SAP Certified Application Associate - SAP Integrated


Business Planning - Full

You got 26 of 69 possible points.


Your score was: 38 %

Question Results

Question: Score 1 of 1

Which header name displays are available in the report options menu of the
Excel interface?
There are 2 correct answers to this question.

Response:

Full unique name including technical name

Captions

Business meaning, as defined in configuration

Changed number names created by user

Question: Score 0 of 1

You want to grant only display rights to a specific user in the Microsoft Excel UI.
How do you do this?
Please choose the correct answer.

Response:

Create a filter in the Administration Console

Create user preferences

Create value-based filter in Microsoft Excel add-in

Create permission filter and assign it to a specific user

https://www.erpprep.com/user/quiz/2196641/userresults 1/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 0 of 1

For a PA you need to create time periods for the time profile. What should you
take care of when executing the Create Time Periods application job?
Please choose the correct answer.

Response:

The planning area with this time profile must be activated so that the application
job can proceed.

Multiple time profiles can be run with this application job.

Job cannot be scheduled to start immediately.

A time profile has to be activated so that the application job can proceed.

Question: Score 1 of 1

Model a large machine with high capital request, where you need to run it cost
effectively with minimum utilization, even if it is means producing more than
required/ demand.

Which solution would apply to this scenario?


There are 2 correct answers to this question.

Response:

Balance between excessive prebuild and minimum utilization by incorporating


violation costs.

Excess stock to be staged in an overflow warehouse.

Capacity levelling will be possible for production and storage resources.

Enough demands can be pulled forward and pull production will occur.

Question: Score 1 of 1

Which of the following segmentation options can you use when you configure
the segmentation profile?
Please choose the correct answer.

Response:

Use ABC classification only to provide classification based on two available


https://www.erpprep.com/user/quiz/2196641/userresults 2/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

segmentation strategies.

Use ABC classification and XYZ segmentation with three segments each resulting in
six segments.

Use time independent key figures as segmentation measures for both ABC
classification and XYZ segmentation.

Use XYZ segmentation only to provide classification basing on relative importance.

Question: Score 1 of 1

Which algorithm type can you use to plan the supply?


Please choose the correct answer.

Response:

Local updates

Compute quotas

Time-series based optimizer

Statistical forecasting

Question: Score 0 of 1

Which of the following approaches could you take to reduce run times of an
optimizer?
There are 2 correct answers to this question.

Response:

Increase the use of incremental lot size beyond the frozen horizon.

Use a sub network ID.

Avoid telescopic time buckets.

Split into multiple planning areas to support weekly vs. Daily planning needs.

https://www.erpprep.com/user/quiz/2196641/userresults 3/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which of the following modes can you use when creating a constrained plan?
Please choose the correct answer.

Response:

Profit maximization

Production maximization

Resource maximization

Question: Score 1 of 1

When can you use the TS optimizer?


There are 2 correct answers to this question.

Response:

Create a short – term distribution plan

For creating simulations for tactical planning

When generating a procuremental plan for raw materials and components.

When generating an operational production plan in daily or weekly buckets.

Question: Score 0 of 1

What are S&OP operator (optimizer) parameters associated with demand fair
share?
Please choose the correct answer.

Response:

- Number of fair share segments


- Maximum days of coverage
- Number of fair share segments late delivery

- Number of fair share segments


- Maximum inventory
- Additional tiering costs (default)

- Number of fair share segments

https://www.erpprep.com/user/quiz/2196641/userresults 4/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

- Additional tiering costs (default)


- Target inventory violation cost

- Number of fair share segments


- Additional tiering costs (defaults)
- Number of fair share segments

Question: Score 1 of 1

You are creating an Advanced Simulation (ADVSIM) operator. Which operations


are supported?
There are 3 correct answers to this question.

Response:

Pre-copy

Disaggregate key figures

Simulate statistical forecast

Post-copy

Create time periods

Question: Score 1 of 1

Which of the following key functions are supported by IBP for Sales &
Operations planning?
There are 2 correct answers to this question.

