r0 Ve j108 D E212 Relay Setting Calculation hpl16 09 13 PDF
r0 Ve j108 D E212 Relay Setting Calculation hpl16 09 13 PDF
r0 Ve j108 D E212 Relay Setting Calculation hpl16 09 13 PDF
DSGND. MN
TITLE: RELAY SETTING CALCULATION AND COORDINATION
A For Approval 19.08.13 CHKD. GP
REV. DESCRIPTION BY APPVD. DATE APPVD. GP DOC. NO: VE-J108-D-E212 REV: A
CONTENT
A NOTES 1
1 11/0.415kV 2
1.1 0.415kV MSB Bus coupler 3
1.2 0.415kV MSB Incomer-1 5
1.3 0.415kV MSB Incomer-2 7
1.4 11/0.415kV 400KVA Transformer 9
2 33kV 11
2.1 33kV Capacitor bank- OC and EF 12
2.2 33kV Line OC and EF 14
2.3 33kV Bus coupler OC and EF 16
2.4 40 MVA Transformer OC and EF(LV Side) 18
3 132kV 20
3.1 40 MVA Transformer OC and EF(HV Side) 21
3.2 160MVA Transformer OC and EF(LV Side) 23
3.3 132kV Line OC and EF 25
3.4 132 kV Line Distance Protection(30kM) 27
3.5 132 kV Line Distance Protection(22kM) 34
3.6 132 kV Line Distance Protection(15kM) 41
3.7 132/33kV 40 MVA Trafo Differential Protection 48
4 220kV 52
4.1 160 MVA Transformer OC and EF 53
4.2 220 kV Bus Coupler OC and EF 55
4.3 220 kV Line OC and EF 57
4.4 220kV Distance Protection(50kM) Main-1 59
4.5 220kV Distance Protection(40kM) Main-1 66
4.6 220kV Distance Protection(10kM) Main-1 73
4.7 220kV Distance Protection(50kM) Main-2 80
4.8 220kV Distance Protection(40kM) Main-2 86
4.9 220kV Distance Protection(10kM) Main-2 92
4.10 220/132kV 160 MVA Transformer Differential Proetction 98
4.11 220/132kV 160 MVA Restricted Earthfault Proetction 102
4.12 220 kV Bus Bar protection 106
5 11/0.433kV POC Coordination 108
6 11/0.433kV EOC Coordination 109
7 0.433-33kV POC Coordination 110
8 0.433-33kV EOC Coordination 111
9 132-33kV POC Coordination 112
10 132-33kV EOC Coordination 113
11 220-132kV POC Coordination 114
12 220-132kV EOC Coordination 115
13 220-132kV SC Trip Coordination 116
14 OLV-SC Analysis Three phase-Minimum 117
15 OLV-SC Analysis Three phase-Maximum 118
16 OLV-SC Analysis Ph-G-Minimum 119
17 OLV-SC Analysis Ph-G-Maximum 120
18 Short Circuit Analysis Repot-Minimum 121
19 Short Circuit Analysis Repot-Maximum 121
20 Relay Setting -ETAP Format 150
A1
Note:
1
SBEF Protection For 160MVA Transformer is Not provided, Since the NCT is Not available
Page 1 of 160
0.415kV FEEDERS
Page 2 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR MSB BC CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER MSB BC
1.1. Non Directional Overcurrent and Earth Fault Protection for 0.415kV MSB BC
CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 533.36 A
CT secondary current, = i Load / CT ratio
= 0.53
Consider 110% of transformer Full load = 586.70 Primary
Pickup Phase fault Secondary , recommended = 0.59 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.25
Minimum Fault current = 11240.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.24 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.25*(((11.24/0.6)^0.02)-1))/0.14)
= 0.1
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 1540.83 A
= 1.541 A
t = 0.100 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.25
Fault current = 11340.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.34
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.25*(((11.34/0.2)^0.02)-1))/0.14)
= 0.15
Page 3 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR MSB BC CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER MSB BC
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.59 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.11 0 900 0.01 S
F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.54 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.15 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S
Page 4 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-1 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-1
1.2 Non Directional Overcurrent and Earth Fault Protection for 0.415 kV MSB Incomer-1
CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 533.36 A
CT secondary current, = i Load / CT ratio
= 0.53
Consider 110% of transformer Full load = 586.70 Primary
Pickup Phase fault Secondary , recommended = 0.59 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Minimum Fault current = 11240.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.24 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((11.24/0.6)^0.02)-1))/0.14)
= 0.2
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 1540.83 A
= 1.541 A
t = 0.200 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Fault current = 11340.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
11.34
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((11.34/0.2)^0.02)-1))/0.14)
= 0.30
Page 5 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-1 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-1
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.59 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.22 0 900 0.01 S
F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.54 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.30 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S
Page 6 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-2 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-2
1.3. Non Directional Overcurrent and Earth Fault Protection for 0.415kV Incomer-2
CT Details
CT Ratio = 1000/1 A
CT Primary = 1000 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.6 MVA
Rated HV Voltage = 33.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 11.02 A
Full Load current LV Side = 840.05 A
Impedence = 0.500 5.00%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 840.05 A
CT secondary current, = i Load / CT ratio
= 0.84
Consider 110% of transformer Full load = 924.05 Primary
Pickup Phase fault Secondary , recommended = 0.92 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Minimum Fault current = 15570.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
15.57 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((15.57/0.9)^0.02)-1))/0.14)
= 0.2
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 2184.13 A
= 2.184 A
t = 0.200 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 200.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (200/1000)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.50
Fault current = 15840.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
15.84
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.5*(((15.84/0.2)^0.02)-1))/0.14)
= 0.3
Page 7 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 0.415kV INCOMER-2 CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 0.415kV Incomer-2
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.92 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.21 0 900 0.01 S
F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 2.18 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.33 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.20 0 900 0.01 S
Page 8 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 11/0.415kV 400KVA Trafo 11kV Side CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 11/0.415kV 400KVA Tafo-11kV Side
1.4. Non Directional Overcurrent and Earth Fault Protection for 11kV Incomer
CT Details
CT Ratio = 100/1 A
CT Primary = 100 A
CT Secondary = 1 A
Class = 5P20
Transformer Data:
Rated power = 0.4 MVA
Rated HV Voltage = 11.00 kV
Rated LV Voltage = 0.43 kV
Full Load current HV Side = 21.00 A
Full Load current LV Side = 533.36 A
Impedence = 0.450 4.50%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 21.00 A
CT secondary current, = i Load / CT ratio
= 0.21
Consider 110% of transformer Full load = 23.09 Primary
Pickup Phase fault Secondary , recommended = 0.23 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.75
Minimum Fault current = 15230.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
152.30 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.75*(((152.3/0.2)^0.02)-1))/0.14)
= 0.74
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 60.65 A Calculated
= 0.607 A
t = 0.300 Sec
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.23 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.74 0 900 0.01 S
F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.61 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.30 0 900 0.01 S
Page 9 of 160
ERROR: undefined
OFFENDING COMMAND: ‘~
STACK:
Page 10 of 160
33kV FEEDERS
Page 11 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 19.08.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV CAPACITOR BANK CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Capacitor Bank
2.1. Directional Overcurrent and Earth Fault Protection for 33kV capacitor Bank Feeder
CT Details
CT Ratio = 200-100/1 A
CT Primary = 200 A
CT Secondary = 1 A
Class = PS
Page 12 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 19.08.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV CAPACITOR BANK CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Capacitor Bank
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.04 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.07 0 900 0.01 S
Page 13 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Line
2.2. Directional Overcurrent and Earth Fault Protection for 33kV Line Feeder
CT Details
CT Ratio = 400-200/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS
Page 14 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Line
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.03 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.06 0 900 0.01 S
Page 15 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Bus Coupler
2.3. Non Directional Overcurrent and Earth Fault Protection for 33kV Bus Coupler
CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS
Page 16 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 33kV Bus Coupler
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.07 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.1 0 900 0.01 S
Page 17 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV INCOMER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 33kV Side
2.4. Non Directional Overcurrent and Earth Fault Protection for 33kV Incomer
CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 40 MVA
Rated HV Voltage = 132.00 kV
Rated LV Voltage = 33.00 kV
Full Load current HV Side = 174.96 A
Full Load current LV Side = 699.84 A
Impedence = 0.138 13.80%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 699.84 A
CT secondary current, = i Load / CT ratio
= 0.87
Consider 110% of transformer Full load = 769.82 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.52
Minimum Fault current = 3640.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
4.55 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.52*(((4.55/1)^0.02)-1))/0.14)
= 0.12
Maximum through fault Current = 5020.00 A Primary From ETAP
= 6.28 A Secondary
Operating time at Maximum fault Current = 0.43 Sec
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of through fault current = 6592.69 A
= 8.241 A
t = 0.250 Sec
Earth Over current setting HV side
In solidly earthed system a setting of 10 to 20% of CT Primary = 160.00 A Primary
current is considered = I earth fault / CT ratio
Setting of 20% is selected = (160/800)
= 0.200 A Secondary
Time Multiplier Setting
CHARACTERISTICS = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.56
Fault current = 3880.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
4.85
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.56*(((4.85/0.2)^0.02)-1))/0.14)
= 0.26
Maximum fault Current = 5030.00 A Primary From ETAP
= 6.29 A Secondary
Operating time at Maximum fault Current = 0.515 Sec
Page 18 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 33kV INCOMER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 33kV Side
Setting Table:
F650
GROUP-1 Non Directional Phase Overcurrent- 51
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.12 0 900 0.01 S
F650
GROUP-1 Non Directional Phase Overcurrent- 50
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 8.24 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.25 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.26 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 50N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 2.00 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.10 0 900 0.01 S
Page 19 of 160
132kV FEEDERS
Page 20 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33kV TRANSFORMER(40MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 132kV Side
3.1. Non Directional Overcurrent and Earth Fault Protection for 132/33kV Transformer(40MVA)
CT Details
CT Ratio = 800-400/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 40 MVA
Rated HV Voltage = 132.00 kV
Rated LV Voltage = 33.00 kV
Full Load current HV Side = 174.96 A
Full Load current LV Side = 699.84 A
Impedence = 0.138 13.80%
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 174.96 A
CT secondary current, = i Load / CT ratio
= 0.44
Consider 110% of transformer Full load = 192.46 Primary
Pickup Phase fault Secondary , recommended = 0.48 Secondary
Time Multiplier Setting
Characteristics = IDMT Normal inverse
t Required operating time in seconds = grading time + Downstream relay
Minimum grading time interval considered operating time
in sec = 0.68
Minimum Fault current = 2970.00 A From ETAP
I Fault current at secondary = I fault / CT ratio
7.43 A
TMS = (t *((If/IS)0.02 -1)) /0.14
= (0.68*(((7.43/0.5)^0.02)-1))/0.14)
= 0.27
Maximum fault Current = 28280.00 A From ETAP
70.70
Operating time at Maximum fault Current = 0.37 Sec
Instantaneous Phase Overcurrent Setting
For High set considering the 130% of Through Fault current in = 1648.17 A Calculated
HV Side = 4.12 A
t = 0.30 Sec
Page 21 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33kV TRANSFORMER(40MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132/33kV,40 MVA Trafo 132kV Side
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.48 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.3 0 900 0.01 S
F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 4.12 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.30 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.44 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.0 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.35 0 900 0.01 S
Page 22 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV SIDE TRANSFORMER(160MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 132kV Side
3.2. Directional Overcurrent and Earth Fault Protection for 132kV Side of 220/132kV Transformer(160MVA)
CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220.00 kV
Rated LV Voltage = 132.00 kV
Full Load current HV Side = 419.90 A
Full Load current LV Side = 699.84 A
Phase Over current setting
O/C SETTING (51):
The relay setting shall be such that it shall not operate for max.
