
Soldatenplein, zone 2
IBT nv
Industriepark, 27
B-3300 TIENEN
Tel. 016/49.01.15
Industri‰le Brander Technieken Fax. 016/35.59.36
BTW: BE 462.584.486
Manufacterer : IBT nv
Industriepark, 27
B-3300 Tienen
BELGIUM
Controllers : ETAMATIC
Producer : ELCO Power Tension : 3x 400VAC - 50Hz
Type : RPD40-GLE Circuit Tension : 230VAC - 50Hz
Electrical Panel : Sand dryer kiln Construction : 2010
Fuel : Natural gas/Light oil/LPG
XP: Terminals 400VAC Control Panels
Emission-rules : X1: Terminals 230VAC Control Panel
X2: Terminals 24VDC Control Panel
Location : Production hall
X3: Terminals on Burner Connection Box
Prescriptions : EN50.156-1 X4: Terminals on Gas Train Connection Box
X5: Terminals for Remote Status and Alarms
Protection : Indoor
2
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 1
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
2,5mmý
R/3.0
2,5mmý
T/3.0
2,5mmý
2,5mmý
2,5mmý
2,5mmý
2,5mmý
2,5mmý
2
1
1 3 5
1 3 13 21
QF1
2A 2 4 QF2 14 22
GV2-ME08 16.4 11.7
GV-AE11 2 4 6
2,5-4,0A
2,5mmý
2,5mmý
2,5mmý
1
2
T1 T2 T3
QH
VBF02-12A L1 L2 L3
MAIN
SWITCH E
PANEL L
LIGHT 1 3 5
KM1
Orange Wiring 16.4
1 O 2 2 4 6
N
2,5mmý
2,5mmý
2,5mmý
2,5mmý
2,5mmý
2,5mmý
S0
DOOR
XP 1 2 3 X1 1 2 SWITCH XP 4 5 6
L1 L2 L3 L N
U V W
1 3
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 2
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
9 9
2.9/R L1 /4.0
13
L2 /4.0
2.9/T
13
13
6
9
1 3 1
QF3 QF5
CurveD 2 4 1A 2
4A
11
5
6
X1 X1
H1 Wht H2 Wht
XB4-BVM1 X2 XB4-BVB1 X2
POWER SUPPLY POWER SUPPLY
T1 G1 230VAC 24VDC
400/230VAC MIMI-PS-100 13
400VA 230VAC/24VDC
S1 Zw
XB4-BA21 14
LAMP
10
12
TEST
6
QF6
ESX10-T LOAD
+24VDC
2A
10
14
6
1
QF4
LINE
2A 2 +24VDC 0V
A1
K1
12
10
A2
10
N2 /4.0
6 6
N1 /4.0
PE PE
CAD-50-P7
13 14 12.5
23 24 12.6
33 34 12.8
43 44 16.8
03 04
2 4
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 3
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
230VAC
3.9/L1 L1 /5.0
13 13
3.9/L2 L2 /11.0
+24VDC +24VDC
13
9
A1
5.1 6.1 7.1 A1 +24VDC
8.1 9.1 10.1
11.4 12.1 20.1
PNOZ m1p
SAFETY SYSTEM
A2 0VDC
RS232
A2
PMI M107 DIAG +24VDC
LCD-DISPLAY
0V
10
10
A1
K2
A2
OVDC 10 10
OVDC
3.9/N2 N2 /12.0
6 6
3.9/N1 N1 /5.0
230VAC 230VAC
CAD-32-P7
13 14 28.1
21 22
31 32
43 44
03 04
3 5
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 4
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
4.9/L1 L1 /6.0
A1
4.3
PNOZ m1p
Impuls Reset
T0 T1 T2 T3 I0
15
16
17
18
13 23
S2 Bl
XB4-BA61 14 24
ZBE-101 20.6
RESET
min.2s.
