Presentation of Energy Conservation in Govt. Buildings of Maharashtra State
Presentation of Energy Conservation in Govt. Buildings of Maharashtra State
Presentation of Energy Conservation in Govt. Buildings of Maharashtra State
Energy Conservation
in
Govt. Buildings
of
Maharashtra State.
Energy Saving
Energy Saving
Energy Saving
Ways of Energy
Awareness
Conservation
Ways of Energy
Replacement of electric water heaters with solar water
Conservation
heaters
Sr.
No
.
Year
Use of fitting /
Equipment
Nos.
Capital
cost
(Rs.
Lacs)
Date
of
commi
sioning
Saving
in bill
(Rs.
Lacs)
Simple
paybac
k
period
(yrs)
200102
6
Nos.
8.17
12/01
2.97
2.8
200102
Power factor
correction capacitor
panel
350
KVAR
13.8
12/01
5.49
2.5
200102
E+ 28 W tube fitting
in place of 40 W
fitting
1493
12.02
2/02
5.37
2.2
200102
1493
3.22
2/02
1.79
1.8
An
expenditure of Rs. 40.43 lacs has accrued
saving
of Rs.2/02
17.41 lacs
per annum.
5 2001- New reflector with
1493
3.22
1.79
1.8
02
Sr.
No.
Year
Equipment
Used
Quantit
y
(Nos.)
Cost of
installatio
n
Rs.Lakhs
200102
Capacitor
panel
180
KVAR
3.66
120
KVAR
3.47
Units
save
d
Saving
in
energy
bill
Rs(Lakh
s)
Simple
pay back
YearsMonths
2.67
10 months
200203
4.28
200203
E+fluo.
Tubes
1238
10.78
7293
3
3.65
2 -11
200304
E+fluo.
Tubes
2705
21.77
1593
57
7.97
2-8
200304
Capacitor
panel
50
KVAR
1.58
6 expenditure
2004E+fluo.
3572
2032
10.16
An
of
Rs. 79.05 lacs
accrued 27.77
saving of Rs.
36.45 lacs
in four
05
Tubes
46
years ( 5% increase in load).
2 -8
Sr. No .
Solar
Solar
CFL Lamp (Nos.)
DPSD (Nos.) Light
nic
Fitting
Regulator
Street water
(Nos.)
choke
(Nos.)
(Nos.)
Light heate
(Nos.)
9 Watt 11 Watt 2x11W 1x18 W 2x26W
125W 250W 11W 18W
r
Name of
Circle
Mumbai
10436
269
1003
350
48
1128
1353
123
535
20
Pune
3127
1410
641
150
233
Aurangabad
1397
598
255
43
62
Nagpur
2310
331
526
16
262
52
Total
17270
269
3342
876
960
1390
1598
10
63
526 123
169
46
52
30
264
470
734
85
836 133
Saving by Awareness in J.J. Hospital Units 0.8 MU & Amount Rs. 38.53
Lakhs in three years
Sr. Category
No.
Present
Replaceme
nt
(Quantity)
Capital
Cost
(Rs.
lacs)
Energy
bill
saving /
year
(Rs.
lacs)
Paybac
k
period
(yrs)
469.06
399.16
1.2
1.
Fluo. fitting
Conventional
40W
(76023 Nos.)
E+(28W)
(53303
Nos.)
2.
Passage
Lights:
Conventional
40W fluo.
fitting (1896
Nos.)
CFL 11 W
(1896 Nos.)
2.84
7.98
0.4
3.
Water
Pumps
Conventional
(61 Nos.)
Submersibl
e
(61 Nos.)
18.3
13.97
1.3
4.
Passage
Lights:
0.3
0.76
0.5
Sr. Category
No
.
Present
Replaceme
nt
Capital
Cost
(Rs.
lacs)
Energy
bill
saving /
year
(Rs.
lacs)
Paybac
k
period
(yrs)
6.
AC units
Without
Digiguard
(539 Nos.)
With
Digiguard
(539 Nos.)
19.94
12.76
1.6
7.
Compound &
Flood Lights
Without
DPSD
(614 Nos.)
With DPSD
(614 Nos.)
17.19
9.88
1.74
8.
Water Heating
System
Electric
(1145 Nos.)
Solar
(167 Nos.)
480
75.23
6.4
9.
Water Cooling
Water
Coolers
(425 Nos.)
Heat
Pumps
(9 Nos.)
90
32.39
2.7
Sr. Category
No.
Present
Replaceme
nt
Capital
Cost
(Rs.
lacs)
Energy
bill
saving /
year
(Rs.
lacs)
Paybac
k
period
(yrs)
11.
Water Pumps
Without VFD
(41 Nos.)
With VFD
(41 Nos.)
202.18
41.26
12.
Lifts
Without 3VF
drive
(19Nos.)
With 3VF
drive
(19Nos.)
48.94
13.84
3.5
13.
Ceiling Fan
Regulators
Resistive
(6716 Nos.)
Electronic
(6716 Nos.)
12.08
12
Sr.
No.
Replace by
Saving in
energy Bill Pay back
every year Period
(Rs. Lacs)
14
261.76
51.6
15
20.4
7.32
2.8
16
Centralised Air
condition units
(6 Nos.)