probable load current
Load current I load = 699.84 A
CT secondary current, = i Load / CT ratio
= 0.87
Consider 110% of transformer Full load = 769.82 Primary
Pickup Phase fault Secondary , recommended = 0.96 Secondary
Page 23 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV SIDE TRANSFORMER(160MVA) CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 132kV Side
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.96 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.17 0 900 0.01 S
F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 9.48 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.50 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.23 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.5 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.60 0 900 0.01 S
Page 24 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132kV Line
3.3. Directional Overcurrent and Earth Fault Protection for 132kV Line
CT Details
CT Ratio = 800-400/1 A
CT Primary = 400 A
CT Secondary = 1 A
Class = PS
Page 25 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 132kV Line
Setting table
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45.00 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.15 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45.00 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.20 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.33 0 900 0.01 S
Page 26 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 5.67
Zone-2 setting with 120% reach = 5.18
Since 120%, 5.18 is lower than zone-2 limit. 5.67, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 15.55
Hence set X2 sec = 5.18
Page 27 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 21.46
X3sec = Nct/Nvt * X3prim*IN/A = 7.15
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 2.20
X4sec = Nct/Nvt * X4prim*IN/A = 0.73
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 28 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 29 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 30 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Settings Table
Page 31 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 32 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(30KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-30KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 7.15 Ω
POWER SWING QUAD FWD REACH OUT 8.58
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 4.31 Ω
POWER SWING QUAD REV REACH OUT 5.17 Ω
POWER SWING OUTER RGT BLD 7.59 Ω
POWER SWING OUTER LFT BLD 7.59 Ω
POWER SWING INNER RGT BLD 6.33 Ω
POWER SWING INNER LFT BLD 6.33 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 33 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 4.22
Zone-2 setting with 120% reach = 3.80
Since 120%, 3.80 is lower than zone-2 limit. 4.22, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 11.40
Hence set X2 sec = 3.80
Page 34 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 22.88
X3sec = Nct/Nvt * X3prim*IN/A = 7.63
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 1.62
X4sec = Nct/Nvt * X4prim*IN/A = 0.54
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 35 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 36 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 37 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Settings Table
Page 38 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 39 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(22KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-22KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 7.63 Ω
POWER SWING QUAD FWD REACH OUT 9.15
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 4.35 Ω
POWER SWING QUAD REV REACH OUT 5.22 Ω
POWER SWING OUTER RGT BLD 7.81 Ω
POWER SWING OUTER LFT BLD 7.81 Ω
POWER SWING INNER RGT BLD 6.51 Ω
POWER SWING INNER LFT BLD 6.51 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 40 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
PT Details:
PT Ratio = 132000/110 V
PT Primary Voltage = 132000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 2.85
Zone-2 setting with 120% reach = 2.59
Since 120%, 2.59 is lower than zone-2 limit. 2.85, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 7.78
Hence set X2 sec = 2.59
Page 41 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 9.23
X3sec = Nct/Nvt * X3prim*IN/A = 3.08
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 1.10
X4sec = Nct/Nvt * X4prim*IN/A = 0.37
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 42 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.24
X0-X1 = 0.19
O
Z0-Z1 = 0.31 38.53
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.22 -30.29
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 43 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Broken Conductor Protection
Full load current = 400.000 A
Considered I2 = 40.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 44 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Settings Table
Page 45 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 46 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132kV LINE PROTN(15KM) CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 132kV Line-15KM
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 3.08 Ω
POWER SWING QUAD FWD REACH OUT 3.69
POWER SWING FWD RCA 68.82 DEG
POWER SWING REV REACH 1.91 Ω
POWER SWING QUAD REV REACH OUT 2.29 Ω
POWER SWING OUTER RGT BLD 5.70 Ω
POWER SWING OUTER LFT BLD 5.70 Ω
POWER SWING INNER RGT BLD 4.75 Ω
POWER SWING INNER LFT BLD 4.75 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 47 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
Transformer Data:
Rated Power, Prated = 40.0 MVA
Rated Voltage
HV, Vnom[1] = 132.0 kV
LV, Vnom[2] = 33.0 kV
% Impedance = 0.138 13.80% .
Vector Group = YN yn 0
132kV SIDE Primary-winding 1, CT Ratio
(Inom,a) = 400.0 1.0 A (800-400/1A)
33kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800.0 1.0 A (800-400/1A)
OLTC Range on 132kV side + 15.0 %
to
- 5.0 %
Step Size 1.25 Max Step 12.00 Min Step 4.00
Voltage at Min Tap Position = 151.8 kV
Voltage at Max Tap Position = 125.4 kV
Highest voltage tolerence, Vmax = 37.95 kV
Lowest voltage tolerence,Vmin = 31.35 kV
With this rated currents the CT margin for Winding1& winding 2 as follows,
CT margin for windings 1, Imargin[1] = CT primary[1] / Irated[1]
= 400/174.95
Imargin[1], = 2.29
CT margin for windings 2, Imargin[2] = CT primary[2] / Irated[2]
= 800/699.82
Imargin[2], = 1.14
Note: In the entire calculation primary and secondary windings are referred as winding "1" & "2" respectively.
Since Imargin[2] < Imargin[1], the reference winding W ref is winding 2.
The unit for calculation of the differential and restraint currents and base for the differentialrestraint setting is
the CT primary associated with the reference winding.
Page 48 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
a) Calculating the minimum differential pickup current required for relay to operate,
Criteria:
The minimum differential pickup should be above the no load current of the transformer when the secondary side of the breaker is
open
Stability of relay when the transformer is operating under no load (Secondary side breaker is open) and the transformer is drawn
the magnetising current(up to 5% of rated current)
=
No load current of the transformer primary current, 0.05×174.95
= 8.75 A
No load current refered to the CT secondary, = 8.7475/400
= 0.022 A
No load current to the relay after applying magnitude compendation factor M[1],
= 0.022×2
IS1 = 0.044 A
= side)
No load current of the transf. winding2,(secondary 0.0
IS2 = 0.0
Differential current IdA, = | Is1+Is2 |
= |0.044+0 |
Id A, = 0.0440 A
Restraining current IrA, = max( | Is1|, |Is2 |)
= max( |0.044|, |0 |)
IrA, = 0.0440 A
The differential current IdA=0.0440A is found to be less than the minimum pickup selected setting of 0.1 is
adequate as the relay catalogue has a setting generally recommended between 0.1 to 0.3.
Page 49 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
Restriant current in maximum tap position = | IN2(+15%) + INobj |
IRestaint = I0.905INobj+INobjl
= 1.90 INobj
From the above calculation it is derived that , under rated condition and at Tap Changer Extreme positions,
Operating current are not in the Tripping Area .
break point 2
The setting for Break point -2 depend very much on the capability of CTs to correctly transform Primary into
secondary currents during external faults. Break point -2 should be set below the fault current that is most likely to saturate
some CTs due to an AC Component alone
External Fault current = 12.72 pu
Break point- 2 = 8 pu
Slope-2 = 98% (as per relay catalogue)
2nd HARMONICS:
The percentage of harmonics present in the inrush current, for the relay to recognise the inrush current is set as 20%
as per manufacturer recommended,
5TH HARMONICS:
This
setting is
OVEREXCITN INHIBIT LEVEL, = 30%
Instantaneous differential protection:
The pickup thersold should be set greater than the maximum spurious differential current that could be encountered
under non-internal fault conditions ( typically maganetizing inrush current or an external fault with extremely severe CT saturation.
I) Magnetizing inrush current = 6 x Full load current
= 1049.70 A
= 2.62 pu
Page 50 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 132/33-40MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 132/33-40 MVA Trafo
II) External fault condition:
HV Side Fault Current = 3.18 pu
LV Side Fault Current = 6.36 pu
For safety margin we choosen instantaneous 8 pu
differential protection setting
VOLTS PER HERTZ (OVER FLUX):
The per-unit V/HZ value is calculated using the maximum of the three-phase voltage inputs or the auxiliary
voltage channel Vx input, if the source is not configured with Phase voltages.
The volts-per-Hertz protection, to protect transformers during potentially damaging over voltage and under
frequency disturbances.