17
24VDC/PNOZ-A1
16
T1 /6.1
15
T0 /6.1
6 6
4.9/N1 N1 /6.0
230VAC
4 6
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 5
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
5.9/L1 L1 /7.0
A1
4.3
PNOZ m1p Remote
Emergency Stop Emergency Stop
I1 I2 I3 I4
19
20
21
22
11 21
S3 Rd/Ge
XB4-BS542 12 22
EMERGENCY
STOP
15
16
24VDC/PNOZ-A1
16
5.7/T1 T1 /7.0
15
5.7/T0 T0 /7.0
6 6
5.9/N1 N1 /7.0
230VAC
IA
X2 1 2 3 4
11 21
SR Rd/Ge
XB4-BS542 12 22
REMOTE
EMERGENCY
STOP
5 7
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 6
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
6.9/L1 L1 /8.0
A1
4.3
PNOZ m1p Low Level Low Level Pressure High Level
DAY Tank T-902 Light Oil Pressure Switch
Feed Line Oil Return
I5 I6 I7
23
24
25
24VDC/PNOZ-A1
16 16
6.8/T1 T1 /8.0
15 15
6.8/T0 T0 /8.0
6 6
6.9/N1 N1 /8.0
230VAC
IA IA IA
X2 5 6 X2 7 8 X2 9 10
X3 41 43 X3 44 45
MF1
1 2 4 1 2 4
LOW LEVEL SWITCH F2 F3
DAY TANK T-902 KPS39 KPS37
LOW LEVEL HIGH LEVEL
PRESSURE SWITCH PRESSURE SWITCH
LIGHT OIL P OIL RETURN P
FEED LINE
6 8
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 7
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
7.9/L1 L1 /9.0
A1
4.3
PNOZ m1p Low Level High Level
Pressure Pressure
Natural Gas Nartural gas
I8 I9
26
27
24VDC/PNOZ-A1
16 16
7.8/T1 T1 /9.0
15
7.8/T0
6 6
7.9/N1 N1 /9.0
230VAC
IA IA
X2 11 12 X2 13 14
X4 1 2 3 X4 4 5 6
1 2 4 1 2 4
GPS1 GPS2
GW150A5 GW500A5
LOW LEVEL HIGH LEVEL
PRESSURE PRESSURE SWITCH
SWITCH P NATURAL GAS P
NATURAL GAS
7 9
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 8
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
8.9/L1 L1 /10.0
A1
4.3
PNOZ m1p Low Level
Air Pressure
Pilote Burner
I10
28
24VDC/PNOZ-A1
16 16
8.8/T1 T1 /10.1
6 6
8.9/N1 N1 /10.0
230VAC
IA
X2 15 16
P 1 2
NA1
LGW150-A2P
LOW LEVEL AIR
PRESSURE SWITCH
PILOTE BURNER P
8 10
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 9
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
9.9/L1 L1 /11.0
A1
4.3
PNOZ m1p Rupture Rupture
Disk 1 Disk 2
I11 I12
29
30
29
I9 /15.1
16
T9 /15.1
30
I10 /15.4
16
16 T10 /15.4
16
24VDC/PNOZ-A1
16 16
9.8/T1
230VAC 6 6
9.9/N1 N1 /11.0
9 11
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 10
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
230VAC
10.9/L1 L1 /12.0
13 13
4.9/L2 L2 /13.0
+24VDC +24VDC
A1
4.3
PNOZ m1p Oil Fault
Oil Gas Pumpe Motor
ON Oil Pumpe
32
31
33
34
1 2 13 21 13 21
Q1 KM1 QF2
XB4-BD25 14 22
16.4
14
2.8
22
FUEL SELECTION
MAIN BURNER
1= OIL
2= GAS
31
32
13
13
6 6
10.9/N1 N1 /12.0
230VAC
10 12
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 11
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
