1 SATIP-NDE-RT-01 Radiographic Testing-Rev 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No. APPROVED DATE DISCIPLINE:


SAUDI ARAMCO TYPICAL INSPECTION PLAN
RADIOGRAPHIC TESTING (RT) SATIP- NDE-RT-01 25-May-05 MECHANICAL- NDE
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY QUALITY RECORD CONTRACTOR SAUDI ARAMCO REMARKS
NO. & Activity Code PROCEDURE
NDE CNTRCTR PID OID

1.0 DOCUMENT REVIEW

Radiographic Examination Procedure


1.1 SAIC-RT-2001 H RH1 H1 RH1
Review

1.2 RT Personnel Qualifications Review SAIC-RT-2002 H RH1 H1 RH1

1.3 Radiation Safety Procedure SAIC-RT-2003 H RH1 H1 RH1

2.0 MATERIAL RECEIVING

Verification and Visual Inspection of


2.1 SAIC-RT-2004 SAIC-RT-2004 H R1/W1* S/W2* W1/R1 *Except Isotope materials
Isotope, Radiation Monitoring Devices
Inspect RT Films (Unexposed) &
2.2 SAIC-RT-2005 SAIC-RT-2005 H W1 W2 S
Developing Equipment

3.0 APPLICATION

In-Process Verification of Techniques & SAIC-RT-2007


3.1 SAIC-RT-2007 H W1/R1 W1/R1 W2
Procedure Implementation SATR-NDE-2004

3.2 Radiographic Film Processing SAIC-RT-2008 SAIC-RT-2008 H W2 S W2

SAIC-RT-2009
3.3 Film Evaluation and Reporting SAIC-RT-2009 H W1/RH1 R1 R2
SATR-NDE-2004

3.4 Assessment of RT Film Interpretaton SATR-NDE-2008 H

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1
adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4
attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1 100% Witness Inspection/Test H2 Sample Hold Point for QC Inspection or Test RH1 100% Review and Approval of Documents
W2 Sample Witness Inspection/Test R1 100% Review of Documents RH2 Sample Review and Approval of Documents
H1 100% Hold Point for QC Inspection or Test R2 sample Review of Documents S Surveillance

Page 1 of 1