Revolution: 4. Materials Management
Revolution: 4. Materials Management
Revolution: 4. Materials Management
Management
REVOLUTION
Existing Business Process and Business Requirement from
SUNSTAR OVERSEAS LTD.
SAP Business Process for SUNSTAR OVERSEAS LTD.
(Implementation of mySAP ECC 5.0 by Coconut Software For Sunstar Overseas Limited
4. Materials Management
(GO LIVE on 3rd July, 2006)
Mr. Rohit Aggarwal Mr. Sanjay Aggarwal Mr. Gopal Krishna Mr. Harish K Mr. Mohit Wadera
Steering Committee Member, Steering Committee Steering Committee Steering Committee Steering Committee
Sunstar Member, Sunstar Member, Coconut Member, Coconut Member, Coconut
Mr. Jai Khurana Mr. Sanjeev Grover Mr. Gaurav Shukla Mr. Dinesh Ahuja
Consultant, Coconut Module Owner, Sunstar Module Owner, Sunstar Team Member, Sunstar
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 1 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Introduction
This Business Blue Print Document describes the following:
• Enterprise Structure of SUNSTAR OVERSEAS LTD.
• Business requirements as given by the SUNSTAR OVERSEAS LTD Key Users
• Suggestions by Coconut consultants wherever are found to be useful to SUNSTAR OVERSEAS LTD’s business functionality
• Comments whether the requirement can be realized on the mYSAP ECC partly for the system or not.
The following codes are given to each module that is within the scope of the agreement:
Module
Module
ID
1 Financial Accounting
2 Controlling
3 Sales and Distribution
4 Materials Management
5 Production and Planning
6 Quality Management
Further processes, sub-process and activities in each module are denoted by, say. 4.1, 4.1.1, 4.2.1 etc.
A Business Blueprint document is prepared for each module and reference shall be made wherever required to other modules,
whenever there is an overlap of business processes across modules or a business process requires to be completed in more than
one module. The reference to the business process shall be made using the process ID numbers as described below;
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 2 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
For e.g.:
As per the above notation, All processes in Material Management start with 4.*… So if a reference has to be made to process in
Goods receipt, then the reference is made using the notation say, 4.4.*… where ‘4’ refers to Goods receipt and *.4.3 refers to GRN
due to stock transfers.
Step 1:
The Module Owner shall identify various existing business processes at a broad level and make a list of them as described under
section 1 of this document.
Step 2:
Depending upon the various business processes thus identified in Step 1, various business scenario are described in the following
way:
Existing Business Processes: The current way of executing the business process shall be explained in detail with data/information
flow along with the IT systems / Manual Systems being used in the whole cycle.
Business Requirement: Under this head, the module owner shall describe the requirements of the company vis-à-vis this business
scenario, if necessary with examples. Following situations can arise:
(a) The current provisions in the system are sufficient enough and additional configuration efforts are not required.
(b) The current provisions are not sufficient and satisfactory and additional features need to be incorporated in the system
(c) There is no current provision to handle this transaction at all.
The module owner shall identify each business scenario with the above classification.
Step 3:
Based on the Business Requirement, Coconut consultant shall do a detailed Requirement Analysis and based on the analysis,
shall propose the best fit business process on the mYSAP ECC for the system.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 3 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
It may not be possible to decide the realization possibility of all Business requirements on the mYSAP ECC for the system
immediately and hence the following legend is being followed for describing the statuses:
The SAP Business Process for SUNSTAR OVERSEAS LTD is dependent on the following aspects:
Scope of services described in the Software Services Agreement signed by M/s. SUNSTAR OVERSEAS LTD. and M/s.
COCONUT.
Scope of functionality described in the Software Services Agreement mentioned above.
Capabilities and Limitations of mYSAP ECC for the system.
Existing Business Knowledge Transfer from SUNSTAR OVERSEAS LTD. Project Team members.
Business Requirements defined by the SUNSTAR OVERSEAS LTD. Project Team members.
SUNSTAR OVERSEAS LTD. accepts that the decision to accept the “SAP Business Process for SUNSTAR OVERSEAS LTD” is
completely it’s own and not influenced by Coconut. Coconut shall not be responsible for the business consequences on SUNSTAR
OVERSEAS LTD. after the realization and usage of the processes being suggested here.
