Procedure For Heat Treatment Dated 29-09-06
Procedure For Heat Treatment Dated 29-09-06
Procedure For Heat Treatment Dated 29-09-06
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
CONTRACTOR : AFCONS INFRASTRUCTURE LTD.
JOB NO. : 251%4
PROJECT : J.E.R.P, RPL
JAMNAGAR
NAME OF UNITS : JETT$ MODIFICATION
SECTION : JETT$
O&NER : RELIANCE
E/jetty-230208628.doc Page 1 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
. A. Preheating .
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE.
3. REFERENCE.
4. HEATING MODE.
5. HEAT BAND.
6. TEMPERATURE MEASUREMENTS.
P'()*+,:
This procedure gives the guideline Ior preheating the joints beIore start oI welding activity.
S-*),:
This procedure covers carbon steel joints during Iabrication and erection oI piping.
R,.,(,/-,:
(i) ASME B31.3
(ii) Project SpeciIication .(25194-3PS-GAW-004-Rev.2)
E/jetty-230208628.doc Page 2 oI 8
PR/2247/J-
HTT/001
26.09.06 FOR
APPROVAL/00
T.R.SAHA S.MUKHERJEE M.JAYRAM
PROC. NO. DATE
ISSUED FOR/
REV. NO.
PREP`D BY
AFCONS
CHK`D BY
AFCONS
APP`D BY
AFCONS
APP`D BY
CLIENT / TPI
Heat Treatment
A. Preheat B. Post Heat C. PWHT
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
H,012/3 M*4,:
Preheating shall be perIormed using resistance or induction heating methods. Preheating by
gas burners, with neutral Ilame as per contract speciIication shall also be done.
H,01 B0/4:
Preheating shall extend uniIormly to at least three times the thickness oI the joint, but not less
than 50mm, on both sides oI the weld.
T,5),(01'(, M,0+'(,5,/1:
Preheating temperature shall be maintained over the whole length oI the joint during welding.
Preheat Temperature shall be veriIied with the help oI crayons/ thermal chalk/ thermocouple
pyrometer on the metal surIace.
S),-206 C*/4212*/ 7I/1,((')1,4 8,642/39:
II welding is interrupted, care will be taken to prevent detrimental eIIects in the piping by
controlled cooling rate or by using some other suitable means.
Preheat speciIied in the WPS will be applied beIore welding is resumed. In case oI power
Iailure/ interruption Fit-up shall be insulated & sidewise arrangement (Gas burners with
neutral Ilame) shall be kept ready Ior the execution oI job.
E/jetty-230208628.doc Page 3 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
. B. Post Heating .
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE.
3. REFERENCE.
4. HEATING MODE.
5. HEAT BAND.
6. HEATING CYCLE.
7. TEMPERATURE MEASUREMENTS
8. POST HEAT CHART.
9. DOCUMENTATION
P'()*+,:
This procedure gives the guideline Ior post heating the welded joint, iI the PWHT activity is
not being perIormed just aIter welding (Ior the applicable material as per ASME B 31.3 )
S-*),:
It covers the alloy steel (Cr-Mo) welded joints during Iabrication and erection oI piping.
R,.,(,/-,:
(i) ASME B31.3.
(ii) Project SpeciIication. (25194-3PS-GAW-004-Rev.2)
H,012/3 M*4,:
The weld joint along with the adjacent band to be heat-treated shall be heated either by
induction heating or by electrical resistance heating equipment.
H,01 B0/4:
The weld joint and adjacent portion oI pipe, at least 50mm on either side oI weld, shall be
uniIormly heated to 300
0
C.
E/jetty-230208628.doc Page 4 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
H,012/3 C:-6,:
Material shall be heated upto 300
0
C. The temperature shall be maintained upto a minimum oI
halI an hour. Then wrapped in asbestos/ Insulation beIore allowing it to cool to room
temperature. Post heating temperature and time will Iollow the welding speciIication chart .
T,5),(01'(, M,0+'(,5,/1+:
1. The temperature attained by the heated portion shall be measured by thermo couples.
ManuIacturers test certiIicates shall be submitted Ior the thermocouple materials.
2. The temperature shall be recorded by means oI calibrated automatic temperature recorder.
The calibration certiIicates oI temperature recorders shall be submitted to CLIENT / TPI
beIore start oI work.
3. The thermocouples shall be attached directly along the periphery oI the weld joint by the
resistance welding method.
4. The minimum number oI thermo couples attached per joint shall be:
Up to 6 Diameter : 1 No. (PreIerably at the bottom oI the weld)
Above than 6 Dia : 2 Nos (On Opposite Faces).
P*+1 H,01 C;0(1:
The joint identiIication number shall be noted on the corresponding time-temperature graph.
