IBP1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

SAP Certified Application Associate - SAP Integrated


Business Planning - Full

You got 61 of 67 possible points.


Your score was: 91 %

Question Results

Question: Score 1 of 1

Which of the following are features of the S&OP process templates?


There are 2 correct answers to this question.

Response:

The number of steps in a process template is the same for all implementations

New instances of templates allow for re-use of the same processes again

All process templates are assigned to dashboards.

Each step depicted in the template can have tasks associated with it

Question: Score 1 of 1

For a PA you need to create time periods for the time profile. What should you
take care of when executing the Create Time Periods application job?
Please choose the correct answer.

Response:

The planning area with this time profile must be activated so that the application
job can proceed.

A time profile has to be activated so that the application job can proceed.

Multiple time profiles can be run with this application job.

Job cannot be scheduled to start immediately.

https://www.erpprep.com/user/quiz/2181421/userresults 1/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What kinds of algorithms can you combine to come up with the best forecast in
IBP?
There are 2 correct answers to this question.

Response:

Mid-term ones, and machine - learning ones

Mid-term ones, and long - term ones.

Short - term ones, and machine - learning ones

Short - term ones, and mid-term ones.

Question: Score 1 of 1

Model a large machine with high capital request, where you need to run it cost
effectively with minimum utilization, even if it is means producing more than
required/ demand.

Which solution would apply to this scenario?


There are 2 correct answers to this question.

Response:

Capacity levelling will be possible for production and storage resources.

Enough demands can be pulled forward and pull production will occur.

Balance between excessive prebuild and minimum utilization by incorporating


violation costs.

Excess stock to be staged in an overflow warehouse.

Question: Score 1 of 1

You want to grant only display rights to a specific user in the Microsoft Excel UI.
How do you do this?
Please choose the correct answer.

Response:

Create value-based filter in Microsoft Excel add-in

https://www.erpprep.com/user/quiz/2181421/userresults 2/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Create a filter in the Administration Console

Create permission filter and assign it to a specific user

Create user preferences

Question: Score 1 of 1

You need to limit value in projected periods of coverage to 999. What must you
doing the S&OP operator profile's configuration?
Please choose the correct answer.

Response:

Enter 999 as an allowed quota deviation parameter.

Enter 999 as an additional parameter.

Enter 999 as global limit per message type.

Enter 999 as infinite coverage parameter.

Question: Score 0 of 1

When can you use the TS optimizer?


There are 2 correct answers to this question.

Response:

When generating an operational production plan in daily or weekly buckets.

Create a short – term distribution plan

For creating simulations for tactical planning

When generating a procuremental plan for raw materials and components.

Question: Score 1 of 1

What are the main features of alert key figures?


Please choose the correct answer.

https://www.erpprep.com/user/quiz/2181421/userresults 3/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Response:

They can be defined as a key figure in the same way as the unit price

They check the conditions of other key figures

They can be set to both calculated and stored

Data for these key figures can be loaded into the system

Question: Score 1 of 1

Which library is used by the forecasting engine for the Demand Sensing
algorithm?
Please choose the correct answer.

Response:

Predictive Analytics library

Supply Chain Algorithm library

Heuristics library

Demand library

Question: Score 0 of 1

Why would you run the Purge Non-Conforming Planning Area Data application
job?
Please choose the correct answer.

Response:

To delete non-conforming Location Products after Purge Master Data was


performed

To purge key figure data basing on certain attributes

To purge key figure data outside of certain time frame

To purge Master Data from a certain Planning Area after activation

https://www.erpprep.com/user/quiz/2181421/userresults 4/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which type of object do you use to create an offset for Period ID?
Please choose the correct answer.

Response:

Attribute transformation with stored key figure

Attribute for time profile level

Calculated key figure with IBP_CAGGR function

Stored key figure with time profile attribute

Question: Score 1 of 1

Why would you set up a cascading filter in the planning view?


There are 2 correct answers to this question.

Response:

To filter attributes based on other attribute filters

To filter using attributes that have a large number of values

To filter attributes based on specific values

To filter data in for an Application Job template

Question: Score 1 of 1

Analytics charts are created by user in the advanced analytics application. What
actions are possible in the Advanced Analytics app?
There are 2 correct answers to this question.

Response:

Query data.