According to experience we set the definite time curve with the following settings,
Stage-1
Volts/Hz 1 Pickup, = 1.1 pu
Volts/Hz 1 Curve, = Definite Time
Volts /Hz 1 TD Multiplier, = 10.0 S
Volts/Hz 1 T-Reset, = 0.0 S
Stage-2
Volts/Hz 2 Pickup, = 1.2 pu
Volts/Hz 2 Curve, = Definite Time
Volts /Hz 2 TD Multiplier, = 1.0 S
Volts/Hz 2 T-Reset, = 0.0 S
Setting Table:
Page 51 of 160
220kV FEEDERS
Page 52 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 160MVA TRANSFORMER 220kV SIDE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 220kV Side
4.1. Directional Overcurrent and Earth Fault Protection for 160MVA Transformer(220kV Side)
CT Details
CT Ratio = 800-400/1 A
CT Primary = 800 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220.00 kV
Rated LV Voltage = 132.00 kV
Full Load current HV Side = 419.90 A
Full Load current LV Side = 699.84 A
Page 53 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 160MVA TRANSFORMER 220kV SIDE CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220/132kV,160 MVA Trafo 220kV Side
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.58 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.19 0 900 0.01 S
F650
GROUP-1 Directional Phase Overcurrent- 67 INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA 45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 5.69 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.35 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.24 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N INST
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
MTA -45 -90 90 1 Degree
Direction Forward Forward/Reverse
Pol V Threshold 40.00 0 300 1V
Pickup Level 2.0 0.05 160 0.01 A
Curve Definite Time
Time Dial Multiplier 0.50 0 900 0.01 S
Page 54 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220kV Bus Coupler
4.2. Non Directional Overcurrent and Earth Fault Protection for 220kV Buscoupler
CT Details
CT Ratio = 1600-800/1 A
CT Primary = 1600 A
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220 kV
Rated LV Voltage = 132 kV
Full Load current HV Side = 420 A
Full Load current LV Side = 700 A
Page 55 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV BUS COUPLER CKD: GP
RELAY MAKE GE MODEL F650 BAY/FEEDER 220kV Bus Coupler
Setting Table:
F650
GROUP-1 Directional Phase Overcurrent- 67
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.20 0 900 0.01 S
F650
GROUP-1 Directional Earth Overcurrent- 67N
SETTING RANGE
MENU TEXT RECOMMEND SETTING STEP SIZE UNIT
MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.3 0 900 0.01 S
Page 56 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV LINE CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line
4.3. Non Directional Overcurrent and Earth Fault Protection for 220kV Line
CT Details
CT Ratio = 1600-800/1 A
CT Primary = 1600 A For 10kM Line
800 A For 40 & 50kM Line
CT Secondary = 1 A
Class = PS
Transformer Data:
Rated power = 160 MVA
Rated HV Voltage = 220 kV
Rated LV Voltage = 132 kV
Full Load current HV Side = 420 A
Full Load current LV Side = 700 A
Page 57 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220kV LINE CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line
Setting Table:
D60
GROUP-1 Non Directional Phase Overcurrent- 51
RECOMMEND SETTING RANGE
MENU TEXT STEP SIZE UNIT
SETTING MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 1.00 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.19 0 900 0.01 S
F650
GROUP-1 Non Directional Earth Overcurrent- 51N
RECOMMEND SETTING RANGE
MENU TEXT STEP SIZE UNIT
SETTING MINIMUM MAXIMUM
Phase Overcurrent
Function Enabled Enabled/Disabled
Pickup Level 0.2 0.05 160 0.01 A
Curve IEC Normal Inv
Time Dial Multiplier 0.31 0 900 0.01 S
Page 58 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = (Protected line reactance +
0.85 * adjacent shortest line reactance)
= 12.05
Zone-2 setting with 120% reach = 10.272
Since 120%, 10.272 is lower than zone-2 limit. 12.048, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 25.68
Hence set X2 sec = 10.27
Page 59 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 43.86
X3sec = Nct/Nvt * X3prim*IN/A = 17.55
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 3.64
X4sec = Nct/Nvt * X4prim*IN/A = 1.46
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 60 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.21
X0-X1 = 0.81
O
Z0-Z1 = 0.84 75.62
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.64 -3.30
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 61 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 62 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Settings Table
Page 63 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 64 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(50Km)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 17.55 Ω
POWER SWING QUAD FWD REACH OUT 21.05
POWER SWING FWD RCA 78.92 DEG
POWER SWING REV REACH 10.23 Ω
POWER SWING QUAD REV REACH OUT 12.27 Ω
POWER SWING OUTER RGT BLD 10.06 Ω
POWER SWING OUTER LFT BLD 10.06 Ω
POWER SWING INNER RGT BLD 8.39 Ω
POWER SWING INNER LFT BLD 8.39 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 65 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 7.69
Zone-2 setting with 120% reach = 8.22
Since 120%, 8.22 is Higher than zone-2 limit. 7.69, so the zone-2 setting of 120% will overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 100% of protected line reactance + 50% of Adjacent Shortest Line
Hence set X2 prim = 18.35
Hence set X2 sec = 7.34
Page 66 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 41.56
X3sec = Nct/Nvt * X3prim*IN/A = 16.63
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 2.91
X4sec = Nct/Nvt * X4prim*IN/A = 1.16
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 67 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.21
X0-X1 = 0.81
O
Z0-Z1 = 0.84 75.62
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.64 -3.30
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 68 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 69 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Settings Table
Page 70 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 71 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(40kM)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 16.63 Ω
POWER SWING QUAD FWD REACH OUT 19.95
POWER SWING FWD RCA 78.92 DEG
POWER SWING REV REACH 9.48 Ω
POWER SWING QUAD REV REACH OUT 11.37 Ω
POWER SWING OUTER RGT BLD 9.02 Ω
POWER SWING OUTER LFT BLD 9.02 Ω
POWER SWING INNER RGT BLD 7.52 Ω
POWER SWING INNER LFT BLD 7.52 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 72 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
PT Details:
PT Ratio = 220000/110 V
PT Primary Voltage = 220000.0 V
PT Secondary Voltage = 110.0 V
System Frequency = 50.0 HZ
Zone 2 Settings
Zone 2 element setting with a reach of 120% of Protected line reactance accounts for effect of infeed.This point must be verified
using a fault study to calculate the apparent ohms at the local terminal for a fault at the remote end of transmission line.
In our case 120% is considered for the zone-2 elements with assurance that all faults in the protected line are detectable,even
with infeed from remote terminals.
Assuming the zone-1 reach for the adjacent line protection is set at 85% of that line reactance, and it is to be verified such that
the zone-2 reach of 120%(protected line) shall not extend beyond the max.effective zone-1 reach of the adjacent line protection.
Zone-2 setting limit = Protected line reactance +
0.85 * adjacent shortest line reactance
= 2.15
Zone-2 setting with 120% reach = 1.39
Since 120%, 1.39 is lower than zone-2 limit. 2.15, so the zone-2 setting of 120% will not overreach beyond zone-1 setting
of adjacent line protection. Therefore we consider 120% of protected line reactance
Hence set X2 prim = 3.48
Hence set X2 sec = 1.39
Page 73 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Zone 3 Settings
For Zone3 setting , it is customery to select 1.2 (Protected line + 50% Adjacent Longest line)
X3prim, reach = 5.22
X3sec = Nct/Nvt * X3prim*IN/A = 2.09
Zone 4 Settings
For Zone4 setting, reverse reach impedence is typically 20% Zone 1 reach Impedance.
X4prim, reach = 0.49
X4sec = Nct/Nvt * X4prim*IN/A = 0.20
Resistance settings
For resistance setting of OHL, consideration of AC resistance is most important. Also tower footing resistance shall be
accounted in the calculation.
Time setting
Zone-1 setting = 0.00 sec
Zone-2 setting
zone-2 time delay should be set to discreminative with the primary line protection of the next line sections
including circuit breaker trip time
Adjoining line protection operating time = 0.040
Breaker opening time = 0.080
Local relay reset = 0.030
Grading margin = 0.250
Required zone-2 time delay = 0.40
set zone-2 at = 0.40 sec
Zone-3 setting
zone-3 time delay shall be such that zone-2 time delay plus grading margin
zone-2 time delay = 0.400
Grading margin = 0.400
Required zone-3 time delay = 0.80
set zone-3 at = 0.80 sec
Page 74 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Zone-4 setting
zone-4 might be used to provide back up protection for the local bus bar. zone-4 time delay shall be such that LBB time delay
plus grading margin
LBB time delay = 0.200
Grading margin = 0.250
Required zone-4 time delay = 0.45
set zone-4 at = 0.50 sec
R0-R1 = 0.26
X0-X1 = 0.69
O
Z0-Z1 = 0.74 69.19
O
Z0/Z1 MAG & ANGLE= (Z0-Z1)/3Z1 = 0.84 -16.41
Where
R1 is +ve seq. resistance of protected line
R0 is zero seq. resistance of protected line
X1 is +ve seq. reactance of protected line
X0 is zero seq. reactance of protected line
VT Fuse fail
Function enabled
Page 75 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Broken Conductor Protection
Full load current = 800.000 A
Considered I2 = 80.00 A (10% of fullload current)
I2 / I1 = 0.10
Allow for tolerences and load varations = 200%
I2 / I1 = 20.00 %
time delay = 5.00 s
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase.
