Manual Waartsila PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 374
At a glance
Powered by AI
The manual provides instructions for operating and maintaining an engine. It outlines various safety hazards and risks to be aware of when working with the engine. It also describes different control modes like isochronous load sharing for operating the engine.

The purpose of this manual is to provide accurate information to operators regarding the engine and to ensure it is available for reference. It deals with technical matters related to operating and maintaining the engine safely.

The manual outlines various hazards associated with moving parts, incorrect operating conditions, and component issues like leakage. It emphasizes the use of symbols to identify hazards and risks and reduce risks to personnel working with the engine.

Document ID DBAB555858 -

Installation NEGRA HIPOLITA


Engine type W8L20 C3
Engine number PAAE206695
Project NEGRA HIPOLITA
This manual is intended for the personal use of engine operators
and should always be at their disposal. The content of this manual
shall neither be copied nor communicated to a third person.
Wrtsila Finland Oy
Vaasa Factory
Tarhaajantie 2, FIN-65101 Vaasa, Finland
Tel. +358 10 709 0000, Tlx 74251 wva sf
Fax (Service) +358 6 356 7355
Fax (Spare Parts) +358 10 709 1380
I
N
S
T
R
U
C
T
I
O
N

M
A
N
U
A
L
Copyright by Wrtsil Finland Oy
All rights reserved. No part of this booklet may be reproduced or copied in any form or by
any means (electronic, mechanical, graphic, photocopying, recording, taping or other
information retrieval systems) without the prior written permission of the copyright owner.
THIS PUBLICATION IS DESIGNED TO PROVIDE AN ACCURATE AND AUTHORITATIVE
INFORMATION WITH REGARD TO THE SUBJECT-MATTER COVERED AS WAS
AVAILABLE AT THE TIME OF PRINTING. HOWEVER, THE PUBLICATION DEALS WITH
COMPLICATED TECHNICAL MATTERS SUITED ONLY FOR SPECIALISTS IN THE AREA,
AND THE DESIGN OF THE SUBJECT-PRODUCTS IS SUBJECT TO REGULAR
IMPROVEMENTS, MODIFICATIONS AND CHANGES. CONSEQUENTLY, THE PUBLISHER
AND COPYRIGHT OWNER OF THIS PUBLICATION CAN NOT ACCEPT ANY
RESPONSIBILITY OR LIABILITY FOR ANY EVENTUAL ERRORS OR OMISSIONS IN THIS
BOOKLET OR FOR DISCREPANCIES ARISING FROM THE FEATURES OF ANY ACTUAL
ITEM IN THE RESPECTIVE PRODUCT BEING DIFFERENT FROM THOSE SHOWN IN THIS
PUBLICATION. THE PUBLISHER AND COPYRIGHT OWNER SHALL UNDER NO
CIRCUMSTANCES BE HELD LIABLE FOR ANY FINANCIAL CONSEQUENTIAL DAMAGES
OR OTHER LOSS, OR ANY OTHER DAMAGE OR INJURY, SUFFERED BY ANY PARTY
MAKING USE OF THIS PUBLICATION OR THE INFORMATION CONTAINED HEREIN.
Wrtsil Finland Oy, Services
Services Office Vaasa
Tarhaajantie 2
FI-65380
Vaasa
P.O. Box 252
FI-65101
Finland
Wrtsil service numbers
24 hours
24hrs Phone +358 10 709 080
Fax +358 10 709 1380
Switchboard +358 10 709 0000
(Office hours 7.30 - 16.30)
E-mail [email protected]
Homepage www.wartsila.com/services
Table of Contents
00. Contents, instructions, terminology...................................................................................00 - 1
00.1. About this manual.............................................................................................................................00 - 1
00.2. General operation and maintenance instructions..............................................................................00 - 2
00.3. Terminology......................................................................................................................................00 - 2
00.4. Designations and markings...............................................................................................................00 - 4
00.4.1. Bearing designation....................................................................................................................00 - 4
00.5. Risk reduction...................................................................................................................................00 - 6
00.5.1. Use of symbols...........................................................................................................................00 - 6
00.5.2. General identified hazards..........................................................................................................00 - 7
00.5.3. Hazards due to moving parts......................................................................................................00 - 8
00.5.4. Hazards due to incorrect operating conditions...........................................................................00 - 9
00.5.5. Hazards due to leakage, breakdown or improper component assembly....................................00 - 9
00.5.6. Electrical hazards.....................................................................................................................00 - 10
00.5.7. Other hazards...........................................................................................................................00 - 11
00.6. Welding precautions........................................................................................................................00 - 11
00.6.1. Personal safety when welding..................................................................................................00 - 11
00.6.2. Protecting equipment when welding.........................................................................................00 - 14
00.6.3. Welding precautions for engine control system........................................................................00 - 15
00.7. Hazardous substances....................................................................................................................00 - 15
00.7.1. Fuel oils....................................................................................................................................00 - 15
00.7.2. Lubricating oils..........................................................................................................................00 - 18
00.7.3. Cooling water additives, nitrite based.......................................................................................00 - 20
00.7.4. Fly ashes and exhaust gas dust ..............................................................................................00 - 21
00.7.5. Lead in bearings.......................................................................................................................00 - 23
00.7.6. Fluoride rubber products..........................................................................................................00 - 24
01. Main Data, Operating Data and General Design..............................................................01 - 1
01.1. Main data for Wrtsil 20..................................................................................................................01 - 1
01.2. Recommended operating data..........................................................................................................01 - 2
01.3. Reference conditions........................................................................................................................01 - 3
01.4. General engine design......................................................................................................................01 - 3
02. Fuel, Lubricating Oil, Cooling Water.................................................................................02 - 1
02.1. Fuel...................................................................................................................................................02 - 1
02.1.1. Fuel treatment............................................................................................................................02 - 2
02.1.2. Maximum limits for fossil fuel characteristics..............................................................................02 - 7
02.1.3. Maximum limits for liquid biofuel characteristics.......................................................................02 - 10
02.1.4. Comments on fuel characteristics............................................................................................02 - 14
02.1.5. Measures to avoid difficulties when running on heavy fuel......................................................02 - 19
02.1.6. Using low sulphur & low viscosity distillate fuel (LFO)..............................................................02 - 20
02.1.7. General advice.........................................................................................................................02 - 20
02.2. Lubricating oil..................................................................................................................................02 - 21
02.2.1. Lubricating oil qualities.............................................................................................................02 - 21
02.2.2. Maintenance and control of the lubricating oil..........................................................................02 - 22
02.2.3. Lubricating oil for the governor.................................................................................................02 - 25
02.2.4. Lubricating oils for turbochargers.............................................................................................02 - 26
02.2.5. Handling of oil samples............................................................................................................02 - 26
02.2.6. Dispatch and transportation......................................................................................................02 - 28
02.3. Cooling water..................................................................................................................................02 - 28
Table of Contents
Wrtsil 20 Table of Contents - i
02.3.1. Additives...................................................................................................................................02 - 29
02.3.2. Treatment................................................................................................................................. 02 - 31
02.3.3. Derating engine output............................................................................................................. 02 - 32
02B. Oil requirements & oil quality.......................................................................................02B - 1
02B.1. Requirements and oil quality........................................................................................................02B - 1
02B.2. Condemning limits for used lubricating oil....................................................................................02B - 3
02B.3. Change of lubricating oil brand.....................................................................................................02B - 4
02B.4. Approved lubricating oil qualities for Wrtsil 20 engines............................................................02B - 4
02C. Raw water quality........................................................................................................02C - 1
02C.1. Raw water quality and approved cooling water additives............................................................02C - 1
02C.2. Raw water quality requirements...................................................................................................02C - 1
02C.3. Approved cooling water additives................................................................................................02C - 2
02C.4. Use of glycol................................................................................................................................02C - 5
03. Start, Stop and Operation.................................................................................................03 - 1
03.1. Start...................................................................................................................................................03 - 1
03.1.1. Local start...................................................................................................................................03 - 1
03.1.2. Remote and automatic start.......................................................................................................03 - 2
03.2. Stopping the engine..........................................................................................................................03 - 3
03.2.1. Stopping the engine for a lengthy time.......................................................................................03 - 3
03.2.2. Remote stop...............................................................................................................................03 - 3
03.2.3. Automatic stop............................................................................................................................03 - 4
03.3. Normal operation supervision...........................................................................................................03 - 4
03.3.1. Every second day or after every 50 running hours.....................................................................03 - 4
03.3.2. Every second week or after every 250 running hours................................................................03 - 6
03.3.3. Once a month or after every 500 running hours.........................................................................03 - 7
03.3.4. In connection with maintenance work.........................................................................................03 - 7
03.3.5. General maintenance.................................................................................................................03 - 7
03.4. Start after a prolonged stop (more than 8 h).....................................................................................03 - 8
03.5. Start after overhaul............................................................................................................................03 - 9
03.6. Supervising operation after overhaul................................................................................................03 - 9
03.7. Running-in.......................................................................................................................................03 - 11
04. Maintenance Schedule.....................................................................................................04 - 1
04.1. How to select application and fuel quality.........................................................................................04 - 2
04.2. Every second day..............................................................................................................................04 - 3
04.3. Once a week.....................................................................................................................................04 - 3
04.4. Interval: 50 operating hours..............................................................................................................04 - 3
04.5. Interval: 100 operating hours............................................................................................................04 - 4
04.6. Interval: 250 operating hours............................................................................................................04 - 5
04.7. Interval: 500 operating hours............................................................................................................04 - 5
04.8. Interval: 1000 operating hours..........................................................................................................04 - 6
04.9. Interval: 2000 operating hours..........................................................................................................04 - 7
04.10. Interval: 4000 operating hours........................................................................................................04 - 7
04.11. Interval: 8000 operating hours........................................................................................................04 - 8
04.12. Overhaul interval...........................................................................................................................04 - 10
04.13. Interval: (8000 - 20000) See table 04.12.......................................................................................04 - 10
04.14. Interval: 16000 operating hours.................................................................................................... 04 - 11
04.15. Interval: 24000 operating hours.................................................................................................... 04 - 12
04.16. Interval: 24000 operating hours or after 5 years........................................................................... 04 - 12
04.17. Interval: 48000 operating hours.................................................................................................... 04 - 13
05. Maintenance tools.............................................................................................................05 - 1
Table of Contents
Table of Contents - ii Wrtsil 20
05.1. About Spare Parts Catalogue...........................................................................................................05 - 1
05.2. Ordering maintenance tools..............................................................................................................05 - 1
06. Adjustments, Clearances and Wear Limits.......................................................................06 - 1
06.1. Adjustments......................................................................................................................................06 - 1
06.2. Clearances and wear limits at 20C..................................................................................................06 - 2
07. Tightening Torques and Instructions for Screw Connections...........................................07 - 1
07.1. Tightening torques for screws and nuts............................................................................................07 - 1
07.1.1. A: Crankshaft and flywheel.........................................................................................................07 - 3
07.1.2. B: Camshaft and intermediate gear............................................................................................07 - 4
07.1.3. C: Valve mechanism and multihousing......................................................................................07 - 5
07.1.4. D: Injection pump.......................................................................................................................07 - 6
07.1.5. E: Fuel injection valve.................................................................................................................07 - 7
07.1.6. F: Piston.....................................................................................................................................07 - 8
07.1.7. G: Engine driven pumps...........................................................................................................07 - 10
07.1.8. H: Free end of crankshaft.........................................................................................................07 - 13
07.1.9. I: Side screws for main bearings and screws for engine foot...................................................07 - 14
07.1.10. J : Intermediate gear for balancing shafts..............................................................................07 - 15
07.2. Use of locking fluid..........................................................................................................................07 - 15
07.3. Hydraulically tightened connections................................................................................................07 - 16
07.3.1. Pressures for hydraulically tightened connections...................................................................07 - 16
07.3.2. Maintenance of hydraulic tool set.............................................................................................07 - 17
07.3.3. Dismantling hydraulically tightened screw connections............................................................07 - 19
07.3.4. Reassembling hydraulically tightened screw connections........................................................07 - 19
08. Operating Troubles, Emergency Operation......................................................................08 - 1
08.1. Troubleshooting................................................................................................................................08 - 1
08.2. Emergency operation........................................................................................................................08 - 6
08.2.1. Operation with defective air cooler.............................................................................................08 - 6
08.2.2. Operation with defective turbocharger........................................................................................08 - 7
08.2.3. Operation with defective cams...................................................................................................08 - 7
08.2.4. Operation with removed piston and connecting rod...................................................................08 - 8
08.2.5. Torsional vibrations and other vibrations....................................................................................08 - 9
09. Installation specific data....................................................................................................09 - 1
10. Engine Block, Oil Sump and Cylinder Liner......................................................................10 - 1
10.1. Engine block and covers...................................................................................................................10 - 1
10.2. Engine feet........................................................................................................................................10 - 1
10.3. Oil sump............................................................................................................................................10 - 2
10.4. Main bearings....................................................................................................................................10 - 2
10.4.1. Dismantling of a main bearing....................................................................................................10 - 2
10.4.2. Inspection of main bearings and journals...................................................................................10 - 5
10.4.3. Assembling of main bearing.......................................................................................................10 - 6
10.5. Flywheel/thrust bearing.....................................................................................................................10 - 8
10.5.1. Dismantling of flywheel/thrust bearing........................................................................................10 - 8
10.5.2. Inspection of flywheel/thrust bearings........................................................................................10 - 9
10.5.3. Assembling of flywheel-thrust bearing........................................................................................10 - 9
10.5.4. Measurement of thrust bearing axial clearance........................................................................10 - 11
10.6. Cylinder liner...................................................................................................................................10 - 11
10.6.1. Maintenance of cylinder liner....................................................................................................10 - 11
10.6.2. Removing of cylinder liner........................................................................................................10 - 13
10.6.3. Inspection of cylinder liner........................................................................................................10 - 14
10.6.4. Mounting of cylinder liner..........................................................................................................10 - 14
Table of Contents
Wrtsil 20 Table of Contents - iii
11. Crank Mechanism: Crankshaft, Connecting Rod, Piston..................................................11 - 1
11.1. Crankshaft.........................................................................................................................................11 - 1
11.1.1. Balancing of crankshaft..............................................................................................................11 - 1
11.1.2. Crankshaft alignment..................................................................................................................11 - 2
11.2. Flywheel............................................................................................................................................11 - 3
11.2.1. Chamfered gear rim....................................................................................................................11 - 4
11.2.2. Replacing the gear rim...............................................................................................................11 - 5
11.3. Turning device...................................................................................................................................11 - 6
11.4. Connecting rod and piston................................................................................................................11 - 6
11.4.1. General description of piston......................................................................................................11 - 7
11.4.2. Removing and dismantling the piston and connecting rod.........................................................11 - 8
11.4.3. Maintaining the piston, piston rings and connecting rod bearings............................................11 - 11
11.4.4. Assembling and mounting of piston and connecting rod..........................................................11 - 12
12. Cylinder Head with Valves................................................................................................12 - 1
12.1. Functions of the cylinder head drilling...............................................................................................12 - 2
12.2. Removing the cylinder head..............................................................................................................12 - 2
12.2.1. General maintenance of the cylinder head.................................................................................12 - 4
12.2.2. Mounting the cylinder head screws............................................................................................12 - 4
12.2.3. Mounting the cylinder head........................................................................................................12 - 5
12.2.4. Valve clearance..........................................................................................................................12 - 7
12.2.5. Adjusting valve clearance and yoke...........................................................................................12 - 8
12.3. Exhaust and inlet valves and seat rings............................................................................................12 - 9
12.3.1. Dismantling valves......................................................................................................................12 - 9
12.3.2. Checking and reconditioning of valves and seats....................................................................12 - 11
12.3.3. Lapping.....................................................................................................................................12 - 13
12.3.4. Machine grinding......................................................................................................................12 - 13
12.3.5. Change of seat ring..................................................................................................................12 - 15
12.3.6. Use of Loctite products for locking the seats and centre sleeves.............................................12 - 18
12.3.7. Reassembling the engine valves..............................................................................................12 - 18
12.4. Operation and maintenance of the indicator valve..........................................................................12 - 19
12.4.1. Cylinder firing pressure checking.............................................................................................12 - 20
12A. Testing the cylinder tightness......................................................................................12A - 1
12A.1. Connecting the tool for Wrtsil 20..............................................................................................12A - 1
12A.2. Measurement...............................................................................................................................12A - 2
13. Camshaft Driving Gear.....................................................................................................13 - 1
13.1. Intermediate gears and camshaft gear.............................................................................................13 - 2
13.1.1. Maintenance of camshaft gearing..............................................................................................13 - 2
13.1.2. Basic adjustment of valve timing................................................................................................13 - 3
13.1.3. Removing of camshaft driving gear............................................................................................13 - 4
13.1.4. Mounting of the camshaft gearing..............................................................................................13 - 6
13.2. Crankshaft gear ring..........................................................................................................................13 - 7
14. Valve Mechanism and Camshaft......................................................................................14 - 1
14.1. Valve mechanism..............................................................................................................................14 - 1
14.2. Function of valve mechanism............................................................................................................14 - 2
14.3. Maintenance of valve mechanism.....................................................................................................14 - 3
14.3.1. Dismantling of valve mechanism................................................................................................14 - 3
14.3.2. Inspection of valve mechanism parts.........................................................................................14 - 4
14.3.3. Assembling the valve mechanism..............................................................................................14 - 4
14.4. Camshaft...........................................................................................................................................14 - 5
14.4.1. Removing of camshaft piece......................................................................................................14 - 6
Table of Contents
Table of Contents - iv Wrtsil 20
14.4.2. Mounting of camshaft piece........................................................................................................14 - 7
14.5. Camshaft bearings............................................................................................................................14 - 7
14.5.1. Changing of camshaft bearing bush...........................................................................................14 - 8
14.5.2. Changing of camshaft bearing bush No.1 .................................................................................14 - 9
15. Turbocharging and Air Cooling.........................................................................................15 - 1
15.1. Turbocharger.....................................................................................................................................15 - 1
15.1.1. Turbocharger maintenance........................................................................................................15 - 3
15.1.2. Water cleaning of the turbine......................................................................................................15 - 3
15.1.3. Turbine cleaning procedure........................................................................................................15 - 5
15.1.4. Water cleaning of the compressor..............................................................................................15 - 6
15.1.5. Operation with damaged turbocharger.......................................................................................15 - 8
15.2. Charge air cooler...............................................................................................................................15 - 9
15.2.1. Charge air cooler maintenance................................................................................................ 15 - 10
15.2.2. Cleaning of charge air cooler air side.......................................................................................15 - 10
15.2.3. Cleaning of air cooler insert......................................................................................................15 - 11
16. Injection System...............................................................................................................16 - 1
16.1. Injection pump...................................................................................................................................16 - 1
16.1.1. Function of injection pump..........................................................................................................16 - 1
16.2. Maintenance of injection pump.........................................................................................................16 - 2
16.2.1. Removal of injection pump.........................................................................................................16 - 2
16.2.2. Mounting of injection pump.........................................................................................................16 - 3
16.2.3. Removal of injection pump element...........................................................................................16 - 4
16.2.4. Changing of plunger sealing rings..............................................................................................16 - 5
16.2.5. Mounting of injection pump element...........................................................................................16 - 6
16.2.6. Control of fuel injection timing....................................................................................................16 - 7
16.2.7. Injection pump overhaul.............................................................................................................16 - 8
16.3. Injection line......................................................................................................................................16 - 9
16.3.1. Checking the tightening of injection pipe connections..............................................................16 - 10
16.4. Injection valve................................................................................................................................. 16 - 11
16.4.1. Removing of injection valve......................................................................................................16 - 12
16.4.2. Overhauling of injection valve...................................................................................................16 - 13
16.4.3. Mounting of injection valve.......................................................................................................16 - 16
16.5. Pneumatic overspeed trip device....................................................................................................16 - 17
17. Fuel System......................................................................................................................17 - 1
17.1. Fuel oil safety filter............................................................................................................................17 - 2
17.2. Fuel system maintenance.................................................................................................................17 - 2
17.3. Venting the system............................................................................................................................17 - 2
18. Lubricating Oil System......................................................................................................18 - 1
18.1. Maintenance of oil system.................................................................................................................18 - 3
18.2. Lubricating oil pump..........................................................................................................................18 - 3
18.2.1. Removing of lubricating oil pump...............................................................................................18 - 4
18.2.2. Dismantling of lubricating oil pump.............................................................................................18 - 7
18.2.3. Inspecting the lubricating oil pump.............................................................................................18 - 7
18.2.4. Assembling the lubricating oil pump...........................................................................................18 - 7
18.2.5. Mounting of lubricating oil pump.................................................................................................18 - 8
18.3. Lubricating oil pressure regulating valve and safety valve................................................................18 - 9
18.3.1. Maintenance of the valves..........................................................................................................18 - 9
18.3.2. Adjusting of the lubricating oil pressure....................................................................................18 - 10
18.4. Lubricating oil cooler.......................................................................................................................18 - 10
18.4.1. Maintenance of lubricating oil cooler........................................................................................18 - 11
18.4.2. Disassembling and assembling of cooler.................................................................................18 - 11
Table of Contents
Wrtsil 20 Table of Contents - v
18.4.3. Cleaning of oil side...................................................................................................................18 - 12
18.4.4. Cleaning of water side..............................................................................................................18 - 12
18.5. Thermostatic valve..........................................................................................................................18 - 13
18.5.1. Maintaining the thermostatic valve...........................................................................................18 - 15
18.6. Centrifugal filter...............................................................................................................................18 - 16
18.6.1. Cleaning the centrifugal filter....................................................................................................18 - 17
18.7. Prelubricating pump........................................................................................................................18 - 19
18.7.1. Maintenance of prelubricating pump........................................................................................18 - 20
18N. Lubricating oil automatic filter......................................................................................18N - 1
18N.1. Maintenance of automatic filter....................................................................................................18N - 2
18N.1.1. Filter candles inspection and cleaning..................................................................................18N - 3
19. Cooling Water System......................................................................................................19 - 1
19.1. HT circuit...........................................................................................................................................19 - 1
19.2. Venting and pressure control of HT circuit........................................................................................19 - 2
19.3. LT circuit............................................................................................................................................19 - 2
19.4. Relief valve and venting of LT circuit................................................................................................19 - 2
19.5. Preheating of cooling water system..................................................................................................19 - 3
19.6. Monitoring the cooling water system.................................................................................................19 - 4
19.7. Maintenance of cooling water system...............................................................................................19 - 4
19.7.1. Cleaning of cooling water system...............................................................................................19 - 4
19.8. Water pump.......................................................................................................................................19 - 5
19.8.1. Maintenance of water pump.......................................................................................................19 - 7
19.8.2. Dismantling and reassembling the impeller................................................................................19 - 7
19.8.3. Disassembling and assembling of mechanical shaft seal..........................................................19 - 7
19.8.4. Replacing of bearings and shaft seal.........................................................................................19 - 8
19.9. Temperature control system...........................................................................................................19 - 10
19.9.1. LT and HT thermostatic valve...................................................................................................19 - 10
19.9.2. Maintaining the temperature control system.............................................................................19 - 14
20. Exhaust System................................................................................................................20 - 1
20.1. Exhaust manifold...............................................................................................................................20 - 1
20.1.1. Changing the expansion bellows................................................................................................20 - 2
21. Starting Air System...........................................................................................................21 - 1
21.1. Starting device, turbine air starter.....................................................................................................21 - 2
21.1.1. Disassembly of starter................................................................................................................21 - 3
21.1.2. Cleaning and inspection of starter..............................................................................................21 - 3
21.1.3. Assembly of starter.....................................................................................................................21 - 4
21.2. Starting air vessel and piping............................................................................................................21 - 4
21.3. Pneumatic system.............................................................................................................................21 - 5
21.4. Maintaining the pneumatic system....................................................................................................21 - 7
22. Control Mechanism...........................................................................................................22 - 1
22.1. Maintaining the control mechanism...................................................................................................22 - 1
22.2. Check and adjustment......................................................................................................................22 - 2
22.2.1. Checking and adjusting the fuel rack position............................................................................22 - 2
22.2.2. Checking electro-pneumatic overspeed trip device....................................................................22 - 4
22.3. Speed governor.................................................................................................................................22 - 5
22.3.1. Hydraulic governor drive.............................................................................................................22 - 5
22.3.2. Removing the governor..............................................................................................................22 - 6
22.3.3. Mounting of governor..................................................................................................................22 - 6
22.4. Electro-pneumatic overspeed trip device..........................................................................................22 - 7
22.4.1. Check and adjustment of stop position.......................................................................................22 - 8
Table of Contents
Table of Contents - vi Wrtsil 20
22.4.2. Check of tripping speed..............................................................................................................22 - 8
22.4.3. Adjustment of tripping speed......................................................................................................22 - 8
22.4.4. Maintenance...............................................................................................................................22 - 9
23. Instrumentation and Automation.......................................................................................23 - 1
23.1. UNIC automation system..................................................................................................................23 - 1
23.2. Mechanical design............................................................................................................................23 - 3
23.3. Parts of the UNIC System.................................................................................................................23 - 4
23.3.1. Local control panel.....................................................................................................................23 - 4
23.3.2. Main control module (MCM).......................................................................................................23 - 8
23.3.3. Engine instrumentation.............................................................................................................23 - 14
23.3.4. Engine Safety Module ESM......................................................................................................23 - 19
23.3.5. Power distribution module (PDM).............................................................................................23 - 29
23.4. Functionality of the UNIC................................................................................................................23 - 32
23.4.1. Speed controller.......................................................................................................................23 - 32
23.4.2. Synchronizing/clutch-in.............................................................................................................23 - 33
23.4.3. Engine loading, general............................................................................................................23 - 37
23.4.4. kW control mode.......................................................................................................................23 - 37
23.4.5. Droop mode..............................................................................................................................23 - 40
23.4.6. Isochronous load sharing mode (optional)...............................................................................23 - 42
23.4.7. Backup governor (optional)......................................................................................................23 - 45
Table of Contents
Wrtsil 20 Table of Contents - vii
Table of Contents
Table of Contents - viii Wrtsil 20
00. Contents, instructions, terminology
00.1. About this manual V2
This manual is intended for engine operating and maintenance per
sonnel. The manual contains technical data, maintenance instruc
tions, and instructions for correct and economical operation of the
engine. It also contains instructions for personal protection and first
aid, as well as for handling fuel, lubricating oil, and cooling water ad
ditives during normal operation and maintenance work.
The reader is assumed to have basic general knowledge of engine
operation and maintenance. Such information is therefore not provi
ded in this manual.
The Wrtsil engines are equipped as agreed upon in the sales docu
ments. This manual may contain descriptions of components that are
not included in every delivery. No claims can therefore be made on
Wrtsil on the basis of the contents of this manual.
The system diagrams (fuel system, lube oil system, cooling water
system and so on) included in this manual are only indicative and do
not cover every installation. For detailed system diagrams, see the
installation specific drawings.
The exact engine design in every detail is defined by the engine num
ber which is located on the engine name plate.
Note!
In all correspondence with Wrtsil, and when ordering spare parts,
the engine type and the engine number found on the engine name
plate must be stated.
This Manual is supplemented by the Spare Parts Catalogue including
sectional drawings or exterior views of all components (partial as
semblies).
Wrtsil reserves for itself the right to minor alterations and improve
ments owing to engine development without being obliged to make
the corresponding changes in this manual.
Contents, instructions, terminology
Wrtsil 20 00 - 1
00.2. General operation and maintenance
instructions V4
Read this manual carefully before starting to operate or maintain
the engine.
Keep an engine log book for every engine.
Observe utmost cleanliness and order in all maintenance work.
Before dismantling, check that all concerned systems are drained
and the pressure is released. After dismantling, immediately cover
holes for lubricating oil, fuel oil, and air with tape, plugs, clean cloth
or similar material.
When replacing a worn out or damaged part with a new one, check
for markings on the old part, for instance, identification marking,
cylinder or bearing number, and mark the new part with the same
data at the same location. Enter every exchange in the engine log
along with the reason for the exchange clearly stated.
In marine applications, all changes which may influence the NOx
emission of the engine, for instance, change of components and
engine settings, must be recorded in the "Record Book of Engine
Parameters" according to "Annex VI to MARPOL 73/78".
After assembly, check that all bolts, screws and nuts are tightened
and locked according to the instructions in this manual. Check that
all shields and covers are fully functional, in their places and
closed.
Note!
Preventive maintenance is important when it comes to fire protection.
Inspect fuel lines, lubricating oil lines and connections regularly.
00.3. Terminology V6
The most important terms used in this manual are explained below.
Driving end and free end
The driving end is the end of the engine where the flywheel is located.
The free end is the end opposite the driving end.
Operating side and rear side
The operating side is the longitudinal side of the engine where the
instrument panel (Local Display Unit) or operating devices.
Contents, instructions, terminology
00 - 2 Wrtsil 20
The rear side is the longitudinal side of the engine opposite the op
erating side.
Details located at the operating side may be marked with an "M" (ma
noeuvring side), and details located at the rear side with a "B" (back
side, or B bank on V engines).
Cylinder designation
According to ISO 1204 and DIN 6265, the cylinder designation begins
at the driving end.
Terminology and cylinder designations
Free end
Clockwise rotation
6
5
4
3
2
1
Operating
side
Rear side
Driving end
Fig 00-1 V1
Rotational direction
Clockwise rotating engine: when looking at the engine from the driving
end, the crankshaft rotates clockwise.
Counter clockwise rotating engine: when looking at the engine from
the driving end, the crankshaft rotates counter clockwise.
Top dead centre and bottom dead centre
Bottom dead centre, abbreviated BDC, is the bottom turning point of
the piston in the cylinder.
Top dead centre, abbreviated TDC, is the top turning point of the pis
ton in the cylinder. TDC for every cylinder is marked on the graduation
of the flywheel.
Contents, instructions, terminology
Wrtsil 20 00 - 3
During a complete working cycle, which in a four-stroke engine com
prises two crankshaft rotations, the piston reaches TDC twice:
TDC at scavenging. This occurs when the exhaust stroke of a
working cycle ends and the suction stroke of the next one begins.
Both the exhaust and inlet valves are slightly open and scavenging
takes place. If the crankshaft is turned to and fro near this TDC,
both the exhaust and inlet valves will move.
TDC at firing. This occurs after the compression stroke and before
the working stroke. Slightly before this TDC, the fuel injection
takes place (on an engine in operation). All valves are closed and
will not move if the crankshaft is turned. When watching the
camshaft and the injection pump, it is possible to notice that the
pump tappet roller is on the lifting side of the fuel cam.
00.4. Designations and markings
00.4.1. Bearing designation V4
Main bearings
The shield bearing (nearest the flywheel) is No. 0, the first standard
main bearing is No. 1, the second No. 2 etc.
Note!
During maintenance use a permanent marker pencil to mark any re
moved bearing caps on the rear with their designated position number
according to designation procedure.
Contents, instructions, terminology
00 - 4 Wrtsil 20
Bearing designation
0
00
1 2 3 N
0
00
0 1 2 3 N
0 00
Fig 00-2 V2
Thrust bearings
The thrust bearing rails are located at the shield bearing. The outer
rails close to the flywheel are marked with 00 and the inner rails with
0.
Camshaft bearings
The camshaft bearings are designated as the main bearings, the
thrust bearing bushes being designated 00 (outer) and 0 (inner).
Camshaft gear bearings
The bearing bushes are designated 00 (outer) and 0 (inner).
Contents, instructions, terminology
Wrtsil 20 00 - 5
Upper and lower bearing shells
In bearings where both the shells are identical, the upper one should
be marked with "UP".
00.5. Risk reduction V2
Read the engine manual before installing, operating or servicing the
engine and related equipment. Failure to follow the instructions can
cause personal injury, loss of life and damage to property.
Proper personal safety equipment, for example, gloves, hard hat,
safety glasses and ear protection must be used in all circumstances.
Missing, unsuitable or defective safety equipment might cause seri
ous personal injury or loss of life.
00.5.1. Use of symbols V1
This manual includes different kinds of notes emphasized with a sym
bol. They are meant to draw the reader's attention to possible danger
or aspects to take into consideration when performing an operation.
The following notes and warnings are used:
Warning!
Warning is used in the text whenever there is a risk of personal injury.
Warning!
The electricity warning is used in the text when there is a risk of per
sonal injury due to electrical shocks.
Caution!
Caution is used in the text whenever there is a risk of damaging
equipment.
Note!
Note is used in the text for highlighting important information or re
quirements.
Contents, instructions, terminology
00 - 6 Wrtsil 20
00.5.2. General identified hazards V1
The table below lists general hazards, hazardous situations and
events which are to be noticed during normal operation and mainte
nance work. The table lists also the chapters in this manual which are
concerned by the respective hazard.
Identified hazard, hazardous situation or
event
Concerned
chapters
Notes
Dropping parts during maintenance work 4, 10, 11, 12, 13,
14, 15, 16, 17, 18,
19, 20, 21, 22, 23