9 9
230VAC
11.9/L1 L1 /13.0
40
BA1 /16.7
13 23 33
38
38
40
A1 K1 K1 K1
9
4.3 3.8 3.8 3.8
14 24 34
PNOZ m1p Emergency Furnace
Stop Fault Warning 12 14 12 14 12 14
39
41
42
K3 K4 K5
12.1 12.2 12.3
O0 O1 O2 11 11 11
X1 X1 X1
H3 Rd H4 Rd H5 Ye
35
36
37
XB4-BVM4 X2 XB4-BVM4 X2 XB4-BVM5 X2
EMERGENCY FURNACE WARNING
STOP FAULT
A1 A1 A1
K3 K4 K5
A2 A2 A2
10 10
OVDC
4.9/N2 N2 /13.0
6 6
11.9/N1 N1 /13.0
230VAC
11 13
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 12
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9
230VAC
12.9/L1 L1 /14.0
13
11.9/L2 L2 /24.0
+24VDC +24VDC
A3
14.0
PNOZ mc1p Low Level Low Level Pressure High Level Low Level High Level
EXPANSION
DAY Tank T-902 Light Oil Pressure Switch Pressure Pressure
MODULE
Feed Line Oil Return Natural Gas Nartural gas
16 DO
+24VDC 0VDC OA0 OA1 OA2 OA3 OA4
43
44
45
46
47
13
10
13
A1 A1 A1 A1 A1
K6 K7 K8 K9 K10
A2 A2 A2 A2 A2
OVDC 10 10
OVDC
12.9/N2 N2 /14.0
6 6
12.9/N1 N1 /14.0
230VAC 230VAC
12 14
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 13
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
9 9
230VAC
13.9/L1 L1 /15.0
A3
13.2
PNOZ mc1p Low Level Rupture Rupture Fuel Fuel
Air Pressure Disk 1 Disk 2 Selection Selection
Pilote Burner GAS OIL
49
50
51
52
A1 A1 A1 A1 A1
K11 K12 K13 K14 K15
A2 A2 A2 A2 A2
10 10
OVDC
13.9/N2 N2 /24.0
6 6
13.9/N1 N1 /15.0
230VAC
13 15
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 14
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
14.9/L1 L1 /16.0
A4 A5
eTRON T L1 eTRON T L1
SET-POINT SET-POINT
RELAIS RELAIS
1 2 4 5 N 1 2 4 5 N
29
16
53
54
30
16
55
56
6
6
29
10.4/I9
16
10.4/T9
30
10.6/ I10
16
10.6/ T10
6 6
14.9/N1 N1 /16.0
230VAC
IA IA
X2 17 18 X2 19 20
RUPTURE RUPTURE
DISK1 DISK2
PT100 PT100
14 16
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 15
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
15.9/L1 L1 /17.0
12.9/ BA1
43
A6 LA1 /17.1 K1
40
17.0 18.0 19.0 3.8
LA2 /17.1 44
20.3 21.1 22.1
23.1 24.0 29.1
ETAMATIC 13
60
BURNER K16
Power
CONTROLLER 230VAC
16.5
14
26 25 60 62 61
X1
9
H6 Rd
XB4-BVM4 X2
BURNER
FAULT
57
59
6
13
QF2
2.8
14
58
A1 A1
KM1 K16
A2 A2
6 6
15.9/N1 N1 /17.0
230VAC
LC1-D09-P7 CAD-32-P7
LAD-N20
1 2 2.7 13 14 16.8
3 4 2.7 21 22
5 6 2.8 31 32
13 14 11.6 43 44 25.3
21 22 03 04 26.4
53 54 28.7
63 64
15 17
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 16
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
16.9/L1 L1 /18.0
63 64
61
62
6 6
16.9/N1 N1 /18.0
230VAC
X1 3 4 X1 5
X3 168 N X3 63
NB /18.2
Y26
PM141FV T3
3 WAY VALVE IGNITION
AIR PRESSURE SWITCH TRANSFO
16 18
