S.No DIA MM Dia D D MM

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 51

S.

NO

DIA mm

DIA D

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

S.NO

DIA mm

d mm

0.3
0.35
0.4
0.45
0.5

(3.14)

0.09
0.1225
0.16
0.2025
0.25

DIA m
POWER

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

S.NO

DIA mm

D(POWER)4.87
3
4.87
4.87
4.87
4.87
4.87

0.3
0.35
0.4
0.45
0.5

0.0028417149
0.0060202063
0.0115353867
0.0204712773
0.0341966782

DIA m
POWER

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

3.14
3.14
3.14
3.14
3.14

0.3
0.35
0.4
0.45
0.5

D(POWER)4.87
4.87
4.87
4.87
4.87
4.87

0.0028417149
0.0060202063
0.0115353867
0.0204712773
0.0341966782

4
4
4
4
4

S.NO

DIA mm

DIA D

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

S.NO

DIA mm

d mm

0.3
0.35
0.4
0.45
0.5

(3.14)

0.09
0.1225
0.16
0.2025
0.25

DIA m
POWER

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

S.NO

DIA mm

0.3
0.35
0.4
0.45
0.5

D(POWER)4.87
4.87
4.87
4.87
4.87
4.87

0.0028417149
0.0060202063
0.0115353867
0.0204712773
0.0341966782

DIA m
POWER

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

3.14
3.14
3.14
3.14
3.14

0.3
0.35
0.4
0.45
0.5

D(POWER)4.87
4.87
4.87
4.87
4.87
4.87

0.0028417149
0.0060202063
0.0115353867
0.0204712773
0.0341966782

4
4
4
4
4

S.NO

DIA mm

DIA m

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

S.NO

DIA mm

1 300*10
2 350*10
3 400*10
4 450*10
5 500*10

TOTAL HEAD LOSS (H1)

112.78
79.632
65
58.714
55.217

0.3
0.35
0.4
0.45
0.5

DIA m

TOTAL HEAD LOSS (H1)

0.3
0.35
0.4
0.45
0.5

112.78
79.632
65,465
58.714
55.217

3.14/4

AREA ((3.14)/4)*d)m

0.785
0.785
0.785
0.785
0.785

0.07065
0.0961625
0.1256
0.1589625
0.19625

7.5
7.5
7.5
7.5
7.5

Q (7.5 MLD)
1000000
1000000
1000000
1000000
1000000

Q DISCHARGE m/s
POWER
0.086806
0.086806
0.086806
0.086806
0.086806

Q(POWER)1.85
1.85
1.85
1.85
1.85
1.85

0.0108721898
0.0108721898
0.0108721898
0.0108721898
0.0108721898

Q DISCHARGE m/s
POWER
0.086806
0.086806
0.086806
0.086806
0.086806

Q(POWER)1.85
1.85
1.85
1.85
1.85
1.85

0.0108721898
0.0108721898
0.0108721898
0.0108721898
0.0108721898

7500000
7500000
7500000
7500000
7500000

3.14/4

AREA ((3.14)/4)*d)m

0.785
0.785
0.785
0.785
0.785

0.07065
0.0961625
0.1256
0.1589625
0.19625

10
10
10
10
10

Q (7.5 MLD)
1000000
1000000
1000000
1000000
1000000

Q DISCHARGE m/s
POWER
0.1157
0.1157
0.1157
0.1157
0.1157

Q(POWER)1.85
1.85
1.85
1.85
1.85
1.85

0.0184997864
0.0184997864
0.0184997864
0.0184997864
0.0184997864

Q DISCHARGE m/s
POWER
0.1157
0.086806
0.086806
0.086806
0.086806

Q(POWER)1.85
1.85
1.85
1.85
1.85
1.85

0.0184997864
0.0108721898
0.0108721898
0.0108721898
0.0108721898

10000000
10000000
10000000
10000000
10000000

KW1 REQUIRED

COST OF [email protected] KW(Rs.in thousa

CR1=1.48(H1)
1.48
1.48
1.48
1.48
1.48

166.9144
117.85536
96.8882
86.89672
81.72116

TOTAL HEAD LOSS (H2)