Turning device engaged during mainte
nance work and operated unintentionally
3, 4, 10, 11, 12,
13, 14, 16
Warning light is
on when the turn
ing device is en
gaged.
Crankcase safety explosion valves
opening due to crankcase explosion
3, 10, 23
Noise level 3, 4, 10, 11, 12,
13, 14, 15, 16, 17,
18, 19, 20, 21, 22,
23

Running engine without covers 3, 4, 10, 11, 12,
13, 14, 16, 21, 22

Risk of ejected parts in case of major
failure
3, 4, 10, 11, 12,
13, 14, 22

Contact with electricity during mainte
nance work if power not disconnected
4, 11, 17, 18, 21,
22, 23

Electrical hazard if incorrect grounding
of electrical equipment
3, 4, 11, 18, 19
Ejection of components or emission of
high pressure gas due to high firing pres
sures
3, 4, 12, 13, 14,
16, 21

Risk of ejected parts due to break down
of turbocharger
3, 15
Overspeed or explosion due to air-gas
mixture in the charge air
3, 4, 15 Suction air must
be taken from
gas free space.
Ejection of fuel injector if not fastened
while the crankshaft is turned
4, 12, 16
Engine rotating due to engaged gear box
or closed generator breaker during over
haul
3, 4, 10, 11, 12,
13, 14, 16

Fire or explosion due to leakage in fuel /
gas line or lube oil system
3, 4, 16, 17, 18,
20

Inhalation of exhaust gases due to leak
age
3, 15, 20 Proper ventila
tion of engine
room/plant is re
quired.
Contents, instructions, terminology
Wrtsil 20 00 - 7
Identified hazard, hazardous situation or
event
Concerned
chapters
Notes
Inhalation of exhaust gas dust 4, 8, 10, 11, 12,
15, 20

Explosion or fire if flammable gas/vapour
is leaking into the insulation box
3, 20 Proper ventila
tion and/or gas
detectors are re
quired in the en
gine room.
Touching of moving parts 3, 4, 8, 10, 11, 12,
13, 14, 15, 16, 17,
18, 21, 22, 23

Risk of oil spray from high pressure ho
ses
3, 4, 8, 10, 11, 12,
13, 14, 15, 16, 18,
19, 21, 22