If the fault is three phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
AR Mode, = 1 pole
AR Max Number of Shots, = 1.00
AR Close Time Breaker 1, = 0.20 s
AR Block Time Upon Man Cls. = 10.00 s
AR Reset Time, = 25.00 s
AR Breaker1 Fail Option, = Lockout
AR Incomplete Sequence Time, = 2.00 s
AR 1-P Dead Time, 1.00 s
AR Breaker Sequence, = 1.00
Page 76 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Settings Table
Page 77 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
LOAD ENCROACHMENT
LOAD ENCROACHMENT MIN VOLT 0.25 pu
LOAD ENCROACHMENT REACH 40.01 Ω
LOAD ENCROACHMENT ANGLE 26.00 DEG
LOAD ENCROACHMENT PKP DELAY 0.00 S
LOAD ENCROACHMENT RST DELAY 0.00 S
Page 78 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE GE MODEL D60 BAY/FEEDER 220kV Line(10kM)
Menu text Recommended Setting
PHASE DISTANCE ELEMENTS
Setting Unit
POWER SWING DETECT
POWER SWING SHAPE Quadrilateral
POWER SWING MODE Two Step
POWER SWING SUPV 0.60 pu
POWER SWING FWD REACH 2.09 Ω
POWER SWING QUAD FWD REACH OUT 2.51
POWER SWING FWD RCA 85.60 DEG
POWER SWING REV REACH 1.24 Ω
POWER SWING QUAD REV REACH OUT 1.49 Ω
POWER SWING OUTER RGT BLD 5.31 Ω
POWER SWING OUTER LFT BLD 5.31 Ω
POWER SWING INNER RGT BLD 4.43 Ω
POWER SWING INNER LFT BLD 4.43 Ω
POWER SWING PICKUP DELAY1 0.03 S
POWER SWING RESET DELAY1 0.05 S
POWER SWING PICKUP DELAY2 0.02 S
POWER SWING PICKUP DELAY3 0.01 S
POWER SWING PICKUP DELAY4 0.02 S
POWER SWING SEAL IN DELAY 0.40 S
POWER SWING TRIP MODE Delayed S
LINE PICKUP (SOTF)
PHASE IOC LINE PICKUP 1.00 pu
LINE UV PICKUP 0.70 pu
LINE END OPEN PICKUP DELAY 0.15 S
LINE END OPEN RESET DELAY 0.09 S
LINE OV PICKUP DELAY 0.04 S
AR COORDINATION BYPASS Enabled
AR COORDINATION PICKUP DELAY 0.05 S
AR COORDINATION RESET DELAY 0.01 S
LINE PICKUP DISTANCE TRIP Enabled
FUSE FAILURE
FUNCTION Enabled
AUTO RECLOSE
FUNCTION Enabled
AR MODE 1 pole
MAX NUMBER OF SHOTS 1.00
AR CLOSE TIME BKR1 0.20 S
AR BLK TIME UPON MAN CLS 10.00 S
AR RESET TIME 25.00 S
AR BKR1 FAIL OPTION Lockout
AR INCOMPLETE SEQ TIME 2.00 S
AR 1-P DEAD TIME 1.00 S
AR BKR1 SEQUENCE 1.00
BREAKER FAILURE 1
FUNCTION Enabled
BR1 MODE 3-Pole
BF1 SOURCE SRC1
BF1 USE AMP SUPV Yes
BF1 USE SEAL-IN Yes
BF1 PH AMP SUPV PICKUP 0.20 pu
BF1 N AMP SUPV PICKUP 0.20 pu
BF1 USE TIMER1 Yes
BF1 TIMER1 PICKUP DELAY 0.20 S
BF1 TRIP DROPOUT 0.00 S
BROKEN CONDUCTOR (F650 RELAY)
TAP LEVEL IN PERCENTAGE OF I2/I1 20.00 %
TRIP TIME 5.00 S
UNDERVOLTAGE
PHASE UV1 FUNCTION Enabled
PHASE UV1 MODE Phase to Phase
PHASE UV1 PICKUP 0.90 pu
PHASE UV1 DELAY 3.00 s
Page 79 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS
System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 3.66kA
OHL Details
Condutor type = ZEBRA
Line Length = 50km
Line impedence
Positive sequence impedence (Z1) = 0.084 +j 0.428
Zero sequence impedence ( Z0 ) = 0.292 +j 1.240
Line Length = 50 km
Current rating in Amps = 800
Line impedences
Z1 = 0.436 L 78.920 Ω/km
Page 80 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*50*0.436
Line impedence = 8.72 L 79.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 8.72 L 79.00 Ω secondary
tZ2 = 0.40 s
tZ3 = 0.80 s
tZ4 = 0.50 s
This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.
Z0-Z1 = (0.292+j1.24)-(0.0838+j0.428)
= 0.2082 +j 0.812
0.84 L 75.62 °
(Z0-Z1) / 3Z1 = (0.838/(3*0.436)) L75.62-78.92
0.64 L -3.30 °
kZ0 Res. Comp, │kZ0│ = 0.64
kZ0 Angle, L kZ0 = -3.30 °
Page 81 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
Page 82 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 3660 A
= 1.2*3660
= 4392
= 5.5 A
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111
Page 83 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
Settings Table
GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111
Page 84 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(50KM)
GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A
Page 85 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS
System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 3.66kA
OHL Details
Condutor type = ZEBRA
Line Length = 50km
Line impedence
Positive sequence impedence (Z1) = 0.084 +j 0.428
Zero sequence impedence ( Z0 ) = 0.292 +j 1.240
Line Length = 50 km
Current rating in Amps = 800
Line impedences
Z1 = 0.436 L 78.920 Ω/km
Page 86 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*50*0.436
Line impedence = 8.72 L 79.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 8.72 L 79.00 Ω secondary
tZ2 = 0.40 s
tZ3 = 0.80 s
tZ4 = 0.50 s
This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.
Z0-Z1 = (0.292+j1.24)-(0.0838+j0.428)
= 0.2082 +j 0.812
0.84 L 75.62 °
(Z0-Z1) / 3Z1 = (0.838/(3*0.436)) L75.62-78.92
0.64 L -3.30 °
kZ0 Res. Comp, │kZ0│ = 0.64
kZ0 Angle, L kZ0 = -3.30 °
Page 87 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
Page 88 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 3660 A
= 1.2*3660
= 4392
= 5.5 A
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111
Page 89 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
Settings Table
GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111
Page 90 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(40KM)
GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A
Page 91 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
CT Details
CT Ratio = 800/1A
CT Primary = 800 A
CT Secondary = 1 A
CTR = 800
Class = PS
System Details
VT Ratio = 220kV/√3
= 110V/√3
VT Primary = 220000 V
VT Secondary = 110 V
PTR 2000.00
Frequency = 50HZ
Maximum fault current = 7.98kA
OHL Details
Condutor type = ZEBRA
Line Length = 10km
Line impedence
Positive sequence impedence (Z1) = 0.022 +j 0.290
Zero sequence impedence ( Z0 ) = 0.284 +j 0.978
Line Length = 10 km
Current rating in Amps = 800
Line impedences
Z1 = 0.291 L 85.660 Ω/km
Page 92 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
Relay settings
Line impedence
Ratio of secondary to primary impedence = CT ratio / VT ratio
(800/2000)
0.40
Line impedence secondary = ratio CT/VT x line impedence primary
0.4*10*0.291
Line impedence = 1.16 L 86.00
Relay line angle settings -90° to 90° in 1° steps.Therefore, select Line Angle =79° for convenience.
Therefore set Line Impedence and Line Angle = 1.16 L 86.00 Ω secondary
tZ2 = 0.40 s
tZ3 = 0.80 s
tZ4 = 0.50 s
This feature is useful where line impedence characteristics change between sections or where hybrid circuits are used. here,the line
impedence characteristics not known for adjacent sections.Hence a common KZ0 factor can be applied to each zone.
Z0-Z1 = (0.284+j0.978)-(0.022+j0.29)
= 0.262 +j 0.688
0.74 L 69.15 °
(Z0-Z1) / 3Z1 = (0.736/(3*0.291)) L69.15-85.66
0.84 L -16.51 °
kZ0 Res. Comp, │kZ0│ = 0.84
kZ0 Angle, L kZ0 = -16.51 °
Page 93 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
Page 94 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
SOTF
SOTF Protection operates 120% of fault current with breaker closing command
Fault current = 7980 A
= 1.2*7980
= 9576
= 12.0 A
Auto Reclosure:
This autoreclose can be single pole tripping for single phase faults and three phase tripping for multi-phase faults.
1 pole:
In this mode, the recloser starts the AR-1P DEAD TIME for the first shot if the fault is single phase. If the fault is three
phase or three pole trip occurred on the breaker during single initiation, the scheme goes to lockout with out reclosing.
Number of Shots = 1
1P Dead Time = 1 s
Healthy Window 5 s
Reclaim Time = 25 s
Discrimination Time = 5 s
A/R Inhibit Window = 5 s
Block auto-recloser = 11111111 11111111
Page 95 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
Settings Table
GROUP 1 AUTORECLOSE
AUTORECLOSE MODE
1P Trip Mode Single
Max number of shots 1.00
1P - Dead Time 1(HSAR) 1.00 s
Healthy window 5.00 s
Reclaim Time 25.00 s
Discrimination Time 5.00 s
A/R Inhibit Window 5.00 s
Close Pulse Time 0.20 s
AUTORECLOSE LOCKOUT
Block A/R 11111111 11111111
Page 96 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR DISTANCE PROTECTION CKD: GP
RELAY MAKE Alstom MODEL P442 BAY/FEEDER 220kV Line(10KM)
GROUP 1 SUPERVISION
VT Supervision
VTS Time Delay 5.00 s
VTS I2>IO>inhibit 0.20 A
Detect 3P Enabled
Threshold 3P 10 V
Delta I> 0.20 A
Page 97 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
Transformer Data:
Rated Power, Prated = 160.0 MVA
Rated Voltage
HV, Vnom[1] = 220.0 kV
LV, Vnom[2] = 132.0 kV
% Impedance = 0.125 12.50% .
Vector Group = YNa0
220kV SIDE Primary-winding 1, CT Ratio
(Inom,a) = 800.0 1.0 A (1600-800/1A)
132kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800.0 1.0 A (800-400/1A)
OLTC Range on 132kV side + 10.0 % Step
to
- 5.0 %
Step Size 1.25 Max Step 8.00 Min Step 4.00
Voltage at Min Tap Position = kV
242.0
Voltage at Max Tap Position = kV
209.0
Highest voltage tolerence, Vmax = 145.20 kV
Lowest voltage tolerence,Vmin = 125.40 kV
With this rated currents the CT margin for Winding1& winding 2 as follows,
CT margin for windings 1, Imargin[1] = CT primary[1] / Irated[1]
= 800/419.89
Imargin[1], = 1.91
CT margin for windings 2, Imargin[2] = CT primary[2] / Irated[2]
= 800/699.82
Imargin[2], = 1.14
Note: In the entire calculation primary and secondary windings are referred as winding "1" & "2" respectively.
Since Imargin[2] < Imargin[1], the reference winding W ref is winding 2.
The unit for calculation of the differential and restraint currents and base for the differentialrestraint setting is
the CT primary associated with the reference winding.
Page 98 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
a) Calculating the minimum differential pickup current required for relay to operate,
Criteria:
The minimum differential pickup should be above the no load current of the transformer when the secondary side of the breaker is
open
Stability of relay when the transformer is operating under no load (Secondary side breaker is open) and the transformer is drawn
the magnetising current(up to 5% of rated current)
=
No load current of the transformer primary current, 0.05×419.89
= 20.99 A
No load current refered to the CT secondary, = 20.9945/800
= 0.03 A
No load current to the relay after applying magnitude compendation factor M[1],
= 0.026×1.667
IS1 = 0.0433 A
= side)
No load current of the transf. winding2,(secondary 0.0
IS2 = 0.0
Differential current IdA, = | Is1+Is2 |
= |0.043+0 |
Id A, = 0.0433 A
Restraining current IrA, = max( | Is1|, |Is2 |)
= max( |0.043|, |0 |)
IrA, = 0.04 A
The differential current IdA=0.0433A is found to be less than the minimum pickup selected setting of 0.1 is
adequate as the relay catalogue has a setting generally recommended between 0.1 to 0.3.
Page 99 of 160
DOCUMENT No.
