Lifting Guide
Lifting Guide
Lifting Guide
Contents
Lifting equipment in general Page
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 The ant and the elephant . . . . . . . . . . . . . . . . . . 5 Standards, laws and regulations . . . . . . . . . . . . 6-7 Expressions and terms . . . . . . . . . . . . . . . . . . . 8-9 Safety and responsibility. . . . .. . . . . . . . . . . . 10-13 Components of lifting equipment . . . . . . . . . 14-31
Page
When lifting
Page
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44-69 Chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70-77 Steel wire rope . . . . . . . . . . . . . . . . . . . . . . . 78-87 Soft lifting equipment . . . . . . . . . . . . . . . . . . 88-93
Maintenance
Page
Regular inspection. Storage . . . . . . . . . . . . . 94-95 Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . 96-98 Chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99-103 Steel wire rope . . . . . . . . . . . . . . . . . . . . . 104-105 Components . . . . . . . . . . . . . . . . . . . . . . .106-107 Soft lifting equipment . . . . . . . . . . . . . . . .108-109 Keeping a register . . . . . . . . . . . . . . . . . . .110-111 Inspection planning . . . . . . . . . . . . . . . . . .112-113
Lifting equipment in general Choosing lifting equipment When lifting Maintenance Gunnebo does not, however, in any way claim that this manual covers all kinds of lifting equipment or all lifting situations.
For endless slings both the effective length and the circumference are stated.
10
11
12
13
link (LL, HLC) chain. Chains are also made in different strength grades. Grade 8, 10 (8+) chain is the most common in lifting equipment.The sole exception is chain used in very hot environments, where grade 3 chain is required to prevent the heat treatment from being affected. Only use short link chain for lifting operations.
2 3 5 8 10(8+)
Painted blue (A) Painted yellow (U) painted black (B) Galvanized (Z)
KL HL LL KL HL LL HL LL KL KLF HL ML LL KL
Agriculture, anchorage General consumer use For use in hot environments (KL)
Lashing bundling, lumbering Chain sling EN818-2 / EN818-4 Lifting equipment (KL), Container lashing (HL, HLC). towing, fishing and lumbering. (KL, ML, LL). Chain sling EN818-2 / 818-4 with increased lifting capacity
14
15
The safety factor of grade 8 and grade 10(8+) chain is 4:1, i.e. the max. load must not exceed one quarter of the stipulated minimum breaking force. The safety factor of grade 3 chain is 4,5:1. All chain produced by Gunnebo Lifting is proof loaded with a force more than double the maximum load, as shown in table, page 15. Grade 8 chain for lifting is manufactured to EN 818 and ISO 3076.
70 60 50 40 30 25 20 10 0 10 20 30 0 % elongation 40 50 60
Manufacturing proof force
16
17
Fmin x KT Zp x g
Where: Fmin=The minimum breaking load of the rope in kN KT = allowed factor for the efficiency of the termination KL= is the leg factor related to the number of legs and the angle to the vertical. ZP = 5 (Safety Factor) g=9,81
18
19
The distance between the ferrules on a endless sling must not be less than 3 x the length of the ferrule. The distance between the two ferrules on lifting slings must not be less than 20 x d.
Min 20xd
For spliced lifting slings the minimum length of plain rope shall be at least 15 x d.
20
21
To know
One single cover heavy duty tube for the roundsling is actually stronger than a double cover tube with two thin layers. Our tests show that the quality of the tube is of utmost importance for the lifetime of the product. We refute the argument that when the first layer on a double cover sling is damaged you can still use the sling because there is a risk that sharp objects have entered in between the layers and may cause hidden damages. Another advantage with the single cover roundsling is the protected label which also makes the sling stiffer so it can be passed through narrow spaces.
22
23
Lifting components
The grade of the lifting components must match the grade of the chain (usually grade 8 or grade 10 (8+). The size designation usually refers to the size of the chain with the same strength, e.g.: G-10-8 = Coupling link, type G, suitable for 10 mm chain, grade 8 (max. load 3.2 tonnes)
Master Links
Master links can be drop forged or forged and welded from round steel. There are two basic designs: - single master link, for one- and two-legged lifting slings - master link, with sub links for three- and four-legged lifting slings.
Master Link, M Master Link MF/ Master Link MG For use with All-in-one MFX
G-link For use with Berglok, G-link or top link
Master Link MTC Master Link MT Master Link For use with For use with MGD
G-link Berglok or G-link All-in-one top link
24
25
Hooks
For steel wire rope and chain (G-couplinglink/Berglok) Safety hook, BK/OBK
Will not open when under direct load and prevents the hook from cathing when lifting.