Merge charts together

Open graphics in Excel

https://www.erpprep.com/user/quiz/2181421/userresults 5/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Group data

Question: Score 1 of 1

Which header name displays are available in the report options menu of the
Excel interface?
There are 2 correct answers to this question.

Response:

Business meaning, as defined in configuration

Changed number names created by user

Captions

Full unique name including technical name

Question: Score 1 of 1

Which of the following configuration rules can be applied to the copy operator?
There are 2 correct answers to this question.

Response:

Duration is always optional parameter.

Copy operator can consider both the configured filter and user-specified filter.

Copy operator can create missing periods for the target key figure.

Source and target planning areas are mandatory parameters.

Question: Score 1 of 1

You are working with Inventory Optimization Process and you want to use a
What If analysis. What parameters are assessed by this analysis?
There are 2 correct answers to this question.

Response:

Number of planning combinations

https://www.erpprep.com/user/quiz/2181421/userresults 6/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Capacity consumption

Service levels

Changed variability

Question: Score 1 of 1

You set up periodic activities to support S&OP and want to use a job chain to
sequence these multiple steps. What must you do to use a job chain to sequence
these multiple steps?
There are 2 correct answers to this question.

Response:

Select the recurrence pattern in the Application Job Template app.

Set up the job chain with five steps or less in the application job template.

Ensure that the job chain can continue after the most error-prone step fails.

Schedule the job chain for recurring execution in the application job tile.

Question: Score 1 of 1

Which one of the following values can you use in disaggregation expressions?
Please choose the correct answer.

Response:

KF1 (Stored) + Helper KF

KF1 (Stored) + KF2 (Stored) + Attribute

KF1 (Calculated) + Attribute

If (Attribute!=O, KF1 (Stored), KF2 (Calculated))

Question: Score 1 of 1

What must you do to enable change recording for a key figure?


There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/2181421/userresults 7/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Response:

Set the planning area to active for change logging.

Set the change log to active for master data type used.

Set the planning levels to active for change logging.

Set the key figure to active for change logging.

Question: Score 1 of 1

What are the main benefits of using SAP IBP Control Tower?
There are 3 correct answers to this question.

Response:

To create suitable application job chains

Collaborate, communicate and monitor performance of the supply chain

Gain holistic visibility across internal and external supply chain planning and
execution systems and networks

Understand the impacts and cause of exceptions, and take action to solve the
problem

Control which orders are going to be processed first by assigning rank via priority

Question: Score 1 of 1

Which of the following planning entities must you set up when you configure a
planning area?
There are 2 correct answers to this question.

Response:

Attribute

Time Profile

Planning Operator

https://www.erpprep.com/user/quiz/2181421/userresults 8/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Planning View Template

Question: Score 1 of 1

For which of the following jobs can you enter planning filters as parameters?
There are 2 correct answers to this question.

Response:

Purge Key Figure Data

Purge Non – Conforming Data

Create Time Periods for Time Profiles

Purge Master Data

Question: Score 1 of 1

Which of the following key functions are supported by IBP for Sales &
Operations planning?
There are 2 correct answers to this question.

Response:

Supports manual creation of feasible constrained plans

Supports a basic demand planning process

Supports an advanced demand planning process

Supports a finite resource planning

Question: Score 1 of 1

What does ABC/XYZ segmentation allow you to do?


There are 2 correct answers to this question.

Response:

Assign more appropriate inventory algorithms to planning objects.

Tailor your forecast strategy and inventory optimization to segment characteristics.


https://www.erpprep.com/user/quiz/2181421/userresults 9/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Analyze forecast accuracy by product class

Identify inventory items that require closer attention.

Question: Score 1 of 1

Which master data types can you reference to create a reference master data
type?
There are 2 correct answers to this question.

Response:

Virtual

Compound

Simple

Reference

Question: Score 1 of 1

You want to display and edit data in different units of measure (UOM). Which of
the following must you consider before you use UOM?
There are 3 correct answers to this question.

Response:

Units of measure are usually not time-dependent.

Units of measure are usually not time-independent.

The planning views and analytics provide the user with the option to select the
target unit of measure.

The conversion upload for each combination of Product-Location-Unit of Measures


must use the Data Integration application.

Unit of measure is an attribute of a master data type, such as Product.

https://www.erpprep.com/user/quiz/2181421/userresults 10/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

You are creating an Advanced Simulation (ADVSIM) operator. Which operations


are supported?
There are 3 correct answers to this question.