VOLTECH ENGINEERS PVT. LTD VE-J108-D-E212
DATE 16.09.13
PROJECT: POWER TRANSMISSION CORPORATION OF UTTARKHAND LIMITED(PTCUL) PRPD: MN
TITLE: SETTING CALCULATION FOR 220/132-160MVATRAFO DIFF PROTN CKD: GP
RELAY MAKE GE MODEL T60 BAY/FEEDER 220/132-160 MVA Trafo
Restriant current in maximum tap position = | IN2(+15%) + INobj |
IRestaint = I0.927INobj+INobjl
= 1.93 INobj
From the above calculation it is derived that , under rated condition and at Tap Changer Extreme positions,
Operating current are not in the Tripping Area .
Break point-2
The setting for Break point -2 depend very much on the capability of CTs to correctly transform Primary into
secondary currents during external faults. Break point -2 should be set below the fault current that is most likely to saturate
some CTs due to an AC Component alone
External Fault current = 7.00 pu
Break point- 2 = 8 pu
Slope-2 = 98% (as per relay catalogue)
2nd HARMONICS:
The percentage of harmonics present in the inrush current, for the relay to recognise the inrush current is set as 20%
as per manufacturer recommended,
5TH HARMONICS:
This
setting is
OVEREXCITN INHIBIT LEVEL, = 30%
Instantaneous differential protection:
The pickup thersold should be set greater than the maximum spurious differential current that could be encountered
under non-internal fault conditions ( typically maganetizing inrush current or an external fault with extremely severe CT saturation.
I) Magnetizing inrush current = 6 x Full load current
= 2519.34 A
= 3.15 pu
The volts-per-Hertz protection, to protect transformers during potentially damaging over voltage and under
frequency disturbances.
According to experience we set the definite time curve with the following settings,
Stage-1
Volts/Hz 1 Pickup, = 1.1 pu
Volts/Hz 1 Curve, = Definite Time
Volts /Hz 1 TD Multiplier, = 10.0 S
Volts/Hz 1 T-Reset, = 0.0 S
Stage-2
Volts/Hz 2 Pickup, = 1.2 pu
Volts/Hz 2 Curve, = Definite Time
Volts /Hz 2 TD Multiplier, = 1.0 S
Volts/Hz 2 T-Reset, = 0.0 S
Setting Table:
Transformer Data:
Rated Power, Prated = 160 MVA
Rated Voltage
HV, Vnom[1] = 220 kV
LV, Vnom[2] = 132 kV
% Impedance = 0.125 12.50% .
Vector Group = YN yn 0
132kV SIDE Primary-winding 1, CT Ratio Py Sec
(Inom,a) = 800 1 A (1600-800/1A)
33kV SIDE Primary-winding 2, CT Ratio
(Inom,b) = 800 1 A (800-400/1A)
Neutral CT Ratio = 600 1 A 600/1A
OLTC Range on 132kV side + 10 %
to
- 5 %
Step Size 1.25 Max Step 8.00 Min Step 4.00
Voltage at Min Tap Position = 242.00 kV
Voltage at Max Tap Position = 209.00 kV
Highest voltage tolerence, Vmax = 145.20 kV
Lowest voltage tolerence,Vmin = 125.40 kV
Setting Calculation
For a winding fault point at 5% Distance from the transformer neutral, the phase to ground
primary fault current is calculated as
= | 3I
The ground differential pickup setting can be calculated , IO - Ig |
= (0-(167.97/800)
= 0.21
Note that phase CT primary is used as a unit for calculating the RGF setting . Hence, magnitude scaling is applied to
the measured ground current
The new restraint calculation algorithm provides very secure behavior of the element on external faults and CT saturation,
and high sensitivity on internal faults. The setting of the slope should be selected based on two criteria:
Reliable detection of the internal fault curents corresponding to the point of the selected distance from the grounded neutral
Let us consider the case of an internal fault that occurs on in the winding at 5% distance from the transformer neutral.
The primary fault current of 167.97 A
IG = 0.21 pu
Based on 100% transformer load currents of 419.89 A On the Wye winding, the phase unit currents are
IA = IB=IC = 0.52 pu
I1 = 0.52 pu ; I2 = I0= 0 pu
The restraint current used by the relay algorithm is defined as the maximum from the |R1, |R2 , |R0 quantities,
based on the following symmentrical components calculations:
IGR = max( |R1, |R2, |R0)
The value of |R1 is calculating using the positive-sequence current:
If no CT Saturation is involved, the RGF protection detects no differential current during ground fault that are external to the zone.
However, RGF slope setting should be also selected to maintain the security on external faults with CT saturation.
|R0 = | IG - IN |
= 4.20 pu L 1800 - 4.20 pu L 00
= 8.40 pu
The ground restraint current is
IGR = max( |R1, |R2, |R0)
= max(0pu,0.175pu,8.4pu)
= 8.40 pu
The RGF element would therefore calculate calculate a ground differential / restraint ratio of:
IGD / IGR X 100% = 0pu/8.4pux100%
0.00 %
and the protection element is effectively in non operating stage.
External phase A to ground fault where the ground CT Saturates, producing only 5% of the total fault current
on its secondary winding.
IGDbe
The ground differential current will = | IG + IN |
= 4.20 pu L 00 + 0.21 pu L 1800
= 3.99 pu
The |R1, |R2, and |R0 current are :
|R1 = |I_1| / 8
0.18
|R2 = 3 x |I_2|
= 4.20
|R0 = | IG - IN |
= 0.00 pu L 1800 - 4.20 pu L 00
= 4.20 pu
The RGF element would therefore calculate calculate a ground differential / restraint ratio of:
CT Saturation and switch off conditions, the ground restraint IGR is set to decay slowly. Since the CTs do not immediately saturate
at the same instant the fault occurs, the restraint current will be equal to the intial fault current value of 8.40pu(as in the
no saturation case).The restraint will drop to 50% of its original value after 15.5 cycles, so that if the worst case of saturation
occurs after a cycle, the restraint current will be approximately 7.98 pu,
IGD / IGR X 100% = 3.99pu/7.98pux100%
50 %
The slope would have to be above 50%(assuming very severe saturation leading to only 5% current from the saturated ground CT)
and below 100% (assuming detection of faults on the winding at 5% distance from the neutral point)
slope = 70 %
Setting Table:
Input Parameters
CT Details:
CT Ratio CT Py CT Sec Rct in Lead Res Cable
Feeders CT class
(A) (A) (A) ohms (Ω/m) Length (m)
220kV Line-1 1600/1 1600 1.00 PS 8.00 1.24 168.00
220kV Line-2 1600/1 1600 1.00 PS 8.00 1.27 171.00
220kV Line-3 1600/1 1600 1.00 PS 8.00 1.00 135.00
220kV Line-4 1600/1 1600 1.00 PS 8.00 1.02 138.00
Trafo-1 1600/1 1600 1.00 PS 8.00 0.64 86.00
Trafo-2 1600/1 1600 1.00 PS 8.00 0.53 72.00
Transfer Bus Coupler 1600/1 1600 1.00 PS 8.00 0.56 75.00
Bus Coupler 1600/1 1600 1.00 PS 8.00 0.38 51.00
Relay details:
Type = B90
Burden = 0.2/12 VA
= 0.20 Ω
ktf = 5.00
Setting calculation
Base CT ratio selection
Base CT ratio shall be selected based = 1600.00 A
on highest CT ratio connected to the
protected bus
Basic fault data of the connected circuit
Circuit Ifault (kA) CT sec (A)
220kV Line-1 3.66 2.29
220kV Line-2 4.18 2.61
220kV Line-3 7.98 4.99
220kV Line-4 7.98 4.99
Trafo-1 1.40 0.88
Trafo-2 1.40 0.88
Transfer Bus Coupler 0.00 0.00
Bus Coupler 9.24 5.78
Tne Maximum Secondary current transformed Without Saturation
Imax = Vsat/Rs
Where,
Vsat = Saturation Voltage of CT
Rs = Total Burden Resistance
The Total burden Resistance Rs depends on the fault current and the connection of the CTs. For Single line to
ground fault and the CTs connection in Wye, the Burden Resistance is calculated as,
Rs = 2Rlead+RCT+RRelay
Where,
Rlead = Lead Resistance
RCT = CT Resistance
RRelay = Relay Input Resistance
Rs = 9.27
Imax = 7.00 A
The over dimensioning factor can be as low as Ktf = 5 , particularly for voltages lower than 132 kV.
Basic CT data
Circuit Ratio Vsat RCTSEC
220kV Line-1 1600/1 195.62 8
220kV Line-2 1600/1 224.35 8
220kV Line-3 1600/1 407.01 8
220kV Line-4 1600/1 408.78 8
Trafo-1 1600/1 66.32 8
Trafo-2 1600/1 64.87 8
Transfer Bus Coupler 1600/1 0.00 8
Bus Coupler 1600/1 413.76 8
Setting Table:
500 500
300 300
100 100
50 50
30 30
10 10
5 5
Seconds
Seconds
3 3
11kV - P
OC1
MSB IC-1 - P
1 OC1 1
MSB BC - P
.5 .5
OC1
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
Amps 11kV Bus. (Nom. kV=11, Plot Ref. kV=11) ETAP Star 11.1.0C
11-0.433kV POC
500 500
300 300
100 100
50 50
30 30
10 10
5 5
MSB IC-1 - G
Seconds
Seconds
OC1
3 3
MSB BC - G
OC1
1 1
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
11-0.433kV EOC
500 500
300 300
100 100
33kV Fuse
50 50
30 30
10 10
5
MSB IC-2 - P 5
Seconds
Seconds
OC1
3 3
1 1
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
33-0.433kV POC
500 500
300 300
100 100
50 50
30 30
10 MSB IC-2 - G 10
OC1
5 5
Seconds
Seconds
3 3
1 1
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
33-0.433kV EOC
500 500
300 300
100 100
50 50
30 30
10 10
40 MVA 132 KV SIDE TR-2 - P
OC1 - 67
5 5
Seconds
Seconds
40 MVA 33 KV SIDE TR-2 - P
3 OC1 3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
Amps 132KV BUS (Nom. kV=132, Plot Ref. kV=132) ETAP Star 11.1.0C
132-33kV POC
500 500
300 300
100 100
50 50
30 30
40 MVA 132 KV SIDE TR-2 - N
OC1 - 67
Seconds
33KV BUS COUPLER - N
3
OC1 3
33KV Capacitor Bank - N
OC1
1 33 KV LINE - N - 51 1
OC1
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
132-33kV EOC
500 500
300 300
100 100
50 50
220 KV LINE - P - 51
30
OC1 30
BUS COUPLER - P
OC1
5 5
Seconds
Seconds
132KV LINE-4 - P - 51
3 OC1 - 67 3
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
Amps 132KV BUS (Nom. kV=132, Plot Ref. kV=132) ETAP Star 11.1.0C
220-132kV POC
500 500
300 300
100 100
50 50
BUS COUPLER - N
30 OC1 30
220 KV LINE - N - 51
OC1
10 10
Seconds
3 3
132KV LINE-4 - N - 51
OC1 - 67
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
220-132kV EOC
100 100
50 50
30 30
1.372 kA @ 132 kV
t1: 2.04 s
5 5
Seconds
Seconds
3 220 KV LINE-4 - P - 51 3
OC1
1.221 kA @ 220 kV
t1: 3.3 s
1 1
.5 .5
.3 .3
.1 .1
.05 .05
.03 .03
.01 .01
.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100
R R 0 R R U24 U8 U9 U10
0 kV 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
0
CB1 CB2 CB3 CB4 0 kV
Open Open
220KV Bus1 7.98 3.66 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
7.98 3.66
kA - kA -
CB5 CB6 Open 85.9 CB7 81.5
Open± ±
22KM Line 22KM Line. 15KM Line 30KM Line
160 MVA TR-1 220KV SIDE R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±
R R R R
± ±
±
160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R
40 MVA 40 MVA
±
± ± R MSB IC-1
R 40 MVA 33 KV SIDE TR-1 R
0
0 kV
CB16 CB17 CB22
3.64 40 MVA 33 KV SIDE TR-2 0
33KV BUS 1 Open kA -
87.7 3.64 33KV BUS 2 0 kV
33 KV LINE
±
R 630 kVA
R
R R 0 R R U24 U8 U9 U10
0 kV 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
0
CB1 CB2 CB3 CB4 0 kV
Open
220KV Bus1 7.98 7.98 3.66 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
23.9 23.9
2.19 5.84 9 kA - 18.15 2.19 9 kA
CB5 CB6 84.8 CB7 -84.