Sling hook, EK
Grabhook, OG
Not for use with Berglok. No load derating. Supporting bridge prevents chain deformation.
Clevis shackle
Dee shackle
Bow shackle
GSA
For connection in chain
SA
Swivel safety hook, BKL/BKLK
With a swiveling eye to enable rotation.
C-grab, CG
For use with master link MF.
C-grab, CGD
For use with master link MF.
C-lok , CL
For use with master link MF.
26
27
Will not open when under direct load and prevents the hook from cathing when lifting.
Clevis eggClevis swivel Grab hook, GG safety hook, Shortening hook link, CEL with supporting BKH
Especially for chain hoists. With ball bearing to enable rotation.
SK-System
Sling hook SKN/ESKN
bridge to prevent deformation of the load bearing link. No load derating. Masterlink for direct connection with chain.
Along with ferrules, the most common components, for assembling steel wire rope slings.
Used to insulate the lifted load to enable safe welding. Max. 1000 V. Lubricated, sealed and fully rotational even at maximum load.
28
29
Crimping ferrule
Crimping ferrule
Straight ultragrip
Conical K ferrule
30
31
Choosing equip
Types of lifting equipment
Check the list below every time you are facing a new lifting situation. Checklist Make a good estimate of the lifting and transportation requirements. Find out the weight of the load. Choose appropriate lifting equipment. Decide the best way to attach the lifting equipment to the load, considering its centre of gravity and configuration. Choose appropriate lifting equipment with sufficient capacity. Note that the sling leg loadings rise as the angle between the sling legs increases. Lifting equipment differences The fields of application for the three main types of lifting equipment (chain, steel wire rope and soft lifting equipment) overlap. For this reason, you may often choose the type you are most familiar with, but there are differences in properties you should be aware of:
ment
Chain - Wear resistant, best durability. - Flexible. - A wide range of components to choose from. - Heat resistant (see p. 16). - Shortening possibility - easy to store Steel wire rope - Lighter and often less expensive than chain. - Usually hot-dip galvanised for best rust protection. - Suitable for extremely heavy loads.
Soft lifting equipment - Simple and inexpensive. - Suitable for fragile goods. - Flexible, suitable for choke-hitching load. - Easy identification of max. load by colour. - easy to store
32
33
Choosing equip
Load table for grade 10(8+) chain slings GrabiQ
Working load limits in tonnes Chain dim. (mm)
1-leg
ment
In the case of asymmetric loading 2-legged sling calculated as the corresponding 1-leg sling. 3- and 4-legged sling calculated as the corresponding 1-leg sling (If it is certain that 2-legs are equally carrying the major part of the load it can be calculated as the corresponding 2-legged sling.
2-leg
3-legged
4-legged
Chain
__________
0-45 0-90
6 8 10 13 16
34
35
Choosing equip
Load table for grade 8 chain slings
Working Load Limits in tonnes for chain slings grade 8, according to EN 818-4 Chain dim. (mm)
1-leg 1-leg 2-leg 2-leg
ment
In the case of asymmetric loading 2-legged sling calculated as the corresponding 1-leg sling. 3- and 4-legged sling calculated as the corresponding 1-leg sling (If it is certain that 2-legs are equally carrying the major part of the load it can be calculated as the corresponding 2-legged sling.
3-legged 3-legged
4-legged 4-legged
Chain
__________
0-45 0-90
45-60 90-120 1,12 1,5 2,0 3,15 5,3 8,0 11,2 15,0 21,2 31,5
0-45 0-90 2,36 3,15 4,25 6,7 11,2 17,0 23,6 31,5 45,0 67,0
45-60 90-120 1,7 2,24 3,0 4,75 8,0 11,8 17,0 22,4 31,5 47,5 1,8 2,5 3,15 5,0 8,5 12,5 18,0 23,6 33,5 50,0
6 7 8 10 13 16 19 22 26 32
1,12 1,5 2,0 3,15 5,3 8,0 11,2 15,0 21,2 31,5
1,6 2,12 2,8 4,25 7,5 11,2 16,0 21,2 30,0 45,0
The above loads apply to normal usage and equally loaded legs.