SUNSTAR OVERSEAS LTD. shall indemnify Coconut from all responsibilities for any other business consequences during the
framing of the SAP Business Process for SUNSTAR, or at any time during or after the realization / implementation of these
processes on mYSAP ECC for the system or while using the system.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 4 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Contents
Page Numbers
# Topic
Start End
0 Process Scope – List of Business Processes 6 7
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 5 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Proces
Process Description
s Id
4.1 Master data Maintenance
4.1.1 Material Master Maintenance
4.1.2 Service Master Maintenance
4.1.3 Vendor Master Maintenance
4.1.4 Purchasing Info Records
4.1.5 Source List Maintenance
4.1.6 Maintaining Vendor Evaluation Criteria
4.1.7 Maintaining Conditions
4.1.8 Payment Terms
4.2 Material Requirement Planning
4.3 Procurement Process
4.3.1 Purchase Requisition
4.3.2 Request for Quotation
4.3.3 Maintain Quotation
4.3.4 Release Strategy
4.3.5 Purchase Order - Local (RM, PM, MRO Items)
4.4 Goods Receipts
4.4.1 GRN due to Quality Check
4.4.2 GRN due to Purchase of Materials (into Unrestricted use)
4.4.3 GRN due to Purchase of Materials (into Quality Stock)
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 6 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 7 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 8 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
and price of that material is enquired with various sources. based on Price, Quality and delivery a best possible
vendor is selected and a PO is sent.
3. Purchase Requisition Type
For Purchase Requisitioned items, The user department raises a requisition in the form of B.O.M with details such
as division, cost center, requirement date and preference of vendor if any. is mentioned (certain cases buyer
nominates their vendors. so materials required for that order has to be procured from those sources).The same is
approved by the concerned dept. head and forwarded to the stores. Stores verify the stock and forward the same to
the Purchase . Inquiries are floated and quotations are received. In case technical recommendation is required, it is
referred to the Purchase Requisitioner. Price comparison is made for the approved vendors. A vendor is then
selected in consultation with the user dept. and a note sheet is prepared. Purchase orders are created and approved
by various authorities depending upon the value of the order.
4. Capital
For capital (budgeted) purchases, the user department prepares the Capital Expense Sheet (CAPEX). The same is
signed by the concerned Head of Dept. (HOD) and forwarded to Costing dept. who in turn allots the serial no.. The
Purchase Requisition along with CAPEX is sent to the stores which then be forwarded to Purchase (SSC). The
purchase sends intimations to various vendors for quotations. On receipt of quotations the prices are compared and
analysis is forwarded to the Technical Committee. The Committee selects a vendor and provide the reason for its
selection. The Purchase (SSC) then prepares a PO. The approval of PO is dependent on the value of the order.
5. Service Orders with Material Supply/ Job work Orders
Service Orders / Job work Orders are created on Service Providers in case where SUNSTAR OVERSEAS LTD.
needs to get its material processed from Service providers due to lack of that service capability / capacity with in
SUNSTAR OVERSEAS LTD.. After processing, SUNSTAR OVERSEAS LTD. will take back the entire processed
material.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 9 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Organizational Chart
Company Code
1100
M/s. Sunstar Overseas Ltd.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 10 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
2. Enterprise Structure
Company Code
New Justification / Purpose of the
Code Description Organizational Unit
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 11 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Plants
Manufacturing Plants
Current New Justification / Purpose of the
Code Description Code Description Organizational Unit
Purchasing Organization
Current New Justification / Purpose of the
Code Description Code Description Organizational Unit
SUNSTAR OVERSEAS LTD.
requires maintaining different
Purchasing organisation for
Purchase Department – S001 Paddy Purchase, Sonepat Purchase of Paddy/Rice, Purchase
Paddy/ Rice of General items/ consumables and
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 12 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
3. Purchasing Group
Current New Justification / Purpose of the
Code Description Code Description Organizational Unit
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 13 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
ACC ACCOUNTS
CVL CIVIL MAINTENANCE
ELT ELECTRICAL MAINTENANCE
HRD HRD
MCM MECHANICAL MAINTENANCE
MPR MATERIALS PURCHASE
MTS MATERIALS STORE
OFD ORGANIC FOOD DIVISION SUNSTAR OVERSEAS LTD.