Response:

Supports an advanced demand planning process

Supports manual creation of feasible constrained plans

Supports a finite resource planning

Supports a basic demand planning process

Question: Score 1 of 1
https://www.erpprep.com/user/quiz/2196641/userresults 5/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

You set up periodic activities to support S&OP and want to use a


job chain to sequence these multiple steps. What must you do to use a job chain
to sequence these multiple steps?
There are 2 correct answers to this question.

Response:

Ensure that the job chain can continue after the most error-prone step fails.

Schedule the job chain for recurring execution in the application job tile.

Select the recurrence pattern in the Application Job Template app.

Set up the job chain with five steps or less in the application job template.

Question: Score 0 of 1

For which of the following jobs can you enter planning filters as parameters?
There are 2 correct answers to this question.

Response:

Create Time Periods for Time Profiles

Purge Non – Conforming Data

Purge Key Figure Data

Purge Master Data

Question: Score 0 of 1

You create an S&OP operator for heuristics on an SAP IBP project. What must
you enable for the S&OP operator which is specifically relevant for sub
networks?
Please choose the correct answer.

Response:

Compute Expected Supply parameter

Normalize Quotas parameter

Node-Based isolation check

https://www.erpprep.com/user/quiz/2196641/userresults 6/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Balance Receipts parameter

Question: Score 0 of 1

You would like to persistently enhance the layout, for example by underlining a
key figure, of your planning view template. What can you use to do this?
Please choose the correct answer.

Response:

SQL

Microsoft Excel with Power Pivot

Microsoft Excel with EPM

ABAP

Question: Score 0 of 1

A planning area can include one or more planning levels. What are the functions
of a planning level?
There are 2 correct answers to this question.

Response:

A planning level is defined for each planning area; it is the level at which data is
saved.

A planning level is scenario specific.

A planning level is version specific.

A planning level enables users to analyze and plan at different levels.

Question: Score 0 of 1

Which of the following functional areas are included in the out-of-the-box


Integrated Business Planning Sales and Operations model provided by SAP?
There are 3 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/2196641/userresults 7/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Consensus demand planning

Finite resource capacities planning

Demand Driven Materials Requirement planning

Executive review

Rough cut supply planning

Question: Score 1 of 1

What is a prerequisite for modelling outsourced manufacturers with production


capacity?
Please choose the correct answer.

Response:

Use production lead times and offsets to manage components at the outsourced
location.

Model production cost for internal and external production resources to model
priority.

Ensure set up of multiple modes of transportation.

Model target inventory and stocks at the outsourced location.

Question: Score 0 of 1

How is minimum resource utilization considered by the optimizer?


There are 2 correct answers to this question.

Response:

Achieved in short term and then tail off in future buckets, due to discounts.

Minimum resource utilization may not be achieved in full for restricted storage
capacity.

For all buckets and all quantities that represent the minimum utilization.

It depends on demands in future buckets; if there is no demand, no utilization.

https://www.erpprep.com/user/quiz/2196641/userresults 8/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What are the feasible solution for TS optimiser?


Please choose the correct answer.

Response:

Violation of minimum aggregated inventory values

Violation of minimum resource utilization

Not respecting production capacity

Not adhering to maximum transport values

Not – fully satisfied demands

Question: Score 0 of 1

You need to monitor the capacity of your Distribution Center goods receipt
employees. Every goods receipt takes two working days of a warehouse
employee.

How would you model this?


Please choose the correct answer.

Response:

Maintain a storage resource on the DC and maintain the number of days on the
location product attribute.

Maintain a warehouse-resource on the DC and maintain the number of days on the


location product

Maintain a handling resource with available capacity on the DC and maintain the
number of days on the location product attributes.

Maintain a regular production resource and change the description in goods receipt
employee capacity. Maintain the number of days on the location product attribute.

Question: Score 1 of 1

What are the main features of alert key figures?


Please choose the correct answer.