00.5.3. Hazards due to moving parts V1
Running the engine without covers and coming in contact with
moving parts
Touching pump parts during unintentional start of electrically
driven pump motor
Turbocharger starting to rotate due to draft if not locked during
maintenance
Thrusting a hand into the compressor housing when the silencer
is removed and the engine is running
Unexpected movement of valve or fuel rack(s) due to a broken
wire or a software/hardware failure in the control system
Unexpected movement of components
Turning device engaged during maintenance work
Accidental rotation of the crankshaft if the turning device is not
engaged during maintenance work, for instance, because it has
been removed for overhaul
Mechanical breakage (for example of a speed sensor) due to
incorrect assembly of the actuator to the engine or faulty electrical
connections.
Contents, instructions, terminology
00 - 8 Wrtsil 20
00.5.4. Hazards due to incorrect operating conditions V1
Overspeed or explosion due to air-gas mixture in the charge air
Overspeed due to air-oil mist mixture in the charge air
Malfunction of crankcase ventilation
Crankcase explosion due to oil mist mixing with air during
inspection after an oil mist shut down
Crankcase safety explosion valves opening due to a crankcase
explosion.
00.5.5. Hazards due to leakage, breakdown or
improper component assembly V2
A fuel pipe bursting and spraying fuel.
Leakage of:
- fuel at joints on the low and/or high pressure side
- lube oil
- HT water
- charge air
- exhaust gas
- pressurised air from air container, main manifold or pipes
Fire or explosion due to leakage from a fuel or gas line
Fire or explosion due to flammable gas/vapour (crude oil) leaking
into the insulation box
Inhalation of exhaust gases or fuel gases due to leakage
Failure of pneumatic stop
Ejected components due to:
- breakdown of hydraulic tool
- breakdown of hydraulic bolt
- breakdown of turbocharger
- high firing pressures
- major failure
Ejection of:
- pressurised liquids and gases from the engine block or piping
- high pressure fluid due to breakdown of hydraulic tool
- gas due to high firing pressures
Contents, instructions, terminology
Wrtsil 20 00 - 9
- high pressure fluid due to breakdown of HP sealing oil pipe
- high pressure air from compressed air supply pipes during
maintenance of pneumatically operated equipment
- cooling water or fuel/lube oil if sensor is loosened while the
circuit is pressurised
- leaks during maintenance work
Oil spray if running without covers
Ejection of fuel injector if not fastened and:
- the turning device is engaged and turned
- the engine turns due to closed generator breaker or coupling.
00.5.6. Electrical hazards V1
Fire or sparks due to damage or short circuit in electrical
equipment
Contact with electricity during maintenance work if power not
disconnected
Hazards due to incorrect grounding of electrical equipment
Electrical shocks because electrical cables or connectors are
damaged
Electrical shocks because electrical equipment is dismantled with
the power connected
Incorrectly wired or disconnected emergency stop switch
Overload of a control system component due to incorrect electrical
connections, damaged control circuitry or incorrect voltage
Engine out of control due to a failure in the shutdown circuitry
Unexpected start-up or failed stop
Crankcase explosion if:
- engine not safeguarded at high oil mist levels, due to energy
supply failure
- engine not (fully) safeguarded at high oil mist levels, due to
failure in oil mist detector circuitry
- engine not (fully) safeguarded at high oil mist levels, due to an
incorrect electrical connector or leakage in a pipe connection.
Contents, instructions, terminology
00 - 10 Wrtsil 20
00.5.7. Other hazards V1
Injury may be caused by:
Slipping, tripping or falling
Improper treatment of water additives and treatment products
Touching the insulation box, turbo-charger, pipes, exhaust
manifold, or other unprotected parts without protection during
engine operation
Dropping parts during maintenance work
Starting maintenance work too early, thus, causing burns when
handling hot components
Neglecting use of cranes and/or lifting tools
Not using proper tools during maintenance work
Not using correct protecting outfits when handling hot parts, thus,
causing burns
Contact with fuel, lubrication oil or oily parts during maintenance
work
Exposure to high noise levels
Touching or removing turbocharger insulation too soon after
stopping the engine
Ejection of preloaded springs when dismantling components.
00.6. Welding precautions
00.6.1. Personal safety when welding V1
It is important that the welder is familiar with the welding safety in
structions and knows how to use the welding equipment safely.
00.6.1.1. Welding hazards and precautions V2
General work area hazards and precautions
Keep cables, materials and tools neatly organised.
Connect the work cable as close as possible to the area where
welding is being performed. Do not allow parallel circuits through
scaffold cables, hoist chains, or ground leads.
Use only double insulated or properly grounded equipment.
Contents, instructions, terminology
Wrtsil 20 00 - 11
Always disconnect power from equipment before servicing.
Never touch gas cylinders with the electrode.
Keep gas cylinders upright and chained to support.
Precautions against electrical shock
Warning!
Electrical shock can kill.
Wear dry hole-free gloves. Change when necessary to keep dry.
Do not touch electrically hot parts or electrode with bare skin or
wet clothing.
Insulate the welder from the work piece and ground using dry
insulation, for example, rubber mat or dry wood.
If in a wet area the welder cannot be insulated from the work piece
with dry insulation, use a semi-automatic, constant-voltage welder
or stick welder with a voltage reducing device.
Keep electrode holder and cable insulation in good condition. Do
not use if insulation is damaged or missing.
Precautions against fumes and gases
Warning!
Fumes and gases can be dangerous.
Use ventilation or exhaust fans to keep the air breathing zone clear
and comfortable.
Wear a helmet and position the head so as to minimize the amount
of fumes in the breathing zone.
Read warnings on electrode container and Material Safety Data
Sheet (MSDS) for the electrode.
Provide additional ventilation or exhaust fans where special
ventilation is required.
Use special care when welding in a confined area.
Do not weld with inadequate ventilation.
Contents, instructions, terminology
00 - 12 Wrtsil 20
Precautions against welding sparks
Warning!
Welding sparks can cause fire or explosion.
Do not weld on containers which have held combustible materials.
Check the containers before welding.
Remove flammable material from welding area or shield them
from sparks and heat.
Keep a fire watch in area during and after welding.
Keep a fire extinguisher in the welding area.
Wear fire retardant clothing and hat. Use earplugs when you weld
overhead.
Precautions against arc rays
Warning!
Arc rays can burn eyes and skin.
Select a filter lens which is comfortable for you while welding.
Always use helmet when you weld.
Provide non-flammable shielding to protect others.
Wear clothing which protects skin while you weld.
Precautions when welding in confined spaces
Ensure that the ventilation is adequate, especially if the electrode
requires special ventilation or if welding causes the formation of
gas that may displace oxygen.
If the welding machine cannot be insulated from the welded piece
and the electrode, use semi-automatic constant-voltage
equipment with a cold electrode or a stick welder with voltage
reducing device.
Provide the welder with a helper and plan a method for retrieving
the welder from the enclosure in case of an emergency.
Contents, instructions, terminology
Wrtsil 20 00 - 13
00.6.2. Protecting equipment when welding V2
The main principles for protecting equipment when welding are:
Preventing uncontrolled current loops
Radiation protection
Preventing the spread of welding splatter
Switching off or disconnecting all nearby electrical equipment
when possible
00.6.2.1. Preventing uncontrolled current loops V1
Always check the welding current path. There should be a direct route
from the welding point back to the return connection of the welding
apparatus.
The main current always flows along the path of least resistance. In
certain cases the return current can therefore go via grounding wires
and electronics in the control system. To avoid this, the distance be
tween the welding point and the return connection clamp of the weld
ing apparatus should always be the shortest possible. It must not in
clude electronic components.
Pay attention to the connectivity of the return connection clamp. A bad
contact might cause sparks and radiation.
00.6.2.2. Radiation protection V2
The welding current and the arc is emitting a wide electromagnetic
radiation spectrum. This might damage sensitive electronic equip
ment.
To avoid such damages:
Keep all cabinets and terminal boxes closed during welding.
Protect sensitive equipment by means of shielding with a
grounded (earthed) conductive plate.
Avoid having the cables of the welding apparatus running in
parallel with wires and cables in the control system. The high
welding current can easily induce secondary currents in other
conductive materials.
00.6.2.3. Prevention of damage due to welding splatter V2
Welding splatter is commonly flying from the welding arc. Few mate
rials withstand the heat from this splatter. Therefore all cabinets and
terminal boxes should be kept closed during the welding. Sensors,
actuators, cables and other equipment on the engine must be prop
erly protected.
Contents, instructions, terminology
00 - 14 Wrtsil 20
Welding splatter can also be a problem after it has cooled down; for
example: short-circuits, leaks.
00.6.3. Welding precautions for engine control system V2
Electronic control systems are sensitive and can be seriously dam
aged by external voltage or high-current shocks. To avoid damaging
the engine control system certain precautions must be taken when
welding.
Follow the instructions that apply to the control system installed on
the engine.
00.6.3.1. UNIC precautions checklist V3
Take the following precautions before welding in the vicinity of a UNIC
control system:
1 Deactivate the system. Disconnect all external connectors from the
power module and from the external interface connectors (XM#).
2 Disconnect all connectors of any electronic modules located close to
(approximately within a radius of 2 m) the welding point.
3 Close the cabinet covers and all the distributed units.
4 Protect cables, sensors and other equipment from splatter with a
proper metal sheet as far as possible.
00.7. Hazardous substances V1
Fuel oils, lubricating oils and cooling water additives are environmen
tally hazardous. Take great care when handling these products or
systems containing these products.
00.7.1. Fuel oils V2
Fuel oils are mainly non-volatile burning fluids, but they may also
contain volatile fractions and therefore present a risk of fire and ex
plosion.
The fuel oils may cause long-term harm and damage in water envi
ronments and present a risk of contaminating the soil and ground
water.
Contents, instructions, terminology
Wrtsil 20 00 - 15
Prolonged or repetitive contact (for example, of polyaromatic hydro
carbons) with the skin may cause irritation and increase the risk of
skin cancer. Fumes that are irritating for eyes and respiratory organs,
such as hydrogen sulphide or light hydrocarbons, may be released
during loading/bunkering.
Note!
Study the safety instructions provided by the fuel oil supplier.
00.7.1.1. Safety precautions for fuel oil handling V1
Isolate the fuel oils from ignition sources, such as sparks from
static electricity.
Avoid breathing evaporated fumes, for instance, during pumping
and when opening storage tanks. The fumes may contain toxic
gases, for instance, hydrogen sulphide. Use a gas mask if
necessary.
Keep the handling and storage temperatures below the flash point.
Store the fuel in tanks or containers designed for flammable fluids.
Note the risk of methane gas formation in the tanks due to bacterial
activities during long-term storage. Methane gas causes risk of
explosion, for instance, when unloading fuel and when opening
storage tanks. When entering tanks, there is a risk of suffocation.
Do not release fuel into the sewage system, water systems or onto
the ground.
Cloth, paper or any other absorbent material used to soak up spills
are a fire hazard. Do not allow them to accumulate.
Dispose of any waste containing fuel oil according to directives
issued by the local or national environmental authorities. The
waste is hazardous. Collection, regeneration and burning should
be handled by authorised disposal plants.
00.7.1.2. Personal protection equipment for fuel oils V3
Protection of respiratory organs Against oil mist: Use respirator with
combined particle and gas filter.
Against evaporated fumes (hydrogen
sulphide, etc.): Use respirator with in
organic gas filter.
Hand protection Use strong, heat and hydrocarbon re
sistant gloves (nitrile rubber for exam
ple).
Eye protection Wear goggles if splash risk exists.
Contents, instructions, terminology
00 - 16 Wrtsil 20
Skin and body protection Wear facial screen and covering
clothes as required.
Use safety footwear when handling
barrels.
Wear protective clothing if hot product
is handled.
00.7.1.3. First aid measures for fuel oil accidents V3
Inhalation of fumes Move the victim to fresh air.
Keep the victim warm and lying still.
Give oxygen or mouth to mouth resus
citation if needed.
Seek medical advice after significant
exposure or inhalation of oil mist.
Skin contact If the oil was hot, cool the skin immedi
ately with plenty of cold water.
Wash immediately with plenty of water
and soap.
Do not use solvents as they will dis
perse the oil and might cause skin ab
sorption.
Remove contaminated clothing.
Seek medical advice if irritation devel
ops.
Eye contact Rinse immediately with plenty of water,
for at least 15 minutes.
Seek medical advice.
If possible, keep rinsing until eye spe
cialist has been reached.
Ingestion Rinse the mouth with water.
Do not induce vomiting as this may
cause aspiration into the respiratory or
gans.
Seek medical advice.
Contents, instructions, terminology
Wrtsil 20 00 - 17
00.7.2. Lubricating oils V1
Fresh lubricating oils normally present no particular toxic hazard, but
all lubricants should always be handled with great care.
Used lubricating oils may contain significant amounts of harmful metal
and PAH (polyaromatic hydrocarbon) compounds. Avoid prolonged
or repetitive contact with the skin. Prevent any risk of splashing. Keep
away from heat, ignition sources and oxidizing agents.
There is a risk of long term contamination of the soil and the ground
water. Take every appropriate measure to prevent water and soil
contamination.
Note!
Study and follow the safety information provided by the supplier of the
lubricating oil.
00.7.2.1. Safety precautions for handling lubricating oil V1
When handling lubrication oils:
Ensure adequate ventilation if there is a risk of vapours, mists or
aerosols releasing. Do not breathe vapours, fumes or mist.
Keep the oil away from flammable materials and oxidants.
Keep the oil away from food and drinks. Do not eat, drink or smoke
while handling lubricating oils.
Use only equipment (containers, piping, etc.) that are resistant to
hydrocarbons. Open the containers in well ventilated
surroundings.
Immediately take off all contaminated clothing.
Note also the following:
Empty packaging may contain flammable or potentially explosive
vapours.
Cloth, paper or any other absorbent material used to recover spills
are fire hazards. Do not allow these to accumulate. Keep waste
products in closed containers.
Waste containing lubricating oil is hazardous and must be
disposed of according to directives issued by the local or national
environmental authorities. Collection, regeneration and burning
should be handled by authorised disposal plants.
Contents, instructions, terminology
00 - 18 Wrtsil 20
00.7.2.2. Personal protection equipment for lubricating
oils V3
Hand protection Use impermeable and hydrocarbon re
sistant gloves (nitrile rubber for exam
ple).
Eye protection Wear goggles if splash risk exists.
Skin and body protection Wear facial screen and covering
clothes as required.
Use safety footwear when handling
barrels.
Wear protective clothing when han
dling hot products.
00.7.2.3. First aid measures for accidents with lubricating
oil V3
Inhalation of fumes Move the victim to fresh air.
Keep the victim warm and lying still.
Skin contact Wash immediately with plenty of water
and soap or cleaning agent.
Do not use solvents (the oil is dis
pearsed and may be absorbed into the
skin).
Remove contaminated clothing. Seek
medical advice if irritation develops.
Eye contact Rinse immediately with plenty of water,
and continue for at least 15 minutes.
Seek medical advice.
Ingestion Do not induce vomiting, in order to
avoid the risk of aspiration into respira
tory organs.
Seek medical advice immediately.
Aspiration of liquid product If aspiration into the lungs is suspected
(during vomiting for example) seek
medical advice immediately.
Contents, instructions, terminology
Wrtsil 20 00 - 19
00.7.3. Cooling water additives, nitrite based V1
The products are toxic if swallowed. Concentrated product may cause
serious toxic symptoms, pain, giddiness and headache. Significant
intake results in greyish/blue discoloration of the skin and mucus
membranes and a decrease in blood pressure. Skin and eye contact
with the undiluted product can produce intense irritation. Diluted sol
utions may be moderately irritating.
Note!
Study the safety information provided by the supplier of the product.
00.7.3.1. Safety precautions for handling cooling water
additives V1
Avoid contact with skin and eyes.
Keep the material away from food and drinks. Do not eat, drink or
smoke while handling it.
Keep the material in a well ventilated place with access to safety
shower and eye shower.
Soak up liquid spills in absorbent material and collect solids in a
container. Wash floor with water as spillage may be slippery.
Contact appropriate authorities in case of bigger spills.
Bulk material can be land dumped at an appropriate site in
accordance with local regulations.
00.7.3.2. Personal protection equipment for cooling water
additives V2
Respiratory protection Normally no protection is required.
Avoid exposure to product mists.
Hand protection Wear rubber gloves (PVC or natural
rubber for example).
Eye protection Wear eye goggles.
Skin and body protection Use protective clothing and take care
to minimise splashing.
Use safety footwear when handling
barrels.
Contents, instructions, terminology
00 - 20 Wrtsil 20
00.7.3.3. First aid measures for accidents with cooling
water additives V3
Inhalation In the event of over exposure to spray
mists, move the victim to fresh air.
Keep the victim warm and lying still. If
the effects persist, seek medical ad
vice.
Skin contact Wash immediately with plenty of water
and soap.
Remove contaminated clothing.
If irritation persists, seek medical ad
vice.
Eye contact Rinse immediately with plenty of clean
water and seek medical advice.
If possible, keep rinsing until eye spe
cialist has been reached.
Ingestion Rinse the mouth with water.
Make the victim drink milk, fruit juice or
water.
Do not induce vomiting without medical
advice.
Immediately seek medical advice.
Never give anything to drink to an un
conscious person.
00.7.4. Fly ashes and exhaust gas dust V1
Note!
Study the safety instructions before starting to overhaul the exhaust
gas system, or engine components that have been in contact with
exhaust gases.
Contents, instructions, terminology
Wrtsil 20 00 - 21
00.7.4.1. Precautions for handling fly ashes and exhaust
gas dust V1
When handling fly ashes, exhaust gas dust or any contaminated
components, observe the following requirements and precautions:
Avoid inhaling and swallowing fly ashes and dusts. Prevent eye
and skin contacts.
Avoid spreading and spilling the fly ashes and dusts to the
environment.
Take measures to avoid spreading the dust in the surrounding
area when opening the manholes of the exhaust gas system,
especially the Selective Catalytic Reduction (SCR) system (if
included). Avoid spreading dust when handling exhaust gas
system components.
Take care that the ventilation is suitable when collecting dust
arisen during the machining and cleaning of the components.
Apply appropriate disposal instructions for flue gas dust spillage.
The dust collected from the exhaust gas system must be
considered as hazardous waste. It must be treated according to
the local regulations and legislation.
00.7.4.2. Personal protection equipment for fly ashes and
exhaust gas dust V3
Respiratory organ protection Use P3 filter respirator against toxic
particles.
For work inside the SCR or other pla
ces in the exhaust gas system, where
the dust concentration is high, a respi
ration mask with fresh filtered com
pressed air supply is recommended.
Hand protection Use gloves.
Eye protection Wear goggles.
Skin and body protection Wear covering clothes.
Use proper protection also when machining or cleaning engine com
ponents that have been in contact with exhaust gases.
Contents, instructions, terminology
00 - 22 Wrtsil 20
00.7.4.3. First aid measures for fly ash and exhaust gas
accidents V3
Inhalation of ashes Move the victim to fresh air.
Keep the victim warm and lying still.
Give oxygen or mouth to mouth resus
citation if needed.
Seek medical advice after a significant
exposure.
Skin contact If the ash is hot, cool the skin immedi
ately with plenty of cold water.
Wash immediately with plenty of water
and soap.
Do not use solvents as it disperses the
ash and may cause skin absorption.
Remove contaminated clothing.
Seek medical advice if irritation devel
ops.
Eye contact Rinse immediately with plenty of water
for at least 15 minutes and seek medi
cal advice.
If possible, keep rinsing until eye spe
cialist has been reached.
Ingestion Rinse the mouth with water.
Do not induce vomiting as it may cause
aspiration into respiratory organs.
Seek medical advice.
00.7.5. Lead in bearings V1
Lead has valuable lubricating properties and is therefore incorporated
into many bearing alloys.
The bearings in Wrtsil engines contain lead and are therefore toxic.
Bearings that are to be scrapped and contain lead must be disposed
of according to the local authority regulations.
Contents, instructions, terminology
Wrtsil 20 00 - 23
00.7.6. Fluoride rubber products
00.7.6.1. Precautions when handling fluoride rubber
products V2
Normal sealing applications
In normal sealing applications the use of fluoride rubber products
does not cause any health hazards. The products can be handled
without any risk provided that normal industrial hygiene is maintained.
When changing O-rings of valve seats
Always wear protective rubber gloves when changing the O-rings of
the valve seats.
When handling the remains of burnt fluoride rubber
When handling the remains of burnt fluoride rubber, for instance,
when changing O-rings after a valve blow-by, wear impenetrable acid-
proof gloves to protect the skin from the highly corrosive remains.
Appropriate glove materials are neoprene or PVC. All liquid remains
must be considered to be extremely corrosive.
The remains can be neutralized with large amounts of calcium hy
droxide solution (lime water). Used gloves must be disposed of.
Grinding dust
Dust and particles originating from grinding or abrasion (wear) of flu
oride rubber may when burned form toxic degradation products.
Smoking must therefore be prohibited in areas where fluoride rubber
dust and particles are present.
In case of fire
When burned fluoride rubber can cause the formation of toxic and
corrosive degradation products, for example, hydrofluoric acid, car
bonyl fluoride, carbon monoxide, and carbon fluoride fragments of low
molecular weight.
Operators handling the remains of burnt fluoride rubber must wear
impenetrable acid-proof gloves to protect the skin from the highly cor
rosive remains. Appropriate glove materials are neoprene or PVC. All
liquid state remains must be considered extremely corrosive.
Burning (incineration) of fluoride rubber is allowed only when ap
proved incinerators equipped with gas emission reduction systems
are used.
Contents, instructions, terminology
00 - 24 Wrtsil 20
Use of fluoride rubber products at temperatures above 275C
(527F)
Fluoride rubber can be used in most applications (up to 275C) with
out any substantial degradation or health hazard. Use or test of fluo
ride rubber at temperatures above 275C must be avoided. If the ma
terial is exposed to higher temperatures, the temperature may get out
of control.
00.7.6.2. Personal protection equipment for fluoride
rubber products V3
Hand protection Use impenetrable acid-proof gloves
(neoprene or PVC).
Inhalation protection Use breathing mask.
00.7.6.3. First aid measures for accidents with fluoride
rubber products V3
Inhaling Move the victim from the danger zone.
Make the victim blow his nose.
Seek medical advice.
Eye contact Rinse immediately with water.
Seek medical advice.
Skin contact Rinse immediately with water.
Put a 2 % solution of calcium gluconate
gel on the exposed skin.
If calcium gluconate gel is not availa
ble, continue to rinse with water.
Seek medical advice.
Contents, instructions, terminology
Wrtsil 20 00 - 25
Contents, instructions, terminology
00 - 26 Wrtsil 20
01. Main Data, Operating Data and General
Design V2
01.1. Main data for Wrtsil 20 V6
Cylinder bore.........................................................................200 mm
Stroke....................................................................................280 mm
Piston displacement per cylinder...............................................8.80 l
Firing order
Engine type Clockwise rotation Counter-clockwise rotation
4L20 1-3-4-2 1-2-4-3
5L20 1-2-4-5-3 1-3-5-4-2
6L20 1-5-3-6-2-4 1-4-2-6-3-5
8L20 1-3-7-4-8-6-2-5 1-5-2-6-8-4-7-3
9L20 1-7-4-2-8-6-3-9-5 1-5-9-3-6-8-2-4-7
Normally the engine rotates clockwise.
Lubricating oil volume in the engine
Engine type 4L20 5L20 6L20 8L20 9L20
App. oil volume in litres
Normal sump
270 320 380 490 550
Deep sump 330 500 640 710
Special deep sump 540
Oil volume between max..
and min. marks
appr. litres/mm
0.7 1.4 1.5 1.9 2.0
App. cooling water volume (HT) in the engine in litres
Engine type 4L20 5L20 6L20 8L20 9L20
Engine only 90 105 120 150 160
Lubricating oil volume in the speed governor in litres
Woodward 3161 2.2
Woodward UG-A 1.4
Regulateurs Europa 2221, 2231 2
Main Data, Operating Data and General Design
Wrtsil 20 01 - 1
01.2. Recommended operating data V3
Apply to normal operation at nominal speed.
Temperatures, (C)
Normal values
(xx)
Alarm (stop) limits
(xx)
Load 100 % 0 - 100 %
Lube oil before engine 63 - 67 80
Lube oil after engine 10 - 15
higher
HT water after engine 86 - 95 105 (110)
HT water before engine 6 - 10 lower
LT water before charge air cooler 25 - 38
Charge air in air receiver 50 - 70 75
Exhaust gas after cylinder See test records 70 higher (xxx)
Preheating of HT water 60
Gauge pressures (bar)
Normal values
(xx)
Alarm (stop) limits
(xx)
Load 100 % 0 - 100 %
Lube oil before engine at a speed of 720
RPM (12.0 r/s)
4.0 - 5.0 3.0 (2.0)
1000 RPM (16.7 r/s) 4.0 - 5.0 3.0 (2.0)
HT/LT water before HT/LT pump (=stat
ic)
0.7 -1.5
HT water before engine 1.6 + static press. (x) 1.0 or 0.2 + static press. (x)
LT water before charge air cooler 1.6 + static press.(x) 1.0 or 0.2 + static press. (x)
Fuel before engine (MD) 4 - 7 (x), (HF) 5 - 7 4
Compressed air
Air starter
max. 30
9.0
18
Charge air See test records
Other pressures (bar)
Normal values
(xx)
Alarm (stop) limits
(xx)
Load 100 % 0 - 100 %
Firing pressure See test records
Opening pressure of safety valve on
lube oil pump
6 - 8
Visual indicator and electronic alarm for
high pressure drop over lube oil filter
<1.2 - 1.8 1.2 - 1.8
(x) Depending on speed and installation
Main Data, Operating Data and General Design
01 - 2 Wrtsil 20
With engine driven MD-pump pressure might be lower close to min.
speed.
(xx) Under 30% load the lubricating oil and water temperatures fall a
little.
(xxx) See test records.
01.3. Reference conditions V2
Reference conditions according to ISO 3046/I (2002):
Air pressure.............................................................100 kPa (1.0 bar)
Ambient temperature.....................................................298 K (25C)
Relative air humidity....................................................................30%
Cooling water temperature of charge air cooler.............298 K (25C)
In case the engine power can be utilized under more difficult condi
tions than those mentioned above, it will be stated in the sales docu
ments. Otherwise, the engine manufacturer can give advice about the
correct output reduction. As a guideline additional reduction may be
calculated as follows:
Reduction factor = (a + b + c) %
a=0.5% for every C the ambient temperature exceeds the stated
value in the sales documents.
b=1% for every 100 m level difference above stated value in the sales
documents.
c=0.4% for every C the cooling water of the charge air cooler ex
ceeds the stated value in the sales documents.
01.4. General engine design V5
The engine is a turbocharged intercooled 4-stroke diesel engine with
direct fuel injection.
The engine block is cast in one piece. The main bearings are hanging.
The main bearing cap is supported by two hydraulically tensioned
main bearing screws and two horizontal side screws.
The charge air receiver is cast into the engine block as well as the
cooling water header. The crankcase covers, made of light metal, seal
against the engine block by means of rubber sealings.
Main Data, Operating Data and General Design
Wrtsil 20 01 - 3
The lubricating oil sump is welded.
The cylinder liners are of wet type. The cooling effect is optimised to
give the correct temperature to the inner surface.
To eliminate the risk of bore polishing, the liner is provided with an
antipolishing ring.
The main bearings are fully interchangeable trimetal or bimetal bear
ings which can be removed by removing the main bearing cap.
The crankshaft is forged in one piece and is balanced by counter
weights as required.
The connecting rods are drop forged. The big end is split and the
mating faces are serrated. The small end bearing is stepped to ach
ieve large bearing surfaces. The big end bearings are fully inter
changeable trimetal or bimetal bearings.
The pistons are of composite type with forged steel or casted skirt and
a forged crown screwed together. It is fitted with a Wrtsil patented
skirt lubricating system. The top ring grooves are hardened.
Cooling oil enters the cooling space through the connecting rod. The
cooling spaces are designed to give an optimal shaker effect.
The piston ring set consists of two chrome-plated compression rings
and one chrome-plated, spring-loaded oil scraper rings.
The cylinder head, made of special cast iron, is fixed by four hydraul
ically tensioned screws. The head has a double deck design and
cooling water is forced from the periphery towards the centre giving
efficient cooling in important areas.
The inlet valves are stellited and the stems are chromium-plated. The
valve seat rings are made of a special cast iron alloy and are change
able.
The exhaust valves also with stellited seats and chromium-plated
stems and seal against the directly cooled valve seat rings.
The seat rings, made of a corrosion and pitting resistant material, are
changeable.
The camshafts are made up of one-cylinder pieces with integrated
cams. The bearing journals are separate pieces and thus it is possible
to remove a camshaft piece sideways.
The injection pumps have integrated roller followers and can be
changed without any adjustment. The pumps and piping are located
in a closed space which is heat insulated for heavy fuel running. The
element can be changed without removing the pump housing.
The turbocharger is normally located at the free end of the engine.
The charge air cooler is made as removable inserts.
Main Data, Operating Data and General Design
01 - 4 Wrtsil 20
The lubricating oil system includes a gear pump, oil filter, cooler with
thermostat valve, centrifugal by-pass filter and an electrically driven
prelubricating pump.
The oil sump has the capacity to hold the entire volume of oil needed,
and all cylinder numbers can be run in wet sump configuration. Dry
sump running is also possible.
The starting system. The engine is provided with an air driven starting
device of turbine type. The air starter acts directly on the flywheel.
Main Data, Operating Data and General Design
Wrtsil 20 01 - 5
Main Data, Operating Data and General Design
01 - 6 Wrtsil 20
02. Fuel, Lubricating Oil, Cooling Water V3
Note!
For preventing and minimizing the handling risks, read carefully the
chapter about Environmental Hazards.
02.1. Fuel V10
The Wrtsil medium-speed diesel engine is designed to operate on
heavy fuel (residual fuel) with a maximum viscosity of 700 cSt at 50
C (approx. 55 cSt at 100 C, approx. 7200 Redwood No.1 seconds
at 100 F) and will operate satisfactorily on blended (intermediate)
fuels of lower viscosity, as well as on distillate fuel. Avoid the use of
fuels having lower / higher injection viscosity than the values found in
the table below. The use of fuels having too low injection viscosity
may lead to the seizure of fuel injection pump plunger or fuel injection
nozzle and will also increase fuel leakage in the injection pump lead
ing to increased fuel consumption, deteriorated engine performance
and increased risk of cavitation in the fuel system.
The following types of fossil fuels are defined for the Wrtsil 20:
HFO 1 & 2, ISO 8217:2005(E), ISO-F-RMH 700 and RMK 700
DO, diesel oil or LFO, light fuel oil
Liquid bio fuel
Fuel viscosity limits at engine inlet in running conditions (cSt)
Engine Type Fuel
LFO, min HFO
Wrtsil 20 1,8 16 - 24
The maximum limits of fuel characteristics for a certain engine are
stated in the documentation delivered with the engine.
Blended fuels (residuals and distillate) with a viscosity between ap
prox. 4 and 7 cSt at 100 C (12 and 30 cSt at 50 C, 75 and 200
Redwood No.1 seconds at 100 F) containing between 30 and 60 %
distillate should, however, be avoided due to the risk of precipitation
of heavy components in the blend, with filter clogging and large
amount of centrifuge sludge as a consequence.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 1
When difficulties with filter clogging are experienced, fuel incompati
bility can be tested by the ASTM D4740-00 or ISO 10307-1/93 (LFO)
or ISO 10307-2/A/93 (HFO) test methods.
02.1.1. Fuel treatment
02.1.1.1. Fuel separation V2
Separation principle
Most fuels, except good quality distillate fuels (ISO-F-DMX, DMA and
DMB) must be separated by a centrifugal separator before entering
the engine. However, separation of distillate fuels must shall be con
sidered, since fuels can get contaminated in storage tanks. The sep
arator removes solid particles as small as 5 microns and additionally
free water from the fuel very efficiently. Even smaller particles are
separated, but with reduced efficiency. There are several things to be
taken into consideration, when designing the separation system. The
following fuel parameters are the most important:
Viscosity
The viscosity is very critical in determining the dimensions of the sep
arator. Higher the fuel viscosity, lower the separation capacity. Thus
a bigger separator size (or more separators) is required to separate
the same amount of fuel/hour. The separator manufactures have ta
bles with flow capacities for standard fuel viscosities. Standard sep
arators can handle fuels up to 700 cSt at 50C. The viscosity is low
ered as much as possible by heating the fuel to maximum tempera
ture, which in standard HFO separators is 98C. For liquid biofuels
the separation temperature is typically 50-55C. Higher separation
temperatures, more than 98C can also be utilized. But these cannot
be handled by standard separators. Separators have to be designed
for each case. Higher separation temperatures are used with ex
tremely high viscosity fuels. Separation temperature for distillate fuel
is typically 40C.
Density
The separation of water from fuel is based on the difference in density
between the two fluids. Water must always be heavier than the fuel
to make the separation process possible. This limits the maximum
density of the fuel to 1010 kg/m at 15C for standard separators. The
separation capacity is de-rated when the fuel densities are between
990 and 1010 kg/m at 15C. Fuels, with higher density than 1010 kg/
m at 15C, can be separated but this requires a special separator
including a water treatment system to increase the density of the op
erating water. In that case its not possible to separate water from fuel,
only solid particles.
Flash point
Fuel, Lubricating Oil, Cooling Water
02 - 2 Wrtsil 20
Flash point of heavy fuels varies a lot. Some heavy fuel qualities are
at a temperature above their flash point and some below their flash
point when separated. Distillate fuels are normally separated at a
temperature below their flash point. For special fuels, like many crude
oils, having low flash point and containing light, easily evaporating
fractions, special explosion proof separators along with explosion
proof electrical motors and other electrical components are needed.
Also, with these fuels, a system to avoid explosion inside the sepa
rator bowl is required. This is done by adding an inert gas. These
systems are expensive and are used only in special cases.
Water content
If the water content is >0.3% and the fuel density is >990 kg/m at
15C the separator is de-rated (see diagram below).
Dimensioning of the separator
Requirement for the fuel separator unit flow is calculated according
to the following formula:
V n
b c
f
HFOS ENG
E
FUEL
S

1
100

+



=
V
HFOS
= Required separator capacity [m
3
/h]
n
ENG
= Amount of engines [pcs]