8
± ±
160 MVA TR-1 220KV SIDE 22KM Line 22KM Line. 15KM Line 30KM Line
R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±
R R R R
± ±
±
160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R
40 MVA 40 MVA
±
± ± R MSB IC-1
R 40 MVA 33 KV SIDE TR-1 R
0
0 kV
CB16 CB17 CB22
9.61 40 MVA 33 KV SIDE TR-2 0
33KV BUS 1 4.81 kA -
87.5 4.81 33KV BUS 2 0 kV
33 KV LINE
±
R 630 kVA
R
R R 61 kV R R U24 U8 U9 U10
132. 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
V
88 k
CB1 CB2 CB3 CB4 119.
Open Open
220KV Bus1 6.95 1.08 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13
6.95 4.3
kA 3.24 kA
CB5 CB6 Open CB7
Open± ±
22KM Line 22KM Line. 15KM Line 30KM Line
160 MVA TR-1 220KV SIDE R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±
R R R R
± ±
±
160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R
T6 T9 T5 400 kVA
40 MVA 40 MVA
±
± ± R MSB IC-1
R 40 MVA 33V KV SIDE TR-1 R
6 k
18.3
CB16 CB17 CB22
3.97 40 MVA 33 KV SIDE TR-2 6 kV
33KV BUS 1 Open kA
3.97 33KV BUS 2 18.3
33 KV LINE
±
R 630 kVA
R
R R 28 kV R R U24 U8 U9 U10
127. 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc 2972.199 MVAsc
V
28 k
CB1 CB2 CB3 CB4 127.
Open
220KV Bus1 5.73 5.73 1.73 220KV Bus2 Bus11 Bus12 Bus13 Bus15
13.83
23.5 23.5
5.19 6.9 1 kA 16.62 5.19 1 kA
CB5 CB6 CB7
± ±
160 MVA TR-1 220KV SIDE 22KM Line 22KM Line. 15KM Line 30KM Line
R ± R
R BUS COUPLER 160 MVA TR-2 220KV SIDE
160/160/53.33 MVA 160/160/53.33 MVA 132KV LINE-1 132KV LINE-2 132KV LINE-3 132KV LINE-4
T11 T2 ± ± ± ±
R R R R
± ±
±
160 MVA TR-1 132KV SIDE R 160 MVA TR-2 132KV SIDE R 11kV
R
T6 T9 T5 400 kVA
40 MVA 40 MVA
±
± ± R MSB IC-1
R 40 MVA 33V KV SIDE TR-1 R
2 k
19.0
CB16 CB17 CB22
9.64 40 MVA 33 KV SIDE TR-2 2 kV
33KV BUS 1 4.82 kA
4.82 33KV BUS 2 19.0
33 KV LINE
±
R 630 kVA
R
Short-Circuit Analysis
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
19 Buses Total
Grounding
Secondary: 160.000 132.000 0 Zpt = 45.65 45.00 160.000 0 Std Pos. Seq. 0.000
Tertiary: 53.330 11.000 0 Zst = 29.05 45.00 160.000 0 Std Pos. Seq. -30.000
Secondary: 160.000 132.000 0 Zpt = 45.65 45.00 160.000 0 Std Pos. Seq. 0.000
Tertiary: 53.330 11.000 0 Zst = 29.05 45.00 160.000 0 Std Pos. Seq. -30.000
Branch Connections
% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type
220kV IC Line-1 Bus6 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid
220kV IC Line-2 Bus7 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid
220kV OG Line-1 Bus8 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid
220kV OG Line-2 Bus9 3722.870 220.000 0.19138 2.67927 0.07 Wye - Solid
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
0.433kV Bus-1 Total 0.00 11.367 0.00 99.48 100.01 11.425 11.425 6.10E+002 9.33E+002 6.09E+002 9.13E+002
11kV Bus. 0.433kV Bus-1 98.49 11.367 98.98 100.00 99.51 11.425 11.425 * 6.10E+002 9.33E+002 6.09E+002 9.13E+002
# 220KV Bus2 11kV Bus. 99.98 0.058 99.99 100.00 99.98 0.033 0.000 3.04E+003 3.16E+003
# 132KV BUS 11kV Bus. 99.86 0.505 99.96 99.99 99.91 0.293 0.000 3.42E+002 3.63E+002
Bus8 220KV Bus2 99.99 0.001 100.00 100.00 99.99 0.000 0.000 1.47E+004 2.01E+004
Bus9 220KV Bus2 99.99 0.001 100.00 100.00 99.99 0.000 0.000 1.66E+004 2.31E+004
# 132KV BUS 220KV Bus2 99.86 0.004 99.96 99.99 99.91 0.001 0.000 3.26E+003 4.66E+003
Bus6 220KV Bus1 99.98 0.002 100.00 100.00 99.99 0.001 0.000 8.39E+003 9.97E+003
Bus7 220KV Bus1 99.98 0.002 100.00 100.00 99.99 0.001 0.000 8.39E+003 9.97E+003
# 132KV BUS 220KV Bus1 99.86 0.004 99.96 99.99 99.91 0.001 0.000 3.26E+003 4.66E+003
# T11~3 220KV Bus1 99.85 0.000 99.90 100.00 99.94 0.000 0.000 * 6.11E+004 8.74E+004
Bus13 132KV BUS 99.94 0.009 99.98 100.00 99.96 0.003 0.000 1.97E+003 4.37E+003
Bus11 132KV BUS 99.95 0.007 99.98 100.00 99.97 0.002 0.000 2.31E+003 5.55E+003
Bus12 132KV BUS 99.95 0.007 99.98 100.00 99.97 0.002 0.000 2.31E+003 5.55E+003
Bus15 132KV BUS 99.96 0.006 99.99 100.00 99.98 0.002 0.000 2.71E+003 6.89E+003
33KV BUS 1 132KV BUS 99.86 0.000 99.96 99.99 99.91 0.000 0.000
33KV BUS 2 132KV BUS 99.86 0.000 99.96 99.99 99.91 0.000 0.000
# T11~3 132KV BUS 99.85 0.000 99.90 100.00 99.94 0.000 0.000 * 6.11E+004 8.72E+004
220kV OG Line-1 Bus8 100.00 0.001 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.001 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
U9 Bus13 100.00 0.009 100.00 100.00 100.00 0.003 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.007 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.007 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.006 100.00 100.00 100.00 0.002 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
0.433kV Bus-2 33KV BUS 2 99.86 0.000 99.91 100.00 99.95 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 99.98 0.000 99.99 100.00 99.98 0.000 0.000
33KV BUS 1 Bus Ref A 99.86 0.000 99.96 99.99 99.91 0.000 0.000
33KV BUS 2 33KV BUS 1 99.86 0.000 99.96 99.99 99.91 0.000 0.000
33KV BUS 2 Bus Ref B 99.86 0.000 99.96 99.99 99.91 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
0.433kV Bus-2 Total 0.00 16.075 0.00 99.33 100.01 16.182 16.182 4.29E+002 6.61E+002 4.28E+002 6.43E+002
33KV BUS 2 0.433kV Bus-2 98.02 16.075 98.66 100.00 99.35 16.182 16.182 * 4.29E+002 6.61E+002 4.28E+002 6.43E+002
132KV BUS 33KV BUS 2 99.82 0.105 99.89 100.00 99.93 0.061 0.000 5.51E+002 5.66E+002
132KV BUS 33KV BUS 1 99.82 0.105 99.89 100.00 99.93 0.061 0.000 5.43E+002 5.74E+002
Bus13 132KV BUS 99.92 0.011 99.95 100.00 99.98 0.007 0.000 1.22E+003 1.47E+003
Bus11 132KV BUS 99.94 0.009 99.96 100.00 99.98 0.005 0.000 1.48E+003 1.89E+003
Bus12 132KV BUS 99.94 0.009 99.96 100.00 99.98 0.005 0.000 1.48E+003 1.89E+003
Bus15 132KV BUS 99.95 0.007 99.97 100.00 99.99 0.004 0.000 1.77E+003 2.37E+003
# 220KV Bus2 132KV BUS 99.96 0.009 99.97 100.00 99.98 0.005 0.000 1.89E+003 1.54E+003
# 11kV Bus. 132KV BUS 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.90E+004
# 220KV Bus1 132KV BUS 99.96 0.009 99.97 100.00 99.98 0.005 0.000 1.89E+003 1.54E+003
# T11~3 132KV BUS 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.90E+004
U9 Bus13 100.00 0.011 100.00 100.00 100.00 0.007 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.009 100.00 100.00 100.00 0.005 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.009 100.00 100.00 100.00 0.005 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.007 100.00 100.00 100.00 0.004 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
Bus8 220KV Bus2 99.98 0.002 99.99 100.00 99.99 0.001 0.000 5.46E+003 4.92E+003
Bus9 220KV Bus2 99.98 0.002 99.99 100.00 99.99 0.001 0.000 6.21E+003 5.66E+003
# 11kV Bus. 220KV Bus2 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.91E+004
0.433kV Bus-1 11kV Bus. 99.80 0.000 99.92 99.88 100.00 0.000 0.000
Bus6 220KV Bus1 99.97 0.003 99.98 100.00 99.99 0.002 0.000 3.03E+003 2.37E+003
Bus7 220KV Bus1 99.97 0.003 99.98 100.00 99.99 0.002 0.000 3.03E+003 2.37E+003
# T11~3 220KV Bus1 99.80 0.000 99.87 99.94 99.99 0.000 0.000 * 3.54E+004 2.91E+004
220kV OG Line-1 Bus8 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.002 100.00 100.00 100.00 0.001 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.003 100.00 100.00 100.00 0.002 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.003 100.00 100.00 100.00 0.002 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 98.02 0.000 98.66 100.00 99.35 0.000 0.000
33KV BUS 1 33KV BUS 2 98.02 0.105 98.66 100.00 99.35 0.061 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 2 Bus Ref B 98.02 0.000 98.66 100.00 99.35 0.000 0.000
220KV Bus1 220KV Bus2 99.96 0.002 99.97 100.00 99.98 0.001 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
11kV Bus. Total 0.00 26.699 0.00 173.21 173.21 0.000 0.000 7.37E-001 1.96E+001
0.433kV Bus-1 11kV Bus. 0.00 0.000 100.00 100.00 100.00 0.000 0.000
# 220KV Bus2 11kV Bus. 98.62 3.432 100.00 100.00 100.00 0.000 0.000 3.98E+000 1.53E+002
# 132KV BUS 11kV Bus. 91.52 30.131 100.00 100.00 100.00 0.000 0.000 6.30E-001 1.74E+001
Bus8 220KV Bus2 99.40 0.060 100.00 100.00 100.00 0.000 0.000 2.26E+002 2.49E+001
Bus9 220KV Bus2 99.47 0.052 100.00 100.00 100.00 0.000 0.000 2.58E+002 3.02E+001
# 132KV BUS 220KV Bus2 91.52 0.262 100.00 100.00 100.00 0.000 0.000 5.15E+001 6.74E+000
Bus6 220KV Bus1 98.87 0.114 100.00 100.00 100.00 0.000 0.000 1.19E+002 4.87E+000
Bus7 220KV Bus1 98.87 0.114 100.00 100.00 100.00 0.000 0.000 1.19E+002 4.87E+000
# 132KV BUS 220KV Bus1 91.52 0.262 100.00 100.00 100.00 0.000 0.000 5.15E+001 6.74E+000
# T11~3 220KV Bus1 90.68 0.014 100.00 100.00 100.00 0.000 0.000 9.66E+002 1.26E+002
Bus13 132KV BUS 96.03 0.517 100.00 100.00 100.00 0.000 0.000 4.29E+001 7.78E+000