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 17
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
17.9/L1 L1 /19.0
65
64
1 2 21 13 31
22 24 Q2
K14 XB4-BD25 22 14 32
14.5
21
ZBE-101 28.2
FUEL SELECTION
PILOT BURNER
65
1= Nat.Gas
2= LPG
63
63
65
66
65
6 6
17.9/N1 N1 /19.0
230VAC
X1 6 X1 7
17.5/NB NB /19.3
230VAC 9 9
18.9/L1 L1 /20.0
67 68 66
67
68
69
6 6
18.9/N1 N1 /20.0
230VAC
X1 8 X1 9 X1 10 X1 11
X4 12 X4 11 X4 10 X3 31 N1 X3 35 X3 31A N1 X3 35A
18.9/NB NB /22.0
3 2 1
YB2
DMVDLE5080/11
GASVALVE UNIT Y2 Y1 Y1 Y5 Y1.1 Y5.1
MAIN BURNER 115VAC 115VAC 115VAC 115VAC
1øFUEL VALVE 1øFUEL VALVE 2øFUEL VALVE 2øFUEL VALVE
FEED LINE RETURN FEED LINE RETURN
18 20
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 19
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
19.9/L1 L1 /21.0
A1 Safety Contact A6
4.3 16.2
PNOZ m1p Class 4 ETAMATIC
(DI)
O4 O5
Safety +24vdc Ignition Burner Reset Modulation Gas/Oil
13 14 23 24 Circuit Burner ON/OFF ON/OFF
52 24 46 58 57 56 49
71
73
74
75
76
13 23 23 13 23 22 24
S2 K15
Q3 Q4
5.3 14.6
XB4-BD21 14 24 24 XB4-BD21 14 24 21
ZBE-101 28.3 ZBE-101 28.4
BURNER BURNER
70
72
72
70
70
MODULATION
72
70 70
L4 /21.0
6 6
19.9/N1 N1 /21.0
230VAC
19 21
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 20
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
20.9/L1 L1 /22.0
A6
16.2
ETAMATIC
Leak Test Safety Circuit Safety Circuit Low Level
Gas Valves Gas Oil Air Pressure
Pressure Switch Switch
E 47 55 51 48
PE
77
70
70
78
70 70
20.9/L4
6 6
20.9/N1 N1 /22.0
230VAC
IA IA
X2 21 22 X2 23 24
X4 7 8 9 X3 70 X2 71
1 2 4 P 1 2
GPS3 MA2
GW150A5 DL50A
LEAK TEST LOW LEVEL
GAS VALVES AIR PRESSURE
PRESSURE P SWITCH P
SWITCH MAIN BURNER
20 22
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 21
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
21.9/L1 L1 /23.0
CHANNEL1 CHANNEL2
A6
16.2 19.7/LA1 LA1 /23.1
ETAMATIC
34 33 8 7 9 E 32 31 11 10 12 E
PE PE
79
80
81
82
83
84
85
86
87
88
6 6
21.9/N1 N1 /23.0
230VAC
IA IA
X1 12 13 X2 25 26 27 X1 14 15 X2 28 29 30
X3 13 14 X3 13c 14c
19.8/NB NB /23.1
1 2 13 14 4 3 9 8 10 1 2 13 14 4 3 9 8 10
Y10 Y103
ACTUATOR ACTUATOR
PRIMAIR AIR SECUNDAIR AIR
5kOhm 5kOhm
21 23
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 22
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
22.9/L1 L1 /24.0
CHANNEL3 CHANNEL4
A6
16.2 22.8/LA1
ETAMATIC
30 29 14 13 15 E 28 27 17 16 18 E
PE PE
89
90
91
92
93
94
95
96
97
98
6 6
22.9/N1 N1 /24.0
230VAC
IA IA
X1 16 17 X2 31 32 33 X1 18 19 X2 34 35 36
22.8/NB
1 2 13 14 4 3 9 8 10 1 2 14 13 3 4 9 10 8
Y102 Y101
ACTUATOR ACTUATOR
GAS FLOW OIL FLOW
5kOhm 5kOhm
22 24
