Technical Proposal
Technical Proposal
Technical Proposal
1 PREAMBLE
Technical Proposal
The Bidders shall prepare technical proposals for Maintenance based on purpose, scope, and time of
performance of all works relevant to the Contract.
In its Technical Proposal, the Bidder shall assure the Company that the services to be performed under
the Contract comply with the terms, requirements, and parameters issued in the Tender Documentation.
In addition, the Bidder shall also give due regard to the requirements of the “Schedule” in Annex 4 of
Appendix 1 Scope of Works.
The Bidder shall provide details of Services, Tooling, Equipment, Manpower and Materials, envisaged
for all phases and aspects of the Contract.
Relationships
The successful Bidder is expected to develop a long term collaborative relationship with the Company.
This will enable the successful Bidder (Contractor) to significantly contribute towards achieving the
Company’s key business objectives.
The Company will expect the successful Bidder (Contractor) to demonstrate ability to:
This document together with attachments referenced, is not intended as a definitive list to be submitted
by the Bidder, but should be viewed as some of the key elements Company anticipates compliance with.
Strategy
The Company shall set the maintenance and operations strategy to be adopted during the course of the
Contract.
The Contractor shall execute that strategy, monitor the performance, and proactively identify proposed
changes to the strategy, which would support improved reliability and / or reduce costs.
1
Organisation
It is intended that the Contractor’s final organogram shall align with the Company’s. However, it is a
fundamental requirement of this tender submission that the Contractor identifies the number and type
of resources proposed to support the assets as well as the tooling envisaged.
Qualification
Other technical requirements to ensure adequate work performance are stipulated below and in
appropriate appendices to the Draft Contract.
As a part of technical proposal, the Bidder shall submit the required information and documents as
stipulated in the following section:
TECHNICAL INFORMATION
1.1 Provide Bidder’s company documents in accordance with Chapter V, of the ITB.
2.1. Submit list of ongoing operation (attendance) and maintenance services on Power Plants, with
capacity not less than 100 MW, and associated equipment in the last three (3) years globally
in the format specified in Table 1.
2.2. Submit list of similar projects undertaken in Middle East during the last five years period in the
format specified in Table 1 (ongoing or expired not earlier than 6 months before the
announcement of this tender).
2.3. Submit list of similar projects undertaken in the Republic of Iraq during the last five year period
in the format specified in Table 1.
2.4 Submit list of ongoing or competed refurbishment projects of gas turbine capital spares in
Middle East in the format specified in Table 1.
3. Technical Capabilities
3.1 Provide document/procedure for engineering support in the field of maintenance change and
modification (Management of Change).
2
3.2 Provide evidence of existing partnership or authorized support agreements with the field`s
relevant original equipment manufacturers (OEMs).
3.3 Provide document/procedure that describes development of maintenance programs for oil and
gas facilities.
3.4 Provide evidence of capability to perform planning, scheduling, progress tracking, reporting in
MS Project and Primavera P6. To this end, CONTRACTOR shall further confirm availability of
IT team, ORACLE partnership certificate and confirm approximate system mobilization
schedule.
3.5 Provide evidence of knowledge of SAP Plant Maintenance and experience in implementation,
working, managing and updating of computerized maintenance management systems
(CMMS).
3.6 Provide confirmation that within 90 days from the Effective Date of the Contract, Bidder will
mobilize to the Worksite all individual and collective tools specified within Annex 10 to
Appendix 1 of the draft of the Contract.
3.7 Provide information regarding Home Office in the format specified in Table 2 and describe its
capabilities in terms of supporting the project in engineering and maintenance requirements.
3.8 Provide evidence of availability of an operating branch office in the Republic of Iraq to support
the project OR submit a Letter of Confirmation that Bidder intends to open an operating branch
office in the Republic of Iraq no later than 3 months from the Contract award date.
4. Organisational Capabilities
4.1 Provide a draft of Project Execution Plan that clearly describes how bidder plans to execute
the project.
Project Execution Plan shall contain as a minimum the following:
• Execution of Scope of Work
• Project objectives
• Procurement execution
• Maintenance execution
• Project controls
• Coordination with other parties, interfacing, communication
• Value improvement
• Productivity Analysis Methods.
In case the same processes are described in other procedures, the references shall contain
in the Project Execution Plan and their copies to be provided.
3
• Tracking the physical progress at site.
4.5 Provide manpower chart for the following demonstrating site and home office support:
• Overall project
• Engineering
• Procurement
• Site Maintenance
• Site Supervision.