FUEL
= Density at actual temperature [kg/m
3
]
b
E
= Fuel consumption / Engine [kg/h]
c
S
= Separator safety factor [minimum 15% is Alfa Lavals recom
mendation]
f = Derating factor, depending on the fuel density and water content
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 3
De-rating factor depending on the fuel density and water content
990 992 994 996 998 1000 1002 1004 1006 1008 1010
1
0,9
0,8
0,7
0,6
0,5
0,4
Density kg/m3 at 15 C
D
e
-
r
a
t
i
n
g

f
a
c
t
o
r
Water content >0.5%
Water content 0.3-0.5%
Water content < 0.3%
Fig 02-1 V2
Separator modules
The suppliers are making complete modules today, including heaters
and feeder pumps, which means that the equipment is automatically
calibrated and ready for customer use. The modules include a num
ber of separators needed to meet the capacity of the installation along
with an extra standby separator. This also ensures fuel supply when
one separator is in service.
02.1.1.2. Heating V2
See the diagram in Fig 02-2. In order to minimize the risk of wax for
mation, keep the fuel temperature about 10 C above the minimum
storage temperature indicated in the diagram. To compensate for
heat losses between the heater and the engine, the temperature after
the final heater should be 5 - 10 C above the recommended tem
perature before the injection pumps.
Fuel, Lubricating Oil, Cooling Water
02 - 4 Wrtsil 20
Fuel oil viscosity-temperature diagram
C
-10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
3
4
5
6
7
8
9
10
12
14
16
20
25
30
40
50
60
80
100
200
300
400
600
1000
2000
5000
Centistokes
F
D
E
C
K
B
G
H
A
14 cSt at 40 C
GAS OIL
MARINE DIESEL OIL
11 cSt at 40 C
5.5 cSt at 40 C
APPROX. PUMPING LIMIT
VISCOSITY BEFORE
80 cSt at 50 C
180 cSt at 50 C
380 cSt at 50 C
700 cSt at 50 C
40 cSt at 50 C
FUEL PUMPS
CENTRIFUGING
TEMPERATURE
TEMPERATURE
MINIMUM STORAGE
MAX. TEMP
RECOMMENDED
RANGE
Fig 02-2 320261 V1
Example:A fuel oil with a viscosity of 380 cSt (A) at 50 C (B) or 80
cSt at 80 C (C) must be preheated to 112 - 126 C (D-E) before the
fuel injection pumps, to 97 C (F) at the centrifuge and to minimum
40 C (G) in storage tanks. The fuel oil may not be pumpable below
36 C (H).
To obtain temperatures for intermediate viscosities, draw a line from
the known viscosity/temperature point in parallel to the nearest vis
cosity/temperature line in diagram.
Example:Known viscosity 60 cSt at 50 C (K). The following can be
read along the dotted line: Viscosity at 80 C = 20 cSt, temperature
at fuel injection pumps 74 - 86C, centrifuging temperature 86 C,
minimum storage tank temperature 28 C.
The diagram in Fig 02-3 can be used for converting various viscosity
units to centistokes. The diagram should be used only for conversion
of viscosities at the same temperature. The same temperature should
then be used when entering the viscosity/temperature point into the
diagram in Fig 02-2.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 5
Note!
When converting viscosities from one of the units on the abscissa to
centistokes or vice-versa, keep in mind that the result obtained is valid
only at one and the same temperature. For converting the viscosity
at a given temperature to a viscosity at another temperature, a vis
cosity-temperature diagram or conversion rule must be used.
Viscosity conversion diagram
Centistokes
3
4
5
6
7
8
9
10
12
14
16
20
25
30
40
50
60
80
100
200
300
400
600
1000
2000
5000
10 20 50 100 200 500 1000 2000 5000 10000
Sec. Saybolt Furol
1 2 5 10 20 50 100 200 500 1000
Engler
10 20 50 100 200 500 1000 2000 5000 10000
Sec.Redwood I
10 20 50 100 200 500 1000 2000 5000 10000
Sec. Saybolt Universal
Fig 02-3 320253 V1
02.1.1.3. Viscosity control V2
An automatic viscosity controller, or a viscosimeter, at least, should
be installed in order to maintain the correct fuel injection viscosity be
fore the fuel enters the engines fuel system.
Fuel, Lubricating Oil, Cooling Water
02 - 6 Wrtsil 20
02.1.2. Maximum limits for fossil fuel characteristics V9
The diesel engine Wrtsil 20, is designed and developed for con
tinuous operation, without reduction of the rated output, on fossil fuels
with the following properties:
Heavy fuel oil:
Fuel characteristics, maximum limits
Test method
reference
Kinematic viscosity cSt at 100C
cSt at 50C
Redwood No.1 sec.at 100F
55
700
7200
ISO 3104
Density
kg/m
3
at 15C
991 ISO 3675 or
12185
Density
1)
kg/m
3
at 15C 1010
1)
ISO 3675 or
12185
Water % V/V 0.5 ISO 3733
Water, max. before engine % V/V 0.3 ISO 3733
Flash point, min. (PMCC) C 60 ISO 2719
Pour point C 30 ISO 3016
Total sediment potential % m/m 0.1 ISO 10307-2
Sodium mg/kg 50 ISO 10478
Sodium, bef. engine mg/kg 30 ISO 10478
Al + Si bef. engine mg/kg 15 ISO 10478 or
IP 501 or 470
The limits above also correspond to the demands:
ISO 8217:2005(E), ISO-F-RMH 700 and RMK 700
1)
BS MA 100:1996, RMH 55 and RMK 55
1)
CIMAC 2003, class H 55 and K 55
1)
.
1)
Provided the fuel treatment system can remove water and solids.
The maintenance intervals are decided by the characteristics of the
used fuel, see Chapter 04, Maintenance Schedule.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 7
The differences between HFO 1 and HFO 2 are seen below:
Fuel characteristics, maximum limits
HFO 1 HFO 2 Test method
reference
Sulphur % m/m 1.50 1.51 - 4.50 ISO 8754 or
14596
Ash % m/m 0.05 0.06 - 0.15 ISO 6245
Vanadium mg/kg 100 101 - 600 ISO 14597 or
IP 501 or 470
Al + Si mg/kg 30 31 - 80 ISO 10478 or
IP 501 or 470
Conradson Carb. Residue % m/m 15.0 15.1 - 22.0 ISO 10370
Asphaltens % m/m 8.0 8.1 - 14.0 ASTM D 3279
CCAI 850 851 - 870 ISO 8217,
Annex B
Foreign substances or chemical waste, hazardous to the safety of the
installation or detrimental to the performance of engines, should not
be contained in the fuel.
Note!
If any of specified fuel properties exceed HFO 1 maximum value the
fuel should be classified as HFO 2.
Fuel, Lubricating Oil, Cooling Water
02 - 8 Wrtsil 20
Light fuel oil:
The fuel specification is based on the ISO 8217:2005(E) standard and
covers the fuel categories ISO-F-DMX, DMA, DMB and DMC. The
distillate grades mentioned above can be described as follows:
DMX: A fuel which is suitable for use at ambient temperatures
down to -15 C without heating the fuel. In merchant marine
applications, its use is restricted to lifeboat engines and certain
emergency equipment due to reduced flash point.
DMA: A high quality distillate, generally designated MGO (Marine
Gas Oil) in the marine field.
DMB: A general purpose fuel which may contain trace amounts of
residual fuel and is intended for engines not specifically designed
to burn residual fuels. It is generally designated MDO (Marine
Diesel Oil) in the marine field.
DMC: A fuel which can contain a significant proportion of residual
fuel. Consequently it is unsuitable for installations where engine
or fuel treatment plant are not designed for the use of residual
fuels.
Fuel characteristics, maximum limits
ISO-FDMX ISO-FDMA ISO-FDMB
ISO-FDMC
1)
Test method
reference
Appearance Clear and bright - - Visual
inspection
Viscosity, max.
Injection viscosity, min.
2)
Injection viscosity, max.
2)
cSt at 40 C
cSt
cSt
5.5
1.8
24
6
1.8
24
11
1.8
24
14
1.8
24
ISO 3104
Density, max. kg/m at 15
C
- 890 900 920 ISO 3675 or
12185
Cetane index, min. 45 40 35 - ISO 4264
Water max. % V/V - - 0.3 0.3 ISO 3733
Sulphur, max. % m/m 1.00 1.50
2.00
3)
2.00
3)
ISO 8754 or
14596
ASTM D 7212
4)
Ash, max. % m/m 0.01 0.01 0.01 0.05 ISO 6245
Vanadium, max. mg/kg - - - 100 ISO 14597 or
IP 501 or 470
Sodium, max. before engine
2)
mg/kg - - - 30 ISO 10478
Aluminium + Silicon, max. mg/kg - - - 25 ISO 10478 or
IP 501 or 470
Aluminium + Silicon, max.
before engine
2)
mg/kg - - - 15 ISO 10478 or
IP 501 or 470
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 9
Fuel characteristics, maximum limits
ISO-FDMX ISO-FDMA ISO-FDMB
ISO-FDMC
1)
Test method
reference
Carbon residue, max.
Carbon residue on 10 % V/V
distillation bottoms, max.
% m/m -
0.30
-
0.30
0.30
-
2.50
-
ISO 10370
Flash point (PMCC), min. C
60
2)
60 60 60 ISO 2719
Pour point, max.
- winter quality
- summer quality
C
-
-
- 6
0
0
6
0
6
ISO 3016
Cloud point, max. C -16 - - - ISO 3015
Total sediment existent, max. % m/m - - 0.1 0.1 ISO 10307-1
Used lubricating oil
5)
- calcium, max.
- zinc, max.
- phosphorus, max.
mg/kg
-
-
-
-
-
-
-
-
-
30
15
15
IP 501 or 470
IP 501 or 470
IP 501 or 500
1)
Use of ISO-F-DMC category fuel is allowed provided that the fuel
treatment system is equipped with a fuel centrifuge.
2)
Additional properties specified by the engine manufacturer, which
are not included in the ISO specification or differ from the ISO spec
ification.
3)
A sulphur limit of 1,5 % m/m will apply in SOx emission controlled
areas designated by International Maritime Organization. There may
be also other local variations.
4)
For fuels having sulphur content below 0,05 % m/m
5)
A fuel shall be considered to be free of used lubricating oil (ULO), if
one or more of the elements calcium, zinc and phosphorus are below
or at the specified limits. All three elements shall exceed the same
limits before a fuel shall be deemed to contain ULO.
The fuel should not include any added substance or chemical waste,
which jeopardizes the safety of installations or adversely affects the
performance of the engines or is harmful to personnel or contributes
overall to additional air pollution.
02.1.3. Maximum limits for liquid biofuel
characteristics V2
The Wrtsil 20 diesel engines are designed and developed for con
tinuous operation, without reduction in the rated output, on crude liq
uid biofuels or biodiesels with the properties included in Tables 1 and
Fuel, Lubricating Oil, Cooling Water
02 - 10 Wrtsil 20
2. However, since liquid biofuels typically have lower heating value
than fossil fuels, capacity of the fuel injection system must be checked
case specifically.
The crude liquid biofuel specification included in Table 1 is valid for
crude vegetable based biofuels, like palm oil, coconut oil, copra oil,
rape seed oil, jathropha oil, etc. but is not valid for animal based bio
fuels.
The biodiesel specification in Table 2 is valid for renewable refined
liquid biofuels, including both 1st and 2nd generation biodiesels,
which are manufactured by using transesterification or hydrogenation
processes. Renewable refined liquid biofuels can contain both vege
table and / or animal based raw material and do normally show out
very good physical and chemical properties and can be used as well
provided that the specification included in the Table 2 is fulfilled. In
ternational standards ASTM D 6751-06 or EN 14214:2003 (E) are
typically used for specifying biodiesel quality.
Blending of different fuel qualities:
Crude liquid biofuels must not be mixed with fossil fuels, but have to
be used as such.
Mixing of crude liquid biofuel and distillate fuel will increase the risk
of cavitation in the fuel system, since required fuel temperature before
engine is normally 65 75 C. At this temperature light fractions of
distillate fuel start to already evaporate.
Mixing of crude liquid biofuel with heavy fuel will increase the risk of
biofuel component polymerization leading to formation of gummy de
posits, since the use of heavy fuel would require much higher oper
ating temperature than crude liquid biofuel, i.e. normally above 100
C in order to achieve a proper injection viscosity.
Biodiesel on the other hand can be mixed with fossil distillate fuel.
Fossil fuel being used as a blending component has to fulfil Wrtsils
distillate fuel specification found for different the engine types from
the documents: V92A0459, V92A0572 or V92A0670.
Required fuel temperatures:
Crude liquid biofuel temperature before an engine is an utmost im
portant operating parameter. Too low temperature will cause solidifi
cation of fatty acids leading to clogging of filters, plug formation in the
fuel system and even to fuel injection equipment component break
downs. Too high fuel temperature will increase the risk of polymeri
zation, especially in the presence of oxygen. For liquid palm oil the
fuel temperature before injection pumps shall be kept between 65 and
75 C. For other types of crude liquid biofuels the temperature re
quirement can be slightly different and must be confirmed before the
use.
Biodiesel temperature before fuel injection pumps has to be 45 5 C.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 11
Table 1: Crude liquid biofuel specification
Crude liquid biofuel specification
Test method
reference
Viscosity, max.
Injection viscosity, min.
Injection viscosity, max.
cSt at 40 C
cSt
cSt
100
1)
1.8 2.8
2)
24
ISO 3104
Density, max. kg/m at 15 991 ISO 3675 or
12185
Ignition properties
3)
FIA test
Sulphur, max. % mass 0.05 ISO 8754
Total sediment existent, % mass 0.05 ISO 10307-1
Water, max. before engine % volume 0.20 ISO 3733
Micro carbon residue, max. % mass 0.50 ISO 10370
Ash, max. % mass 0.05 ISO 6245 /
LP1001
Phosphorus, max. mg/kg 100 ISO 10478
Silicon, max. mg/kg 15 ISO 10478
Alkali content (Na+K), max. mg/kg 30 ISO 10478
Flash point (PMCC), min. C 60 ISO 2719
Cloud point, max. C
4)
ISO 3015
Cold filter plugging point,
max.
C
4)
IP 309
Copper strip corrosion (3
hrs at 50 C), max.
1b ASTM D130
Steel corrosion (24 / 72
hours at 20, 60 and 120
C), max.
No signs of
Corrosion
LP 2902
Acid number, max. mg KOH/g 15.0 ASTM D664
Strong acid number, max. mg KOH/g 0.0 ASTM D664
Iodine number, max. 120 ISO 3961
1)
If injection viscosity of max. 24 cSt can not be achieved with an
unheated fuel, fuel system has to be equipped with a heater.
2)
Min. limit at engine inlet in running conditions; 1,8 cSt.
3)
Ignition properties have to be equal to or better than the
requirements for fossil fuels, i.e., CN min. 35 for LFO and CCAI max.
870 for HFO.
4)
Cloud point and cold filter plugging point have to be at least 10 C
below fuel injection temperature.
Fuel, Lubricating Oil, Cooling Water
02 - 12 Wrtsil 20
Table 2: Biodiesel specification based on EN 14214:2003 standard
Biodiesel specification based on EN 14214:2003 standard
Test method
reference
Viscosity, min. - max.
Injection viscosity, min.
cSt at 40 C
cSt
3,50 5,00
1,8 2,8
1)
EN ISO 3104
Density, min. - max. kg/m at 15 860 - 900 EN ISO 3675 /
12185
Cetane number, min. 51,0 EN ISO 5165
Sulphur content, max. mg/kg 10,0 prEN ISO
20846 / 20884
Sulphated ash content,
max.
% m/m 0,02 ISO 3987
Total contamination, max. mg/kg 24 EN 12662
Water content, max. mg/kg 500 EN ISO 12937
Carbon residue (on 10%
distillation residue), max.
% m/m 0.30 EN ISO 10370
Phosphorus content, max. mg/kg 10,0 EN 14107
Group I metals (Na + K)
content, max.
mg/kg 5,0 EN 14108 /
14109
Group II metals (Ca + Mg)
content, max.
mg/kg 5,0 prEN 14538
Flash point, min. C 120 prEN ISO
3679
Cold filter plugging point,
max. (climate dependent
requirement)
C -44 => +5 EN 116
Oxidation stability at 110
C, min.
hrs 6,0 EN 14112
Copper strip corrosion (3
hrs at 50 C), max.
Rating Class 1 EN ISO 2160
Acid value, max. mg KOH/g 0,50 EN 14104
Iodine value, max. g iodine / 100 120 EN 14111
Ester content, min. % m/m 96,5 EN 14103
Linolenic acid methyl ester,
max.
% m/m 12,0 EN 14103
Polyunsaturated methyl
esters, max.
% m/m 1
Methanol content, max. % m/m 0,20 EN 14110
Monoglyceride content,
max.
% m/m 0,80 EN 14105
Diglyceride content, max. % m/m 0,20 EN 14105
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 13
Biodiesel specification based on EN 14214:2003 standard
Test method
reference
Triglyceride content, max. % m/m 0,20 EN 14105
Free glycerol, max. % m/m 0,02 EN 14105 /
14106
Total glycerol, max. % m/m 0,25 EN 14105
1)
Min. limit at engine inlet in running conditions; 1,8 cSt.
02.1.4. Comments on fuel characteristics V8
Viscosity
The viscocity is not a measure of the fuel quality, but determines the
complexibility of the fuel heating and handling system, as the HFO
has to be heated to reach required viscosity at the point of injection.
At low viscosities, the flow past the plunger in the injection pump in
creases. This leads to a decrease in the amount of injected fuel, which
in bad cases might make it impossible to reach full engine output. The
standard engine fuel system is laid out for max. 700 cSt at 50 C fuel
(approx. 55 cSt at 100C, approx. 7200 Redwood No. 1 seconds at
100F).
Density
The density influences mainly on the fuel separation. Separators can
remove water and to some extent solid particles from fuels having
densities of up to 991 kg/m
3
at 15C. There are also separators on
the market that can clean fuel with densities of up to 1010 kg/m
3
at
15C. The separator capability must be checked before purchasing a
fuel with a very high density, as a bad separation will lead to abnormal
wear due to unremoved particles and water. If an older design fuel
separator is used, the separators gravity disc must be chosen ac
cording to the fuel density.
Caution!
Fuels having a low viscosity in combination with a high density usually
have bad ignition properties!
Ignition quality
Heavy fuels may have very low ignition quality. This may cause trou
ble at start and low load operation, particularly if the engine is not
sufficiently preheated. Low ignition quality may also result in a long
ignition delay and can cause a fast pressure rise and very high max
imum pressures. This increases the mechanical load and can even
damage engine components such as e.g. piston rings and bearings
Fuel, Lubricating Oil, Cooling Water
02 - 14 Wrtsil 20
severely. Deposits on the piston top, on the exhaust valves, in the
exhaust system, and on the turbine nozzle ring and turbine blades
can also be expected. The turbocharger fouling will lead to decreased
turbocharger efficiency, and increased thermal load.
A symptom of low ignition quality is diesel knock, i.e. hard, high pitch
ed combustion noise. The effects of diesel knocking are increased
mechanical load on components surrounding the combustion space,
increased thermal load, as well as increased lubricating oil consump
tion and contamination.
Caution!
Although low ignition quality produces long ignition delay, advancing
the injection timing makes things only worse: fuel is injected at a lower
compression temperature, and this will produce an even longer igni
tion delay!
Ignition quality is not defined, nor limited, in marine residual fuel
standards. The same applies to ISO-F-DMC marine distillate fuel.
The ignition quality of a distillate fuel can be determined according to
several methods, i.e. Diesel Index, Cetane Index, and Cetane Num
ber. The ignition quality of a heavy fuel oil can be roughly determined
by calculating the CCAI (= Calculated Carbon Aromaticity Index) from
the viscosity and density of a fuel.
Formula for determining CCAI:
CCAI =- 81 - 141 log
10
log
10
(
k
+ 0.85)
Where:
= density (kg/m
3
at 15C)