Response:
https://www.erpprep.com/user/quiz/2196641/userresults 9/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

They can be set to both calculated and stored

Data for these key figures can be loaded into the system

They can be defined as a key figure in the same way as the unit price

They check the conditions of other key figures

Question: Score 1 of 1

You need to limit value in projected periods of coverage to 999. What must you
doing the S&OP operator profile's configuration?
Please choose the correct answer.

Response:

Enter 999 as an allowed quota deviation parameter.

Enter 999 as an additional parameter.

Enter 999 as global limit per message type.

Enter 999 as infinite coverage parameter.

Question: Score 1 of 1

Analytics charts are created by user in the advanced analytics application. What
actions are possible in the Advanced Analytics app?
There are 2 correct answers to this question.

Response:

Merge charts together

Open graphics in Excel

Query data.

Group data

Question: Score 0 of 1
https://www.erpprep.com/user/quiz/2196641/userresults 10/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

What does ABC/XYZ segmentation allow you to do?


There are 2 correct answers to this question.

Response:

Assign more appropriate inventory algorithms to planning objects.

Identify inventory items that require closer attention.

Analyze forecast accuracy by product class

Tailor your forecast strategy and inventory optimization to segment characteristics.

Question: Score 1 of 1

Which of the following global parameters can be used to initialize the value of
the forecast input key figure to a small value when historical data is missing for
some periods?
Please choose the correct answer.

Response:

MTHMISSIONS parameter in SCENARIO group

FORECAST_ESCAPENULL parameter in FORECAST group

MAX_DIM_MEMBERS parameter in PLAN_VIEW group

FORECAST_ALLOW parameter in FORECAST group

Question: Score 0 of 1

Which of the following are functions of the Snapshot Key Figures feature?
There are 3 correct answers to this question.

Response:

A snapshot takes a copy of a key figure at a particular point in time

You can create up to nine time snapshots at periodic intervals, producing a time-
lapsed view of your data

A snapshot is taken only if a snapshot operator is run

https://www.erpprep.com/user/quiz/2196641/userresults 11/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Not exposed to the user in planning views

The most recent snapshot is numbered with the highest number

Question: Score 0 of 1

What are some of the prerequisites for configuring a planning area that results
in a successful consistency check?
There are 2 correct answers to this question.

Response:

Specify a planning horizon in the planning area for each level of the assigned time
profile.

Configure at least one calculated key figure for the planning area.

Assignment of a compound master data type necessitates the assignment of its


component master data types too.

Configure at most two input key figures on the same planning level in a key figure
calculation.

Question: Score 0 of 1

You are creating a planning view in the SAP IBP for Microsoft Excel add-in.
Which settings can you maintain as default values?
There are 2 correct answers to this question.

Response:

Permission filter

Default Planning Area

Language

Default Display Time (Zone)

Question: Score 0 of 1

https://www.erpprep.com/user/quiz/2196641/userresults 12/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

What are some of the available ABC segmentation methods in IBP?


There are 2 correct answers to this question.

Response:

By Pareto Principle (Sorted and Cumulated %)

By number of items (Sorted Average)

By number of items (Sorted values)

By Pareto Principle (Sorted and Calculated Values)

Question: Score 0 of 1

You are working on a mid – range plan that spans the seasonal peak and you are
evaluating the need for additional crewing. Which of the following parameters
can you model to plan production with extra shift(s)?
Please choose the correct answer.

Response:

Incremental production values

Production source validity at the start of seasonal peak

Cost based capacity expansion.

Adjusted production interactive values

Question: Score 0 of 1

What can you use the Disaggregation (DISAGG) operator for in planning areas?
There are 2 correct answers to this question.

Response:

Copy master data and key figures from one planning area version to another.

Copy key figure values between the same versions of different planning areas.

Check master data and key figures to reveal inconsistencies.

Create missing planning objects

https://www.erpprep.com/user/quiz/2196641/userresults 13/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What function would you use to configure year to date calculation?


Please choose the correct answer.

