2. Shall refer to the Architect commissioned by the Owner/Client to plan and design
the building/structure and all its utilities and to coordinate the works of all allied
design professionals involved in the project including all inter-disciplinary and
specialized works.
4. Are Specialist personnel who may be consulted by the Jurors during the conduct
of ADC to permit them to obtain all necessary relevant information.
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 1/7
07/11/2023, 13:04 Prof Prac (3)
8. shall refer only to the Professional Regulatory Board of Architecture (PRBoA), duly
created under R.A. No. 9266 and its IRR and under the supervision and
administrative control of the Commission.
A Commission B UAP
C Board D IAPOA
9. means the cost of salaries of professional consultants for the time directly
chargeable to the projects,
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 2/7
07/11/2023, 13:04 Prof Prac (3)
10. Recommended Professional Fee (RPF) for Detailed Architectural Design Services
under GROUP 3
11. What is the recommended professional fee (RPF) per hectare for the first five (5
hAS.) hectares net to the Architect?
A P50,000.00 B P25,000.00
C P100,000.00 D P15,000.00
12. Means a duly notarized written contract or equivalent public instrument stipulating
the scope of services and guaranteeing compensation of such services to be
rendered by an architect registered and lincensed by the PRC-PRBoA.
13. This method of remuneration is best suited for projects for which the cost are
difficult to predetermine, or in cases where it may become necessary to undertake
additional experimental or investigative work, the result of which may further alter
the scope of the project.
14. This services deals with specific expertise for further enhancement of the
architectural interior and exterior components of a project.
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 3/7
07/11/2023, 13:04 Prof Prac (3)
16. What is the Cumulative payment upon completion of the Design Development
Services?
A RA 9285 B RA 8293
C RA 9382 D RA 9184
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 4/7
07/11/2023, 13:04 Prof Prac (3)
21. Payment schedule that is applied for Conceptual Master Development Plan
(CMDP)
22. Architect as used in the Official Guideline shall refer only to a Registered and
Licensed Architect (RLA), a natural person under Philippine law and jurisprudence
with a valid certificate of registration and a valid professional identification card
(representing the renewable _____ license) for the lawful practice of the State-
regulated profession of Architecture.
A 2-year B 5-year
C 1-year D 3-year
23. Under Bidding or Negotiation Phase, within ______ after the award to the
winning bidder or bidders the payment to the Architect shall be adjusted so that it
will amount to a sum equivalent to ninety (90%) percent of the Professional Fee.
A 15 days B 7 days
C 30 days D 10 days
24. Means the total cost of all fixtures and accessories for architectural interiors,
acoustics, lighting works, site development civil works and landscaping works;
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 5/7
07/11/2023, 13:04 Prof Prac (3)
A Section 23 B Section 22
C Section 41 D Section 37
https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 6/7
07/11/2023, 13:04 Prof Prac (3)
Answer Key
1. c 2. d 3. c 4. c
5. c 6. d 7. c 8. c
25. c