36
37
Choosing equip
Load table for steel wire rope
Working load limit in tonnes Wire dim. mm. 1-legged 1-legged
ment
The table below shows the maximum permitted load for the most common steel rope slings, tensile grade 1770 N/mm2 and 1960 N/mm2, according to EN13414-1
45-60
endless
38
39
Choosing equip
Steel rope slings When planning a lift where technical data on weight , centre of gravity etc. are known, trigonometrics may be used for calculating the maximum load on the lifting equipment. Basis for the calculation is the column for 1-legged slings, or the following formula: WLL =
Where
ment
Lifting angle Factor
KL
3-4 2,1 1,5
0-90 90-120
Fmin x KT Zp x g
Fmin=The minimum breaking load of the rope in kN KT = allowed factor for the efficiency of the termination KL= is the leg factor related to the number of legs and the angle to the vertical. ZP = 5 (Safety Factor) g=9,81 The calculation yields the max. load on each leg when the lifting angle is 0, rounded off to the nearest hundred kgs. Max. load for multilegged equipment If the table is not used, the max. load must be calculated. The result of the above formula, representing the max. load on a 1-legged sling, shall be multiplied by a factor according to the following table:
Never excee the stated max. load at the lifting angle involvved. Always check the rated capacity of the equipment before lifting, not after the catastrophe.
40
41
Choosing equip
Load table for soft lifting products
WLL in tonnes according to EN 1492 Maximum load Straight lifting Choke hitch basket hitch
ment
45-60 90-120
90 basket hitch
4,0
5,0 6,0 8,0 10,0 12,0 15,0 20,0 25,0 30,0 35,0 40,0 50,0
3,2
4,0 4,8 6,4 8,0 9,6 12,0 16,0 20,0 24,0 28,0 32,0 40,0
8,0
10,0 12,0 16,0 20,0 24,0 30,0 40,0 50,0 60,0 70,0 80,0 100,0
5,6
7,0 8,4 11,2 14,0 16,8 21,0 28,0 35,0 42,0 49,0 56,0 70,0
4,0
5,0 6,0 8,0 10,0 12,0 15,0 20,0 25,0 30,0 35,0 40,0 50,0
42
43
When lifting
General
Do not ride on the load.
Never stand under the suspended load. People within the working area of the lifting equipment must not be exposed to danger when the load is lifted or moved.
44
45
When lifting
General
Lift vertically. Otherwise the load will swing horizontally when clearing the ground.
Be careful where you stand in relation to the load when lifting. The load might slip and cause injury. Keep your back clear.
46
47
When lifting
General
Avoid snatch loading. Do not expose the equipment to unnecessary strain, for example sudden jerks.
48
49
When lifting
Treat chain with care. Do not pull it clear from under the load without using spacers. The chain can easily become damaged and a weakened chain might break next time you use it.
General
Avoid choke-hitching, as loads can tip over.
Always position the load in a way that makes it possible to remove the lifting equipment without using force.
50
51
When lifting
Never point load the hook. Use an eyebolt with a larger eye or connect with a suitable shackle.
General
Never force a master link on to a hook. Use a hook with a larger opening.
52 53
When lifting
General
Test-lift by carefully lifting the load just clear of the ground. Check the load security and angles before continuing.
Use sheet-metal clamps when lifting sheet-metal packs. Avoid point loading of hooks.
54
55
When lifting
General
Handle the load with care. Raise and lower it gently and avoid jerks.
Grip the hook by its sides with your fingertips only, never with your entire hand, otherwise your fingers might be crushed.
56
57
When lifting
General
Do not side load the hook.
When connecting to lifting eyes, make sure that the hooks/eyes are turned the right way (facing outwards). A rotating lifting point (RLP) automatically adjust itself to the right position.
58 59
When lifting
Make sure that the load is distributed as evenly as possible.
General
Never lift with ropes or bands used for wrapping. They are only intended for keeping the goods together, not for lifting.
60
61
When lifting
General
Correct usage of pressure.
Note that the pressure increases as the lifting angle grows. Use the pressure correctly.
62
63
When lifting
Use a spreader beam. When using basket slings, make an extra turn around the load to get a firm hold.
General
64
65
When lifting
General
The internal angle of a multilegged lifting sling should never exceed 120, or 60 to the vertical. Use edge protection if there are sharp edges. When choke hitching, reduce the WLL by 20%.
Max 120
Loads consisting of separate parts should be secured by wrapping the lifting sling(s) around twice to prevent the load from falling apart.
66
67
When lifting
General
Incorrect alignment causes excessive strain on this shackle when lifting or pulling.
correct alignment.
68
69
When lifting
Chain
A chain is never stronger than its weakest link. Do not repair broken chains with wires, bolts or by welding. Replace the entire damaged chain length.
70
71
When lifting
Chain
When welding or cutting, make sure that the lifting equipment is not affected by the heat involved, as it can damage the heat treatment of the chain.
72
73
When lifting
Chain
Use shortening hooks when lifting asymmetric loads. Avoid lopsided lifting.