k
= kinematic viscosity ( cSt at 50 C)
Note!
An increased CCAI value indicates decreased ignition quality.
CCAI can also be determined (but with limited accuracy) by the nomo
gram, see Fig 02-4.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 15
Nomogram for determining CCAI
820
840
860
880
900
920
940
960
980
1000
1020
1040
800
810
820
830
840
850
860
870
880
890
900
910
920
930
4
5
6
7
8
9
10
15
20
25
30
35
40
50
75
100
150
200
250
300
400
500
750
1000
2
3
4
5
6
7
8
9
10
15
20
25
30
35
40
50
60
VISCOSITY
cSt (mm
2
/s)
CCAI DENSITY
(kg/m3 at 15C)
50C at 100C
Fig 02-4 320259 V1
Straight run fuels show CCAI values in the 770 - 840 range, and are
very good igniters. Cracked residues may run from 840 to over 900,
while most bunkers remain in the 840 to 870 range at present.
The CCAI is not an exact tool for judging fuel ignition. Following rough
guidelines can however be given:
Engines running at constant speed and load over 50 % can without
difficulty use fuels with CCAI-values of up to 870.
Engines running at variable speed and load can without difficulty
run on fuels with CCAI-values up to 860.
To avoid difficulties with poor ignition quality fuels the following should
be noted:
Sufficient preheating of the engine before start.
Proper function of the cooling system.
Proper function of the injection system, especially the injection
nozzle condition must be good.
Fuel, Lubricating Oil, Cooling Water
02 - 16 Wrtsil 20
Water content
The water content of heavy fuel oils varies widely. Water may come
from several different sources, it can either be fresh or salt. It can also
originate from e.g. condensation in the installation's bunker tanks.
If the water is sweet and very well emulgated in the fuel, the
effective energy content of the fuel decreases with increasing
water content, leading to an increase in fuel consumption.
If the fuel is contaminated with sea water, the chlorine in the salt
will cause corrosion of the fuel handling system, including the
injection equipment. The effects of sodium, that also originates
from salt, are described more in detail below.
To avoid problems and damage in the engines fuel injection system,
the water content must be reduced to a max. 0.3 % before the engine.
Sulphur
Sulphur in the fuel may cause cold corrosion and corrosive wear, es
pecially at low loads. Together with vanadium and/or sodium sulphur
also contributes to deposit formation in the exhaust system, normally
in the form of sulphates. The deposits can also cause high tempera
ture corrosion.
Ash content
A high ash content may be detrimental in several ways. Different ash
components can cause different problems:
Aluminium and silicon oxides originate from the refining process,
and can cause severe abrasive wear mainly of the injection pumps
and nozzles, but also of cylinder liners and piston rings. An
efficient fuel separation is a must for minimising wear.
Oxides of vanadium and sodium , mainly sodium vanadyl
vanadates, are formed during the combustion, and mix or react
with oxides and vanadates of other ash components, e.g. nickel,
calcium, silicon and sulphur. The melting temperature of the
compound may be such, that ash particles stick to surfaces and
deposits are formed on a valve, in the exhaust gas system or in
the turbo-charger. This deposit is highly corrosive in the molten
state, destroying the protective oxide layer on e.g. an exhaust
valve and leads to hot corrosion and a burned valve. Deposits and
hot corrosion in the turbocharger, especially on the nozzle ring and
turbine blades will cause a decreased turbocharger efficiency. The
gas exchange will be disturbed, less air flows through the engine
and thus the thermal load on the engine increases. The deposit
formation increases at increased temperatures and engine
outputs.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 17
To avoid the above mentioned problems when running on high ash
fuels, it is important to:
Have an efficient fuel separation.
Clean the turbocharger regularly with water.
Have a strict quality control of the bunkered fuel, i.e. to see that
the amounts of ash and dangerous ash constituents stay low.
Maintain clean air filters and charge air coolers by regular cleaning
based on pressure drop monitoring.
Carbon residue content
High carbon residue content may lead to deposit formation in the
combustion chamber and in the exhaust system, especially at low
loads.
Deposit formation on injection nozzle tips will disturb the fuel
atomisation and deform the fuel sprays, decreasing the
combustion process efficiency, and even leading to locally
increased thermal loads.
Deposits in the piston ring grooves and on the rings will hinder the
movement of the rings, causing, among other things, increased
blow-by of combustion gases down to the crank case, which in
turn increases the fouling of the lubricating oil.
Deposits in the exhaust gas system and in the turbocharger will
disturb the gas exchange and increase the thermal load.
Asphaltene content
Asphaltenes are complex, highly aromatic compounds with a high
molecular weight, that usually contain sulphur, nitrogen and oxygen,
as well as metals like vanadium, nickel and iron (see "Ash" above). A
high asphaltene content indicates that a fuel may be difficult to ignite
and that it burns slowly. If the fuel is unstable, asphaltenes may pre
cipitate from the fuel and block filters and/or cause deposits in the fuel
system, as well as excessive centrifuge sludge.
High asphaltene content may contribute to deposit formation in the
combustion chamber and in the exhaust system, especially at low
loads.
Flash point
A low flash point (high vapour pressure) is often seen especially for
crude oils. The low flash point will not influence the combustion, but
the fuel can be dangerous to handle and store. This is especially the
case if the pour point is high, and the fuel has to be heated due to
this. Special explosion proof equipment and separators can be used
in extreme cases.
Fuel, Lubricating Oil, Cooling Water
02 - 18 Wrtsil 20
A high vapour pressure (low flash point) can also cause cavitation and
gas pockets in the fuel pipes. These can be avoided by using an ele
vated pressure in the fuel handling system. It is to be noted that some
insurance companies demand the use of fuels having a flash point
higher than 60C.
Pour point
The pour point tells at which temperature the fuel becomes so thick
that it does no longer flow. It determines how easy it will be to handle
the fuel. The whole fuel handling system, including tanks and pipes,
must be heated to a temperature at least 10 - 15C above the pour
point.
Total sediment potential
Total sediment potential (TSP) tells something about the fuel's sta
bility. If the TSP is high, the danger of sediment and sludge formation
in tanks and fuel handling systems increases, as well as the proba
bility for filter clogging.
TSP can also be used as a check for the compatibility of two different
fuels. For this purpose, samples of the two fuels are mixed. If the TSP
for the mix remains low, the fuels are compatible.
02.1.5. Measures to avoid difficulties when running on
heavy fuel V2
Poor fuel quality will adversely influence wear, engine-part lifetime
and maintenance intervals.
In order to obtain maximum operating economy it is recommendable:
a ) To limit maximum continuous output, as much as operating conditions
allow, if fuel is known or suspected to have high vanadium content
(above 200 ppm) and sodium content.
b ) To limit low load operation, as much as operating conditions allow, if
fuel is known or suspected to have high sulphur content (above 3
mass-%), conradson carbon residue (above 12 mass-%) and/or as
phaltene content (above 8 mass-%).
Operation below 20 % of rated output should be limited to max. 100
hours continuously, by loading the engine above 70 % of rated load
for one hour before continuing the low load operation or shutting down
the engine.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 19
Idling (i.e. generator set disconnected) should be limited as much as
possible. Warming-up of the engine at no load for more than 3-5 mi
nutes before loading, as well as idling for more than 3 minutes before
stopping, is unnecessary and should be avoided.
02.1.6. Using low sulphur & low viscosity distillate fuel
(LFO) V7
Low fuel viscosity is generally speaking not a severe problem for 4-
stroke engines, but can in severe cases damage the fuel injection
equipment and affect on the running parameters of the engine. In ex
ceptional cases loss of capability to produce full power, black-out and
starting problems may also occur. Possible remedial actions against
too low viscosity are to specify minimum viscosity when ordering the
fuel (LFO) or to design/modify the fuel systems to maintain appropri
ate minimum viscosity by cooling.
Wrtsil does not specify any minimum sulphur content for the used
fuel. Based on present experience, lubricity is not considered a prob
lem for 4-stroke fuel injection components as long as the sulphur (S)
content is above 100 ppm (0.01 %). In some cases lubricity additives
are also used by fuel manufacturers and marketers in order to im
prove lubricity properties of very low sulphur fuels. A common indus
trial test is also available, based on the ISO 12156-1 standard Diesel
fuel Assessment of lubricity using the high-frequency reciprocating
rig (HFRR). The recommended maximum limit, which is also typically
specified in other industrial applications, for this HFRR test is 460
microns.
If the sulphur content is below 100 mg/kg, it is also recommended to
carefully follow up any signs of increased wear in the fuel injection
pumps or exhaust valves / valve seats. If exhaust valve clearances
need more frequent adjustments compared to earlier experience, it is
a possible sign that fuel lubricity is not optimal. In this way a possible
problems can also be detected before an excessive wear will occur.
02.1.7. General advice V4
To avoid stability and incompatibility problems (precipitation of heavy
components in the fuel), avoid, if possible, blending fuels from differ
ent bunker stations, unless the fuels are known to be compatible.
If stability and compatibility problems occur, never add distillate fuel,
as this will probably increase precipitation. A fuel additive with a highly
powerful dispersing characteristics can be of help until a new fuel de
livery takes place.
Fuel, Lubricating Oil, Cooling Water
02 - 20 Wrtsil 20
The characteristics of heavy fuels blended from residuals from mod
ern refinery processes like catalytic cracking and visbreaking may
approach at least some of the limit values of the fuel characteristics.
Compared with "traditional" heavy fuels blended from straight run re
siduals, the "modern" heavy fuels may have reduced ignition and
combustion quality.
Caution!
Fuels blended from catalytic cracking residuals may contain very
abrasive catalytic fines (silicon and aluminium oxides) which, if al
lowed to enter the injection system, may wear down injection pumps
and nozzles in a few hours.
Some of the difficulties that may occur when operating on heavy fuels
blended from cracked residuals can be avoided by:
Sufficient centrifuging capacity. The best and most disturbance-
free results are obtained with the purifier and clarifier in series.
Alternatively the main and stand-by separators may be run in
parallel, but this makes heavier demands on correct gravity disc
choice and constant flow and temperature control to achieve
optimum results. Flow rate through the centrifuges should not
exceed the maximum fuel consumption by more than 10 %.
Sufficient heating capacity to keep centrifuging and injection
temperatures at recommended levels. It is important that the
temperature fluctuations are as low as possible (2 C before
centrifuge) when centrifuging high viscosity fuels with densities
approaching or exceeding 991 kg/m
3
at 15 C.
Sufficient preheating of the engine and the fuel systems before
starting the engine.
Keeping fuel injection equipment and the inverse cooling system
in good condition.
02.2. Lubricating oil
02.2.1. Lubricating oil qualities V6
Lubricating oil is an integrated engine component and thus the quality
of it is upmost important. All lubricating oils, which have been ap
proved for use in Wrtsil 20 engine type, have gone through an ap
proval test according to the engine manufacturer's procedure.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 21
The use of approved lubricating oil qualities during the warranty pe
riod is mandatory and is also strongly recommended after the war
ranty period.
The list of approved lubricating oils can be found in Chapter 02B: Oil
requirements & oil quality.
Note!
Never blend different oil brands unless approved by the oil supplier,
and during the warranty period, by the engine manufacturer.
Note!
Before using a lubricating oil not listed in the table, the engine man
ufacturer must be contacted. The engine manufacturer has available
an approval procedure, which at need makes it possible to test new
suitable lubricating oil candidate formulations.
02.2.2. Maintenance and control of the lubricating oil V5
a ) Use of lubricating oil separator is mandatory for engines running on
residual fuel. It is optional for engines running on distillate fuel or nat
ural gas. Continuous centrifuging of engine oil is recommended in
order to separate water and insolubles from the oil effectively.
To achieve an effective result, the separation temperature recom
mended by the separator manufacturers is 95 C. This temperature
is also used to calculate the optimum flow rate. Please check with the
lubricating oil supplier the optimal temperature range and use the
highest recommended temperature.
With older design of separators, about 20% flow rate calculated from
the rated capacity is recommended. But with new Alfa Laval SA/SU
series and Westfalia OSD series, the flow rate mentioned in the sizing
tables must be used. In order to achieve optimum separation, the
separator must be capable of circulating the entire volume of oil, four
to five times every 24 hours, at the recommended flow rate.In the
separator types being equipped with a gravity disc, the right size of
the disc can be chosen according to the lubricating oil density at the
separation temperature.
Ensure that the separators conditioning water does not leak into the
lubricating oil during separation, leading to increased water content
in the lubricating oil and possibly to depletion of additives ("washing").
Follow the operation instructions given by the separator manufacturer
for optimal performance of the separator.
Fuel, Lubricating Oil, Cooling Water
02 - 22 Wrtsil 20
Note!
The lubricating oil separation efficiency influences the condition of the
lubricating oil and the change interval of the lubricating oil batch. De
pending on type of application and from the different lubricating oil
system arrangements point of view, the following separation routines
are adviced:- Continous running of the separator(s) when the en
gine(s) is running, recommended in the first place.- Periodical sepa
ration of auxiliary engine in stand-by or running mode in installation
equipped with one or more separator(s), which treats lubricating oil of
more than one engine.
Caution!
Defects on automatic, "self-cleaning" separators can quickly increase
the water content of the oil under certain circumstances! (The water
control valve fails.)
b ) During the first year of operation it is advisable to take samples of the
lubricating oil at 500 operating hours intervals. The sample should be
sent to the oil supplier for analysis. On the basis of the results it is
possible to determine suitable intervals between oil changes. Fre
quent oil analysis at 500 - 1000 operating hours intervals is also rec
ommended after the first year of operation to ensure safe engine op
eration. See also section 02.2.5., Handling of oil samples. When es
timating the condition of the used oil, the following properties should
be observed. Compare with guidance values (type analysis) for new
oil of the brand used.
Viscosity. Should not decrease by more than 20% and not rise by
more than 25% above the guidance value at 100 C.Should not de
crease by more than 25 % and not rise by more than 45% above the
guidance value at 40 C.
Flash point. Should not fall by more than 50 C below the guidance
value. Min. permissible flash point 190 C (open cup) and 170 C
(closed cup) . At 150 C risk of crankcase explosion.
Water content. Should not exceed 0.3%. A value higher than 0.3%
can not be accepted for longer periods, but measures must be taken;
either centrifuging or oil change.
BN (Base Number).
Fuel categories A, B and F: The minimum allowable BN value of
a used oil is 50% of the nominal value of a new oil.
Fuel categories C and D: The minimum allowable value of used
oil is BN 20.
Insolubles. The quantity allowed depends on various factors. How
ever, an n-Pentane insoluble value above 1.5% calls for attention. A
value higher than 2% cannot be accepted for longer periods.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 23
In general it can be said that the changes in the analyses give a better
basis of estimation than the absolute values.
Fast and great changes may indicate abnormal operation of the en
gine or of a system.
c ) Compensate for oil consumption by adding max. 10% new oil at a
time. Adding larger quantities can disturb the balance of the used oil
causing, for example, precipitation of insolubles. Measure and record
the quantity added. Attention to the lubricating oil consumption may
give valuable information about the engine condition. A continuous
increase may indicate that piston rings, pistons and cylinder liners are
getting worn, and a sudden increase motivates pulling the pistons, if
no other reason is found.
d ) Guidance values for oil change intervals are to be found in chapter
04, Maintenance Schedule. Intervals between changes are influ
enced by system size (oil volume), operating conditions, fuel quality,
centrifuging efficiency and total oil consumption. Efficient centrifuging
can result in increased oil change intervals. It is recommended to fol
low up that the BN value of the lubricating oil keeps within engine
manufacturer's limits during the whole oil change interval.
02.2.2.1. Changing the lubricating oil V7
When changing the lubricating oil, the following procedure is recom
mended:
1 Empty the oil system while the oil is still hot. Be sure that oil filters and
coolers are also emptied.
2 Clean all the oil spaces with a high quality fibre and lint free cloth.
Clean also the filters and camshaft compartment. Insert new filter
cartridges.
3 Fill a small quantity of new oil in the oil sump and circulate with the
pre-lubricating pump.
4 Fill required quantity of oil in the system. See chapter 01: Main Data,
Operating data and General Design.
Oil samples taken at regular intervals are analysed by the oil supplier.
The results of this analysis is plotted as a function of operating hours.
This is an efficient way of predicting oil change intervals. Ask the oil
supplier for copies of oil analysis report. Send it to the engine manu
facturer for evaluation.
Fuel, Lubricating Oil, Cooling Water
02 - 24 Wrtsil 20
When changing the lubricating oil brand from one to another follow
the procedure given below. This minimizes the risk of lubricating oil
foaming, deposit formation, blocking of lubricating oil filters, damage
of engine components, etc.
If possible, change the lubricating oil brand during an engine (pis
ton) overhaul.
Drain old lubricating oil from the lubricating oil system.
Clean the lubricating oil system, if excessive amount of deposit
has formed on the surfaces of engine components like crankcase,
camshaft compartment.
Fill the lubricating oil system with fresh lubricating oil.
If the procedure described above is not followed, responsibility of
possible damage and malfunctions caused by lubricating oil change
should always be agreed between the oil company and customer.
02.2.3. Lubricating oil for the governor V11
See the Instruction Book for the governor, attached. An oil of viscosity
class SAE 30 or SAE 40 is suitable, and the same oil can be used as
in the engine. Turbocharger oil can also be used in the governor. In
low ambient conditions it may be necessary to use multigrade oil (e.g.
SAE 5W-40) to get a good control during start-up. Oil change interval,
see maintenance schedule chapter 04.
Condensed water, high temperature or leaking drive shaft seal may
cause the oil to deteriorate, or internal surfaces of the governor to
collect deposits. If the reason cannot be clarified and rectified, a
shorter oil change interval or change of oil type should be considered.
The governor should be flushed with the oil in use or gasoil if heavy
contamination of the oil is evident.
Examples of suitable lubricating oils for governor can be found from
the end of this chapter, where the lists of approved lubricating oils for
an engine and turbocharger are available.
If the system is equipped with a start booster, then this should also
be emptied when changing oil.
In installations whereby the actuator is equipped with a filter, it has
to be cleaned when changing oil.
Depending on the governor type, oil should be separately emptied
from the power cylinder. This is done by removing the plug in the
bottom of the power cylinder.
Some governors are equipped with a magnetic oil plug, this plug
should be cleaned in connection with an oil change.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 25
Caution!
If turbine oil is used in the governor, take care not to mix it with engine
lubricating oil. Only a small quantity of engine lubricating oil into the
turbine oil may cause heavy foaming.
02.2.4. Lubricating oils for turbochargers V10
Please note that different types of turbochargers can be used for the
engine. The lubricating system is different for the different turbo
charger. One type of chargers has a common lubricating oil system
with the engine, see chapter 15 (Turbocharging and air cooling), while
the other type of chargers has an internal lubricating system for the
bearings, See the Instruction Book for the turbocharger, attached.
Note!
In the ABB VTR..4 series turbochargers the use of synthetic low fric
tion lubricating oils is strongly recommended by the engine and the
turbocharger manufacturers!
Oil change interval is 1500 h service for special mineral oils and 2500
h service for synthetic lubricating oils.
Caution!
Take care that the turbine oil is not mixed with engine lubricating oil.
Only a small quantity may cause heavy foaming.
The list of approved lubricating oils for the ABB VTR..4 series turbo
chargers can be found in the end of this chapter. These lubricating
oils are, regarding viscosity and quality, according to the recommen
dations.
02.2.5. Handling of oil samples V2
When taking fuel oil or lubricating oil samples the importance of prop
er sampling cannot be over-emphasised. The accuracy of the analy
sis results depends significantly on proper sampling and the results
will be only as good as the quality of the sample.
Use clean sample containers holding approximately 1 litre. Clean
sample containers and accessories (IATA carton boxes for transpor
tation, ready made address labels, etc.) are available, for example,
from Wrtsil local network office. Rinse the sampling line properly
before taking the actual sample. Preferably also rinse the sample
bottles with the oil a couple of times before taking the sample, espe
cially if "unknown" sample bottles need to be used. Close the bottles
Fuel, Lubricating Oil, Cooling Water
02 - 26 Wrtsil 20
tightly using the screw caps provided. Seal all bottles and record all
the separate seal numbers carefully. Put the bottles to be sent for
analysing in "Ziploc" plastic bags to prevent any spillage. Gently
squeeze the "Ziploc" bag to minimise any air content prior to sealing.
The background information for the fuel oil/lubricating sample is as
important as the sample itself. Oil samples with no background infor
mation are of very limited value. The following data are essential to
note when taking the sample:
Installation name
Engine type and number
Engine operating hours
Lubricating oil brand/fuel oil type
Lubricating oil operating hours
The location where the lubricating oil/fuel oil sample was taken
Sampling date and seal number of the separate samples, if seals
are available
Reason for taking and analysing the sample
Contact information: Name (of the person who took the sample),
telephone, fax, e-mail, etc.
Use, for example, the ready made "Oil Analyse Application" form, see
Instruction Manual attachments .
Observe personal safety precautions when taking and handling fuel
oil and lubricating oil samples. Avoid breathing oil fumes and mist,
use respirator if necessary. Use strong, heat and hydrocarbon resist
ant gloves (nitrile rubber for example). Wear eye goggles if splash risk
exists. Wear facial screen and protecting clothes if hot product is
handled.
02.2.5.1. Lubricating oil sampling V1
Lubricating oil samples should be taken with the engine in operation
immediately after the lubricating oil filter on the engine. Always take
lubricating oil samples before adding fresh oil to the system.
02.2.5.2. Fuel oil sampling V1
Fuel oil samples can be drawn from different places in the fuel oil
system. Fuel samples "as bunkered" or "before the engine" (after fuel
oil separation and filtration) are perhaps the most common sample
types. From the engines point of view the most important fuel oil sam
ple is naturally the one which enters the engine, i.e. taken after fuel
oil separation and filtration. But if for example fuel oil separator effi
ciency needs to be checked samples should be taken just before and
after the separator. It is not advisable to take samples from tank bot
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 27
tom drain valves, since these will probably contain high levels of water
and sediment and thus the samples will not be representative of the
bulk phase.
02.2.6. Dispatch and transportation V2
Place the bottle with the "Ziploc" bag inside the IATA carton box and
fold the box according to the assembly instructions given on the box.
Enclose a copy of the "Bunker Receipt", if available, before closing
the last flap on the IATA carton.
Check the DNVPS Air Courier Directory and use appropriate label for
the IATA carton box to ensure that the sample is forwarded to the
nearest DNVPS laboratory. Complete the courier dispatch instruc
tions on the side of the IATA carton. Fill in the DNVPS universal ac
count number to prevent rejection from the courier company (DHL).
Complete the Proforma Invoice Form and tape it to the outside of the
IATA carton.
Call the air courier directly at the number as indicated in the Air Cou
rier Directory and request urgent pick-up, if necessary. When the
courier arrives you will need to complete an Airway Bill.
It is recommendable to handle the dispatching of the fuel oil and lu
bricating oil samples at site. The results will be achieved faster when
the dispatching is handled at site and additionally it is illegal to carry
fuel oil samples as personal luggage on normal aeroplanes.
Support with interpretation of the analysis results and advice on pos
sible corrective actions is available from Wrtsil, if needed.
02.3. Cooling water V1
In order to prevent corrosion, scale deposits or other deposits in
closed circulating water systems, the water must be treated with ad
ditives.
Before treatment, the water must be limpid and meet the specification
found in the end of this chapter. Further, the use of an approved cool
ing water additive or treatment system is mandatory.
Caution!
Distilled water without additives absorbs carbon dioxide from the air,
which involves great risk of corrosion.
Fuel, Lubricating Oil, Cooling Water
02 - 28 Wrtsil 20
Sea water will cause severe corrosion and deposit formation even if
supplied to the system in small amounts.
Rain water has a high oxygen and carbon dioxide content; great risk
of corrosion; unsuitable as cooling water.
If risk of freezing occurs, please contact the engine manufacturer for
use of anti-freeze chemicals.
Fresh water generated by a reverse osmosis plant onboard often has
a high chloride content (higher than the permitted 80 mg/l) causing
corrosion.
Caution!
The use of glycol in the cooling water is not recommended, if it is not
necessary. Since glycol alone does not protect the engine against
corrosion, additionally an approved cooling water additive must al
ways be used!
02.3.1. Additives V8
As additives, use approved products from well-known and reliable
suppliers. In marine applications suppliers wide distribution networks
makes it easier to get the same product in different geographical lo
cations.
Caution!
The use of emulsion oils, phosphates and borates (sole) is not ac
cepted.
In an emergency, if compounded additives are not available, treat the
cooling water with sodium nitrite (NaNO
2
) in portions of 5 kg/m
3
. To
obtain a pH value of 9, add caustic soda (NaOH), if necessary.
Warning!
Sodium nitrite is toxic. Handle with care and dispose all possible re
siduals in accordance with valid environmental regulations.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 29
Corrosion rate as a function of nitrite concentration
B
A
C
o
r
r
o
s
i
o
n

r
a
t
e
X ppm
Nitrite Concentration
To give full protection the Nitrite level
should be kept above X ppm. The
actual concentration is additive
supplier dependent.
A permanent lower level will lead to
an accelerated corrosion rate.
Fig 02-5 320260 V1
Nitrite based cooling water additives are so called anodic inhibitors
and require proper dosing and maintenance in order to serve as in
tended. The nitrite of the additive is as such a salt and it will increase
the conductivity of the water. The conductivity is on the other hand
one of the main parameters affecting the corrosion rate once a cor
rosion process gets started, the higher the conductivity the higher the
corrosion rate.
If the conditions (nitrite level, chlorides, pH, etc.) in the systems are
such that the nitrite based additive is no longer able to protect the
entire surface of the system there may occur a rapid, local corrosion
in the areas that are not protected. The corrosion rate at the attacked
areas will even be much greater than it would be with no additive at
all present in the system, see schematic graph of the corrosion rate
as a function of the nitrite dosage in Fig 02-5. Observe that the posi
tion of the curve peak on the x-axis (= dangerous condition for corro
sion) is not stable, but will shift depending on temperature, pH, chlor
ides and sulphates contents, etc. in the cooling water.
Fuel, Lubricating Oil, Cooling Water
02 - 30 Wrtsil 20
The table below shows shows examples of the most common cooling
water additive types.
Summary of the most common cooling water additives
Additive Advantages Disadvantages
Sodium
nitrite
- good efficiency, if dosage is con
trolled carefully
- small active quantities, 0.5 % by
mass
- cheap
- suitable as additive except in air cooled heat exchang
ers with large soft solder surfaces
- toxic
- risk of spot corrosion when too low concentration
Nitrite
+
borate
- no increased risk of corrosion at
over doses
- innocuous for the skin
- tendency to attack zinc coverings and soft solderings
- toxic: lethal dosage 3 - 4 g solid nitrite
- risk of spot corrosion when too low concentration
Sodium
silicate
- not toxic
- harmless to handle
- not active when water velocity exceeds 2 m/s
- commercial products very expensive
- increased risk of corrosion when too low concentration;
spot corrosion
- limited suitability
Sodium
molybdate
- not toxic
- harmless to handle
- more expensive than toxic additives
- increased risk of corrosion, if unsufficently dosed
- can cause deposit formation (molybdates can collect to
ferrous sulphates)
Organic and inor
canic synergistic
based
- not toxic - more expensive than sodium nitrite and molybdate
based additives
- big active quantitives by mass
02.3.2. Treatment V3
When changing the additive or when entering an additive into a sys
tem where untreated water has been used, the complete system must
be thoroughly flushed and if necessary chemically cleaned and rinsed
before fresh treated water is poured into the system. If against engine
manufacturers recommendations an emulsion oil has been used, the
complete system must be absolutely cleaned of oil and greasy de
posits.
Evaporated system water should be compensating by adding untrea
ted water; if treated water is used, the content of additives may grad
ually become too high. To compensate for leakage or other losses,
add treated water.
In connection with maintenance work calling for draining of the water
system, take care to store and reuse the treated water.
The list of approved cooling water additives and treatment systems
can be found in the end of this chapter.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 31
Note!
Ask the supplier of the treatment product for instructions about treat
ment procedure, dosage and concentration control.
Most suppliers will provide a test kit for the concentration control.
Additionally a frequent laboratory analysis of cooling water at 3
months interval is recommended to ensure safe engine operation. For
further information and recommendations on cooling water treatment
and analysis, see chapter 02C, Raw Water Quality.
02.3.3. Derating engine output V1
Use of glycol in LT water circuit
The maximum allowed amount of glycol in the LT water circuit is 50%.
There will not be derating if the glycol content is less than 20%.
For LT circuit with glycol content above 20%, an offset is applied to
the K2 derating factor (derating from charge air coolant temperature)
according to the table below. This offset is applied to compensate for
the increased charge air cooler pinch point when using glycol. The
degree of offset is greater for engines with 1-stage CAC, due to a
higher sensitivity to glycol.
LT-circuit glycol content
K2 -offset in T
ref
[1]
2-stage CAC 1-stage CAC
0-20% 0C 0C
30% -3.3C -6.6C
40% -6.7C -13.3C
50% -10C -20C
[1] K2 derating break point for CA cooling water temp (engine and PP/SP specific)
Fuel, Lubricating Oil, Cooling Water
02 - 32 Wrtsil 20
Offset in derating constant K2 (example: 2-stage CAC)
0,96
0,97
0,98
0,99
1,00
30,00 35,00 40,00 45,00 50,00 55,00 60,00
Charge air cooling water temp [C]
D
e
r
a
t
i
n
g