Response:

Post-copy

Disaggregate key figures

Simulate statistical forecast

Create time periods

Pre-copy

Question: Score 1 of 1

Which of the following fields can be overwritten in the New Planning view by
fixed default value settings?
There are 3 correct answers to this question.

Response:

Language

Currency to ID

Default Display Time

Planning Unit

Unit of Measure to ID

Question: Score 1 of 1

A planning area can include one or more planning levels. What are the functions
of a planning level?
There are 2 correct answers to this question.

Response:

A planning level is scenario specific.


https://www.erpprep.com/user/quiz/2181421/userresults 11/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

A planning level enables users to analyze and plan at different levels.

A planning level is version specific.

A planning level is defined for each planning area; it is the level at which data is
saved.

Question: Score 1 of 1

You are setting up a drill down chart in the Advanced Analytics application to
allow the planner to drill down in a predefined sequence for consensus demand.

Which of the following levels are in the correct sequence?


Please choose the correct answer.

Response:

Product Sub Family, Product Family, Product ID

Product ID, Month, Product Family

Product Family, Product ID, Product Sub Family

Product Family, Product ID, Month

Question: Score 1 of 1

What must you use to integrate order data into SAP IBP?
Please choose the correct answer.

Response:

Microsoft Excel UI

Web UI data Load

Smart Data Integration

Cloud Platform Integration for Data Service

Question: Score 1 of 1
https://www.erpprep.com/user/quiz/2181421/userresults 12/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

What is a prerequisite for modelling outsourced manufacturers with production


capacity?
Please choose the correct answer.

Response:

Use production lead times and offsets to manage components at the outsourced
location.

Model production cost for internal and external production resources to model
priority.

Ensure set up of multiple modes of transportation.

Model target inventory and stocks at the outsourced location.

Question: Score 1 of 1

You are reviewing the master data types for supply planning. Which master data
types are compound master data types?
There are 2 correct answers to this question.

Response:

SOURCEPRODUCTION

SOURCELOCATION

LOCATIONFR

SOURCECUSTOMER

Question: Score 1 of 1

What are some of the available ABC segmentation methods in IBP?


There are 2 correct answers to this question.

Response:

By number of items (Sorted values)

By Pareto Principle (Sorted and Calculated Values)

By number of items (Sorted Average)

https://www.erpprep.com/user/quiz/2181421/userresults 13/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

By Pareto Principle (Sorted and Cumulated %)

Question: Score 1 of 1

What are some of the ways to create network visualization?


There are 2 correct answers to this question.

Response:

Use the Analytics Advanced app and create a supply chain network

Chart functionality in the planning view

Dedicated supply chain network app

Use an application job for network visualization

Question: Score 1 of 1

Which of the following modes can you use when creating a constrained plan?
Please choose the correct answer.

Response:

Profit maximization

Resource maximization

Production maximization

Question: Score 1 of 1

Which action that can be performed with an existing configuration object will
result in the creation of a D record in the database?
Please choose the correct answer.

Response:

Performing the active deletion

Generating any new object

Modifying the active record


https://www.erpprep.com/user/quiz/2181421/userresults 14/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Modifying the inactive record

Question: Score 1 of 1

Why do you run a consistency check for a key figure?


There are 3 correct answers to this question.

Response:

To verify that you used at most two input planning levels.

To verify that all key figures are marked as stored input in a key figure calculation.

To verify that SUM() calculation is used for a key figure only if the Aggregation
Mode of the key figure is set to Sum or Custom

To verify that all key figures have a calculation defined at REQUEST level.

Question: Score 1 of 1

Which of the following stages can be modeled using scenarios from the S&OP
planning cycle?
There are 2 correct answers to this question.

Response:

Demand review

Demand sensing stage

Demand-Supply balancing

Data input review for inventory

Question: Score 1 of 1

What are the feasible solution for TS optimiser?


Please choose the correct answer.

Response:

Not adhering to maximum transport values


https://www.erpprep.com/user/quiz/2181421/userresults 15/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Not respecting production capacity

Not – fully satisfied demands

Violation of minimum aggregated inventory values

Violation of minimum resource utilization

Question: Score 1 of 1

You are working on a mid – range plan that spans the seasonal peak and you are
evaluating the need for additional crewing. Which of the following parameters
can you model to plan production with extra shift(s)?
Please choose the correct answer.