Use edge protection to prevent sharp edges from damaging the lifting equipment. A rule of thumb is that the radius of the edge >2 x chain diameter. When lifting with chain directly on lugs we recommend that the lug diameter >3 x the pitch of the chain. With a lug diameter which is less than stipulated above, the WLL must be reduced with 50%.
74 75
When lifting
Chain
Do not connect directly to the chain by forcing a link on to the hook. Always use a master link.
Severe environment Chain and components in grade 8 and grade 10 (8+) must not be used in alkaline (> pH10) or acidic conditions (< pH6). Comprehensive and regular examination must be carried out when used in severe or corrosive inducing environments, if using in an uncertain situation, contact the manufacturer.
76 77
= = = = = =
80
81
Use a suitable spacer to prevent the ropes from sliding. Avoid sharp bending of the rope. The load can slip if the lifting points slide. Sharp bending damages the rope.
Bending like this will immediately destroy the rope. Use lifting slings with hooks instead.
82
83
84
85
90 max
86
87
equipment
1 2 3 4 5 6 8 10 12 15 20 25 30 35 40 50
mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm
Note If smaller lug dimensions are used it will effect the safety due to that the roundsling may be damaged.
Lift vertically and use protective sleeving and/or edge protection to keep the equipment from directly contacting sharp corners and edges.
88
89
equipment
Keep soft lifting equipment away from alkalis such as caustic soda and ammonia. The colour fades and the slings disintegrate.
90
91
equipment
Note that the maximum load of roundslings in connection with choke or basket hitching assumes vertical legs (see table on p. 42-43). If the load is placed inside the roundsling, the max load should be calculated as straight lifting (see table on p. 42-43).
92
93
Maintenance
Regular inspection
Lifting equipment must be checked on a continual basis and be inspected in accordance with standards and industrial safety legislation. The responsibility for carrying this out rests with the site management. Regular inspection includes functional checks, as well as the adjustments and maintenance that may be required from time to time. Inspections must be carried out by people possessing sufficient knowledge of design, use and maintenance of lifting equipment. Damaged or worn equipment must be reported to the site management, who in turn, must arrange for the equipment to be taken out of use and then be repaired or replaced. Lifting equipment having been stored for a period of time must be inspected before being taken back into use. In addition to regular inspection, which must be thoroughly recorded, everyone working with lifting equipment must be on guard and inspect the equipment before every use.
Storage
Dragging or dropping the equipment can cause damage and should be avoided. Arrange for appropriate storage, preferably at an even temperature. Good storage preserves the equipment and helps you find what you need faster. Chain and steel wire rope stored for long periods should be rust protected.
Soft slings and strops should not be exposed to bright sunlight for any long periods of time. Choose a storage location accordingly.
94
95
Maintenance
Inspection
Lifting equipment must be inspected regularly. Good lighting without shadows is necessary during inspection. Check Check / inspect the equipment regularly. Make sure that repairs are made when needed. When inspecting soft lifting slings or strops: put the equipment, stretched to its full length, on a table. Turn eyes on the equipment inside out and inspect for wear or damage. Inspect webbing one side at a time. When inspecting endless slings it is recommended to run them around a revolving pin, or similar.
96
97
Maintenance
Chain
Before inspecting a chain it must be thoroughly cleaned of dirt and oil. All cleaning methods that do not damage the basic material are acceptable. No methods that cause hydrogen embrittlement or overheating are allowed, nor methods that remove basic material or move material in a way that might hide cracks or other visible damage. The illustration below, showing the distribution of strain in a link, can be of guidance for decisions on chain wear and damage.
The stress distribution in the link is very favourable. Tensile stresses are the most important to chain strength. They are concentrated to the most protected areas of the link: the outside of the short side and the inside of the long side. The relatively harmless compressive stresses are distributed the opposite way around, i.e. where link wear is at its maximum. Here the link can wear down significantly without any major effect on chain strength. Keeping strain distribution in mind, we shall take a look at some examples of wear and damage on the following pages.
98
99
Maintenance
Cracks / gouges Deformation When a twisted chain is overloaded the resultant twist becomes permanent. The chain must be replaced.
Chain showing cracks and gouges must be discarded. Transverse cracks are the most serious.
100
101
Maintenance
Wear
Inter-link wear, as measured by taking the diameter indicated (d1) and one at right angles, (d2) is acceptable until the mean of these diameters has been reduced to 90% of the nominal diameter (dn) (see figure) provided.
Elongation
Overloaded equipment must be discarded. Permanent elongation is not permitted.
d1+d2 >0,9d n
2
d
A-A
The chain must be slackened and the adjoining links pushed back to allow inspection of the contact surfaces of each link.