SUNSTAR OVERSEAS PDC PROJECT & DEVELOPMENT (CIVIL) requires maintaining different
LTD., Sonepat PDE PROJECT & DEVELOPEMENT (ELECT.) Purchasing Groups for different
PDM PROJECT & DEVELOPEMENT (MECH.) department.
PPC PPC
PPR PADDY PURCHASE
PRD PRODUCTION
QLY QUALITY
SLS SALES (DOMESTIC)
SYS SYSTEMS
UTL UTILITY
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 14 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
4. Material Group
Manufacturing / Procuring
Plant Material Group Product Type
Location
A001 ASSET
A002 CHEMICAL
A003 CIVIL
A004 CIVIL MAINT.
A005 CONSUMABLE
A006 ELECTRICAL
A007 MECHANICAL
Sonepat (Paddy Purchase A008 MISCELLANEOUS
Division) Sonepat (General A009 ORGANIC
1110
Items/ Consumables Division)
1120 A010 PACKING
Paddy Purchase Division,
1130 A011 PACKING MATERIAL
Haryana
Purchase Division, Delhi A012 PADDY
A013 PROMOTION
A014 RICE
A015 SEED
A016 SYSTEM
A017 TOOLS
A018 UTILITY
A019 WHEAT
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 15 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
5.Material Coding
Existing SAP
Business Process for SUNSTAR
To
Material Grou Grou
Ext tal Group
Type p1 p2
/ Le Logic1 Logic2 3
lengt lengt
Int? ng length
h h
th
Paddy Ext 10 Na Na Na Na Na No Material Code
Finished
Ext 13 Na Na Na Na Na No Material Code
goods
Spare
Ext 18 Na Na Na Na Na No Material Code
Parts
Packagin
Ext 18 Na Na Na Na Na No Material Code
g
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 16 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 17 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
• Vendors
Business Requirement :
1. Enhancement of the following master data is required.
Material, Vendor, Purchase info records, Source list,
Vendor Evaluation Criteria, Conditions have to be
maintained in SAP R/3.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 19 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 20 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
The same should be captured in the system for services 1. Service Number which gives a unique identification to the
taken by any department. service. This shall be internally generated by the system.
2. Service Category which describes whether a service is an
internal service or a service to be procured externally or services
performed for third parties. In conjunction with the organizational
(maintenance) status of the service master, the maintenance views
can be controlled i.e. whether a service master can have – a basic
data view, controlling view, sales & distribution view. Based on the
type of service, the service category shall be maintained.
3. Description which describes the service in brief
Examples of Services for which Master records shall be created :
1. Annual Maintenance Contracts
2. Repairs in SUNSTAR OVERSEAS LTD. premises
3. Repairs outside
4. Rental Services
5. Lease Services
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 21 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
brokers). includes, for example, payment transaction data and the number of
Brokers are given Commission charges. the
Some fixed expenses are charges by all seasonal paddy relevant control account. Only one control account can be
suppliers like Dami, Labour, Cess etc., these are assigned to each
maintained in Vendor Master. vendor. And we can maintain vendor customer relation and vendor
Business Requirement. bank details in
In Vendor Master the following data should be vendor master.
maintained. Purchase Organisation Data:
General information (Address, Correspondences, Purchasing data like contact persons, terms of delivery, etc. shall
Company related information be
Terms of payment maintained at purchasing organization level. Vendor’s excise
Pricing procedure is required to be maintained. It is details can be
different for Local Vendors and for Import Vendors. maintained using the CIN functionality of R/3.
Terms of payment depends upon the vendor, Material Identification of Vendor is also done with the help of CODE.
and negotiations and they are as follows: Example :
For Local Vendors Vendor Name Vendor Code
For Example : Industrial Sales Promoter HRI10000
100% advance against Order First two digit of the code signifies that the vendor is of harayana
100% advance against delivery state and third character specifies that his name begins with I and
02 Days credit from the date of purchase by the branch next comes his serial number.
07 Days credit from the date of purchase by the branch This vendor code shall be maintained at Co. code and purchasing
organization level.
12 Days credit from the date of purchase by the branch
In Vendor master record all data pertaining to the vendor ie. His
15 Days credit from the date of purchase by the branch bank details, Office address, payment terms ie 100% advance or
Payment against Mandi dhara. after job completion, order currency ie in INR or other currency and
partner function ie invoicing party is same as supplying party can be
maintained.