D*-'5,/1012*/:
Prepared report (showing the details oI heat treatment) & graph shall be submitted to
CLIENT / TPI Ior review.
E/jetty-230208628.doc Page 5 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
C. Post Weld Heat Treatment
TABLE OF CONTENTS
1. SCOPE.
2. REFERENCE.
3. SURFACE PREPARATION.
4. HEATING MODE.
5. HEAT BAND.
6. TEMPERATURE MEASUREMENTS.
7. HEATING CYCLE.
8. PWHT CHART.
9. HARDNESS TEST
10. DOCUMENTATION.
1. SCOPE:
This procedure Iormulates the guidelines Ior Post Weld Heat Treatment oI Carbon Steel and
alloy Steel weld joints during Iabrication and erection oI piping.
PWHT work will be done beIore Non Destructive Examination oI the welded joints (As per
Project spec.25194-3PS-GAW-004) Rev 2
2. REFERENCE:
1. ASME B 31.3
2. Welding speciIication Ior piping
3. NDE requirement oI Piping
4. Approved Welding Procedure SpeciIication
3. SURFACE PREPARATION:
The surIace to be examined and adjacent band width oI the surIace to be heat treated shall be
dry and Iree oI dirt, grease, lint, scale, welding Ilux, oil or any other extraneous matter.
E/jetty-230208628.doc Page 6 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
4. HEATING MODE:
The weld joint along with the adjacent band to be heat-treated shall be heated either by
induction heating or by electrical resistance heating equipment.
HEAT BAND:
5.1 Proper care shall be taken to ensure that width oI heated band over which speciIied post
weld heat treatment temperature attained is at least that speciIied in the relevant
applicable standards/ codes.
5.2 While carrying out local Post Weld Heat Treatment the technique to be adapted Ior
heating shall be ensured that uniIorm heating shall be maintained at all points oI the
portion being heat-treated.
5.3 The bandwidth to be decided accordingly, while heating welded joints; the exposed
surIace temperature shall not be allowed to exceed 50 oI the peak temperature.
6. TEMPERATURE MEASUREMENTS:
6.1 The temperature attained by the heated portion shall be measured by thermo couples.
ManuIacturers test certiIicates shall be submitted Ior the thermocouple materials.
6.2 The measure temperature shall be recorded by means oI calibrated automatic
temperature recorder. The calibration certiIicates oI temperature recorders shall be
submitted to CLIENT / TPI beIore starting oI PWHT.
6.3 The thermocouples shall be attached directly at equally spaced location along the
periphery oI the weld joint either by putty or by resistance welding.
6.4 The minimum number oI thermo couples attached per joint shall be
Up to 4 Diameter (NPS). : 1 No. (PreIerably at the bottom oI the joint)
6 ~ 12Diameter (NPS). : 2 Nos. (PreIerably one at the bottom oI the joint)
Above 12 Diameter (NPS). : 3 Nos. (PreIerably one at the bottom oI the joint)
7. HEATING C$CLE:
7.1 The rate oI heating, soaking temperature, soaking time, rate oI cooling Ior each
shall be governed the approved welding procedure speciIication.
E/jetty-230208628.doc Page 7 oI 8
AFCONS INFRASTRUCTURE LTD.
RPL,JAMNAGAR
CONTRACT NO: 3612153
JOB PROCEDURE FOR
HEAT TREATMENT
DOC. NO: PR/2247/J
HTT /!!1
RE" NO: !!
CLIENT: RELIANCE
PROJECT: JAMNAGAR E#PORT REFINER$
7.2 The heating and cooling process shall be uncontrolled up to 300
0
C and below 300
0
C respectively.
7.3 During heating / soaking diIIerence between any two points shall be as minimum as
possible.
7.4 PWHT work will be started aIter the installation oI piping supports as per AFC
drawing to prevent any sagging/wrapage/distortion during the thermal cycle. For the
Iabrication joints, beIore starting the PWHT cycle, care shall be taken to prevent any
sagging/wrap age/distortion.
<. P&HT CHART:
8.1 The joint identiIication number shall be noted on the corresponding time
temperature graph and along with a report shall be prepared showing the details oI heat
treatment.
8.2 Hardness test shall be conducted aIter the completion oI PWHT, wherever required
as mentioned in the Welding speciIication chart and a report Ior the same shall be
prepared.
%. HARDNESS TEST:
AIter the completion oI PWHT work, Hardness test shall be done. Hardness oI the weld &
Heat AIIected Zone (HAZ) shall be measured by digital type hardness tester only.
1!. DOCUMENTATION:
The PWHT chart along with PWHT & Hardness Reports duly signed by AFCONS-QC
personnel will be submitted to CLIENT / TPI Ior their review.
#
E/jetty-230208628.doc Page 8 oI 8