Method Statement For Installation of SMDB, DB & Isolator
Method Statement For Installation of SMDB, DB & Isolator
Method Statement For Installation of SMDB, DB & Isolator
Revision History
Prepared By Reviewed By Approved By
Rev No Date Description
Electrical Engineer MEP Manager Project Manager
Signatures
Contents
TIPP6A-KIC-MS-E-03 Page 2 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
1.0 SCOPE
The purpose of generating this method statement is to define the procedure step by step
to implement the correct practices for safe work METHOD OF STATEMENT FOR INSTALLATION OF
SWITCH GEAR & ISOLATOR FOR LOW VOLTAGE POWER DISTRIBUTION SYSTEM. The
guidelines contained herein so as to ensure that the job execution complies with the requirements
and serves the intended function to a satisfactory level.
2.0 REFERENCES
1. Switches shall be of the quick start make; slow break grid switch type specially designed for AC
circuits to BS 3676. The operation of the switch shall not depend wholly on the action of the
spring. The switches shall generally be of the rocker operated type.
2. The local switches shall be 15/20 amp. Circuit switches shall be one-way, two-way, intermediate
or double pole as indicated on the drawings. Where more than one switch is indicated at any
position multiple gang grid units shall be used.
3. Generally, switch units shall be of the adjustable grid pattern and to be secured to the adjustable
grid by means of screws. For flush mounting switches the switch-plate shall overlap all edges of
the box by not less than 7mm. For surface mounting switches the switch plate shall finish flush
with the edges of the switch boxes. Switches for water heaters and fan coil units shall be
complete with neon indicator lights.
4. Local switches shall be arranged in convenient positions for switching the various circuits and
generally as indicated on the drawings.
5. In Plant rooms the switch units shall be surface or flush as required.
6. The switches shall be of the same manufacture for a particular type of switch throughout the
installation. All accessories in wet and damp areas shall be of the splash-proof type to IP56
protection standard.
Project Manager:
1. To ensure that all the preparation and application works are carried out according to the
Contract Specification and with the approved drawings.
MEP Manager:
1. To ensure that the progressing of work is carried out according to the planned program and as
per the approved method of statement.
2. To ensure that all the equipment and materials required to execute the work are available
according to the planned construction program.
3. To co –ordinate with the Main contractor, MEP Coordinator and Safety Officer, for a safe and
proper execution of the works.
TIPP6A-KIC-MS-E-03 Page 3 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
Site Engineer:
1. To ensure that the works are carried out according to the Contract Specifications, approved
method statement and the shop drawings.
2. To provide all necessary information and distribute responsibilities to his construction team.
3. To monitor the progress of work in relation with the work program and to report to the Project
Manager.
4. To co-ordinate with the safety officer and to ensure that the works are carried out in safe
practicing methods.
Foreman:
1. Foreman will carry out his duties by maintaining continuous coordination with the site engineer
on daily basis and ensure proper distribution of the workforce in the required and planned
locations.
2. To ensure that his assistant foreman/ charge hand is aware of the job requirements and they
have enough information to carry out their duties properly.
3. To ensure in consultation with the site engineer that the manpower involved in the works are
moving as agreed and planned for the work.
4. To ensure that the daily work is progressing as planned and advice the site engineer of any
requirement for additional resources.
5. To control disposal of waste materials according to the instructions received from the site
engineer.
6. To ensure full coordination with the safety officer to maintain safe working and proper
housekeeping of the site, following the approved safety measures and further ensure that all
his working team are aware of the same to prevent accident and losses.
7. To inform the site engineer and of the areas ready for inspection.
8. Distribution and the control of material shall be monitored by foreman and store keeper.
HSE Engineer:
1. Interface with site supervisors on a daily basis to provide proactive technical advice for field
activities.
2. Delegate responsibilities to Junior Safety Officers and Safety Assistants to provide an effective
safety monitoring and supervisor support program.
3. Verify safety precautions stipulated on permits to work, risk assessments and job safety analysis
are being implemented.
4. Verify all scaffolding is tagged and a safe condition.
5. Identify site hazards, non-conformances, corrective and preventive actions and bring them to
the immediate attention of site supervision (and record).
6. Closely monitor high risk activities; confined space entry gas testing and air monitoring, lifting
activities, work at height, movement of abnormal loads etc.
7. Produce pertinent toolbox talks with the assistance of responsible construction supervision
including the identification of proactive and reactive site issues for communication to the
workforce and collection of constructive feedback.