97.108
26.939
14.059
7.9221
4.7424

520
360
340
280
260

VELOCITY IN m/s
Q DISCHARGE MLD TO ms
{7.5*1024*60*60*10}
HOURS

MINUTES
24
24
24
24
24

SECONDS
23
60
60
60
60

60
60
60
60
60

LITRES TO METRES m
1000
1000
1000
1000
1000

FRICTION HEAD LOSS PER 1000 m

C FRICTION FACTOR DIMENSIONLESS FACTOR


POWER
100
100
100
100
100

100(POWER 1.85)
1.85
1.85
1.85
1.85
1.85

5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727

FRICTION HEAD LOSS PER 7000 m

C FRICTION FACTOR DIMENSIONLESS FACTOR


POWER
100
100
100
100
100

100(POWER 1.85)
1.85
1.85
1.85
1.85
1.85

5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727

VELOCITY IN m/s
Q DISCHARGE MLD TO ms
{7.5*1024*60*60*10}
HOURS

MINUTES
24
24
24
24
24

SECONDS
60
60
60
60
60

LITRES TO METRES m
60
1000
60
1000
60
1000
60
1000
60
1000

FRICTION HEAD LOSS PER 1000 m

C FRICTION FACTOR DIMENSIONLESS FACTOR


POWER
100
100
100
100
100

100(POWER 1.85)
1.85
1.85
1.85
1.85
1.85

5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727

FRICTION HEAD LOSS PER 7000 m

C FRICTION FACTOR DIMENSIONLESS FACTOR


POWER
100
100
100
100
100

100(POWER 1.85)
1.85
1.85
1.85
1.85
1.85

5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727
5011.8723362727

KILOWATTS REQUIRED AND COST OF PUMP SETS FOR DIFFERE


7.5 MLD

OF [email protected] KW(Rs.in thousands)

COMPARATIVE STATEMENT OF OVERALL COST


RATE PER METRE LENGTH

640.77
804.92
918.72
1106.51
1302.66

7.5 MLD

S TO METRES m

PRODUCT(L8*M8*N8*O8)
33120000
86400000
86400000
86400000
86400000

Q CONVERSION
0.2264492754
0.0868055556
0.0868055556
0.0868055556
0.0868055556

7.5 MLD

LENGHT m

1000
1000
1000
1000
1000

10.68
10.68
10.68
10.68
10.68

7.5 MLD

LENGHT m

7000
7000
7000
7000
7000

10.68
10.68
10.68
10.68
10.68

10 MLD

24*60*60*10}

S TO METRES m

PRODUCT(L8*M8*N8*O8)
86400000
86400000
86400000
86400000
86400000

Q CONVERSION
0.1157407407
0.1157407407
0.1157407407
0.1157407407
0.1157407407

10 MLD

LENGHT m

1000
1000
1000
1000
1000

10.68
10.68
10.68
10.68
10.68

10 MLD

LENGHT m

7000
7000
7000
7000
7000

10.68
10.68
10.68
10.68
10.68

PUMP SETS FOR DIFFERENT PIPE SIZE

TOTAL HEAD LOSS (H2)

1.92
1.92
1.92
1.92
1.92

156.82
79.632
65.465
58.714
55.217

MENT OF OVERALL COST STRUCTUR OF PUMPING MAIN L FOR DIFFER


COST OF 7000 m pipe line

COST OF PUMP1 @Rs.2000PER KW(Rs.in thousands)

4486
5635
6431
7746
9119

520
360
340
280
260

VELOCITY IN m/s
V=(Q/A)

3.2052268275
0.9026965351
0.6911270347
0.5460756817
0.4423213022

NUMERATOR

116.1149875664
116.1149875664
116.1149875664
116.1149875664
116.1149875664

NUMERATOR

812.8049129647
812.8049129647
812.8049129647
812.8049129647
812.8049129647

DENOMINATOR

FRICTION HEAD LOSS PER 1000 m

14.2423124936
30.1725055596
57.8138854688
102.5994285976
171.3893852846

DENOMINATOR

14.2423124936
30.1725055596
57.8138854688
102.5994285976
171.3893852846

FRICTION HEAD LOSS PER 7000 m

VELOCITY IN m/s
V=(Q/A)

1.6382270452
1.2035953801
0.9215027129
0.728100909
0.5897617363

NUMERATOR

197.5777187644
197.5777187644
197.5777187644
197.5777187644
197.5777187644

NUMERATOR

1383.0440313509
812.8049129647
812.8049129647
812.8049129647
812.8049129647

DENOMINATOR

FRICTION HEAD LOSS PER 1000 m

14.2423124936
30.1725055596
57.8138854688
102.5994285976
171.3893852846

DENOMINATOR

14.2423124936
30.1725055596
57.8138854688
102.5994285976
171.3893852846

FRICTION HEAD LOSS PER 7000 m

10 MLD
KW2 REQUIRED

COST OF [email protected] KW(Rs.in thousands)