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 23
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
230VAC 9 9
23.9/L1 L1 /25.0
13 13
13.9/L2
+24VDC
A6
16.2
ETAMATIC
20 21 38 37 36 35 22 E 4+ 5+ 3- E 1- 2+
PE PE
99
100
101
102
103
104
105
107
109
111
A7 A8
CONVERTOR 3 +5 -6 CONVERTOR 3 +1 -2
4/20-4/20mA 4/20-4/20mA
MCR-SL MCR-SL
4 +1 -2 4 +5 -6
106
108
110
112
OVDC 10 10
14.9/N2
6 6
23.9/N1 N1 /25.0
230VAC
IA IA IA
X2 37 38 39 40 41 X2 42 43 X2 44 45
X3 +24V 90 91 BN GND PE
AI1 AO1
Rd
Ye
Wh
Gr
Bl
230VAC 9
24.9/L1
9
22 24 22 24 43
K3 K4 K16
12.1 12.2 16.5
21 21 44
113
113
EMERGENCY STOP
FURNACE FAULT
13
BURNER FAULT
S4
XB4-BA21 14
21 31 STOP
K17 K17 ALARM HORN
116
13
25.8
22
25.8
32 K17
25.8
14
114
115
A1
HS K17
ALARM A2
HORN
6 6
24.9/N1
230VAC
X1 20 21
CAD-32-P7
13 14 25.8
HA 21 22 25.6
REMOTE 31 32 25.7
ALARM 43 44
03 04
24 26
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 25
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
117
120
32 34 32 34 32 34 03
K3 K4 K5 K16
12.1 12.2 12.3 16.5
31 31 31 04
118
119
121
118
122
123
X5 1 2 3 4 5
Power
Emergency Stop
Furnace Fault
Warning
Burner Fault
25 27
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 26
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
K6 K7 K8 K9 K10 K11 K12 K13
13.3 13.4 13.5 13.7 13.8 14.1 14.3 14.4
11 11 11 11 11 11 11 11
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
X5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Low Level
DAY Tank T-902
Low Level
Pressure Switch
Oil Feed Line
High Level
Pressure Switch
Oil Return
Low Level
Pressure Switch
Natural Gas
High Level
Pressure Switch
Nartural gas
Low Level
Air Pressure
Pilote Burner
Rupture
Disk 1
Rupture
Disk 2
26 28
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 27
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.
0 1 2 3 4 5 6 7 8 9
13 31 23 23 12 14 12 14 53
K2 Q2 Q3 Q4 K14 K15 KM1
4.2 18.6 20.6 20.8 14.5 14.6 16.4
14 32 24 24 11 11 54
141
140
143
142
145
144
147
146
148
149
150
151
153
152
X5 22 23 24 25 26 27 28 29 30 31 32 33 34 35
POWER SUPPLY
Fuel Selection
Pilot Burner
Natural Gas
Burner
Switch ON
Burner Modulation
Switch ON
Fuel Selection
OIL
Fuel Selection
GAS
A6 A9
16.2 FRAS4/1
ETAMATIC 663R4027
DO-Module
Address 07
CAN-L CAN-H + - 13 14 23 24 33 34 43 44
154
155
156
157
158
159
160
161
PE
X5 36 37 38 39 40 41 42 43
Pre-Ventilation
Burner Ignition
Burner Operation
Post-Ventilation
28
Datum =
1002002
IBT nv
Tek. KVV +
SIBELCO LM Cikarang Indonesia Sand dryer kiln
Gez. 09.Aug.2010 Bl. 29
Wijziging Datum Naam Norm EPLAN Gem.v. Gem.d. Industri‰le Brander Technieken 29 Bl.