Bus11 132KV BUS 96.83 0.412 100.00 100.00 100.00 0.000 0.000 5.35E+001 1.12E+001
Bus12 132KV BUS 96.83 0.412 100.00 100.00 100.00 0.000 0.000 5.35E+001 1.12E+001
Bus15 132KV BUS 97.43 0.334 100.00 100.00 100.00 0.000 0.000 6.57E+001 1.52E+001
33KV BUS 1 132KV BUS 91.52 0.000 100.00 100.00 100.00 0.000 0.000
33KV BUS 2 132KV BUS 91.52 0.000 100.00 100.00 100.00 0.000 0.000
# T11~3 132KV BUS 90.68 0.023 100.00 100.00 100.00 0.000 0.000 9.69E+002 8.46E+000
220kV OG Line-1 Bus8 100.00 0.060 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.052 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.114 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.114 100.00 100.00 100.00 0.000 0.000 1.91E-001 2.68E+000 1.91E-001 2.68E+000
U9 Bus13 100.00 0.517 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.412 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.412 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.334 100.00 100.00 100.00 0.000 0.000 2.40E-001 3.36E+000 2.40E-001 3.36E+000
0.433kV Bus-2 33KV BUS 2 91.52 0.000 100.00 100.00 100.00 0.000 0.000
220KV Bus2 220KV Bus1 98.62 0.029 100.00 100.00 100.00 0.000 0.000
33KV BUS 1 Bus Ref A 91.52 0.000 100.00 100.00 100.00 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 2 33KV BUS 1 91.52 0.000 100.00 100.00 100.00 0.000 0.000
33KV BUS 2 Bus Ref B 91.52 0.000 100.00 100.00 100.00 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 1 Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001
132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001
0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000
132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001
Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001
# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000
Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000
Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000
33KV BUS 2 33KV BUS 1 0.00 4.813 0.00 99.84 99.94 4.823 4.823
33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 2 Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001
0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000
132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001
132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001
Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001
# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000
Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000
Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000
33KV BUS 1 33KV BUS 2 0.00 4.812 0.00 99.84 99.94 4.823 4.823
33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
132KV BUS Total 0.00 28.281 0.00 97.87 99.69 28.986 28.986 2.90E-001 1.52E+000 3.13E-001 1.40E+000
Bus13 132KV BUS 54.85 6.015 58.82 98.32 97.00 5.561 4.387 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 64.15 4.796 67.71 98.33 97.51 4.383 3.346 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 64.15 4.796 67.71 98.33 97.51 4.383 3.346 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 70.99 3.892 74.11 98.43 97.95 3.527 2.629 3.12E+000 1.08E+001 7.22E+000 1.41E+001
33KV BUS 1 132KV BUS 0.00 0.000 0.00 97.87 99.69 0.000 0.000
33KV BUS 2 132KV BUS 0.00 0.000 0.00 97.87 99.69 0.000 0.000
# 220KV Bus2 132KV BUS 77.53 4.716 77.76 99.28 99.92 4.406 3.551 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# 11kV Bus. 132KV BUS 9.16 0.251 55.31 53.95 100.00 1.293 4.393 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
# 220KV Bus1 132KV BUS 77.53 4.716 77.76 99.28 99.92 4.406 3.551 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# T11~3 132KV BUS 9.16 0.251 55.31 53.95 100.00 1.293 4.393 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
U9 Bus13 100.00 6.015 100.00 100.00 100.00 5.561 4.387 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 4.796 100.00 100.00 100.00 4.383 3.346 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 4.796 100.00 100.00 100.00 4.383 3.346 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 3.892 100.00 100.00 100.00 3.527 2.629 2.40E-001 3.36E+000 2.40E-001 3.36E+000
0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.56 56.51 100.00 0.000 0.000
Bus8 220KV Bus2 90.37 0.941 92.01 99.03 99.11 0.781 0.413 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 91.57 0.823 93.07 99.11 99.21 0.677 0.345 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 11kV Bus. 220KV Bus2 9.16 0.151 55.31 53.95 100.00 0.307 0.613 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
0.433kV Bus-1 11kV Bus. 9.16 0.000 87.96 25.43 87.10 0.000 0.000
Bus6 220KV Bus1 81.63 1.798 83.54 99.04 98.62 1.610 1.144 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 81.63 1.798 83.54 99.04 98.62 1.610 1.144 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# T11~3 220KV Bus1 9.16 0.151 55.31 53.95 100.00 0.307 0.613 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 0.941 100.00 100.00 100.00 0.781 0.413 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.823 100.00 100.00 100.00 0.677 0.345 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 1.798 100.00 100.00 100.00 1.610 1.144 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 1.798 100.00 100.00 100.00 1.610 1.144 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 0.00 0.000 0.00 97.87 99.69 0.000 0.000
33KV BUS 2 33KV BUS 1 0.00 0.000 0.00 97.87 99.69 0.000 0.000
33KV BUS 2 Bus Ref B 0.00 0.000 0.00 97.87 99.69 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 77.53 0.920 77.76 99.28 99.92 0.883 0.765
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 Total 0.00 28.161 0.00 101.61 103.16 26.866 26.866 9.12E-002 9.27E-001 1.32E-001 1.06E+000
Bus6 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# 132KV BUS 220KV Bus1 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001
# T11~3 220KV Bus1 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000
Bus8 220KV Bus2 57.40 4.180 65.58 96.82 97.29 3.382 2.174 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 62.76 3.656 70.20 97.00 97.54 2.929 1.812 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 132KV BUS 220KV Bus2 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001
# 11kV Bus. 220KV Bus2 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000
220kV IC Line-1 Bus6 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000
Bus13 132KV BUS 82.71 2.248 85.25 99.48 98.81 1.921 1.481 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 88.83 1.455 90.68 99.53 99.16 1.219 0.887 3.12E+000 1.08E+001 7.22E+000 1.41E+001
33KV BUS 1 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000
33KV BUS 2 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000
# 11kV Bus. 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000
# T11~3 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000
220kV OG Line-1 Bus8 100.00 4.180 100.00 100.00 100.00 3.382 2.174 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 3.656 100.00 100.00 100.00 2.929 1.812 1.91E-001 2.68E+000 1.91E-001 2.68E+000
0.433kV Bus-1 11kV Bus. 70.74 0.000 93.96 81.27 97.33 0.000 0.000
U9 Bus13 100.00 2.248 100.00 100.00 100.00 1.921 1.481 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 1.455 100.00 100.00 100.00 1.219 0.887 2.40E-001 3.36E+000 2.40E-001 3.36E+000
0.433kV Bus-2 33KV BUS 2 63.27 0.000 81.30 84.70 100.00 0.000 0.000
220KV Bus2 220KV Bus1 0.00 10.020 0.00 101.61 103.16 9.507 9.409
33KV BUS 1 Bus Ref A 63.27 0.000 66.18 98.96 99.76 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 2 33KV BUS 1 63.27 0.000 66.18 98.96 99.76 0.000 0.000
33KV BUS 2 Bus Ref B 63.27 0.000 66.18 98.96 99.76 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus2 Total 0.00 28.161 0.00 101.61 103.16 26.866 26.866 9.12E-002 9.27E-001 1.32E-001 1.06E+000
Bus8 220KV Bus2 57.40 4.180 65.58 96.82 97.29 3.382 2.174 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 62.76 3.656 70.20 97.00 97.54 2.929 1.812 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 132KV BUS 220KV Bus2 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001
# 11kV Bus. 220KV Bus2 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000
Bus6 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 18.28 7.984 27.65 98.50 96.22 7.080 6.016 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# 132KV BUS 220KV Bus1 63.27 2.309 66.18 98.96 99.76 2.212 2.231 1.24E+000 1.13E+001 1.23E+000 1.28E+001