8. Identify additional safety training requirements to be delivered to the workforce.
9. Investigate unsafe acts and conditions and provide solutions to prevent recurrences.
10. Lead Junior Safety Officers and Safety Assistants in an immediate response to incidents and
emergency situations that occur on site, act as emergency marshals and provide first aid.
11. Place safety posters, hazard flashes, site safety campaign promotional material and the results
of safety incentive schemes prominently on site
TIPP6A-KIC-MS-E-03 Page 4 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
12. Provide, or where necessary source, training for staff in relation to Health and Safety policies,
practice and procedures
13. Ensure all personnel have the necessary training for the project and new hire safety training
orientation.
14. Generate Accident/Incident Reports and Corrective Actions
Manpower:
1. Site engineer
2. Safety officer
3. Electrical Technicians
4. Helpers
TIPP6A-KIC-MS-E-03 Page 5 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
14. Clear all boxes from cement stains and foreign materials.
15. Fix wiring accessories ensuring that they are fixed properly and squarely aligned. Ensure that
the type of wiring devices shall be as approved type as to the areas where they are going to
fixed.
16. Ensure that all connections are correct and the wiring devices and boxes shall be earthed.
17. Cover all device plates with plastic sheet to protect the wiring accessories.
18. Request for Inspection shall be raised for wiring devices installation.
TIPP6A-KIC-MS-E-03 Page 7 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
TIPP6A-KIC-MS-E-03 Page 8 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
All Cables Laying and Wiring installation will be inspected as per the standards and Specification
and accordance with the sizes mentioned in the drawing.
The work activity shall be monitored during operation for any deviation to this work
activity plan and records of these checks noted in the table below.
Checked By Date Checked Deviation from Work Activity Plan (Yes/ NO)
If yes, any deviations to the method of work described shall be detailed in the table below,
identifying the operation number affected. The project management team shall be made
aware of any changes to the work Activity Plan and shall review the associated task Briefing
sheets to assess the impact of these changes. Operative shall be re-briefed on any revised
content within the task briefing sheets, as appropriate.
TIPP6A-KIC-MS-E-03 Page 9 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
TIPP6A-KIC-MS-E-03 Page 10 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
All site personnel are briefed on emergency procedures and arrangements within their safety
induction. Site staff will be instructed that they will be required to clock in or sign in when they
arrive on site and to clock out or sign out when they leave site. This is to ensure that an
accurate picture of who is present on site is maintained at all times and in case of emergency
all site based personal can be quickly accounted for.
Police: 999
Ambulance: 998
Fire: 997
Electricity: 911
Water: 922
Project Emergency Numbers
• Ensure that supervisors clearly understand their responsibility and role in the site emergency
procedures.
• Designate first aid and provide medical supplies and other material and equipment that may
be required for emergency use.
• Determine emergency evacuation routes for work areas and construction site and designate
safe assembly areas.
• Ensure that all site personnel & visitors clearly understand emergency warning siren signals
used at site and the safe assembly areas.
• Designate a supervisor to conduct a head count and give instructions to evacuees as
necessary.
• Post emergency information for each work area on the site.
• Conduct emergency procedure drill periodically.
TIPP6A-KIC-MS-E-03 Page 11 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
Emergency Engineer
Incident observer Supervisor HSE Officer
First Aider/
Project Manager Fire Fighter
HSE Lead
Emergency
General Manager Client/Consultant
Services
TIPP6A-KIC-MS-E-03 Page 12 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
• Toilet and washing facilities shall be provided before the commencement of work and shall
maintain as per OSHMS AD standard & Tawazun HSE and security rules & Regulations.
• Food shall only be consumed in designated properly shaded areas agreed with the prior
approval. No food shall be consumed within the work areas
• All food wastes shall remove immediately, in a hygienic manner, and shall not be allowed to
accumulate.
• Drinking water (cool water in summer) will be made available at site all time. All workmen
will be provided with Laban water, lime juice, electrolytes etc. during summer season and
cleaning the drinking water storage tank routine and as per inspection schedule.
• Resting shed (shaded) should be provided near the work area with adequate seating
arrangements and ventilation facility.
In order to provide adequate sanitary conditions for all personnel at site, the following provisions as
part of the temporary facilities to be provided.
TIPP6A-KIC-MS-E-03 Page 13 of 14
TAWAZUN INDUSTRIAL PARK TAWAZUN INDUSTRIAL PARK
Project Name:
ABU DHABI, U.A.E
Method Statement for Installation OF Switch
Title:
Gear & Isolator
TIPP6A-KIC-MS-E-03 Page 14 of 14