5. Human Resources
5.1 Submit CVs of candidates (at least three (3) candidates for each role) in the format shown in
the Table 4 for the following Key Personnel:
• Operations & Maintenance manager
• Shift Electrical Supervisor (Operations)
• Shift Rotating Engineer (Operations)
• Shift Control & Automation Engineer (Operations)
4
• Shift Engineer-Technologist CCR (Operations)
• Electrical Engineer (Maintenance)
• Relay Protection Engineer (Maintenance)
• Mechanical Engineer (Maintenance)
• Instrument Engineer (Maintenance)
5.2 Provide evidence of availability of qualified and experienced Iraqi staff and specify total
number of Iraqi staff in overall headcount of the bidder.
5.3 Provide manpower histogram demonstrating total number of maintenance personnel available
in the Republic of Iraq, current utilization, and projected additional requirement for the duration
of project.
The chart shall contain all contractors’ personnel as well as all subcontractors, for every stage
of the Project.
5.4 Submit formal training and competency assurance program planned to be executed on the
Project.
The program shall describe the anticipated organizational structure and include both list and
description of individual training and development programs with objectives and timing for
each position.
Furthermore, the bidder is required to provide evidence of successful previous experience in
training and competency assurance and describe its planned hiring practices and
performance management processes.
5.5 Provide personnel training procedure planned to be executed on the Project that describes
the methods and sequences of training process specific to Contract requirements.
5.6 Provide evidence of your ability to mobilize key personnel for plant maintenance activity within
a three (3) month duration from the Mobilization Notice, as defined in Scope of Works.
6.1 Submit copy of valid registration certificate that demonstrate that bidder's Quality Management
System is accredited by one of the recognized certifying bodies in compliance with ISO
standards.
5
6.2 Provide corporate document that describes bidder's Quality Management System and QA/QC
manual.
6.4 Provide a prospective audit schedule that meets the requirements of Scope of Work
7.1 Submit copies of valid registration certificates that demonstrate that bidder's occupational
health and safety and environmental management systems are accredited by one of the
recognized certifying bodies in compliance with ISO standards.
7.3 Provide HSE organization structure that describes both corporate and project HSE support
personnel.
Provide CVs of HSE personnel (experience HSE officer at least 3 yrs. in the relevant area)
declared within HSE organization structure.
7.5 Provide evidence of establishment of safety standards, covering all aspects of Scope of Work
under the Contract.
7.8 Provide HSE statistics for the last 3 years including number of employees, man-hours worked,
Fatalities, Total Recordable Incidents number and rate, Lost Time Injury number and rate,
number of First Aid Cases and near misses registered, Road Traffic Accidents, Environmental
Incidents etc.
6
7.9 Provide copies of Incident Management procedures.
8.1 Provide evidence that you have in place an ISO compliant and accredited Procurement and
Logistics Management System relevant to the Republic of Iraq and embracing the following
aspects:
• Procurement procedures
• Evaluation of Vendors and subcontractors
• Inspection and test plans
• Logistics and Material Management
• Warehouse procedures
• Mobilisation and demobilisation of equipment
• Preservation procedures
• Custom clearance
• Spare parts and tools
8.2 Provide corporate procedures of warehouse material management, storage and preservation.
9.1 Confirm and certify your ability and obligation to perform the full scope of work (all the activities
in accordance with the Scope of Work under the Tender) by the sections and by types of
works. Refers to Table 3.
7
TABLES
Evidence of ongoing Operation / Maintenance projects for oil and gas production facilities.
Main and Branch offices that the Bidder intends to use during the Contract and its
availability. Include all the information listed below.
1 Management
1.1.
2 Engineering Support
2.1.
3 Procurement
3.1.
4 HSEQ
4.1.
8
Table 3 – Bid Criteria checklist
Answer
No. CRITERIA
(YES/NO)
Table 4 – CV Format
Applicable Position
Main or Reserve
1. Full Name
2. Date of Birth
3. Professional qualification
Information about candidate 4. Education and Training details
5. Certifications
6. Awards
7. Current role
1. Name
2. Address
3. Phone
Current Employer
4. Fax
5. Contact person (manager, responsible contact person for personnel)
6. Telex/e-mail
9
Provide (in reverse chronological order) brief description about candidate’s working career for the last
ten (10) years. Specify the existence of professional, technical experience that is relevant to the
project.
10