Split AC Units
( 73 Nos)
36.54
37.49
17
16.03
13.32
1.2
1723.12
763.19
2.26
Total ::
Department
Home (Police)
Home (Jail)
Qty
(Nos)
Capital
Cost
CFL Fittings
Qty Capital
(Nos)
Cost
Solar Water
Heaters
Qty
(Ltrs)
(Rs. in Crores)
Grand Total
Capital Capital
Cost
Cost
Energy Saving
per year
(million units)
35057
3.09
7386
0.11
0.00
3.20
3.01
7415
0.65
1653
0.02
0.00
0.67
0.64
32288
2.84
5521
0.08
0.00
2.92
2.7
Education
46199
4.07
8907
0.13
0.00
4.20
3.92
Social Welfare
9342
0.82
2807
0.04
0.00
0.86
0.85
34907
3.07
7496
0.11
0.00
3.18
34938
3.07
12772
0.19
287750
5.80
3.26
6.52
Revenue
Public Works (NonResi)
Pblic Works (Resi)
6084
0.54
1288
0.02
0.00
0.56
0.52
Other Administrative.
16759
1.47
2146
0.03
0.00
1.50
1.36
92
0.01
16
0.00
0.00
0.01
0.01
855
0.08
134
0.00
0.00
0.08
0.07
63638
5.60
11385
0.17
0.00
5.77
5.35
13 Finance
3974
0.35
826
0.01
0.00
0.36
0.34
14 Animal Husbandry
3245
0.29
638
0.01
0.00
0.30
0.28
15 Fisheries
861
0.08
334
0.01
0.00
0.09
0.08
16 Tech. Education
337
0.03
53
0.00
0.00
0.03
0.03
17 Dairy Deptt.
425
0.04
209
0.00
0.00
0.04
0.04
296416
26.10
63571
0.93
287750
5.80
27.03
28.72
10 Labour Dept.
11 Vidhan Bhavan
12 Public Health
An expenditure of Rs. 27.03 crores accrues saving of Rs. 12.92 crores per annum & 28.72 million units .
Department
Home (Police)
Home (Jail)
Qty
(Nos)
Capital
Cost
CFL Fittings
Solar Street
Light Fittings
Solar Water
Heaters
Qty
(Ltrs)
(Rs. in Crores)
Grand Total
Capital Capital
Cost
Cost
Energy Saving
per year
(million units)
35057
3.09
7386
0.11
4424
10.35
0.00
13.55
4.15
7415
0.65
1653
0.02
776
1.82
0.00
2.49
0.84
32288
2.84
5521
0.08
1952
4.57
0.00
7.49
3.2
Education
46199
4.07
8907
0.13
2992
7.00
0.00
11.20
4.69
Social Welfare
9342
0.82
2807
0.04
1590
3.72
0.00
4.58
1.26
Revenue
Public Works (NonResi)
34907
3.07
7496
0.11
2937
6.87
0.00
10.05
3.76
34938
3.07
12772
0.19
3942
9.22 287750
5.80
18.28
7.54
0.54
1288
0.02
1118
2.62
0.00
3.18
0.81
Other Administrative.
16759
1.47
2146
0.03
477
1.12
0.00
2.62
1.48
92
0.01
16
0.00
0.00
0.00
0.01
0.01
855
0.08
134
0.00
72
0.17
0.00
0.25
0.09
63638
5.60
11385
0.17
3822
8.94
0.00
14.71
6.33
13 Finance
3974
0.35
826
0.01
470
1.10
0.00
1.46
0.46
14 Animal Husbundary
3245
0.29
638
0.01
513
1.20
0.00
1.50
0.41
15 Fisheries
861
0.08
334
0.01
195
0.46
0.00
0.55
0.13
16 Tech. Education
337
0.03
53
0.00
35
0.08
0.00
0.11
0.04
17 Dairy Deptt.
425
0.04
209
0.00
203
0.48
0.00
0.52
0.1
296416
26.10
63571
59.72 287750
5.80
92.55
35.3
10 Labour Dept.
11 Vidhan Bhavan
12 Public Health
0.93 25518
An expenditure of Rs. 92.55 crores accrues saving of Rs. 15.89 crores per annum & 35.3 million units .
Name
of the
Lacs)
Building
Consumption in
units
Saving
Energy Bill
2003-04
2004-05
(units)
4037085
3959960
77125
1.91%
260.58
1325600
1225000
100600
7.59%
681996
675855
6141
Manora
2346520
2294500
J J Hospital
1570770
1561000
9961971
9716315 245656
Mantralaya
Navin Vidhan
Bhavan
Mumbai High
Court
Total
2003-04 2004-05
Energy Saving
Rs.
229.94
30.64
11.76%
90.27
74.04
16.23
17.98%
0.90%
46.87
41.27
5.6
11.95%
52020
2.22%
159.59
157.17
2.42
1.52%
9770
0.62%
60.62
52.47
8.15
13.44%
2.47%
617.93
554.89
63.04
10.20%
Month &
Year
units
Consumed
Differnce
Units
8
Percentage
9
Mar-04
22125
Mar-05
17063
5062
22.88
Apr-04
19691
Apr-05
16726
2965
15.06
May-04
24379
May-05
20770
3609
14.80
Jun-04
21280
Jun-05
16221
5059
23.77
No. of
Suits
LPD
Capacity
(Ltrs)
E+
CFL
Fittings Fittings
(Nos.)
(Nos.)
Capital
Cost
Expected
Net
Saving
Payback
Period
IRR
386
39000
1158
1644
70.71
17.23
7 YRS
15.46%
128
6600
340
130
14.4
3.47
7 YRS
15.08%
51
4700
58
139
9.66
2.37
7 YRS
15.69%
45
4500
177
256
12.43
2.62
8 YRS
14.01%
56
8400
200
15.31
4.56
5 YRS
14.93%
666
58700
1933
2169
122.51
30.25
Total
Thank You
Save Energy To Build Nation.