Response:

IBP_CAGGR with parameter for time profile level restart of a quarter

IBP_LPA with static configuration as you are aggregating across broader time
period

IBP_CAGGR with aggregation mode parameter set to SUM

IBP_LPA with dynamic configuration to query key figures at request level

Question: Score 0 of 1

You want to setup Demand Sensing to analyze demand changes in execution or


close to execution windows. Which of the following conditions must you consider
during the setup?
There are 2 correct answers to this question.

Response:

It is mandatory to load historical lag-based snapshot data

Set up the forecast model to be executed at product-location level

At setup test the system to run the Demand Sensing (full) algorithm weekly and
the Demand Sensing (update) on a daily basis.

The result generates sensed demand data at the monthly time granularity for the
time horizon defined in the forecast model

Question: Score 0 of 1

Which conditions are prerequisites for key figure disaggregation?


Please choose the correct answer.

Response:

The key figure is stored and editable in the current and future.
https://www.erpprep.com/user/quiz/2196641/userresults 14/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

The key figure is set to Not Editable.

The key figure is calculated and editable in the current and future.

The calculated key figure is available and aggregation mode is selected.

Question: Score 0 of 1

Which of the following can be used as an input for inventory level optimization?
There are 2 correct answers to this question.

Response:

Lead time variance

Reorder point

Lot sizes

Target inventory level

Question: Score 1 of 1

You are designing the planning area granularity. How do you construct the
granularity of the data which is saved?
Please choose the correct answer.

Response:

Assign, besides the base planning level, a separate time profile for every additional
planning level in the planning area

Define a base planning level and assign a storage profile with the required
granularity

Assign a time profile and define the smallest granularity for every additional
planning level

Assign a time profile and a storage profile in the planning area header configuration
and for any additional planning level

https://www.erpprep.com/user/quiz/2196641/userresults 15/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which library is used by the forecasting engine for the Demand Sensing
algorithm?
Please choose the correct answer.

Response:

Demand library

Supply Chain Algorithm library

Predictive Analytics library

Heuristics library

Question: Score 0 of 1

Which objects can you query on in the Advanced Analytics application?


There are 2 correct answers to this question.

Response:

Only on the base version

On simulations

On all versions

On scenarios

Question: Score 0 of 1

Which of the following checks for master data and key figures does the Check
Mode algorithm trigger?
There are 3 correct answers to this question.

Response:

Checks whether the required planning level master data exists for a subset of input
key figures.

Checks whether the heuristic detects cycles formed by nodes (such as location
products) in the supply chain network.

https://www.erpprep.com/user/quiz/2196641/userresults 16/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Checks whether the location resource specified in the master data form a cycle in
the supply chain network.

Checks whether the location products specified in the master data are connected
by customer sourcing rules within the supply chain network.

Checks whether the sourcing in the Production Source Item Master Data type
exists.

Question: Score 0 of 1

What must you do to enable change recording for a key figure?


There are 2 correct answers to this question.

Response:

Set the key figure to active for change logging.

Set the planning levels to active for change logging.

Set the change log to active for master data type used.

Set the planning area to active for change logging.

Question: Score 0 of 1

Which configuration elements can be used to add meaning to the planning


activities?
There are 2 correct answers to this question.

Response:

Planning View notes

Business Meaning Key figure Definition

Reason codes

Microsoft Excel notes in Planning

Question: Score 0 of 1

https://www.erpprep.com/user/quiz/2196641/userresults 17/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

What objects do you need to upload before key figure data?


Please choose the correct answer.

Response:

Time periods and time profile attributes

Time periods and business roles

One simple master data record and one compound master data record

Time periods and relevant master data

Question: Score 0 of 1

You created a time profile and want to use time levels. In which of the following
cases is it mandatory to set the time level?
There are 2 correct answers to this question.

Response:

Assign a time profile level for a planning level of a planning area.

Maintain a time profile level as parameter in a disaggregation planning operator.

Assign a time profile level during the load of key figure values with the Data
Integration Jobs app.

Choose a time profile level in a planning view in Microsoft Excel.

