The document discusses a precast concrete slab track system using Pandrol fasteners for ballastless track in main lines.

It is describing a precast concrete slab track system that uses Pandrol polyvalent fasteners to attach the rails. The slabs have dimensions of 5100mm x 2500mm x 250mm thick and have holes for the fasteners spaced every 0.65m.

The design criteria include supporting mixed traffic up to 22.5 ton axle loads at 220kph and main line traffic up to 17 ton axle loads at 350kph. The environmental conditions it can withstand are rail temperatures from +75°C to -22°C and slab temperature increases up to ±16°C.

RAHEE-PANDROL SOLUTIONS FOR

SLABTRACK
BALLASTLESS TRACK
IN MAIN LINE

LOSA AFTRAV + SFC


Pandrol
PRECAST SLAB

6 Holes

Dimension: 5100 mm x 2500 mm x 250 mm


SFC polyvalent fastener

Precast slab

Elastic matt

Mortar or bending layer

Concrete base
(Fundation)
CONDITIONS AND DESIGN CRITERIA

Application: Mixed traffic (passengers y merchandises)


Polyvalent gauge (1668 y 1435 mm)
Use Mixed traffic: 22,5 ton/Axel load 220 Kmph
Main line: 17 ton/Axel load 350 Kmph.
Traffic network group number 3 following the 111 y 112 UIC
classification points (80.000 t/d)
Geometry conditions: The IGP 3.1 (2004) recommendations Geometry design parameters
for high speed.
External parameters: minimum radio 500 m, maximal inclination 160
mm, minimal longitudinal inclination 25.
Environmental Rail temperature: +75/-22 C
conditions: Slab temperature increase: 16C
The slab will be adapted to de environmental conditions if needed.
Structure: Precast slab on a concrete base of 20 cm minimum thickness installed in
a tunnel , or on a tunnel foundation or on a embankment with a modulus
Ev2>120 MPa.
Rail fastener fixation stiffness: 40 KN/mm
Design: Precast slab of 5,1x2,5x0,2 m
Fastening spacing 0.65 m
All kind of polyvalent fasteners are possible
PRECAST PRESTRESED SLAB

Movil mould for the factory


Manipulation by hydraulic machines in factory
ELASTIC MATT

The matt is glued into the Factory.

Elastic matt

Precast slab
Fast clip fit and forget system

Isolators

The system has been designed to be preassembled


Preassembled clip

installation
Cast iron regulation element
Regulation of +/- 12 mm
INSTALLATION METHOD

The foundation must be made with a strict tolerances


INSTALLATION METHOD

Separators used to support the slab at the beginning


Space between foundation and slab
INSTALLATION METHOD

Tools to get the correct geometry


INSTALLATION METHOD
INSTALLATION METHOD

Slab ready to receive the mortar


Clipping machine for fast clip
FINAL SLAB

You might also like