1.92KW
301.0944
152.89344
125.6928
112.73088
106.01664

N L FOR DIFFERENT PIPE SIZE

PER KW(Rs.in thousands)

660
420
320
260
240

ON HEAD LOSS PER 1000 m

8.1528184148
3.8483707406
2.0084273289
1.1317313279
0.6774922926

ON HEAD LOSS PER 7000 m

OTHER LOSSES 10%


10% FRICTIONAL HEAD LOSSES

57.0697289033
26.9385951843
14.0589913024
7.9221192951
4.7424460483

0.1
0.1
0.1
0.1
0.1

ON HEAD LOSS PER 1000 m

13.8725869731
6.5482701917
3.4174786414
1.9257194846
1.1528002066

ON HEAD LOSS PER 7000 m

OTHER LOSSES 10%


10% FRICTIONAL HEAD LOSSES

97.1081088114
26.9385951843
14.0589913024
7.9221192951
4.7424460483

0.1
0.1
0.1
0.1
0.1

KW1 REQUIRED

1.67E+02
1.18E+02
9.69E+01
8.69E+01
8.17E+01

KW2 REQUIRED

301.09
152.89
125.69
112.73
106.02

R LOSSES 10%

STATIC HEAD 50 m

RICTIONAL HEAD LOSSES


5.7069728903
2.6938595184
1.4058991302
0.7922119295
0.4742446048

50
50
50
50
50

R LOSSES 10%

STATIC HEAD 50 m

RICTIONAL HEAD LOSSES


9.7108108811
2.6938595184
1.4058991302
0.7922119295
0.4742446048

50
50
50
50
50

ANNUAL COST OF ENERGY CHARGES

CR1=((7001.65)*(10E-3)*(KW1))
7001.65
7001.65
7001.65
7001.65
7001.65

1.00E-03
1.00E-03
1.00E-03
1.00E-03
1.00E-03

TOTAL LOSSES
FRICCTION HEAD LOSS+ 10% FRICTIONAL HEAD LOSSES+ STATIC HEAD (H1)

112.776701794
79.6324547027
65.4648904327
58.7143312247
55.2166906531

TOTAL LOSSES
FRICCTION HEAD LOSS+ 10% FRICTIONAL HEAD LOSSES+ STATIC HEAD (H2)

156.818919692
79.6324547027
65.4648904327
58.7143312247
55.2166906531

GY CHARGES

5)*(10E-3)*(KW1))
CR1
1168.6454015
825.214469
678.319852
608.42238005
572.18183965

ANNUAL COST OF ENERGY CHARGES

CR2=(7348.65)*KW2)
7348.65
7348.65
7348.65
7348.65
7348.65

1.00E-03
1.00E-03
1.00E-03
1.00E-03
1.00E-03

OSSES+ STATIC HEAD (H1)

OSSES+ STATIC HEAD (H2)

GY CHARGES

48.65)*KW2)
CR2
2212.6050285
1123.5350985
923.6518185
828.4133145
779.103873

ENERGY CHARGES CAPITALISED

C1=7.606*CR1
7.606 8888.71692381
7.606 6276.58125121
7.606 5159.30079431
7.606 4627.66062266
7.606 4352.01507238

ENERGY CHARGES CAPTILISIED

C2=7.606*CR2
7.606 16829.0738468
7.606 8545.60795919
7.606 7025.29573151
7.606 6300.91167009
7.606 5925.86405804

TOTAL CAPTILISED COST= (COST OF 7000m PIPE LINE IN m)+(COST OF PUMPSETS)

13894.7169238
12271.5812512
11930.3007943
12653.6606227
13731.0150724

OST OF PUMPSETS)

COST OF PUMP2 @Rs.2000PER KW(Rs.in thousands)

660
420
320
260
240

INITIAL CAPITAL INVESTMENT FOR PUMPSETS AND ANNUA

4.177
4.177
4.177
4.177
4.177

MENT FOR PUMPSETS AND ANNUAL ELECTRICAL CHARGES

4186.9939782
2146.4227817
1758.5098711
1570.7234068
1476.1465305

GRAND TOTAL OF CAPITALISED COST

18081.710902
14418.0040329
13688.8106654
14224.3840294
15207.1616029

LISED COST

You might also like