Response:

Cost based capacity expansion.

Incremental production values

Adjusted production interactive values

Production source validity at the start of seasonal peak

Question: Score 1 of 1

You need to monitor the capacity of your Distribution Center goods receipt
employees. Every goods receipt takes two working days of a warehouse
employee.

How would you model this?


Please choose the correct answer.

Response:

Maintain a warehouse-resource on the DC and maintain the number of days on the


location product

Maintain a handling resource with available capacity on the DC and maintain the
number of days on the location product attributes.

Maintain a storage resource on the DC and maintain the number of days on the

https://www.erpprep.com/user/quiz/2181421/userresults 16/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

location product attribute.

Maintain a regular production resource and change the description in goods receipt
employee capacity. Maintain the number of days on the location product attribute.

Question: Score 1 of 1

Which of the following are the key features of SAPIBP Control tower?
There are 3 correct answers to this question.

Response:

Smart alerts

What if simulation capabilities

Create a feasible plan

Task and case management

Balance demand and supply and attain financial targets

Question: Score 1 of 1

A time profile is defined with the levels week, month, quarter, and year. Which
PERIODID will be assigned to quarter?
Please choose the correct answer.

Response:

PERIODID3

PERIODIDO

PERIODID1

PERIODID2

Question: Score 1 of 1

When you promote calculated and approved inventory parameters from SAP IBP
for inventory, what other IBP modules can be receiving them?

https://www.erpprep.com/user/quiz/2181421/userresults 17/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

There are 2 correct answers to this question.

Response:

DDMRP

SAP IBP for demand

SAP IBP for SandOP

SAP IBP for response and supply

Question: Score 1 of 1

What objects do you need to upload before key figure data?


Please choose the correct answer.

Response:

Time periods and relevant master data

Time periods and time profile attributes

One simple master data record and one compound master data record

Time periods and business roles

Question: Score 1 of 1

Which of the following are functions of the Snapshot Key Figures feature?
There are 3 correct answers to this question.

Response:

The most recent snapshot is numbered with the highest number

A snapshot is taken only if a snapshot operator is run

You can create up to nine time snapshots at periodic intervals, producing a time-
lapsed view of your data

Not exposed to the user in planning views

A snapshot takes a copy of a key figure at a particular point in time


https://www.erpprep.com/user/quiz/2181421/userresults 18/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What action can be performed in the Advanced Dashboards application?


There are 3 correct answers to this question.

Response:

Display all assigned analytics on a single UI

Rename the charts

Organize charts

Link two analytics charts

Add process templates

Question: Score 1 of 1

Which configuration elements can be used to add meaning to the planning


activities?
There are 2 correct answers to this question.

Response:

Planning View notes

Microsoft Excel notes in Planning

Reason codes

Business Meaning Key figure Definition

Question: Score 1 of 1

What differentiates the Create New (Simple copy) and the Create New with
Dependencies (Advanced copy) functions of a planning area?
There are 2 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/2181421/userresults 19/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Master data is only shared between the original and the new planning area when
you use the Create New (Simple copy) function.

A copy of the time profile is only created when you use the Create New with
Dependencies (Advanced copy) function.

Associated attributes are only shared between the original and the new planning
area when you use the Create New (Simple copy) function.

The planning view favorites are only copied when you use the advanced copy.

Question: Score 1 of 1

You are adding a value-based filter to a planning view. Which of the following
conditions apply?
There are 3 correct answers to this question.

Response:

These filters are always applied based on the values stored in the database

The alerts dashboard is not available if a value-based filter is set for the open
planning view

Can only apply one value-based filter per planning view.

These filters can be used together with attribute totals in the same planning view

You can add or delete planning objects to planning view after these filters are
applied

Question: Score 1 of 1

Which algorithm type can you use to plan the supply?


Please choose the correct answer.

Response:

Time-series based optimizer

Statistical forecasting

Local updates

https://www.erpprep.com/user/quiz/2181421/userresults 20/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Compute quotas

Question: Score 1 of 1

Which of the following global parameters can be used to initialize the value of
the forecast input key figure to a small value when historical data is missing for
some periods?
Please choose the correct answer.

Response:

MTHMISSIONS parameter in SCENARIO group

FORECAST_ALLOW parameter in FORECAST group

MAX_DIM_MEMBERS parameter in PLAN_VIEW group

FORECAST_ESCAPENULL parameter in FORECAST group

Question: Score 0 of 1

What are the ways to achieve period shift in SAP IBP calculations?
There are 2 correct answers to this question.