c
o
n
s
t
a
n
t

K
2
0-20% LT-circuit
glycol content
50% 40% 30%
T
ref
* T
ref
-5 T
ref
-10
Fig 02-6 V1
Use of glycol in HT water circuit
The maximum allowed amount of glycol in the HT water circuit is 20%.
If the HT-circuit glycol content is required to be above 20% arrange
the cooling circuits so that the whole HT-circuit can be kept inside the
heated engine room, cooled with an intermediate cooler by a secon
dary circuit (e.g. LT-circuit). With this arrangement the use of glycol
in the HT-circuit can be avoided altogether.
Note!
In exceptional cases where the engine room is subject to sub-zero
temperature, a maximum HT-circuit glycol content of 50% is permit
ted.
In case of HT-circuit glycol content above 20% and 2-stage charge
air cooler, both stages of the charge air cooler must be included as
part of the LT-circuit. Also check the lubricating oil cooler capacity
when using glycol in the cooling water.
Fuel, Lubricating Oil, Cooling Water
Wrtsil 20 02 - 33
Fuel, Lubricating Oil, Cooling Water
02 - 34 Wrtsil 20
02B. Oil requirements & oil quality
02B.1. Requirements and oil quality V6
SYSTEM OIL REQUIREMENTS AND QUALITY FOR WRTSIL 20
ENGINES
Viscosity
Viscosity class SAE 40
Viscosity Index (VI)
Min. 95
Alkalinity (BN)
The required lubricating oil alkalinity is tied to the fuel specified for the
engine, which is shown in the table below.
FUEL STANDARDS AND LUBRICATING OIL REQUIREMENTS
Category Fuel standard Lube oil BN
A
ASTM D 975-01,
BS MA 100: 1996
CIMAC 2003
ISO 8217: 2005(E)
GRADE NO. 1-D, 2-D
DMX, DMA
DX, DA
ISO-F-DMX, DMA
10 - 30
B
BS MA 100: 1996
CIMAC 2003
ISO 8217: 2005(E)
DMB
DB
ISO-F-DMB
15 - 30
C
ASTM D 975-01,
ASTM D 396-04,
BS MA 100: 1996
CIMAC 2003
ISO 8217: 2005(E)
GRADE NO. 4-D
GRADE NO. 5-6
DMC, RMA10-RMK55
DC, A30-K700
ISO-F-DMC, RMA10-
RMK55
30 - 55
D CRUDE OIL (CRO) 30 - 55
F LIQUID BIO FUEL (LBF) 10 - 20
If a low sulphur (S max. 0.2 % m/m) distillate fuel is used, a lubricating
oil with a BN of 10-15 is recommended.
When operating with heavy fuels, BN 50-55 lubricants are recom
mended as a first choice. This recommendation is valid especially for
engines having wet lubricating oil sump and using heavy fuel with
Document No:
4V92A0665
Revision: j
Oil requirements & oil quality
Wrtsil 20 02B - 1
sulphur content above 2.0 % mass. BN 40 lubricants can also be used
when operating on heavy fuel as well if experience shows that the
lubricating oil BN equilibrium remains at an acceptable level.
On heavy fuel operation BN 30 lubricants are recommended only in
special cases, such as installations equipped with an SCR catalyst.
Lower BN products can improve the cleanliness of the SCR catalyst.
With BN 30 oils, lubricating oil change intervals may be rather short,
but total operating costs may be reduced if the maintenance intervals
of the SCR catalyst can be increased.
BN 30 oils are also a recommended alternative when operating on
crude oil having a low sulphur content. Though crude oils often have
low sulphur content, they can contain other acid compounds and thus
an adequate alkali reserve is important. With crude oils having higher
sulphur content, BN 4055 lubricating oils should be used.
If both distillate fuel and residual fuel are used periodically as fuel,
lubricating oil quality has to be chosen according to recommendations
for residual fuel operation, i.e. BN 30 is the minimum. The optimum
BN in this kind of operation depends on the relative operating periods
and the sulphur contents of the fuels. Thus in particular cases BN 40
or even higher BN lubricating oils should be used.
The intervals between lubricating oil changes may be extended by
adding oil daily to keep the oil level constantly close to the maximum
level.
An example of a BN depletion curve with different BN lubricating oils
Fig 02B-1 92A0645J V2
Additives
Oil requirements & oil quality
02B - 2 Wrtsil 20
The oils should contain additives that:
Stabilize oxidation.
Prevent corrosion.
Improve load carrying capacity.
Neutralize residues of combustion and oxidation.
Prevent deposit formation on internal engine parts (piston cooling
gallery, piston ring zone and bearing surfaces in particular).
Foaming characteristics
Fresh lubricating oil should meet the following limits for foaming ten
dency and stability, according to the ASTM D 892-92 test method:
Sequence I: 100/0 ml
Sequence II: 100/0 ml
Sequence III: 100/0 ml
Base oils
Use only Virgin base stocks.
02B.2. Condemning limits for used lubricating oil V3
When estimating the condition of used lubricating oil, the limit values
for the following properties must be noted. If the limits are exceeded,
measures must be taken. Compare also with the guidance values for
fresh lubricating oil of the brand used.
Property Unit Limit Test method
Viscosity cSt at 40 C max. 25% decrease
max. 45% increase
ASTM D 445
Viscosity cSt at 100 C max. 20% decrease
max. 25% increase
ASTM D 445
Water % V/V max. 0.30 ASTM D 95 or D 6304
Base Number mg KOH/g min. 20 in HFO operation,
max. 50% depletion in LFO
operation
ASTM D 2896
Insolubles % m/m in n-Pentane max. 2.0 ASTM D 893b
Flash Point, PMCC C min. 170 ASTM D 93
Flash Point, COC C min. 190 ASTM D 92
Oil requirements & oil quality
Wrtsil 20 02B - 3
02B.3. Change of lubricating oil brand V3
In order to minimise the risk of lubricating oil foaming, deposit forma
tion, blocking of lubricating oil filters, damage to engine components,
etc., the following procedure should be followed when lubricating oil
brand is changed from one to another:
If possible, change the lubricating oil brand in connection with an
engine (piston) overhaul
Drain old lubricating oil from the lubricating oil system
Clean the lubricating oil system in case of an excessive amount
of deposits on the surfaces of engine components, like crankcase,
camshaft compartment, etc.
Fill the lubricating oil system with fresh lubricating oil
If the procedure described above is not followed, responsibility of
possible damage and malfunctions caused by lubricating oil change
should always be agreed between the oil company and customer.
02B.4. Approved lubricating oil qualities for
Wrtsil 20 engines V6
Warning!
Should unapproved lubricating oils be used during the engine war
ranty period, and there is no agreement with the engine manufacturer
about testing, the engine guarantee does not hold.
GAS OIL, MARINE DIESEL OIL AND LIQUID BIO FUEL
OPERATION
If gas oil, marine diesel oil or liquid bio fuel is used as fuel, lubricating
oils with a BN of 10-20 are recommended. The BN 30 lubricating oils
included in Table 3 can also be used in gas oil and marine diesel oil
fuelled engines.
Revision: k
Document No:
4V92A0665
Oil requirements & oil quality
02B - 4 Wrtsil 20
Approved system oils - fuel categories A, B and F recommended in
gas oil, marine diesel oil or liquid bio fuel installations:
TABLE 1
SUPPLIER BRAND NAME VISCOSITY BN FUEL CATEG.
BP Energol HPDX 40
Energol IC-HFX 204
SAE 40
SAE 40
12
20
A,F
A,B,F
Castrol HLX 40
MHP 154
Seamax Extra 40
TLX Plus 204
SAE 40
SAE 40
SAE 40
SAE 40
12
15
15
20
A,F
A,B,F
A,B,F
A,B,F
Chevron (Texaco + Caltex
+ FAMM)
Delo 1000 Marine 40
Delo 2000 Marine 40
Taro 12 XD 40
Taro 20 DP 40
SAE 40
SAE 40
SAE 40
SAE 40
12
20
12
20
A,F
A,B,F
A,F
A,B,F
ExxonMobil Delvac 1640
Mobilgard ADL 40
Mobilgard 412
Mobilgard 1 SHC
SAE 40
SAE 40
SAE 40
SAE 40
12
15
15
15
A,F
A,B,F
A,B,F
A,B,F
Indian Oil Corporation Servo Marine 1040
Servo Marine 2040
SAE 40
SAE 40
10
20
A,F
A,B,F
Petrobras Marbrax CCD-410-AP
Marbrax CCD-415
Marbrax CCD-420
SAE 40
SAE 40
SAE 40
12
15
20
A,F
A,B,F
A,B,F
Shell Gadinia Oil 40 SAE 40 12 A,F
Statoil MarWay 1040 SAE 40 10.6 A,F
Total / Lubmarine Disola M 4015
Disola M 4020
SAE 40
SAE 40
14
20
A,F
A,B,F
HEAVY FUEL AND CRUDE OIL OPERATION
Modern trunk piston diesel engines consume less amount of lubri
cating oils. This, among other things, stresses the trunk piston se
verely. Also, residual combustion products that contaminate the lu
brication oil can form deposits on certain engine components and
cause severe problems. Due to this many lubricating oil suppliers
have developed new lubricating oil formulations with better fuel and
lubricating oil compatibility.
Oil requirements & oil quality
Wrtsil 20 02B - 5
Approved system oils - fuel categories C and D, recommended when
operating on heavy fuel or on crude oil having high sulphur content,
in order to reach full service intervals. BN 50-55 lubricating oils are
preferred.
TABLE 2
SUPPLIER BRAND NAME VISCOSITY BN FUEL CATEG.
BP Energol IC-HFX 404
Energol IC-HFX 504
SAE 40
SAE 40
40
50
C,D
C,D
Castrol TLX Plus 404
TLX Plus 504
TLX Plus 554
SAE 40
SAE 40
SAE 40
40
50
55
C,D
C,D
C,D
Cepsa Troncoil 4040 PLUS
Troncoil 5040 PLUS
Ertoil Koral 4040 SHF
Ertoil Koral 5040 SHF
SAE 40
SAE 40
SAE 40
SAE 40
40
50
40
50
C,D
C,D
C,D
C,D
Chevron (Texaco + Caltex
+ FAMM)
Taro 40 XL 40
Taro 50 XL 40
Taro 40 XL 40 X
Taro 50 XL 40 X
Delo 3400 Marine 40
Delo 3550 Marine 40
SAE 40
SAE 40
SAE 40
SAE 40
SAE 40
SAE 40
40
50
40
50
40
55
C,D
C,D
C,D
C,D
C,D
C,D
Chinese Petroleum
Corporation
Marilube Oil W 404
Marilube Oil W 504
SAE 40
SAE 40
40
50
C,D
C,D
ENI S.p.A. Cladium 400 S SAE 40
Cladium 500 S SAE 40
Cladium 550 S SAE 40
SAE 40
SAE 40
SAE 40
40
50
55
C,D
C,D
C,D
ExxonMobil Exxmar 40 TP 40
Exxmar 50 TP 40
Mobilgard M 440
Mobilgard M50
SAE 40
SAE 40
SAE 40
SAE 40
40
50
40
50
C,D
C,D
C,D
C,D
Fuchs Titan PSW 40 SAE 40
Titan PSW 55 SAE 40
SAE 40
SAE 40
40
55
C,D
C,D
Indian Oil Corporation Servo Marine K-4040
Servo Marine K-5040
Servo Marine K-5540
SAE 40
SAE 40
SAE 40
40
50
55
C,D
C,D
C,D
Lukoil Navigo TPEO 40/40
Navigo TPEO 50/40
Navigo TPEO 55/40
SAE 40
SAE 40
SAE 40
40
50
55
C,D
C,D
C,D
Oil requirements & oil quality
02B - 6 Wrtsil 20
TABLE 2
SUPPLIER BRAND NAME VISCOSITY BN FUEL CATEG.
Morris Lubricants Aquamor 140MD
Aquamor 150MD
SAE 40
SAE 40
40
50
C,D
C,D
Nippon Oil Corporation Marine T404
Marine T504
SAE 40
SAE 40
40
50
C,D
C,D
Pertamina Martron 440
Martron 450
Salyx 440
Salyx 450
Medripal 440
Medripal 450
SAE 40
SAE 40
SAE 40
SAE 40
SAE 40
SAE 40
40
50
40
50
40
50
C,D
C,D
C,D
C,D
C,D
C,D
Petrobras Marbrax CCD-440
Marbrax CCD-450
SAE 40
SAE 40
40
50
C,D
C,D
Petron Petromar XC 4040
Petromar XC 5540
SAE 40
SAE 40
40
55
C,D
C,D
Petronas Lubricants
International
Disrol 400 SAE 40
Disrol 500 SAE 40
MAEO 4040
MAEO 4050
SAE 40
SAE 40
SAE 40
SAE 40
40
50
40
50
C,D
C,D
C,D
C,D
Repsol YPF Neptuno W NT 4000 SAE 40
Neptuno W NT 5500 SAE 40
SAE 40
SAE 40
40
55
C,D
C,D
Shell Argina X 40
Argina XL 40
SAE 40
SAE 40
40
50
C,D
C,D
Total / Lubmarine Aurelia XL 4040
Aurelia XL 4055
Aurelia TI 4040
Aurelia TI 4055
SAE 40
SAE 40
SAE 40
SAE 40
40
55
40
55
C,D
C,D
C,D
C,D
Approved system oils - fuel categories A, B, C and D. Lubricating oils
with BN 30 included in Table 3 are designed to be used when oper
ating on crude oil with low sulphur content (< 1 % m/m). Further, on
heavy fuelled installations BN 30 lubricants enhance the cleanliness
Oil requirements & oil quality
Wrtsil 20 02B - 7
of the SCR catalyst. However, due to low lubricating oil consumption
with BN 30, oils change intervals are shorter than with higher BN lu
bricating oils.
TABLE 3
SUPPLIER BRAND NAME VISCOSITY BN FUEL CATEG.
BP Energol IC-HFX 304 SAE 40 30 A,B,C,D
Castrol TLX Plus 304 SAE 40 30 A,B,C,D
Cepsa Troncoil 3040 PLUS
Ertoil Koral 3040 SHF
SAE 40
SAE 40
30
30
A,B,C,D
A,B,C,D
Chevron (Texaco + Caltex
+ FAMM)
Taro 30 DP 40
Taro 30 DP 40X
Delo 3000 Marine 40
SAE 40
SAE 40
SAE 40
30
30
30
A,B,C,D
A,B,C,D
A,B,C,D
Chinese Petroleum
Corporation
Marilube Oil W 304 SAE 40 30 A,B,C,D
ENI S.p.A. Cladium 300 S SAE 40 SAE 40 30 A,B,C,D
ExxonMobil Exxmar 30 TP 40
Mobilgard M 430
SAE 40
SAE 40
30
30
A,B,C,D
A,B,C,D
Fuchs Titan PSW 30 SAE 40 SAE 40 30 A,B,C,D
Indian Oil Corporation Servo Marine K-3040 SAE 40 30 A,B,C,D
Morris Lubricants Aquamor 130MD SAE 40 30 A,B,C,D
Nippon Oil Corporation Marine T304 SAE 40 30 A,B,C,D
Pertamina Martron 430
Salyx 430
Medripal 430
SAE 40
SAE 40
SAE 40
30
30
30
A,B,C,D
A,B,C,D
A,B,C,D
Petrobras Marbrax CCD-430 SAE 40 30 A,B,C,D
Petron Petromar XC 3040 SAE 40 30 A,B,C,D
Petronas Lubricants
International
Disrol 300 SAE 40 SAE 40 30 A,B,C,D
Shell Argina T 40 SAE 40 30 A,B,C,D
Total / Lubmarine Aurelia XL 4030
Aurelia TI 4030
SAE 40
SAE 40
30
30
A,B,C,D
A,B,C,D
Before using a lubricating oil not listed in Tables 1-3, the engine man
ufacturer must be contacted. Lubricating oils that are not approved
have to be tested according to engine manufacturers procedures.
Oil requirements & oil quality
02B - 8 Wrtsil 20
APPROVED LUBRICATING OILS FOR ABB VTR-
TURBOCHARGERS
SPECIAL LOW FRICTION SYNTHETIC OILS: CHANGE INTERVAL: 1500 hours
(ABBs List 2b)
MANUFACTURER BRAND NAME VISCOSITY
cSt at 40C
VISCOSITY
cSt at 100C
VI
Shell Corena AP 68 68 8.5 94
SPECIAL LOW FRICTION SYNTHETIC OILS: CHANGE INTERVAL: 2500 hours
ABBs List 3b
MANUFACTURER BRAND NAME VISCOSITY
cSt at 40C
VISCOSITY
cSt at 100C
VI
BP Enersyn TC-S 68 68 8.5 98
Chevron (Texaco + Caltex
+ FAMM)
Cetus PAO 68 68 10.3 138
Castrol Aircol SR 68 68 10.5 142
ENI S.p.A. Dicrea SX 68 71.6 10.5 134
ExxonMobil Compressor Oil RS 68
Rarus SHC 1026
SHC 626
67
66.8
69.9
10
10.4
10.9
135
144
147
Shell Corena AS 68 67.8 10.1 145
Total / Lubmarine Barelf SM 68 73.8 11.4 147
LUBRICATING OILS FOR GOVERNOR / ACTUATOR
An oil of viscosity class SAE 30 or SAE 40 is suitable and the same
oil as in the engine can be used . Turbocharger oil can also be used
in the governor. In low ambient conditions it may be necessary to use
a multigrade oil (e.g. SAE 5W-40) to get good control during start-up.
Oil change interval: 2000 service hours.
LUBRICATING OILS FOR STARTING MOTOR
According to starting motor manufacturer Tech Development Inc., the
following lubricating greases are approved.
LUBRICATING GREASES FOR STARTING MOTOR, TDI 45M and T50-P
MANUFACTURER BRAND NAME
NYE Lubricants Rheolube 377AL
Oil requirements & oil quality
Wrtsil 20 02B - 9
Oil requirements & oil quality
02B - 10 Wrtsil 20
02C. Raw water quality
02C.1. Raw water quality and approved cooling
water additives V10
FOR WRTSIL 20, ENGINE TYPES
02C.2. Raw water quality requirements V5
Raw water for the closed cooling water circuits of engines has to meet
the following specification:
Property Limit
pH min. 6,5
Hardness max. 10 dH
Chlorides max. 80 mg/l
Sulphates max. 150 mg/l
For raw water, evaporated water and a good quality tap water are
normally suitable. Distilled (evaporated) water without additives ab
sorbs carbon dioxide from air creating a high risk of corrosion. Fresh
water generated by a reverse osmosis plant often has a higher chlor
ide content than specified above. However, if the quality requirement
is fulfilled, it can be used as well. Sea water causes severe corrosion
and deposit formation, even if supplied to the system in small amounts
and cannot be used. Rain water is neither suitable as cooling water,
because of high carbon dioxide and oxygen contents resulting in a
high risk of corrosion.
Revision: e
Document No:
4V92A0765
Raw water quality
Wrtsil 20 02C - 1
02C.3. Approved cooling water additives V5
Manufacturer Additive name
S.A. Arteco N.V.
Technologiepark-Zwijnaarde 2
B-9052 Ghent/Zwijnaarde, Belgium
Havoline XLi
Ashland Specialty Chemical
Drew Industrial
One Drew Plaza
Boonton, NJ 07005, USA
Drewgard 4109
Ashland Specialty Chemical
Drew Marine
One Drew Plaza
Boonton, NJ 07005, USA
DEWT-NC powder
Liquidewt
Maxigard
Chevron Global Lubricants
6101 Bollinger Canyon Road
San Ramon, CA 94583
Havoline XLi
GE Water and Process Technologies
Interleuvenlaan 25
B-3001 Heverlee, Belgium
GE Water and Process Technologies
4636 Somerton Road
Trevose
PA 19053, United States
CorrShield NT 4293
CorrShield NT 4200
Houseman Ltd
The Priory, Burnham
Slough SL1 7LS, UK
Cooltreat 651
Kuwait Petroleum (Danmark) AS
Hummetoftveij 49
DK-2830 Virum, Denmark
Q8 Corrosion Inhibitor Long-Life
Maritech AB
Box 143
S-29122 Kristianstad, Sweden
Marisol CW
Nalco Chemical Company
One Nalco Centre
Naperville, Illinois
60566-1024 USA
Trac 102 (ex-Nalcool 2000)
Raw water quality
02C - 2 Wrtsil 20
Manufacturer Additive name
Nalfleet Marine Chemicals
PO Box 11
Winnington Avenue, Northwich
Cheshire, CW8 4DX, UK
Trac 102 (ex-Nalcool 2000)
Nalfleet EWT 9-108
Rohm & Haas
La Tour de Lyon
185, Rue de Bercy
75579 Paris, Cedex 12, France
RD11
RD11M
RD25
Suomen KL-Lmp Oy
Keisarinviitta 22
33960 Pirkkala, Finland
Korrostop KV
Total
Diamant B, 16, rue de la Rpublique
92922 Paris La Dfense Cedex, France
WT Supra
Unitor ASA
P.O. Box 300 Skyen
N-0212 Oslo, Norway
Dieselguard NB
Rocor NB liquid
Cooltreat AL
Vecom Holding BV
PO Box 27
3140 AA Maassluis, The Netherlands
Vecom CWT Diesel QC-2
In order to prevent corrosion in the cooling water system, the instruc
tions of right dosage and concentration of active corrosion inhibitors
should always be followed. The information can be found in the table
below.
Product designation Dosage per 1 m of system capacity Concentration of active corrosion
inhibitor
Corrshield NT 4293
CorrShield NT 4200
10 litres 670 - 1000 ppm as NO
2
Drewgard 4109 16 - 30 li-tres 640 - 1200 ppm as NO
2
DEWT-NC powder
Drewgard 4109
Liquidewt
Maxigard
3 - 4.5 kg
16 - 30 litres
8 - 12 litres
16 - 30 litres
1500 - 2250 ppm as NO
2
640 - 1200 ppm as NO
2
470 - 700 ppm as NO
2
640 - 1200 ppm as NO
2
Cooltreat 651 5 litres 800 ppm as NO
2
Q8 Corrosion Inhibitor
Long-Life
50 - 100 litres 1.8 - 3.7 Brix of active compounds
measured with a suppliers refrac
tometer
Raw water quality
Wrtsil 20 02C - 3
Product designation Dosage per 1 m of system capacity Concentration of active corrosion
inhibitor
Maricol CW 6 - 9 litres 1000 - 1500 ppm as NO
2
Trac 102 (ex-Nalcool 2000)
Nalfleet EWT 9 - 108
32 - 48 litres
2.25 - 3.4 litres
1000 - 1500 ppm as NO
2
670 - 1000 ppm as NO
2
Korrostop KV 20 - 25 litres 120 - 150 ppm as Mo
RD11 (RD11M)
RD25
5 kg
50 litres
1250 ppm as NO
2
710 ppm as Mo
Havoline XLi 50 - 100 litres 1.8 - 3.7 Brix of active compounds
measured with a suppliers refrac
tometer
WT Supra 50 - 100 litres 1.8 - 3.7 Brix of active compounds
measured with a suppliers refrac
tometer
Dieselguard NB
Rocor NB Liquid
Cooltreat AL
2.0 - 4.8 kg
9.5 - 24 litres
50 - 100 litres
1000 - 2400 ppm as NO
2
1000 - 2400 ppm as NO
2
1.8 - 3.7 Brix of active compounds
measured with a suppliers refrac
tometer
Vecom CWT Diesel QC-2 6 - 10 litres 1500 2500 ppm as NO
2
Note!
For many products the recommended minimum and maximum limits
are listed in the table above. Since the amount of active corrosion
inhibitors, especially nitrites, decreases during service, the engine
manufacturer recommends to start the dosage from the upper level
of indicated range.
Note!
The nitrite content of nitrite-based cooling water additives tends to
decrease in use. The risk of local corrosion increases substantially
when nitrite content goes below the recommended limit.
Note!
Cooling water additive manufacturers can indicate the required nitrite
content measured either as sodium nitrite, NaNO
2
or as nitrite, NO
2
.
1 mg/l as NO
2
is equivalent to 1.5 mg/l as NaNO
2
.
Raw water quality
02C - 4 Wrtsil 20
02C.4. Use of glycol V3
If a freezing risk exists, glycol needs to be added to cooling water.
Since glycol alone does not protect the engine and cooling water sys
tem against corrosion, an approved cooling water additive must also
be used. All approved cooling water additives are compatible with
glycol.
Ready-to-use mixtures containing both glycol and corrosion inhibitors
are not permitted since the concentration of each component cannot
be individually optimized. Usually, if the inhibitor concentration is cor
rect, the glycol concentration will be unnecessarily high. No reduction
in the glycol concentration is possible without increasing the risk of
corrosion.
The amount of glycol in a closed cooling water systems should always
be minimized since glycol adversely affects the heat transfer proper
ties of water. Therefore it may be necessary to de-rate the engine if
glycol is used; see document DAAE062266 for more information.
Two types of glycol are available: monopropylene glycol (MPG) and
monoethyleneglycol (MEG). So called industrial qualities of both gly
col types can be used, but MPG is considered to be less harmful to
the environment.
Raw water quality
Wrtsil 20 02C - 5
Raw water quality
02C - 6 Wrtsil 20
03. Start, Stop and Operation V1
03.1. Start V1
Before starting the engine, check that
the lubricating oil level is correct,
the fuel system is in running order (correct preheating, correct
pressure, sufficient precirculation to heat the high pressure pump),
both cooling water systems, LT- and HT-water circuit, are in
running order (correct pressures, circulating water preheated and
precirculated sufficiently to heat the engine),
the oil level in the governor and turbocharger is correct,
the starting air pressure exceeds 7.5 bar,
the starting air system is drained of condensate,
the fuel and cooling water systems are properly vented from air,
power supply to all control systems is OK.
if the engine is not preheated it must be run 15 minutes before the
full load.
All covers and protecting shields are to be mounted before starting
the engine. Covers should be removed occasionally only for meas
urements and checks, and they must be immediately mounted again.
Note!
Never leave the engine running when covers are removed.
03.1.1. Local start V5
1 Start the prelubricating oil pump to obtain a oil pressure of about 0.5
bar. Normally, the prelubricating oil pump is running when the engine
is stopped (switch in auto-mode). The prelubricating oil pump is au
tomatically switched off when the engine reaches 300 RPM in running
mode.
2 Turn the crankshaft by two revolutions or run the engine on starting
air for some revolutions keeping the stop lever in stop position and
the indicator valves open. This eliminates the risk of water locks and
close the indicator valves later.
3 Disengage the turning gear from the flywheel.
Start, Stop and Operation
Wrtsil 20 03 - 1
4 Check that the stop lever is in work position. Open the starting air
valve, shut the blow-off valve when there is no more condensate.
5 Push the start button till the engine starts firing. If the engine does not
start after 2-3 seconds the reason should be checked.
6 A second start attempt is automatically blocked by a time relay until
the engine is absolutely standing still.
7 After start, check that the pressure and temperature values are nor
mal.
03.1.2. Remote and automatic start V2
If the engine has been out of operation for more than a week, it must
first be started manually, as mentioned in point 1
Note!
Engines with automatic start must be tested once a week.
1 When starting the engine remotely, start the lubricating oil priming
pump at first. Usually, the operation of the pump is indicated by a
signal lamp. The engine can be started when the lube oil pressure
gauge shows an oil pressure of about 0.5 bar.
In automatically starting engines, the priming pump operates contin
uously thus keeping the engine ready for start. Every second day,
ensure that the pump is running.
2 Press the remote start button of the remotely controlled engine. The
solenoid valve located on the engine is energized and allows starting
air into the engine. Press the start button long enough (2-3 seconds)
to make the engine start. The remote tachometer or a signal lamp
indicates that the engine is running. In some cases the remote control
starts the priming pump. After the oil pressure increases to about 0.5
bar, the engine starts automatically. Between each attempt to start
the engine via the external control system (if the first start attempt
fails), ensure that the engine has stopped completely. This time gap
is normally about 30 seconds but has to be checked/adjusted case
by case. The number of automatic starting attempts must be limited
in order to reserve some capacity of the starting air bottles.
3 When the engine reaches a predeterminated speed, an auxiliary relay
energized by the remoted tacho transmitter cuts off the starting circuit
and the starting air solenoid valve closes. At the same time the current
to the priming pump is disconnected thus preventing the pump from
operating when the engine is running. On certain installations the pri
ming pump continues to operate at low engine speed to assist the
Start, Stop and Operation
03 - 2 Wrtsil 20
engine driven lubricating oil pump to maintain the oil pressure. After
a fixed time (10-30 seconds) the system for alarm, stop and speed
remote control is automatically connected.
03.2. Stopping the engine V5
The engine can always be stopped manually (with the stop lever) in
dependent of the remote control or automation system.
Note!
When overhauling the engine, make absolutely sure that the ready/
blocked switch is in "blocked" position and the priming pump is dis
connected.
1 Idle the engine 1 minute before stopping.
2 Close the starting air shut-off valve located before the pressure reg
ulating valve.
3 Push the STOP button or move the stop lever into STOP position.
The time of slowing down offers a good opportunity to detect possible
disturbing sounds.
03.2.1. Stopping the engine for a lengthy time V1
1 Check that the indicator valves are closed. See chapter 12: Operation
and maintenance of the indicator valve. It is also advisable to cover
the exhaust pipe opening to prevent water from entering the cylinders
via the exhaust manifold.
2 Fill the lubricating oil system on a stopped engine with oil every sec
ond day by priming the engine. At the same time, turn the crankshaft
into a new position. This reduces the risk of corrosion on journals and
bearings when the engine is exposed to vibrations.
3 Run the engine by the air starter. Ensure that the indicator valves are
open. start the engine once a week to check that everything is in order.
03.2.2. Remote stop V6
1 Engines with built-in circulating water pump: Idling more than 3-5 mi
nutes before stopping is unnecessary and should be avoided.
Start, Stop and Operation
Wrtsil 20 03 - 3
2 Press the remote control stop button. The shut-down solenoid, built
on the governor, will then be energised for a fixed time and the control
racks of the injection pumps will move into the stop position. The time
for the solenoid to be energised is set at 20-50 seconds so that the
solenoid operates until the engine stops. During this time the engine
cannot be restarted. After a predetermined time the shut-down sole
noid will return to its initial position.
3 When the engine stops and the speed decreases below a certain limit,
the system for alarm, stop and speed remote control will be discon
nected and the signal lamp will indicate that the engine is shutting
down. In engines equipped with automatic lubricating oil priming
pumps, the pump will be started at the same time.
03.2.3. Automatic stop V5
When the shut-down solenoid is energized from the automatic shut-
down system due to some disturbance, the engine will stop as in re
mote stop. Before this, an alarm device will normally initiate an alarm
signal indicating the reason for the shut-down.
When the engine stops because of overspeed, the electro-pneumatic
overspeed trip device may have tripped.
03.3. Normal operation supervision V2
If an alarm limit is reached and an alarm is activated, the engine sit
uation is already serious. All necessary countermeasures must be
taken to remove this emergency condition and return to normal op
erating conditions. As the abnormal operating situation may cause
damages to the engine, all efforts must be put into returning to the
normal operating situation instead of just waiting for an automatic shut
down of the engine.
03.3.1. Every second day or after every 50 running
hours V5
1 Read the values of thermometers, pressure gauges and the load of
the generating set. Compare the values, with those at the corre
sponding load in the Acceptance test records and curves.
Start, Stop and Operation
03 - 4 Wrtsil 20
Guidance values are stated in Chapter 01: Main Data, Operating Data
and General Design.
If the difference between exhaust gas temperatures of various
cylinders is larger than 70C at loads higher than 25% the cause
should be established.
At loads higher than 80%, the charge air temperature should be
as low as possible, but not so low that condensation occurs, see
Fig 03-1. At loads lower than 25% it is favourable to have the
charge air temperature as high as possible.
2 Check the indicator for pressure drop over fuel filters, if installed.
When the pressure drop over the filters increases, the pressure in the
system decreases. Very low pressure (less than 0.5 bar) reduces the
engine performance and may cause uneven load distribution between
the cylinders (risk of breakdown). Too high pressure drop may also
result in deformation of filter cartridges (risk of injection pump seiz
ure).
3 Check the indicator for pressure drop over the lubricating oil automatic
filter. A too large pressure drop indicates clogged filter candles, which
results in reduced oil filtration when the overflow valves are open
(from a differential pressure of 2 bar upwards). Reduced oil filtration
results in increased wear. Clean or change clogged filter candles.
4 Check the oil level in the oil sump/oil tank. Estimate the appearance
and consistence of the oil. The presence of water may be simply con
trolled by dropping oil onto a hot surface (about 150C). If the drops
"frizzle", the oil contains water. Compensate for oil consumption by
adding maximum 10% fresh oil at a time.
5 Check that the ventilation (de-aerating) of the engine circulating water
system (the expansion tank) is working. Check that the leakage from
the "tell-tale" drainage holes of the circulating water pumps is not ex
cessive.
6 Check the quantity of leak-fuel from the drain pipes. .
7 Check that the drain pipes of the air coolers are open.
8 Check that the "tell-tale" drainage holes of the oil coolers and the cir
culating water coolers are open.
9 Clean the compressor side of the turbocharger by injecting water. See
Chapter 15: Turbocharging and Air cooling.
10 Drain the fuel day tank of any water and sediments, and drain the
starting air receiver of water.
11 On a stopped generating set, prime the engine and turn the crankshaft
into a new position. This reduces the risk of crankshaft and bearing
damage due to vibrations.
Start, Stop and Operation
Wrtsil 20 03 - 5
Condensation in charge air coolers
60
50
40
30
20
10
0
10
20
30
40
50
60
70
.01 .02 .03 .04 .05 .06 .07 .08 .09
Water content
W
a
t
e
r

