Log Sheet - STP

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Company Name: XYZ

SITE :-
NAME OF THE OPERATOR :- LOG SHEET
SHIFT TIMING :-
OUTPUT QUALITY OF WATER REMAKKS
TIME 600Hrs. 1000Hrs 1400Hrs. 1800Hrs. 2200Hrs. 0200Hrs. 1ST 2ND 3RD
SUMP PUMPS -WORKING TH
-STAND BY Ph
-No. 1 Free Chlorine
BLOWERS -No. 2 Colour
SEWAGE -WORKING
INCOMING -STAND BY TREATED WATER USAGE
SLUDGE RECIRCULATION -WORKING
PUMP (SST) -STAND BY
FILTER FEED -WORKING
PUMP -STAND BY
TREATED WATER -WORKING CHEMICAL CONSUMED
PUMP -STAND BY 1ST 2ND 3RD TTL
TREATED -IRRIGATION
WATER -MAKEUP TO CT
USAGE -REJECTION
DOSING -ON
PUMP -OFF POINTS TO DISCUSS TO OFFICE
DUAL MEDIA -BACKWASH
FILTER -SERVICE
ACTIVATED CARBON -BACKWASH
FILTER SERVICE

OVERALL PERFORMANCE OF PLANT

POINTS TO DISCUSS WITH ENGG

SIGNATURE
LOG SHEET FOR SCRUBBERS
UNIT : BOILER AND DG SCRUBBER Project :

DATED :

BOILER/HWG SCRUBBER DG SCRUBBER Quantity of water/caustic Status of water in recirculation tank Scooping of carbon Complete drawing/ pH

TIME Nos. of boiler Nos. of HWG Boiler/HWG/ No. of DG set DG Scrubber pumps Dosing pump Agitator charged in dosing tank Fresh water Drain water Return practicies from the Refilling of recir. scrubbering REMARKS

working working Scrubber pump working working to tank recirculation tank Tank water liquid

No.1 No.2 No.1 No.2 No.1 No.2 No.1 No.2 No.1 No.2 No.3 No.4 On Off On / Off Causitc(kgs) Water(ltrs) On Off On Off On On Off Done Not Done

6:00 AM

7:00 AM

8:00 AM

9:00 AM

10:00 AM

11:00 AM

12:00 PM

1:00 PM

2:00 PM

3:00 PM

4:00 PM

5:00 PM

6:00 PM

7:00 PM

8:00 PM

9:00 PM

10:00 PM

11:00 PM

12:00 AM

1:00 AM

2:00 AM

3:00 AM

4:00 AM

5:00 AM

NOTE:- Signature of Operator

STOCK OF CHEMICALS a. -Ensure diffrence between pH sensor & monitor should not be more than 5%

NAME OF THE CHEMICAL OPENING BALANCE CONSUMED STOCK b. - Ensure a reguler flow of cold water through pH electrod.

-CAUSTIC SODA c. - Clabrite pH sensor atleast once a month with standred buffer solution.
LOG SHEET FOR SCRUBBERS
UNIT : DG SCRUBBER DATE :

DG SCRUBBER Quantity of water/ Status of water in recirculation tank Scooping of carbon Complete drawing/ pH
TIME No. of DG set DG Scrubber Dosing pump Agitator causitc charged Fresh water Drain water Return practicies from the refilling of recir. scrubbering REMARKS
working pumps working in dosing tank to tank recirculation tank Tank water liquid
No.1 No.2 No.1 No.2 On Off On/Off Causitc(kgs) Water(ltrs) On Off On Off On On Off Done Not Done
6:00 AM
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM

STOCK OF CHEMICALS
NAME OF THE CHEMICAL OPENING BALANCE CONSUMED STOCK Signature of Operator
-CAUSTIC SODA
Ist Shift
NOTE:- IInd Shift
a. -Ensure diffrence between pH sensor & monitor should not be more than 0.05 IIIrd Shift
b. - Ensure a reguler flow of cold water through pH electrode.
c. - Calibrate pH sensor atleast once a month with standard buffer solution.
d. - Reading interval shall be as per your convinience.
Enhanced Wapp System (India) Pvt. Ltd.
SITE :-
NAME OF THE OPERATOR :- LOG SHEET
SHIFT TIMING :-
PREV. MAINT. OUTPUT QUALITY OF WATER REMAKKS
TIME 600Hrs. 1000Hrs 1400Hrs. 1800Hrs. 2200Hrs. 0200Hrs. 1ST 2ND 3RD
SUMP PUMPS -WORKING TH
-STAND BY Ph
-No. 1 Free Chlorine
BLOWERS -No. 2 Colour
-No. 3 Odour
SEWAGE -DOMESTIC
INCOMING -LAUANDRY TREATED WATER USAGE
LAUNDARY -ON 1ST 2ND 3RD TTL
PRETREATMENT -OFF IRRIGAN
SLUDGE LIFTING -ON CL. TR
PUMP (PST) -OFF REJ.
SLUDGE LIFTING -ON
PUMP (SST) -OFF CHEMICAL CONSUMED
FILTER FEED -WORKING 1ST 2ND 3RD TTL
PUMP -STAND BY
TREATED WATER -WORKING
PUMP -STAND BY
TREATED -IRRIGATION
WATER -MAKEUP TO CT POINTS TO DISCUSS TO OFFICE
USAGE -REJECTION
DOSING -ON
PUMP -OFF
DUAL MEDIA -BACKWASH
FILTER -SERVICE
ACTIVATED CARBON -BACKWASH
FILTER SERVICE
POINTS TO DISCUSS WITH CLIENT
OVERALL PERFORMANCE OF PLANT

CLIENT'S SIGNATURE
Enhanced Wapp System (India) Pvt. Ltd.
SITE :-
NAME OF THE OPERATOR :- LOG SHEET
SHIFT TIMING :-
PREV. MAINT. QUANTITY OF WATER/CAUSTIC REMAKKS
TIME 600Hrs. 1000Hrs 1400Hrs. 1800Hrs. 2200Hrs. 0200Hrs. IN DOSING TANK
BOILER No. 1 1ST 2ND 3RD
No. 2 WATER
No. 1 CAUSTIC
DG SETS No. 2
No. 3 Odour
No. 4
BOILER No. 1 TREATED WATER USAGE
SCR. PUMP No. 2 1ST 2ND 3RD TTL
DG No. 1 IRRIGAN
No. 2 CL. TR
SCRUBBER
No. 3 REJ.
PUMS No. 4
DOSING No. 1 CHEMICAL CONSUMED
PUMPS No. 2 1ST 2ND 3RD TTL
Ph
AGITATOR
WATER/CAUSTIC WATER
CHARGED CAUSTIC
STATUS OF FRESH POINTS TO DISCUSS TO OFFICE
WATER IN DRAIN
REC. TANK REURN
SCOOPING OF -ON
CARBON PART. -OFF
FILTER SERVICE

OVERALL PERFORMANCE OF PLANT POINTS TO DISCUSS WITH CLIENT

CLIENT'S SIGNATURE