If the lengths of the legs of a multilegged chain sling are unequal, overload should be suspected.
102
103
Maintenance
Steel wire rope
Rust Remember that even galvanised steel wire rope may rust. Bend the rope to expose the inner strands and core to inspection. Broken wires Broken wires weaken the rope and causes injury.
The correct way to remove a broken wire is to bend it back and forth until it breaks. Do not use pliers.
Effects of shock loading A load applied or relieved quickly (shock) can damage a steelwire rope as the adjacent picture shows. Such a rope must be discarded.
Ropes with kinks, crushing, excesive broken wires or damaged ferrules must be taken out of service.
104
105
Maintenance
Components
Check the function of hook latches, locking pins/ collars on coupling links etc. - Check hooks thoroughly for widened apertures, which indicate abnormal loading.
This table indicates the maximum permissible clearance between hook and latch in horizontal and vertical direction.
Size Maximum A mm 2,2 2,7 3,0 3,3 4,0 5,0 6,0 6,5 7,0 Maximum B mm 3,5 4,5 6,0 7,0 9,0 10,0 11,0 12,0 13,0
For griplatch hooks (OBK/GBK) the maximum clearence is defined as the difference between measure A with uploaded spring and meassure A when latch is pressed against the hook, note clearence B is not applicate for griplatch hooks.
- The increase in hook aperture must not exceed 10%. - No elongation is permitted for coupling components, such as G-links, master links and Berglok links. - Wear must not exceed 10%. - Examine all lifting components thoroughly for transversal cracks, wear and other damage.
106
107
Maintenance
Soft lifting equipment
Discard the equipment if a load bearing cord is broken. Repair protective sleeving when needed. Cut discarded slings and straps immediately.
Round slings
The sleeving has been torn apart by dragged along a rough surface. The load bearing cord is intact. Let the manufacturer repair the sling or discard it.
A cut as a result of sharp edges combined with heavy loads in movement. A load bearing cord is broken. Discard the sling.
A hardened, shiny surface is a sign of damage caused by severe friction. Webbing can easily slide, causing friction, when the lifting angle is wide. Folding the webbing at the damage makes it easier to see the extent of it. If the damage is wider than 5% of the webbing width the equipment must be discarded.
108
109
Maintenance
Keeping a register
Keeping a proper register is important to safe lifting. The register must describe the equipment and list its identity markings. Intervals for inspection and testing should be determined and entered into the register. The condition of the equipment and all test results must be recorded after every inspection. The reason for, and a description of, every repair must also be recorded. The register is intended as a continuous description, ensuring that the equipment is properly inspected, tested and maintained and that it is currently in a good condition for use.
110
111
Maintenance
Inspection planning
1. Master links Material wear must not exceed 10%. Permanent elongation is not permitted. File away small, sharp cuts and burrs. Note: In case of bad deformation the link must be discarded. 2. Coupling links Material wear must not exceed 10%. Permanent elongation is not permitted. File away small sharp cuts and burrs. Failure to pivot is a sign of previous overload. Make sure that the load pin is locked in position and that the locking pins (BL) securely lock the load pin. 3. Chain Material wear must not exceed 10%. Wear is defined as the reduction in average diameter of the chain material, measured in two transversal directions. Permanent chain elongation is not permitted. File away small sharp cuts and burrs. 4. Hooks Material wear must not exceed 10%. The maximum permissible increase in hook opening due to wear is 10%. File away small sharp cuts and burrs. 5. Steel wire rope Steel wire rope with kinks, excessive broken wires or damaged ferrules must be discarded. Concentrated wire breakage on one strand should not exceed 3 wires. On a distance of 6x diameter, max 6 breakage or on a distance of 30x diameter, maximum 14 breakage.Note that steel wire rope should be opened up to expose the inner strands and core to inspection. 6. Round slings / webbing slings and straps Roundslings: When holes in the protective sleeving expose the loadbearing fibres to dirt, the sling should be discarded. If there are holes in the sleeving and broken load-bearing cords, the sling must be discarded. Roundslings must also be examined by hand for lumps, indicating fibre breakage. Webbing slings and strops: If there is damage from friction, the equipment must be discarded. If eye sleeving is worn out: discard or repair. If edge damage exceeds 5% of the webbing width, the equipment must be discarded. Check that the seams are intact.
112
113
More information?
Export Sales / Production Gunnebo Industrier AB Business Unit Lifting P.O. Box 44 SE-730 60 Ramns Tel: Fax: +46 (0)220 384 00 +46 (0)220 384 98
Dealer
114
115
E F F E C T V i m m e r b y, S w e d e n