Prof Prac (3) - Quiz

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

07/11/2023, 13:04 Prof Prac (3)

NAME :

CLASS :
Prof Prac (3)
DATE :
25 Questions

1. Under Multiple of Direct Personnel Expenses,


if Direct Cost = An + Cn + Tn;
What is the Formula for "Fee"?

A Direct Cost + R B (An + Cn + Tn) / M

C Direct Cost x M D Direct Cost x M + R

2. Shall refer to the Architect commissioned by the Owner/Client to plan and design
the building/structure and all its utilities and to coordinate the works of all allied
design professionals involved in the project including all inter-disciplinary and
specialized works.

A Consultant B Specialist Consultant

C Construction Manager D Prime Professional

3. This method of compensation is particularly suited to engagements involving


intermittent personal service.

A Salary Cost plus Direct Cost B Retainer

C Per diem or Hourly Basis D Professional Fee plus Expense

4. Are Specialist personnel who may be consulted by the Jurors during the conduct
of ADC to permit them to obtain all necessary relevant information.

A Professional Advisor B Specialist Consultant

C Technical Advisors D Competition Secretariat

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 1/7
07/11/2023, 13:04 Prof Prac (3)

5. What does APCC means?

Accredited Professional Construction None of the above


A B
Consultant

Awarded Project Construction Cost Architectural Project Construction


C D
Consultant

6. Buildings of the simplest utilization and character;


I. Warehouses
II. Bakeries
III. Armories
IV. Hangars
V. Printing Plants
VI. Publishing Plants

A II, III, IV & VI B All of the above

C I, II, III & IV D I, II, III, IV & V

7. This method of remuneration is used when the services of a Professional


Consulting Architect (PCA) is expected to be required at intervals over a period of
time.

Salary cost times a multiplies, plus Per Diem, Honorarium plus


A B
direct cost or reimbursable expenses Reimbursable Expenses

C Retainer D Professional Fee plus Expense

8. shall refer only to the Professional Regulatory Board of Architecture (PRBoA), duly
created under R.A. No. 9266 and its IRR and under the supervision and
administrative control of the Commission.

A Commission B UAP

C Board D IAPOA

9. means the cost of salaries of professional consultants for the time directly
chargeable to the projects,

A Direct Cost B Professional Fee

C Hourly Cost D Salary Cost

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 2/7
07/11/2023, 13:04 Prof Prac (3)

10. Recommended Professional Fee (RPF) for Detailed Architectural Design Services
under GROUP 3

A 6% of PCC B 3.6% of PCC

C 4.2% of PCC D 7% of PCC

11. What is the recommended professional fee (RPF) per hectare for the first five (5
hAS.) hectares net to the Architect?

A P50,000.00 B P25,000.00

C P100,000.00 D P15,000.00

12. Means a duly notarized written contract or equivalent public instrument stipulating
the scope of services and guaranteeing compensation of such services to be
rendered by an architect registered and lincensed by the PRC-PRBoA.

A Contract Document B Contract Agreement

C Bond D Service Agreement

13. This method of remuneration is best suited for projects for which the cost are
difficult to predetermine, or in cases where it may become necessary to undertake
additional experimental or investigative work, the result of which may further alter
the scope of the project.

Mixed method of compensation Salary cost times a multiplier, plus


A B
direct cost or reimbursable expenses

Multiple of Direct Personnel Per diem or hourly basis


C D
Expenses

14. This services deals with specific expertise for further enhancement of the
architectural interior and exterior components of a project.

A Specialized Allied Services B Specialized Architectural Services

Comprehensive Architectural Comprehensive Design Services


C D
Services

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 3/7
07/11/2023, 13:04 Prof Prac (3)

15. Buildings of moderate complexity of plan/design requiring a moderate amount of


research and of engineering and allied architectural design EXCEPT.

A Motels & Apartels B Public Health Centers

C Supermarkets D City/Town Halls & Civic Centers

16. What is the Cumulative payment upon completion of the Design Development
Services?

A 40% of the PF B 90% of the PF

C 20% of the PF D 50% of the PF

17. Buildings and facilities under GROUP 5 EXCEPT:

A Mausoleums B Specialized Decorative buildings

C Mortuaries D Exposition & Fair Buildings

18. Means the rendering by a professional consulting architect (PCA) or by a


consulting firm of independent advice, extension of technical assistance and
services, as well as undertaking of activities, requiring appropriate knowledge,
skills, training and experience, recognized competence, integrity, and/or financial
and logistical capability.

A Consultation B Pre-feasibility Study

Technical Advise Professional Architectural Consulting


C D
Services (PACS)

19. Alternative Dispute Resolution Act of 2004

A RA 9285 B RA 8293

C RA 9382 D RA 9184

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 4/7
07/11/2023, 13:04 Prof Prac (3)

20. Time-based fees are typically used for the following:


I. Services which are not well defined
II. Pre-design services
III. Partial services
IV. Additional Services
V. Specialist Expertise
VI. For services as Construction Manager

A I, II, III, IV, & V B II, III, IV, V, & VI

C III, IV, V & VI D I, II, III, & IV

21. Payment schedule that is applied for Conceptual Master Development Plan
(CMDP)

A 50% of RPF B 20% of RPF

C 30% of RPF D 40% of RPF

22. Architect as used in the Official Guideline shall refer only to a Registered and
Licensed Architect (RLA), a natural person under Philippine law and jurisprudence
with a valid certificate of registration and a valid professional identification card
(representing the renewable _____ license) for the lawful practice of the State-
regulated profession of Architecture.

A 2-year B 5-year

C 1-year D 3-year

23. Under Bidding or Negotiation Phase, within ______ after the award to the
winning bidder or bidders the payment to the Architect shall be adjusted so that it
will amount to a sum equivalent to ninety (90%) percent of the Professional Fee.

A 15 days B 7 days

C 30 days D 10 days

24. Means the total cost of all fixtures and accessories for architectural interiors,
acoustics, lighting works, site development civil works and landscaping works;

A Estimated Cost B Cost of Work

C Project Development Cost D Construction Cost

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 5/7
07/11/2023, 13:04 Prof Prac (3)

25. Standards of Professional Practice (SPP) is a required document under _____ of


R.A. No. 9266 (The Architecture Act of 2004) and its Implementing Rules and
Regulations (IRR)

A Section 23 B Section 22

C Section 41 D Section 37

https://quizizz.com/print/quiz/5ec0cc65f4ec3c001b408c90 6/7
07/11/2023, 13:04 Prof Prac (3)

Answer Key

1. c 2. d 3. c 4. c

5. c 6. d 7. c 8. c

9. d 10. c 11. a 12. d

13. b 14. b 15. b 16. a

17. c 18. d 19. a 20. a

21. c 22. d 23. a 24. b

25. c