Kindly be informed that the received submittal has been reviewed and below is our conclusion for your information, record and
further necessary action:
A_ Acceptable
C_ Uncompleted and need further data to be evaluated with the received Submittal ( need to submit)
F_ Need a meeting to discuss the attached agenda with: Manufacturer Contractor SEC/ NG Department(s)
Review of this submittal is for general conformance with the SOW/PTS of this project.
This review does not relieve the contractor from responsibility of full compliance with the contract documents.
If the status is "C" or "D" or "F", We expect to receive your positive response to this letter no later than
to close this project technically together within the target date.
If you need any further clarification on this subject, please call Mr. SureshKumar L. Mikilinen @ 011-807-9338
Regards,
1 of 2
FACTS Projects Engineering & Design Division
Attachment of letter # 12024301 - 197 -22 Dated
16-Mar-2022
CN # 4400014231
Subject: TECHNICAL MATERIAL SUBMITTAL FOR PVC & UPVC PIPE & FITTINGS & UG CABLE CONDUITS PIPES/FITTINGS [M/S AL TAASAN EST]
Sr. FACTS Comments on the Submittal (Rev 0) Reply of Contractor (Rev. 1) FACTS Comments on the Submittal (Rev 1) Reply of Contractor (Rev. 2) FACTS Comments on the Submittal (Rev 2)
1
It is noted that manufacturer Al Watania Plastics to
be supplied by Al Taasan Est. is in the approved list
for PVC, UPVC & UG Cable Conduit Pipes & Fittings
2
Contractor shall ensure that the supplied materials
will be in compliance with Appendix-VIIIb, Section
3.27 as well as approved calculations, drawings &
company standards