Vendor Schema Group
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 23 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
contracting, etc. records. The information in the latest purchasing info record for a
These details should be maintained for plant and combination of vendor and material for that purchasing organization
purchasing organisations at material level. and plant shall always be defaulted when creating a Purchase
Order. Purchasing info records shall be created manually or
Other details like prices, conditions under and over automatically. Manual Creation shall be done when a purchasing
delivery tolerances(like rate/ quantity), vendor evaluation info record doesn’t exist for a vendor – material combination, for a
data are stored in purchase info records. purchasing organization and plant. Manual Update shall be done.
When there are changes in the values of the Purchasing Info
Records. Automatic Updating/Creation shall be done at the time of
creation of Request for Quotation, Quotation or Purchase Order for
those records which already exist. Purchasing Info Records for
multiple validity periods can be maintained at the same time. This
shall also be used for generating Negotiation Sheet for a vendor.
Provision for deleting obsolete info records is also available.
Example :
In Purchase info record all data such as when raw paddy was last
procured, at which rate and from which vendor, what was his
payment term and all other information’s related to the purchasing
can be overviewed.
Example :
M/s. Sunstar wants to procure paddy from M/s. Industrial sales for
the period of 01-04-2006 to 30-05-2006.
Source list is maintained for a particular material at plant level. Here
the user can maintain the validity period of the vendor who is
authorised to supply raw paddy for the period of two months only
and the purchasing organisation responsible for procurement for
that plant.
Example :
Vendor HRI10000 wants to be evaluated for delivery. In SAP with
functionality of sub criteria a vendor evaluation can be done for on
time delivery, quantity reliability etc.
4.1.7.2 Discounts
Business Requirement The Discount condition records shall be maintained with conditions
Discounts are to be maintained as discount per unit, and values associated with conditions. While processing a
discount per value, discount percentage. transaction system will search for valid record and as soon as it
finds the record matching the condition of sale it should return a
discount value. Some of the discounts can be maintained at the
time of preparing the purchasing document.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 29 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
4.1.7.3 Excise Vendor, Material and other factors that determine the Excise duty
Business Requirement shall be maintained through the CIN Module of SAP R/3.
Engineering & General Material Purchase department This shall include the Exceptional rates that may be applicable for
Some of the inputs are excisable which adds to the cost certain vendors and material combination. This shall also take into
of finished goods. account different tax rates based on the Vendor’s Status (SSI or
Normal). The setoff of excise duty or inventorying of excise duty will
No credit is availed. be controlled by Tax codes.
Paddy purchase department
There are no inputs which are excisable.
4.1.7.4 Sales Tax
Business Requirement Tax condition records can be maintained in the system for various
Sales tax has to be maintained as a condition type levels of taxes, like central and state level, which will be
required for purchase.(VAT/ CST) automatically determined during a transaction depending upon the
receiving plant and the vendor’s locations.
The tax values are maintained as percentages with the help of tax
codes.
4.1.7.5 Import Duty
PPD & EGM department This condition type will be available with a separate pricing
There is no import duty. procedure.
4.1.7.6 Freight
Business Requirement The Planned Freight costs shall be booked in the same Purchase
Freight charges are levied on purchase from all markets. Order for which the procurement is to be done. In cases where the
Material carrying party is different from the one on whom the PO is
raised the Freight Vendor shall also be maintained in the same PO.
4.1.7.7 Service Tax
Business Requirement Service Tax will be maintained as condition type
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 30 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
4.2 MRP
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 31 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 33 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Example :
A reorder level can be set for a material say “Cartridge”. As soon as
the reorder level reaches the value set in the material master
record, system generates requests for raising a purchase
requisition.
4.3 Procurement Process
Engineering & General Material Purchase department Purchase Requisitions are created under the following situations:
The User of M/s. Sunstar Overseas Ltd. will initiate Requirement Analysis:
requisition in the case of Engineering Items. The request 1. Purchase Requisitions shall be created - automatically on MRP
first reaches the stores department where they checks Run or manually by the requesting department. Manual creation of
the availability of stock. Even if the stock is available the Purchase Requisitions for Stock Items shall be restricted to the
request is forwarded to higher authority for approval with corresponding MRP Controllers through authorization profiles.
appropriate remarks. For the Capital items requisition
comes from Higher level User. 2. Manual creation of Purchase Requisition for MRO items will be
controlled by authorization profiles. Release Strategy shall be
incorporated for release of Purchase Requisition as per the
Paddy purchase department requirements.