# T11~3 220KV Bus1 70.74 0.123 84.45 88.18 100.00 0.996 3.222 * 2.32E+001 2.12E+002 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 4.180 100.00 100.00 100.00 3.382 2.174 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 3.656 100.00 100.00 100.00 2.929 1.812 1.91E-001 2.68E+000 1.91E-001 2.68E+000
Bus13 132KV BUS 82.71 2.248 85.25 99.48 98.81 1.921 1.481 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 86.22 1.793 88.40 99.49 99.00 1.514 1.129 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 88.83 1.455 90.68 99.53 99.16 1.219 0.887 3.12E+000 1.08E+001 7.22E+000 1.41E+001
33KV BUS 1 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000
33KV BUS 2 132KV BUS 63.27 0.000 66.18 98.96 99.76 0.000 0.000
# 11kV Bus. 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000
# T11~3 132KV BUS 70.74 0.205 84.45 88.18 100.00 0.620 1.483 * 2.02E+001 7.71E+001 2.10E-001 9.46E+000
0.433kV Bus-1 11kV Bus. 70.74 0.000 93.96 81.27 97.33 0.000 0.000
220kV IC Line-1 Bus6 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 7.984 100.00 100.00 100.00 7.080 6.016 1.91E-001 2.68E+000 1.91E-001 2.68E+000
U9 Bus13 100.00 2.248 100.00 100.00 100.00 1.921 1.481 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 1.793 100.00 100.00 100.00 1.514 1.129 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 1.455 100.00 100.00 100.00 1.219 0.887 2.40E-001 3.36E+000 2.40E-001 3.36E+000
0.433kV Bus-2 33KV BUS 2 63.27 0.000 81.30 84.70 100.00 0.000 0.000
220KV Bus1 220KV Bus2 0.00 18.153 0.00 101.61 103.16 17.363 17.457
33KV BUS 1 Bus Ref A 63.27 0.000 66.18 98.96 99.76 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
33KV BUS 2 33KV BUS 1 63.27 0.000 66.18 98.96 99.76 0.000 0.000
33KV BUS 2 Bus Ref B 63.27 0.000 66.18 98.96 99.76 0.000 0.000
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus Ref A Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001
132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001
0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000
132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001
Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001
# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000
Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000
Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 0.00 9.625 0.00 99.84 99.94 9.646 9.646
33KV BUS 2 33KV BUS 1 0.00 4.813 0.00 99.84 99.94 4.823 4.823
33KV BUS 2 Bus Ref B 0.00 0.000 0.00 99.84 99.94 0.000 0.000
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
Bus Ref B Total 0.00 9.625 0.00 99.84 99.94 9.646 9.646 7.79E-001 1.82E+001 8.03E-001 1.80E+001
0.433kV Bus-2 33KV BUS 2 0.00 0.000 57.70 57.65 100.00 0.000 0.000
132KV BUS 33KV BUS 2 91.59 4.813 91.79 99.84 99.94 4.823 4.823 1.30E+000 3.63E+001 1.35E+000 3.61E+001
132KV BUS 33KV BUS 1 91.59 4.812 91.79 99.84 99.94 4.823 4.823 1.82E+000 3.63E+001 1.87E+000 3.61E+001
Bus13 132KV BUS 96.06 0.512 96.45 99.91 99.70 0.463 0.365 1.68E+000 7.08E+000 3.73E+000 8.71E+000
Bus11 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus12 132KV BUS 96.86 0.408 97.21 99.91 99.75 0.365 0.278 2.35E+000 8.81E+000 5.36E+000 1.12E+001
Bus15 132KV BUS 97.46 0.331 97.76 99.91 99.79 0.293 0.219 3.12E+000 1.08E+001 7.22E+000 1.41E+001
# 220KV Bus2 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# 11kV Bus. 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
# 220KV Bus1 132KV BUS 98.12 0.401 98.19 99.95 99.98 0.367 0.295 3.60E-001 9.27E+000 5.35E-001 1.17E+001
# T11~3 132KV BUS 90.82 0.021 95.03 95.84 100.00 0.108 0.365 * 6.75E+000 1.74E+002 2.10E-001 9.46E+000
U9 Bus13 100.00 0.512 100.00 100.00 100.00 0.463 0.365 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U24 Bus11 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U8 Bus12 100.00 0.408 100.00 100.00 100.00 0.365 0.278 2.40E-001 3.36E+000 2.40E-001 3.36E+000
U10 Bus15 100.00 0.331 100.00 100.00 100.00 0.293 0.219 2.40E-001 3.36E+000 2.40E-001 3.36E+000
Bus8 220KV Bus2 99.19 0.080 99.34 99.94 99.90 0.065 0.034 8.84E-001 6.22E+000 2.60E+000 1.29E+001
Bus9 220KV Bus2 99.29 0.070 99.43 99.94 99.91 0.056 0.029 1.06E+000 7.10E+000 3.21E+000 1.55E+001
# 11kV Bus. 220KV Bus2 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
0.433kV Bus-1 11kV Bus. 90.82 0.000 98.11 93.86 98.89 0.000 0.000
Bus6 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
Bus7 220KV Bus1 98.47 0.153 98.66 99.95 99.86 0.134 0.095 2.37E-001 3.28E+000 7.78E-001 4.70E+000
# T11~3 220KV Bus1 90.82 0.013 95.03 95.84 100.00 0.026 0.051 * 3.76E+000 3.90E+001 1.98E-001 8.89E+000
220kV OG Line-1 Bus8 100.00 0.080 100.00 100.00 100.00 0.065 0.034 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV OG Line-2 Bus9 100.00 0.070 100.00 100.00 100.00 0.056 0.029 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-1 Bus6 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
220kV IC Line-2 Bus7 100.00 0.153 100.00 100.00 100.00 0.134 0.095 1.91E-001 2.68E+000 1.91E-001 2.68E+000
33KV BUS 1 Bus Ref A 0.00 0.000 0.00 99.84 99.94 0.000 0.000
33KV BUS 1 33KV BUS 2 0.00 4.812 0.00 99.84 99.94 4.823 4.823
33KV BUS 2 Bus Ref B 0.00 9.625 0.00 99.84 99.94 9.646 9.646
(Cont.)
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0
220KV Bus1 220KV Bus2 98.12 0.078 98.19 99.95 99.98 0.073 0.064
0.433kV Bus-1 0.433 11.367 18.617 11.367 11.425 18.711 11.425 11.425 9.844 16.122 9.844 9.844 11.427 18.714 11.427 11.427
0.433kV Bus-2 0.433 16.075 26.364 16.075 16.182 26.539 16.182 16.182 13.922 22.832 13.922 13.922 16.185 26.543 16.185 16.185
11kV Bus. 11.000 26.699 71.651 26.699 0.000 0.000 0.000 0.000 23.122 62.051 23.122 23.122 23.122 62.051 23.122 23.122
33KV BUS 1 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
33KV BUS 2 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
132KV BUS 132.000 28.281 63.930 28.281 28.986 65.523 28.986 28.986 24.492 55.365 24.492 24.492 28.911 65.355 28.911 28.911
220KV Bus1 220.000 28.161 69.772 28.161 26.866 66.563 26.866 26.866 24.388 60.425 24.388 24.388 27.770 68.803 27.770 27.770
220KV Bus2 220.000 28.161 69.772 28.161 26.866 66.563 26.866 26.866 24.388 60.425 24.388 24.388 27.770 68.803 27.770 27.770
Bus Ref A 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
Bus Ref B 33.000 9.625 25.636 9.625 9.646 25.692 9.646 9.646 8.335 22.201 8.335 8.335 9.640 25.676 9.640 9.640
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
0.433kV Bus-1 0.433 0.01143 0.01749 0.02089 0.01143 0.01749 0.02089 0.01141 0.01712 0.02058 0.00000 0.00000 0.00000
0.433kV Bus-2 0.433 0.00805 0.01239 0.01477 0.00805 0.01239 0.01477 0.00803 0.01205 0.01448 0.00000 0.00000 0.00000
11kV Bus. 11.000 0.00892 0.23770 0.23787 0.00892 0.23770 0.23787 0.00000 0.00000 0.00000
33KV BUS 1 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000
33KV BUS 2 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000
132KV BUS 132.000 0.50447 2.64711 2.69475 0.50447 2.64711 2.69475 0.54616 2.43871 2.49913 0.00000 0.00000 0.00000
220KV Bus1 220.000 0.44146 4.48871 4.51036 0.44146 4.48871 4.51036 0.64068 5.12409 5.16399 0.00000 0.00000 0.00000
220KV Bus2 220.000 0.44146 4.48871 4.51036 0.44146 4.48871 4.51036 0.64068 5.12409 5.16399 0.00000 0.00000 0.00000
Bus Ref A 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000
Bus Ref B 33.000 0.08485 1.97772 1.97954 0.08485 1.97772 1.97954 0.08746 1.96469 1.96664 0.00000 0.00000 0.00000
OCR: 11kV
MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 100/1 11.000
OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.230
Time Dial 0.740
Phase INST Pickup 0.5 - 40 xCT Sec 1.000
Time Delay 0 - 150 0.300
OCR: 33 KV LINE
MFR: GE Multilin Tag #: CT Base kV If (kA)
Model: F650 Phase: 400/1 33.000
OCR: MSB BC
MFR: AREVA Tag #: CT Base kV If (kA)
Model: P127 Phase: 1000/1 0.433
OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.590
Time Dial 0.100
Phase INST Pickup 0.5 - 40 xCT Sec 1.500
Time Delay 0 - 150 0.100
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.150
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.100
OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.590
Time Dial 0.200
Phase INST Pickup 0.5 - 40 xCT Sec 1.500
Time Delay 0 - 150 0.200
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.300
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.200
OC Level: OC1
Range Setting
Phase TOC IEC - Standard Inverse
Pickup (Tap) 0.1 - 25 xCT Sec 0.920
Time Dial 0.200
Phase INST Pickup 0.5 - 40 xCT Sec 2.000
Time Delay 0 - 150 0.200
Ground TOC IEC - Standard Inverse
Pickup (Tap) 0.002 - 1 xCT Sec 0.200
Time Dial 0.300
Ground INST Pickup 0.002 - 1 xCT Sec 1.000
Time Delay 0 - 150 0.200