Response:

Use attribute transformation.

Use eisting IBP formula.

Use an attribute as a key figure.

Use a local member.

Question: Score 0 of 1

What are some of the prerequisites for configuring a planning area that results
in a successful consistency check?
There are 2 correct answers to this question.

Response:

Configure at most two input key figures on the same planning level in a key figure

https://www.erpprep.com/user/quiz/2181421/userresults 21/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

calculation.

Specify a planning horizon in the planning area for each level of the assigned time
profile.

Configure at least one calculated key figure for the planning area.

Assignment of a compound master data type necessitates the assignment of its


component master data types too.

Question: Score 1 of 1

Which of the following are features of tag – based snapshots?


There are 2 correct answers to this question.

Response:

Target key figures for theses snapshots must have lag as a root attribute.

They are created in the configuration app for a fixed time range.

They are automatically assigned to a snapshot operator

Target key figures are exposed to the user in planning views.

Question: Score 0 of 1

What are the mandatory when creating a new time profile?


There are 2 correct answers to this question.

Response:

At least one attribute for the time profile levels

A start and end date

Description

ID and name

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/2181421/userresults 22/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

How many different time levels can be selected within one planning view?
Please choose the correct answer.

Response:

Only time levels from base planning level of selected key figures

All time levels available in the time profile

Only base time levels of planning area

All time levels available in the time profile. Restricted by global configuration
parameter

Question: Score 1 of 1

Which forecasting algorithms leverage the SAP HANA Predictive Analysis


Library?
There are 3 correct answers to this question.

Response:

Accuracy Measurements

Best Model Selection

Demand Sensing

Time-Series

Pre-Processing

Question: Score 1 of 1

Which of the following SAP Integrated Business Planning modules supports


Operational Supply Planning?
Please choose the correct answer.

Response:

SAP Integrated Business Planning for Inventory

SAP IBP Sales and Operations Planning

https://www.erpprep.com/user/quiz/2181421/userresults 23/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

SAP IBP Response and Supply planning

SAP IBP Supply

Question: Score 0 of 1

How is minimum resource utilization considered by the optimizer?


There are 2 correct answers to this question.

Response:

Minimum resource utilization may not be achieved in full for restricted storage
capacity.

It depends on demands in future buckets; if there is no demand, no utilization.

For all buckets and all quantities that represent the minimum utilization.

Achieved in short term and then tail off in future buckets, due to discounts.

Question: Score 1 of 1

Which of these conditions must be met to create a Local Member key figure?
Please choose the correct answer.

Response:

Activate Local Member Recognition is selected

Key Figure is selected in the Key Figures tab in Excel add-on

Key Figure is created in the Planning Area app

Use Excel Cell References in Report Editor is selected

Question: Score 1 of 1

Which of the following configuration options are part of the New Key Figure
creation process?
There are 3 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/2181421/userresults 24/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Enable planning notes for the key figure.

Hiding or displaying totals for the key figure.

Enable fixing for the key figure.

An option to set allowed planning levels.

Setting disaggregation logic for the key figure.

Question: Score 1 of 1

What do you have to do to connect to the SAP IBP database with SAP IBP Add-In
for Microsoft Excel?
There are 2 correct answers to this question.

Response:

Install the EPM Add-In for Microsoft Excel

Install the SAP IBP add-in for Microsoft Excel.

Check that you have access to the Planning area.

Activate the time profile

Question: Score 1 of 1

Which of the following settings can you use in your supply planning background
job triggered from Excel?
There are 2 correct answers to this question.

Response:

UOM to ID

Type of algorithm used

Planning unit

Target Currency

https://www.erpprep.com/user/quiz/2181421/userresults 25/26
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which of the following chart types can be used to represent distribution in the
Advanced Analytics application?
There are 2 correct answers to this question.

Response:

Heat map

Dual Stacked Column

Scatter

Dual Y-Axis Line

Question: Score 1 of 1

You need to create various planning operators. Which operators must you assign
to your planning area to view them in Microsoft Excel?
There are 2 correct answers to this question.

Response:

Copy Operator

Disaggregation Operator

Statistical Forecasting

Check Mode Operator

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/user/quiz/2181421/userresults 26/26

You might also like