Question: Score 0 of 1

You model the following supply chain:

- A finished product is manufactured on 2 different packaging lines


- Production takes place for 40 % on line A. 60 % on line which varies over time
- Produced products are immediately shipped to two warehouses, respecting the required
minimum safely stock values
- One warehouse is temporarily closed sometime during the next three months.

Which sourcing rules do you use?


There are 2 correct answers to this question.

Response:

U-rule

https://www.erpprep.com/user/quiz/2196641/userresults 18/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

T-rule, time independent

P-rule

T-rule, time dependent

Question: Score 1 of 1

End users are validating the SAP IBP solution, and are concerned with how long
it takes to open templates. Which can impact performance the most, that should
you consider checking?
There are 2 correct answers to this question.

Response:

Number of local members and complexity of calculations

Key figures complex calculation

Excessive IBP formatting in Excel UI

Number of analytics charts displaying Key figures’ values

Question: Score 1 of 1

Co-production allows you to model co-products. The output of a production


process is several different products, which are produced concurrently.

Which parameters apply to the co-product?


Please choose the correct answer.

Response:

Production Lot Size

Output Product Coefficient

Consumption of components

Capacity Consumption

https://www.erpprep.com/user/quiz/2196641/userresults 19/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 0 of 1

What is a possible technique used by forecast models in IBP S&OP Module?


Please choose the correct answer.

Response:

Mixed Integer Linear Programming (MILP)

Security Assertion Markup Language (SAML)

Statistical Algorithms

Predictive Analytics

Question: Score 0 of 1

What are the mandatory when creating a new time profile?


There are 2 correct answers to this question.

Response:

A start and end date

ID and name

At least one attribute for the time profile levels

Description

Question: Score 0 of 1

Why do you run a consistency check for a key figure?


There are 3 correct answers to this question.

Response:

To verify that all key figures are marked as stored input in a key figure calculation.

To verify that all key figures have a calculation defined at REQUEST level.

To verify that you used at most two input planning levels.

To verify that SUM() calculation is used for a key figure only if the Aggregation

https://www.erpprep.com/user/quiz/2196641/userresults 20/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Mode of the key figure is set to Sum or Custom

Question: Score 0 of 1

You have set up a planning area and data is available. You adjust the necessary
time profile settings and run the consistency check.

Which settings can you change and still run a successful consistency check?
There are 2 correct answers to this question.

Response:

Change the past and future horizon of the levels in the time profile.

Remove an attribute assigned to the time profile level if the attribute is used in a
planning level.

Change the description of the attributes in a time profile.

Add a new time profile level to the time profile.

Question: Score 0 of 1

Your project requires end-to-end visibility and basic supply and demand
planning. Which one of the following IBP Solution components do you
recommend?
Please choose the correct answer.

Response:

IBP for Sales and Operations


IBP for Demand

Supply Chain Control Tower


IBP for Supply

Supply Chain Control Tower


IBP for Sales and Operations

Supply Chain Control Tower


IBP for Response

Question: Score 0 of 1

https://www.erpprep.com/user/quiz/2196641/userresults 21/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Which of the following stages can be modeled using scenarios from the S&OP
planning cycle?
There are 2 correct answers to this question.

Response:

Demand sensing stage

Demand review

Data input review for inventory

Demand-Supply balancing

Question: Score 1 of 1

Which master data types can you reference to create a reference master data
type?
There are 2 correct answers to this question.

Response:

Reference

Virtual

Simple

Compound

Question: Score 1 of 1

How many different time levels can be selected within one planning view?
Please choose the correct answer.

Response:

Only base time levels of planning area

Only time levels from base planning level of selected key figures

All time levels available in the time profile. Restricted by global configuration
parameter

https://www.erpprep.com/user/quiz/2196641/userresults 22/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

All time levels available in the time profile

Question: Score 1 of 1

A time profile is defined with the levels week, month, quarter, and year. Which
PERIODID will be assigned to quarter?
Please choose the correct answer.

