NS2-DH01-P0ZEN-140011 - ITP For Cable Pulling and Termination - REV.C
NS2-DH01-P0ZEN-140011 - ITP For Cable Pulling and Termination - REV.C
NS2-DH01-P0ZEN-140011 - ITP For Cable Pulling and Termination - REV.C
C 21-Dec-19 N.Q.HUY S.I. KIM Y.H. KANG REVISED AS PER THE OWNER'S COMMENTS
B 2-Dec-19 N.Q.HUY S.I. KIM Y.H. KANG REVISED AS PER THE OWNER'S COMMENTS
Owner's Engineer
Contractor
Sub-Supplier
Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW)
Title
CONTENTS
3. Reference Document
DETAILED LEGEND:
S : Surveillance Point A point where Contractor and others may carry out surveillance of work in progress and documentation associated
on an unscheduled basis, with no notification required by any party and without amendment to the scheduled program.
R : The documents are to be submitted to the appropriate inspectorate for review by Owner. Note that work shall not proceed until
Owner approval has been received.
W : Witness Point - That is designated to be witnessed by a specified party. The specified party must be given reasonable advance
notification prior to performing the designated operation. If the specified party is unable to be contacted or fails to be present,
the operation may be performed without being witnessed.
H : Hold Point - A designated stopping place during or following a specified activity at which inspection or examination is required
before further work can be performed without the approval of designated organization or authorized personnel.
1
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT ID No : NS2-DH01-P0ZEN-140011
(2 x 600MW) Rev : C
WORK TITLE: INSPECTION AND TEST PLAN FOR CABLE PULLING AND TERMINATION
Participation by
Codes & Standards Sampling
No Description of Inspection and Test Acceptance Criteria Record Format Remark
Procedure Sub- frequency
Contractor Owner
Contractor
1.1 Incoming material inspection Packing List/ Material Technical Specification Technical Specification/QCR Material department inspection report H W W 100%
2.1 Check cable route and cable laid condition, arrangement. Cable schedule Cable route/cable schedule NS2- DHI01-P0ZEN-140011 (1) H W W 100%
2.2 Check the cable sizes and types as per cable schedule. Cable schedule Cable schedule NS2- DHI01-P0ZEN-140011 (1) H W W 100%
2.6 Check earthing connection of shields. Drawing/Interconnection wiring diagram Drawing/Interconnection wiring diagram NS2- DHI01-P0ZEN-140011 (1) H W W 100%
2.7 Check cable identification. Cable schedule Cable schedule NS2-DHI01-P0ZEN-140011 (1) H W W 100%
Cable schedule /Technical Specification - Fire NS2-YR02-P0ZEN-140016 -Technical Specification - Fire Stop
2.9 Check no damage and ends sealing of cable NS2-DHI01-P0ZEN-140011 (1) H W W 100%
Stop Material Material
3 CABLE TEST
3.1 Continuity Test for control/ instrument cable. IEC 60227 NS2- DHI01-P0ZEN-140011 (4) H W W 100%
3.2 Insulation resistance test for LV power cable IEC 60227 1000 DC V during (1min) insulation resistance >10MΩ NS2- DHI01-P0ZEN-140011 (3) H W W 100%
2
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT (2 x 600MW)
Name Unit
Drawing Number
RESULT
Inspection Construction Drawing/
Inpection item REMARK
part Code & Standard
ACCEPT REJECT N/A
1 Check cable route and Cable laid condition. As per approved layout drawings
2 Check the cable sizes and types As per approved layout drawings
3 Check cable ties, clamps & Glands installation. As per approved layout drawings
5 Check cable color code( for power cable) As per approved layout drawings
9 Check no damage and ends sealing of cable As per approved layout drawings
Signature
Full Name
Date
3
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT (2 x 600MW)
Drawing Number
INFORMATION DATA
Temperature Humidity
CHECK ITEMS
MV CABLE TEST
1. Continuity Test :
Applied voltage
After HV test
RESULT
Voltage Apply
Test voltage (kV, D.C) Time (min) Applied voltage
Points ACCEPT REJECT N/A
1 L1-(L2+L3+E)
3 L3-(L1+L2+E)
Signature
Full Name
Date
4
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT (2 x 600MW)
INSPECTION REPORT FOR INSULATION RESISTANCE TEST OF LV POWER CABLE (Before/After pulling cable)
Drawing Number
L1 L2 L3 L4 Ln Phase
Continuity test
Test Result
INSULATION RESISTEANCE TEST REPORT
1
For LV cable:
2 1000VDC during (1
minute) insulation
3 resistance >10MΩ
5
<Remarks & Comment>
5
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT (2 x 600MW)
Inspection
Date
Item
Drawing
Number
INFORMATION DATA
Location Attachment
CHECK ITEM
Description
No Tesst Result
Cable No Cable Size From Equipment To Equipment
Pass Fault
10
<Remarks/Comments>
Signature
Full Name
Date
6
3) DOCUMENT REFERENCE.