d
e
w
p
o
i
n
t

C
(kg water/kg dry air)
A
m
b

a
i
r

t
e
m
p
e
r
a
t
u
r
e

C
P=Air manifold pressure
bar abs
P=4,5
P=2,5
P=3,5
P=1,5
f=40
f=60 f=80
f=100
f=Relative humidity %
Fig 03-1 V1
Example: If the ambient air temperature is 35C and the relative hu
midity is 80% the water content in air can be read from the diagram
(0.029 kg water/kg dry air). If the air manifold pressure (receiver pres
sure) under these conditions is 2.5 bar, that is, absolute air pressure
in the air manifold is about 3.5 bar (ambient pressure + air manifold
pressure), the dewpoint will be 55C (see diagram). If the air temper
ature in the air manifold is only 45C, the air can only contain 0.018
kg/kg (see diagram). The difference, 0.011 kg/kg (0.029-0.018), will
appear as condensed water.
03.3.2. Every second week or after every 250 running
hours V5
1 Clean the centrifugal lubricating oil filters. If the deposits are thicker
than 8 mm, reduce the cleaning interval to retain filtering efficiency.
Maximum deposit capacity is 16 mm.
Start, Stop and Operation
03 - 6 Wrtsil 20
2 Keep the injection pump racks clean (free from sticky deposits).
Check that the parts of the fuel control shaft system move easily. This
must be done on a stopped engine.
Note!
There are hot surfaces inside the hot box, when the engine is warm.
3 Clean the turbine side of the turbocharger by injecting water. See
Chapter 15: Turbocharging and Air cooling.
03.3.3. Once a month or after every 500 running hours V7
1 Check the concentration of additives in the circulating water.
2 Check the cylinder pressures.
At the same time, note the load of the engine. The position of the load
indicator or the injection pump racks offers an accurate measure of
the engine load.
Note!
Measuring the cylinder pressures without simultaneously noting the
engine load is practically useless.
3 Check the function of the cooling system.
03.3.4. In connection with maintenance work V3
1 Record the following steps and the running hours in the engine log:
lubricating oil sampling (record also operating time of oil). Lubri
cating oil analyses without a statement of operating times are of
limited value ("go/no-go" only).
lubricating oil changes.
cleaning of centrifugal lubricating oil filters.
change of lubricating and fuel oil filter cartridges.
change of parts in connection with maintenance according to
Chapter 04: Maintenance Schedule.
03.3.5. General maintenance V1
1 There is no automatic supervision or control arrangement that can
replace an experienced engineer's observations.
LOOK at and LISTEN to the engine!
Start, Stop and Operation
Wrtsil 20 03 - 7
2 Strong gas blow-by past the pistons is one of the most dangerous
things that can occur in a diesel engine. If gas blow-by is suspected
(e.g. because of a sudden increase of the lubricating oil consumption)
check the crankcase pressure. If the pressure exceeds 20 mm H2O
(100% load), check the crankcase venting system and cylinder tight
ness, if in order, check the function of the radial turbocharger.
3 Operation at loads below 20 % of rated output should be limited to
maximum 100 hours continuously when operating on heavy fuel by
loading the engine above 70 % of rated load for one hour before con
tinuing the low load operation or shutting down the engine. Continu
ous operation on marine diesel fuel at loads below 10 % of rated out
put should be limited to maximum 100 hours by loading the engine
by more than 70 % of rated output for one hour before continuing the
low load operation or shutting down the engine.
Idling (i.e. main engine declutched, generator set disconnected)
should be limited as much as possible.
03.4. Start after a prolonged stop (more than 8 h)V4
1 Check:
lubricating oil level
circulating water level in the expansion tank
raw water supply to heat exchangers
fuel oil level in the day tank (it is a troublesome and time consum
ing job to vent the fuel system if the feed pump has sucked in air!)
starting air pressure
that the control shaft system and the injection pump racks move
freely, otherwise there is a risk of overspeed.
2 Observe all points in Chapter 03: Local start. Point 2 becomes more
important the longer the engine has been stopped.
3 Vent fuel and lubricating oil filters.
4 After starting, check that pressure and temperature reach the normal
levels.
Start, Stop and Operation
03 - 8 Wrtsil 20
03.5. Start after overhaul V5
1 Check that the connection between the speed governor and injection
pumps is set correctly (especially the injection pump rack position)
and does not jam, and that all connections are properly locked and
the injection pump racks move freely in the pumps.
2 Activate manually the solenoid for the overspeed trip device. Check
that all injection pump racks move to a value less than 5 mm.
3 If the injection pumps, camshaft or its driving mechanism have been
touched, check the injection timing. If the camshaft or its driving
mechanism have been touched, check the valve timing of one cylin
der, at least.
4 Check the cooling water system for leakage, especially:
the lower part of the cylinder liners
the oil cooler
the charge air cooler
5 Check/adjust the valve clearances. Guidance values, see chapter
06.
6 Vent the fuel oil system if it was opened.
7 Start the priming pump. Vent the lubricating oil filters. Check that lu
bricating oil appears from all bearings and lubricating nozzles, from
the piston cooling oil outlet and from the valve mechanism. Check that
there is no leakage from the pipe connections inside or outside the
engine.
Note!
Observe that the crankshaft has to be turned in order to get oil through
all connecting rods and valve yokes.
8 Rags or tools left in the crankcase, untensioned or unlocked screws
or nuts (those which are to be locked), worn-out self-locking nuts,
MAY CAUSE total breakdown.
Well cleaned oil spaces (oil sump and camshaft spaces) save the oil
pump and oil filter.
9 See the instructions in chapter 03., sections 03.1 and 03.4 when
starting.
03.6. Supervising operation after overhaul V2
1 At the first start, listen carefully for possible jarring sounds.
Start, Stop and Operation
Wrtsil 20 03 - 9
Caution!
If anything unusual is noticed, stop the engine immediately.
2 Let the engine idle at normal speed for five minutes.
3 Check the condition of the stopped engine.
a ) Stop the engine.
b ) Check the temperature of the main and big end bearings.
c ) Check the temperature of all other bearings which have been
opened.
d ) If everything is in order, restart the engine.
4 Check the engine for leakage of gas, water, fuel or lubricating oil.
a ) Check the fuel lines, injection pumps and injection valves.
Note!
Observe if the oil leakage from the pipes increases.
5 Check the condition of the running engine.
a ) Check:
Pressure and temperature
Automatic alarm and stop devices
Pressure drop over the fuel filter and lubricating oil filter
Oil level in the oil sump/oil tank
Condition of the oil
Ventilation of the engine cooling water system
Quantity of leak fuel
Inspection ports in the coolers
Content of additives in the cooling water
Cylinder pressures
Crankcase pressure.
b ) Listen for jarring sounds.
c ) Vent the filters.
Start, Stop and Operation
03 - 10 Wrtsil 20
03.7. Running-in V4
1 After piston overhaul, follow programme A as closely as possible. The
piston rings have slid into new positions and need time to bed in. If
the programme cannot be followed, do not load the engine fully until
it has run for at least 4 hours.
2 After changing the below, follow programme B as closely as possi
ble.:
piston rings
pistons or cylinder liners
honing of cylinder liners
Running-in programme
1 2 3 4 5 6 7 h
0
10
20
30
40
50
60
70
80
90
100
Engine
load %
Operating hours
A After piston overhaul
B After change of piston rings, pistons or cylinder liners,
after honing cylinder liners
Stop. Check big end bearing temperatures
End of running-in programme. Engine may be put on normal mode
1
2 2
1
2
Fig 03-2 V1
Caution!
If the programme cannot be followed, do not load the engine fully until
it has run for at least 10 hours.
Caution!
Avoid running-in at a continuous low load.
The important thing is to vary the load several times. The ring groove
will tilt differently at each load stage, and consequently the line of
contact between the ring and cylinder will change.
Start, Stop and Operation
Wrtsil 20 03 - 11
The running-in may be performed either on distillate or heavy fuel,
using the normal lubricating oil specified for the engine.
Start, Stop and Operation
03 - 12 Wrtsil 20
04. Maintenance Schedule V3
The maintenance in general is necessary for the engine according to
the operating conditions especially when attached with generating set
or similar attachments. Because of the difficulty of anticipating the
various operating conditions that may be encountered in the field, the
periods stated in the schedule should be used for guidance purposes
only. They must not however be exceeded during the warranty period.
If, at a shorter interval than recommended, observations or inspec
tions indicate that it is necessary to perform a maintenance procedure
or to replace a component, such work should not be delayed. While
using diesel or intermediate fuels of comparatively good quality as
fuel, it may be possible to extend the stated maintenance intervals
considerably depending on the load of the engine. See also the chap
ter for the turbocharger and the governor and the instructions in chap
ter Start, Stop and Operation.
For Risk Reduction see chapter 00: Risk Reduction.
For Environmental Hazards see chapter 00: Hazardous
substances
Before any steps are taken, read the corresponding item in this
Manual carefully.
At all maintenance work, observe the utmost cleanliness and
order.
Before dismantling, check that all systems concerned are drained
or the pressure is released. After dismantling, immediately cover
holes for lubricating oil, fuel oil and air with plugs.
When exchanging a worn-out or damaged part provided with an
identification mark stating cylinder or bearing number, mark the
new part with the same number on the same spot. Every exchange
should be entered in the engine log and the reason should be
clearly stated.
Always renew all gaskets , sealing rings and O-rings at
maintenance work.
After reassembling, check that all screws and nuts are tightened
and locked, if necessary.
Warning!
During any form of maintenance, make absolutely sure that the au
tomatic start and the priming pump are disconnected. Make also sure
that the starting air shut-off valve located before the main starting
valve is closed. Otherwise it might cause engine personal injury and/
or damage.
Maintenance Schedule
Wrtsil 20 04 - 1
Warning!
During any form of maintenance, make absolutely sure that the gear
box is not engaged and the generator breaker is secured to avoid any
engine rotation.
Warning!
Accidental turning of engine may cause personal injury and/or engine
damage.
04.1. How to select application and fuel quality V2
There are two different types of applications defined:
Average load is above 75 % of nominal engine output.
Average load is below 75 % of nominal engine output.
Three types of fuel are defined:
HFO 1 Heavy fuel oil of normal quality.
HFO 2 Heavy fuel oil of below normal standard quality.
DO Diesel oil or light fuel oil (LFO).
Fuel characteristics, maximum limits
HFO 1 HFO 2
Sulphur % mass 1.5 1.5 - 4.5
Ash % mass 0.05 0.05 - 0.15
Vanadium mg/kg 100 100 - 600
Sodium mg/kg 50 50
Sodium, before engine mg/kg 30 30
Aluminium + silicon mg/kg 30 30 - 80
Aluminium + silicon, bef.
eng.
mg/kg 15 15
Conradson Carbon resi
due
% mass 15 15 - 22
Asphaltenes % mass 8 8 - 14
CCAI 850 850 - 870
Note!
If any of specified fuel properties exceed HFO 1 maximum value the
fuel should be classified as HFO 2.
Maintenance Schedule
04 - 2 Wrtsil 20
04.2. Every second day V5
Every second day, irrespective of the engine being in operation or not
Automatic prelubrica
tion
Check operation. 03.1.2
18.7
Crankshaft Marine engine: In a stopped engine, turn the crankshaft into a new
position.
04.3. Once a week V1
Once a week irrespective of the engine being in operation or not
Start process Test start (if the engine on stand-by). 03.1
04.4. Interval: 50 operating hours V12
Interval: 50 operating hours
Air cooler Check draining of air cooler.
Check that the draining pipe is open, check for leak
age.
15.2.1
03.3.1
Cooling system Check water level in cooling system.
Check the water level in the expansion tank(s) and/
or the static pressure in the engine cooling circuits.
19.2, 19.7
Connecting rod Check tightening of the connecting rod screws.
Check the tightening of the connecting rod screws
after the first 50 operating hours on a new engine and
after overhaul (those screws that have been opened).
11.4.4
07
Fuel and lubricating oil
filters
Check pressure drop indicators.
Change filter cartridges if high pressure drop is indi
cated.
17.2
03.3.1
23.1
Gauges and indicators Take readings.
Read and record (use form No. WV98V089) all tem
perature and pressure gauges, and also the load of
the engine.
03.3.1
Governor, actuator Check oil level in governor.
Check oil level, and look for leaks.
See manufacturers instructions.
Injection and fuel sys
tem
Check leak fuel quantity.
Check the amount of leak fuel from the injection
pumps and injection nozzles.
03.3.1
17
Maintenance Schedule
Wrtsil 20 04 - 3
Interval: 50 operating hours
Injection pipes Check tightening of injection pipe connections.
Check the tightening of injection pipe connections on
a hot engine after the first 50 operating hours on a
new engine and, after overhaul (those connections
that have been opened).
16.2
07.1
Lubricating oil sump Check oil level in sump.
Check oil level with a dip stick, compensate for con
sumption.
18.1
02.2.1
Main bearings Check tightening of main bearing screws.
Check the tightening of main bearing screws after the
first 50 operating hours on a new engine and after
overhaul (those screws that have been opened).
10.4
07.1
Turbocharger Water cleaning of compressor.
Clean the compressor by injecting water.
15.1.4
Check the turbine side V-clamp ring tightening on
TPS chargers.
If specified, after the first 50 operating hours on a new
engine and, after overhaul.
See manufacturer's instructions
Check fastening bolts at feet, tighten housing bolts
and piping joints.
Once after commissioning or overhaul; then every
4000 hrs. See the turbocharger makers manual.
Valve mechanism Check valve clearances.
Check the valve clearances after 50 hours running in
new and overhauled engines. Check tightening of
rocker arm screws and valve/yoke adjusting screw
nuts.
12.2.5
06.1
07.1.3
Multiduct Check tightening of the multiduct screws.
Check the tightening of the multiduct screws after the
first 50 operating hours on a new engine and, after
overhaul (those screws that have been opened). The
engine should be at normal operating temperature.
07.1
04.5. Interval: 100 operating hours V7
Interval: 100 operating hours
Turbocharger Water cleaning of turbine.
Clean the turbine by injecting water; adjusted acc. to operation.
15.1.2
Maintenance Schedule
04 - 4 Wrtsil 20
04.6. Interval: 250 operating hours V5
Interval: 250 operating hours
Centrifugal filter Clean centrifugal filter.
Clean more often if necessary. Remember to open the valve before
the filter after cleaning. Check the condition of bearings and shaft
journals.
18.6
Control mechanism Maintenance of control mechanism.
Check for free movement, clean and lubricate.
22.1
Lubricating oil Take oil sample.
In a new installation or after change to use of a new lubricating oil
brand, take samples for analysing.
02.2.2
04.7. Interval: 500 operating hours V7
Interval: 500 operating hours
Circulating water Check water quality.
Check content of additives.
02.3.2
02.3.1
Cylinder pressure Check cylinder pressure.
Record firing pressures of all cylinders.
03.3.3
Lubricating oil Take oil sample.
Take oil sample for analysis. Use of lubricating oil can be prolonged as
long as the analysis results are within the specified limits set by the
engine manufacturer.
For a new installation, see the interval: 1000 hours.
Clean all oil spaces with a high quality fibre-free / lint free cloth when
changing lubricating oil.
18.1
Turbochargers Wash filter mat on silencer.
After completing 3000 operating hours or being washed five times re
place with a new one.
15.1.1
See manufac
turers instruc
tions.
Maintenance Schedule
Wrtsil 20 04 - 5
04.8. Interval: 1000 operating hours V9
Interval: 1000 operating hours
Automation Functional check of automation.
Check function of the alarm and automatic stop devices.
23.3.2
01.2
Fuel filter Replace fuel oil filter cartridges.
Clean the wire gauze and filter housing. Replace the filter cartridg
es. (The cartridges are to be replaced when the pressure difference
indicator shows too high pressure drop).
17
17.2
Lubricating oil Change lubricating oil.
Change oil in a new installation (wet sump installations). Take sam
ples for analysing. Use of lubricating oil can be prolonged, in steps
of 500 operating hours, as long as the analysis results are within
the specified limits set by the oil supplier or the engine manufac
turer.
Change oil in an installation (wet sump installations) that is not pu
rifying regularly the lubricating oil, independently of oil analysis re
sult.
Clean all oil spaces with a high quality fibre-free / lint free cloth when
changing lubricating oil.
18.1
02.2.2
Valves Check of valve condition.
Check valve clearances.
Check cylinder tightness (valves, piston rings) with a pneumatic
test. Check that the inlet and exhaust valves move freely in their
guides. This should preferably be done when the engine has been
out of operation for a couple of hours.
12.2.5
06.1
12A
Maintenance Schedule
04 - 6 Wrtsil 20
04.9. Interval: 2000 operating hours V8
Interval: 2000 operating hours
Charge air cooler Check water side of charge air cooler.
The first time check and possible cleaning of the waterside . If in
good condition and deposits unsignificant: future intervals 4000
running hours.
15.2.1
Measuring instruments Checking of gauges.
Check pressure and temperature gauges. Replace faulty ones.
23.1
Governor Change oil in governor.
Change lubricating oil.
02.2.3
Injection valves Inspect injection valves.
Test the opening pressure. Dismantle and clean nozzles. Check the
effective needle lift. Check the springs. Replace the O-rings. .
16.4.2
Overspeed trip device Check function of overspeed trip.
Check function and tripping speed
22.4
04.10. Interval: 4000 operating hours V8
Interval: 4000 operating hours
Air cooler Clean the charge air cooler.
Clean the air and water side of the charge air cooler and pressure
test it. Look carefully for corrosion.
15.2.1
Automation Check connectors and cables.
Check mounting and connection. Make a visual check of all cables
and replace these cables that are damaged.
23.1
Camshaft and valve
mechanism
Visually inspect contact faces of camshaft.
Check the contact faces of the cams and tappet rollers. Check valve
yoke and adjusting screw nut and that the rollers rotate. Rotate the
engine with the turning gear.
14
Control mechanism Check control mechanism.
Check for wear in all connecting links between the governor and all
injection pumps.
22.1
Flexible coupling If specified check alignment, use form WV98V041. Check condition
of coupling.
See manufactur
ers instructions.
Crankshaft Check crankshaft alignment.
Check alignment, use form No. WV98V036. Alignment check has
to be performed on a warm engine.
11.1.2
Resilient mounts Inspect buffer clearance, reset if necessary. Inspection to be made
at least once a year.