Purchase requisition is not created for procuring the 3. Purchase requisition shall be created manually by the
paddy. corresponding department.
General items
Departments will initiate requisition which is collected and Example :
reviewed by the Vice President and forwarded to M/s. Sunstar wants to procure paddy basmati of A Grade, material
Purchase department. no. PAD-AA-RAW, of 100 Bags from the Vendor HRI10000. For
Services this a request is to be fed in the system, which reaches
Purchase requisition is created for service items by automatically to purchase department for procurement of paddy.
concerned department at SUNSTAR OVERSEAS LTD.
Vice President is authorised to procure services for which
Service purchase order is created by Purchase
department or concerned department themselves.
Packing materials
Purchase requisition is created by the Paddy purchase
department for bardana, based on their requirement for
procurement of Paddy. Requisition for packing material
for sale is created by PPC department.
Business Requirements
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 35 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 36 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 37 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 38 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 39 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 40 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 41 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 42 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Service contracts are created for periodic services. To Create a Purchase order for Service select item category D
Services are also procured by Plant maintenance and account assignment Category K, system will ask for a service
department against maintenance order. entry number, quantity and save the document. Hence service
PO is created.
Payment is done for the services provided.
Example :
AMC exist for the maintenance of Equipments, in which
material is supplied by SUNSTAR OVERSEAS LTD. And M/s. Sunstar want to raise a service order for AMC of milling
in some case material is supplied by the Vendor also. machine. For this they have to raise a Service PO on a Vendor.
Payment is done on yearly basis/ monthly basis and
sometimes in advance. Stock Transport Order :
Service Contracts related to labour is being handled by It is required for transferring the material inter plant. On raising the
Stores paddy and rice department. At present they don’t STO, the stocks and values move into the buying plant from the
raise any PO on the Contractor. They have a database of supplying plant.
all the settled rates for all contract related activities such
as shifting of paddy bag from one location to other location Example :
or to Haudi. M/s. Sunstar Overseas Ltd., Sonepat raises a Stock transport
Contractor provides them the bill on monthly basis, which order for getting the material Pad-AA-00 from their other branch at
is then send to Accounts department after certification. M/s. Sunstar Overseas Ltd., Karnal. In SAP they can keep track
of how much of the material is in transit. Once inwarded by the
HR department looks after the service Contract, such as buying plant ie. M/s. Sunstar, Sonepat the inventory of the buying
of canteen/ bus services. At present they don’t raise any will increase.
PO in the name of the service provider, it is just a verbal
commitment. M/s. Sunstar have the finalized rates with
them on the basis of meals in case of canteen contract.
However, they are providing meals to their employees at
subsidized rate, the additional cost is being absorbed by
M/s. Sunstar. Other departments can also raise requisition
for service like Systems department can raise requisition
for Computer cartridges refilling.
Business Requirement
They want Service Purchase Order to be created. M/s.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 43 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 44 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
4.4.2 Sub-Process Scope: GRN due to Purchase of Materials (into Quality Stock)
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 45 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Admixture : In this Sunstar quality person checks 1. The excise entries for RG23A or RG23C part I and Part II can be
the percentage of mixture of other paddy. performed simultaneously after GR.
Average length : In this Sunstar check whether its 2. The Part1 entries for RG23A or RG23C can be performed first
length is ok. They record this in terms of mm. then GR is to be prepared and then Part2 entries are to be entered.
Abnormal + Mixture : Sunstar check the paddy if it At this stage when the stock is lying in quality inspection, if Invoice
is looks healthy in appearance and sleek from Verification is done, the system blocks the invoice because of
down. They record it in terms of percentage. quality reasons (Since quality decision has not been made for this
GR Quantity).
Broken : This activity is done after dehusking, here
Sunstar checks the brokenness of rice. They (At present No Excise is applicable)
record it in terms of percentage.
Chalky : Here Sunstar checks as to how much At the time of goods receipt as soon as a Purchase order number
percentage of chalky is there. If a rice contains is entered in the system, materials against the purchase order are
more chalky it can be broken down easily. So a displayed if post to inspection stock indicator is ON in the material
more chalky rice is sent to parboiling plant for master system will automatically post the goods to inspection stock.
welding.