Response:

PERIODID1

PERIODIDO

PERIODID2

PERIODID3

Question: Score 0 of 1

Which of the following SAP Integrated Business Planning modules supports


Operational Supply Planning?
Please choose the correct answer.

Response:

SAP IBP Sales and Operations Planning

SAP IBP Supply

SAP IBP Response and Supply planning

SAP Integrated Business Planning for Inventory

Question: Score 0 of 1

What are the ways to achieve period shift in SAP IBP calculations?
There are 2 correct answers to this question.

Response:

Use an attribute as a key figure.

https://www.erpprep.com/user/quiz/2196641/userresults 23/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Use eisting IBP formula.

Use a local member.

Use attribute transformation.

Question: Score 0 of 1

What are some of the ways to create network visualization?


There are 2 correct answers to this question.

Response:

Dedicated supply chain network app

Use an application job for network visualization

Chart functionality in the planning view

Use the Analytics Advanced app and create a supply chain network

Question: Score 0 of 1

Which of the following are functions that represent milestone steps of the S&OP
process templates?
There are 2 correct answers to this question.

Response:

All process templates are assigned to dashboards

Each step depicted in tl1e template can have tasks associated with it

New instances of templates allow for re-use of the same processes again

Number of steps in a process template is the same for all implementations

Question: Score 0 of 1

Which of the following are features of the S&OP process templates?


There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/2196641/userresults 24/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Response:

The number of steps in a process template is the same for all implementations

New instances of templates allow for re-use of the same processes again

All process templates are assigned to dashboards.

Each step depicted in the template can have tasks associated with it

Question: Score 0 of 1

What differentiates the Create New (Simple copy) and the Create New with
Dependencies (Advanced copy) functions of a planning area?
There are 2 correct answers to this question.

Response:

Master data is only shared between the original and the new planning area when
you use the Create New (Simple copy) function.

The planning view favorites are only copied when you use the advanced copy.

A copy of the time profile is only created when you use the Create New with
Dependencies (Advanced copy) function.

Associated attributes are only shared between the original and the new planning
area when you use the Create New (Simple copy) function.

Question: Score 1 of 1

Which of the following planning entities must you set up when you configure a
planning area?
There are 2 correct answers to this question.

Response:

Time Profile

Planning Operator

Planning View Template

Attribute
https://www.erpprep.com/user/quiz/2196641/userresults 25/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What global config parameter can be used to limit the number of planning
versions in a system?
Please choose the correct answer.

Response:

ANALYTICS->MAX_RECORDS

SCENARIO->SCN_COUNT_MAX

PLAN_VIEW->PV_COUNT_MAX

Question: Score 0 of 1

You run a what-if analysis and use the Scenario planning function. Which actions
can you perform?
There are 3 correct answers to this question.

Response:

Run a scenario-specific demand sensing job.

Share data with other users.

Run scenario-specific inventory optimization job

Change scenario-specific master data.

Display data in analytics.

Question: Score 0 of 1

Which of the following are the key features of SAPIBP Control tower?
There are 3 correct answers to this question.

Response:

Task and case management

https://www.erpprep.com/user/quiz/2196641/userresults 26/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Create a feasible plan

Balance demand and supply and attain financial targets

What if simulation capabilities

Smart alerts

Question: Score 1 of 1

What kinds of algorithms can you combine to come up with the best forecast in
IBP?
There are 2 correct answers to this question.

Response:

Mid-term ones, and long - term ones.

Short - term ones, and mid-term ones.

Short - term ones, and machine - learning ones

Mid-term ones, and machine - learning ones

Question: Score 0 of 1

You have set up infinite S&OP Heuristics for unconstrained planning. What must
you do to model inputs as constraints?
There are 2 correct answers to this question.

Response:

Create product substitutions.

Model adjusted transport receipts.

Enter transportation lead times.

Set minimum and maximum lot sizes.

https://www.erpprep.com/user/quiz/2196641/userresults 27/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/user/quiz/2196641/userresults 28/28

You might also like