Work Method:
The following procedure shall be carried out in sequence:
1. Deployment
Once the lorry is in position, the operator will start to deploy his outrigger and do leveling for his lorry. At the same time, the workers will cordon off the area with safety cones with red/white tape to demark the tree felling area. Signage will display to warn other workers working within the site.
Office: 155-14 Mandai Road Singapore 779392 CO REG: 02917700J Email: [email protected]
6.
Once all the branches are cleared from the tree, the worker will then secure the tree trunk with a metal chain which is attached on a lorry crane to prevent the tree from felling straight to the ground after it has been cut to ground level.
7.
After the tree has been cut to ground level, the tree trunk will then slowly being lift down to the ground by the lorry crane, then the ground workers will cut the tree trunk into smaller pieces and stack them together and secured it with a safety metal chain. The secured tree trucks will be loaded up to the slip tank by the lorry crane.
8. 9.
The process will be repeated till all the trees are fell in the work zone area. Once the tree felling zone area is completed, the worker will clear and tidy up the area before moving to the next work zone.
10. Once the slip tank is full with debris, the lorry driver will transport the debris to the woodchipping warehouse to do further process of the debris. 11. After the debris has been chipped, it will be then transported to Eco Resource Recovery Centre to make further processes.