Crackness : Here Sunstar checks as to how much Example :
percentage of crackenss is there.
M/s. Sunstar wants to send the material PAD-AA-00 for quality
Damaged/ Discolour : In this Sunstar checks as to check before it is being sent into unrestricted stock of the system.
how much percentage of damage or discolourness As soon as a Goods receipt is done in the system the stock will
is there. move into quality inspection where it will be checked for
Dead Paddy : Here Sunstar checks how much parameters on the left side.
percentage of paddy is there without rice. As soon as the material Pad-AA-00 is certified Ok. The material
Green : In this test Sunstar checks the greenness quantity will move into the unrestricted stock.
of paddy. This is recorded it in terms of
percentage.
Head rice : Here Sunstar checks that how much
percentage of rice is of full size.
Husk : Here Sunstar checks the huskness level
after dehusking, it is also recorded in terms of
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 46 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
percentage.
Moisture : Here Sunstar checks the moisture level
in paddy. This is also recorded in terms of
percentage.
Red/ chobba : Here Sunstar checks whether the
rice is red coloured. This is also recorded in terms
of percentage.
Short grain : Here Sunstar checks the length of
basmati paddy, it is also recorded in terms of
percentage. Here they checks how much of paddy
is below 7.0 mm.
Yield Loss : Here Sunstar checks what is their
yield in this particular lot. Brokenness, head rice
and husk combine to give them the yield level. It is
also recorded in terms of percentage.
Apart from these tests in case of Organic paddy
pesticide residue test is also being done.
Business Requirement
At the time of goods receipt the system should
automatically send the materials to Quality inspection
Stock.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 47 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 48 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
In the first step, you enter the removal from storage at the issuing
storage location.
In the second step, you enter the placement into storage at the
receiving storage location.
In the two-step procedure, you can only transfer material from the
unrestricted-use stock of the issuing storage location into the
unrestricted-use stock of the receiving storage location.
Reservations are not possible with this procedure.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 49 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Example :
M/s. Sunstar, Sonepat wants to inward the material which is being
stock transferred from M/s. Sunstar, Karnal. The material PAD-AA-
00 is being inwarded by making the Goods receipt and the stock is
transferred into Quality lot for inspection. Once cleared from the
quality then only it reaches into unrestricted stock.
4.4.4 Sub-Process Scope: GRN due to Outbound Service / Job Orders(Purchase Orders for Service)
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 50 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 51 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Excise invoice is created before the GR, Upon GR, J1IB is created.
(Excise is applicable)
Imports
In case of Imports, the CVD that is claimed back is processed
differently from the normal procurement process. In this case, the
Invoice verification for CVD is done first and then part1 is taken, GR
is done and then part 2 is posted. This now creates the CENVAT
postings.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 53 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Requirement
The Process of Goods Issue of goods has to be
maintained.
4.5.1 Goods Issue due to Outbound Service/Job orders (Purchase Orders for services)
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 54 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 55 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Requirement
M/s. Sunstar Overseas Ltd wants all the invoices to be
processed using SAP.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 56 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Import Vendor
Imports invoice verification is slightly different from the normal
invoice verification. In this case the CVD applicable is taken into
RG23 Registers. In Import PO the CVD and other conditions are
maintained as delivery condition types hence the Invoice
verification for the CVD part is to be done first before the GR is
done. Then RG part1 entries are done then GR is done and then
RG part2 entries are posted. Invoice verification is done for the
Purchase Order. In this case No GR based Invoice verification is
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 58 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Example :
M/s. Sunstar wants to make payment to the Vendor HRI10000. On
signing of the invoice by the approved authority, it can be recorded
in SAP for making the payment. Once entered the invoice can be
handed over to the Accounts person for making the payment.
M/s. Sunstar if later on feels that they had made excess payment to
the vendor, they can raise a Credit memo for the same.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 60 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Periodic Inventory
In a periodic inventory, all stocks of the company are physically
counted on the balance sheet key date. In this case, every material
must be counted. During counting, the entire warehouse must be
blocked for material movements.
Continuous Inventory
In the continuous inventory procedure, stocks are counted
continuously during the entire fiscal year. In this case, it is important
to ensure that every material is physically counted at least once
during the year.
Cycle Counting
Cycle counting is a method of physical inventory where inventory is
counted at regular intervals within a fiscal year. These intervals (or
cycles) depend on the cycle counting indicator set for the materials.
The Cycle Counting Method of Physical Inventory allows fast-
moving items to be counted more frequently than slow-moving
items.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 61 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Inventory Sampling
In MM Inventory Sampling randomly selected stocks of the
company are physically counted on the balance sheet key date. If
the variances between the result of the count and the book
inventory balance are small enough, it is presumed that the book
inventory balances for the other stocks are correct.
Example:
M/s. Sunstar wants to do the stock taking of the paddy RAW-AA-00.
They checks the physical stock of the material and the book
inventory balance ie. The system stock. If it is found that the
physical Vs system stock is same they can post it with zero
difference and if it is found that there is a variance they adjust the
stock to match it with the book inventory.
2. Enter the Plant for which you want to carry out the Physical
inventory.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 62 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
3. Enter the Storage location for which you want to create the
Physical
Inventory document.
4. Enter the Special Stock “O” if you want to create the Physical
Inventory document for material Lying with the Subcontractor.
5. Tick the check box Posting Block for blocking any posting for the
materials for which you are Planning the Physical Inventory.
6. Tick the check box Freeze Book Inventory, to freeze the Book
Stock.
7. On this you can give the Physical inventory number (PIN) also.
PIN will group all the PID’s in one Heading. This can be used
while printing the PID’s.
8. Enter the Material number for which you want to carry out the
Physical inventory. Here you can enter the list of materials and
generate single PID for all the materials. If materials are managed
in batches, enter the Batch number in Batch field
9. Use Save button to Save create the Physical Inventory
Document. System will give the PID number.
10. If in the initial screen you have selected Special Stock as “O”,
then same screen will appear as shown above except, additional
field of Vendor for entering the Subcontractor’s number will
appear on the screen.
11. Enter transaction code MI04. Enter the Physical Inventory
Document number , Fiscal year and the Count date.
12. Enter the Counted stock of the material which are in the PID’s
13. Save the Entry.
14. Enter transaction code MI07. Post the differences if any and
hence the physical
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 63 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 64 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
7. Pricing Matrix
Pricing matrix is defined in the form of EXCEL-sheet. However, looking at the business scenario of SUNSTAR OVERSEAS LTD.,
there is already many ‘Pricing Schema’ exists out of which we suggested to choose few of them. Since list of Taxes and various
charges are so exhaustive. So it may not be easy to maintain one or two pricing Schema. To ease up the process we propose the
following “Pricing Schema”.
1- Raw Material – Local
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 65 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Integration with SD
1. Based on the type of order booking done in SD module, the purchase requisitions or process orders will be generated which
will be used for further processing of purchasing documents.
2. During the MRP Run the requirements will be calculated based on the existing Sales documents.
3. Delivery of Goods in SD module leads to a reduction in stock and return of goods increases the stock.
Integration with PP
1. Goods Issue for consumption against a production order will be done in the MM Module and this reduces the inventory of the
materials.
2. Goods receipt after production is received through the MM Module.
Integration with QM
1. Whenever the material is received, the quality inspection lot is created and after result recording, a transfer posting
automatically proposes the quantity to be posted to unrestricted/block stock after the results recording.
2. Quality Blocks will be activated for blocking invoices if posted prior to quality inspection.
3. Procurement of any material can be restricted to a period using the quality info record.
Integration with FI
Inventory Dr
GR/IR Clearing A/c Cr
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 66 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Vendor A/c Cr
GR/IR Clearing A/c Dr
CENVAT Clearing A/c Dr
Vendor A/c Cr
GR/IR Clearing A/c Dr
CENVAT Clearing A/c Dr
Inventory A/c Cr
Consumption A/c Dr
Inventory A/c Cr
COGS A/c Dr
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 67 of 68
4 Materials Existing Business Process and Business Requirement from
SAP Business Process for SUNSTAR OVERSEAS LTD.
Management SUNSTAR OVERSEAS LTD.
Business Blue Print – Materials Management – Mr. Sanjeev Grover/ Mr. Jai Khurana – Coconut Software Pvt. Ltd. Page 68 of 68