Maintenance Schedule
Wrtsil 20 04 - 7
Interval: 4000 operating hours
Cylinder liners Inspect jacket water spaces.
Pull one cylinder liner. If the deposits are thicker than 1 mm, clean
all liners and engine block water space. Improve the cooling water
treatment.
Replace the distance shim under liner if installed.
02.3
10.6
Exhaust manifold Check the expansion bellows, nuts and pipe support of the flange
connections.
Tighten loose nuts. Replace supports and bellows if necessary.
20.1
Lubricating oil cooler Clean the lubricating oil cooler.
If the lubricating oil temperature before the engine is within normal
operating values, the interval can be prolonged. Unnecessary open
ing of the cooler should be avoided. Clean the lubricating oil cooler
before the alarm limit for the lubricating oil temperature is reached.
Examine carefully for corrosion.
18.4
Lubricating oil automat
ic filter
Inspect lubricating oil filter candles.
Replace worn parts and clean the candles and safety filter mesh, if
necessary.
Mechanical cleaning not allowed.
18N.1.1
Nozzles Check the nozzle condition in a test pump.
Recommendation: Replace the nozzles by new ones
16.4.2
Turbocharger Inspect and clean.
Clean the compressor and turbine mechanically if necessary.
15.1.1
19.7
Inspect nozzle ring.
15.1.2
04.11. Interval: 8000 operating hours V8
Interval: 8000 operating hours
Camshaft driving gear Inspect camshaft driving gear.
Check clearances and backlash. Replace parts, if necessary.
13
Flexible hoses Visually inspect the flexible hoses.
Replace, if necessary.

Governor driving gear Inspect governor driving gear.
Replace parts, if necessary.
22.3
HT-water pump Inspect HT-water pump.
Dismantle and check. Replace shaft seals and worn parts. Check
backlash.
19.8
HT-water pump driving
gear
Inspect HT-water pump driving gear.
Replace parts, if necessary. Check backlash.
19.8
Maintenance Schedule
04 - 8 Wrtsil 20
Interval: 8000 operating hours
HT-water thermostatic
valve
Clean and inspect HT-water thermostatic valve.
Clean and check the thermostatic element, valve cone-casing and
sealings.
19.9
LT-water thermostatic
valve
Clean and inspect LT-water thermostatic valve.
Clean and check the thermostatic element cone-casing and replace
sealings. Check the function of the valve.
19.9
LT-water pump Inspect LT-water pump.
Dismantle and check. Replace shaft seals and worn parts. Check
backlash.
19.8
LT-water pump driving
gear
Inspect LT-water pump driving gear.
Replace parts, if necessary. Check backlash.
19.8
Lubricating oil pump Inspect the lubricating oil pump.
Dismantle and check. Replace worn parts. Check backlash.
18.2
Oil pump driving gear Inspect oil pump driving gear.
Replace parts, if necessary. Check backlash.
18.2
Oil thermostatic valve Clean and inspect oil thermostatic valve.
Clean and check the thermostatic element, valve cone-casing and
sealings.
18.5
Prelubricating oil pump Inspect the prelubricating oil pump.
Replace shaft seals and worn parts.
18.7
Electrical motor Electrical motor for prelubricating oil pump.
Replace roller bearings on electrical motor or latest after three (3)
years in use.
Lubricating oil automat
ic filter
Replace lubricating oil filter candles.
Drain the filter housing. Clean the wire gauze. Replace the filter
candles.
Conduct visual inspection of all filter candles once a year. Replace
the filter candles after latest 2 years in service or if p alarm occurs.
18N.1
Fuel system Check and adjust fuel system.
Check the settings of the fuel system. Check for possible leakage.
Replace parts, if necessary.
17
Starting/smoke fuel
limiter
Check function of starting/smoke fuel limiter. 22
23.1
Air starter General overhaul of air starter motor.
Conduct starter maintenance along with general engine mainte
nance or latest after 3 years. Replace bearings, solenoid valve and
worn parts.
21.1
See manufactur
ers instructions.
Maintenance Schedule
Wrtsil 20 04 - 9
04.12. Overhaul interval V1
Fuel
Overhaul interval
Average load > 75 % Average load < 75 %
HFO 2 8000 10000
HFO 1 12000 14000
DO 16000 20 000
04.13. Interval: (8000 - 20000) See table 04.12. V7
Interval: (8000 - 20000) See table above
Connecting rod Replace big end bearings.
Replace big end bearings. Inspect mating face and surface of ser
rations. Measure the big end bore, use form 2011V001.
11.4.2
Inspect small end bearings
Replace if necessary, use form 2011V007.
11.4.3, 06.2
Crankshaft Check thrust bearing clearance.
Check axial clearance
10.5.3
Cylinder heads Overhaul of cylinder head.
Dismantle and clean the underside, inlet and exhaust valves and
ports. Pull out the exhaust gas seat rings, inspect cooling spaces
and clean, replace the O-ring(s). If necessary, grind the valves and
EX / IN seat rings (often lapping by hand is enough). Inspect the
valve rotators.
Replace the O-rings in the valve guides. Use the Cylinder Head
Overhaul Report measurement record 2012V015.
12
Cylinder liners Inspect the cylinder liners.
Measure the bore using form No. 2010V002, replace liner if wear
limits are exceeded. Hone the liners. Renew the antipolishing ring.
10.6
Inspect all cylinder liners water side and replace O-rings.
Pull all cylinder liners. If the deposits are thicker than 1 mm, clean
all liners and the engine block water space. Replace the O-rings in
the bottom part by new ones at every overhaul.
19.7
10.6
Injection pumps Overhaul of injection pumps.
Clean and inspect injection pumps, replace worn parts. Replace all
seal rings and constant pressure valve. Check the erosion plugs,
replace if necessary.
16.2.7
Pistons Inspect the piston.
Dismantle one composite piston for inspection of mating surfaces
between piston skirt and piston crown. Inspect and clean oil spaces.
Repeat the procedure with other pistons if necessary.
11.4.3
Maintenance Schedule
04 - 10 Wrtsil 20
Interval: (8000 - 20000) See table above
Piston, piston rings Inspect pistons and piston rings.
Pull, inspect and clean. Check the height of the ring grooves. Check
the retainer rings of the gudgeon pins. Replace complete set of pis
ton rings. Note the running-in program.
11.4.2
Main bearings Inspect the bearing shells of one main bearing.
Replace all bearing shells, if necessary.
10.4.2
Turbocharger
TPS-chargers
Inspect the bearings of radial type charger.
Replace bearings if necessary.
15.1.1
See manufactur
ers instructions.
Valve mechanism Check valve mechanism bearings.
Check tappets and rocker arms. Replace valve tappet roller bearing
bush, if specified.
14.3.2
06.2
04.14. Interval: 16000 operating hours V5
Interval: 16000 operating hours
Fuel feed pump Inspect fuel feed pump.
General overhaul and replace shaft seals and gaskets.

Governor drive Check the governor drive bearing.
Check governor driving shaft bearing clearance in situ.
22.3.1
06.2
Vibration damper Dismantle and check. 11.1
See manufactur
ers instructions.
Viscous vibration
damper
Take oil sample from vibration damper.
Take oil sample for analysing.
11.1
See manufactur
ers instructions.
Camshaft Inspect camshaft bearings.
Replace if necessary.
14.3.2
06.2
Intermediate gears and
bearings
Inspect gear teeth and measure backlash and axial clearance. Re
place bearings at least every 32. 000 hrs.
13
06.2
Governor Governor general overhaul at an authorized workshop latest after 5
years in use.
See manufactur
ers instructions.
Check the function and adjustments of the governor.
Replace worn parts.
22.3
Maintenance Schedule
Wrtsil 20 04 - 11
04.15. Interval: 24000 operating hours V8
Interval: 24000 operating hours
Connecting rod Replace connecting rod screws.
Replace connecting rod screws at the latest every 24000 operating
hrs. with new ones.
11.4.4
07
Crankshaft Inspect crankshaft.
Inspect the crankshaft bearing surfaces. Measure the crankpin di
ameter and ovality.
06.2
Engine fastening bolts Check tightening of engine fastening bolts.
Replace if necessary.
07.3
Overspeed trip device
Elektro-pneumatic
General overhaul of overspeed trip device.
Check function and tripping speed.
22.4
22.4.2
Turbocharger Replace turbocharger bearings. 15.1.1
See manufactur
ers instructions.
Automation and control
system
Replace vibration dampers (rubber elements).
Replace the rubber elements for components such as connection
boxes, control modules, connection rails and main cabinet. The vi
bration damper should be replaced latest every fourth (4) year.
23.3.1
04.16. Interval: 24000 operating hours or after 5
years V6
Interval: 24000 operating hours or after 5 years
Valve mechanism Replace rocker arm screws, yoke and adjusting screw nuts. 14.1
Injection valve yoke Injection valve yoke tension screws.
Replace screws.
12
Exhaust gas piping Exhaust gas piping support, plates, nuts and screws.
Replace supports, nuts and screws.
20.1
Control mechanism Replace support bearing bushes and V-rings on fuel control shaft. 22.1
Maintenance Schedule
04 - 12 Wrtsil 20
04.17. Interval: 48000 operating hours V1
Interval: 48000 operating hours
Turbocharger Replace rotor. 15.1.1
See manufactur
ers instructions.
Maintenance Schedule
Wrtsil 20 04 - 13
Maintenance Schedule
04 - 14 Wrtsil 20
05. Maintenance tools V1
Maintenance of the engine requires the use of some special tools
developed in the course of engine design. Some of these tools are
delivered with the engine, others are available from the Wrtsil's
service stations.
The tools required for a particular installation varies depending on the
application. The standard tool sets have been composed to meet the
basic requirements.
Before starting a maintenance work, check that all necessary spare
parts, consumables and maintenance tools are available. The re
quired maintenance tools are stated in the maintenance instructions.
Tools available from Wrtsil are listed in the Spare Parts Catalogue.
Tools delivered with the engine are listed in the installation specific
delivery list.
Regarding maintenance tools for the governor and the turbocharger,
refer to the enclosed governor and turbocharger documentation.
05.1. About Spare Parts Catalogue V1
The Spare Parts Catalogue presents a comprehensive selection of
tools for the Wrtsil engines. Each tool is specified by a code and a
descriptive name. In order to facilitate the choice of tools for a specific
service operation, the tools are grouped according to the engine part
they are intended for. The tools for servicing a certain part are shown
in a picture, where each tool is marked with its code. They are also
listed in a table with tool codes and names.
Note!
Some of the tools listed in the Spare Parts Catalogue are only appli
cable for certain cylinder numbers and/or certain engine mounting
equipment.
05.2. Ordering maintenance tools V2
To order maintenance tools or spare parts:
Maintenance tools
Wrtsil 20 05 - 1
1 Find the required tools or parts in the Spare Parts Catalogue. Note
down the specifications (part number and name) from the Spare Parts
Catalogue along with other ordering information, or fill in the Inquiry/
Order List. See the table below for required ordering information. The
engine type, engine specification and engine number are found on
the engine name plate.
Table 05-1 Information required when ordering maintenance tools
Required information Example
Engine type Wrtsil 9L20
Specification number 173176
Engine number PAAE035380
Tool number 832 004
Name of part Lifting tool for cylinder head
Quantity 1
Name of consignee Engineer A. Clipper
M/S Brigitte
C/O Seaforwarding
Sea Port, Hull
Purchaser Shipowner Atlanta
Head Square,
Birmingham E.C.
Method of forwarding Express air line
2 Send the order to the Wrtsil Service Office address printed on the
Inquiry/Order List, or directly to Wrtsil. Addresses and telephone
numbers are printed on the title page of this manual. All commercial
terms are stated in the Inquiry/Order List.
Note!
All orders placed by telephone should be confirmed by email or letter.
When ordering special equipment or tools not included in the Spare
Parts Catalogue or Instruction Manual, please state the manufactur
er's type designation and serial number. If the data is not available,
describe the tool as clearly as possible and enclose a picture.
Maintenance tools
05 - 2 Wrtsil 20
06. Adjustments, Clearances and Wear
Limits V2
06.1. Adjustments V8
Valve timing
The valve timing is fixed and cannot be changed individually, cylinder
by cylinder.
Valve timing
E
X
H
A
U
S
T

V
A
L
V
E

I
N
L
E
T

V
A
L
V
E

1
2
3
4
5
1. Inlet valve opens. 2. TDC. 3. Exhaust valve closes. 4. Exhaust valve
opens. 5. BDC inlet valve closes.
Fig 06-1 200601 V3
Adjustments, Clearances and Wear Limits
Wrtsil 20 06 - 1
Other set values:
Valve clearances, cold engine: inlet valves 0.4 mm, exhaust
valves 0.8 mm.
Fuel delivery commencement. See test records.
Opening pressure of fuel injection valve 45010 bar.
06.2. Clearances and wear limits at 20C V9
Part, measuring point Drawing dimension (mm) Normal clear
ance (mm)
Wear limit
(mm)
Maximum Minimum
10 Main bearing clearance
(also flywheel bearing)
0.190-0.294
Journal, diameter 210.000 209.971 209.900
Journal, out of circularity 0.015 0.05
Journal, taper 0.02/100
Main bearing shell thickness 7.420 7.405 7.36
Main bearing housing bore 225.046 225.000
Assembled bearing bore 210.265 210.190
Thrust bearing, axial clearance 0.170-0.350 0.50
Thrust washer thickness 13.850 13.830
Camshaft bearing clearance 0.125-0.215
Camshaft journal diameter 140.000 139.975
Camshaft bearing bush, thickness 4.945 4.930
Camshaft bearing housing, bore 150.046 150.000
Assembled bearing bore 140.190 140.125
Camshaft thrust bearing housing,
bore
105.035 105.000
Assembled bearing bore 90.165 90.100
Camshaft thrust bearing clearance 0.100-0.187
Camshaft thrust bearing, axial clear
ance
0.25-0.55
Cylinder liner, diameter 200.046 200.000 top: 200.45
bottom: 200.25
Cylinder liner, out of cylindricity at
TDC
0.02 0.20
Antipolishing ring, wall thickness 4.25 4.20 4.05
Adjustments, Clearances and Wear Limits
06 - 2 Wrtsil 20
Part, measuring point Drawing dimension (mm) Normal clear
ance (mm)
Wear limit
(mm)
Maximum Minimum
11 Big end bearing clearance 0.145-0.230
Crankshaft, axial clearance 0.170-0.350
Crank pin, diameter 180.000 179.975 179.900
Crank pin, out of circularity 0.015 0.05
Crank pin, taper 0.03/100
Big end bearing shell thickness 4.950 4.935 4.90
Big end bore, ovality 190.029 190.000 0.12
Assembled bearing bore 180.205 180.145
Gudgeon pin bearing clearance 0.050-0.112
Gudgeon pin diameter 90.000 89.990
Small end bore 105.022 105.000
Assembled bearing bore 90.120 90.068
Connecting rod axial clearance in pis
ton
0.2-0.6
Small end bearing bush, thickness 7.475 7.460
Piston gudgeon pin clearance 0.04-0.07
Piston gudgeon pin diameter 90.060 90.040
Piston ring height clearance:
Compression ring 1
Compression ring 2
Oil scraper ring

0.10-0.145
0.06-0.105
0.04-0.075
0.4
0.35
0.35
Piston ring groove height:
Groove I
Groove II
Groove III
6.12
5.08
6.05
6.09
5.05
6.03

6.40
5.35
6.30
Piston crown M18 screw length 66.5 66.3 67.1
11B
11C
Balancing shaft 4L20 and 5L20
Intermediate gear axial clearance

0.10-0.20

Balancing shaft intermediate gear,
bearing clearance
0.06-0.15
Axial clearance 0.10-0.20
Backlash balancing shaft intermedi
ate gear/crankshaft gear
0.10-0.30
Backlash balancing shaft intermedi
ate gear/balancing shaft gear
0.30-0.50
Backlash balancing shaft gear/bal
ancing shaft gear
0.21-0.43
Drive shaft, axial clearance 0.15-0.40
Drive shaft, bearing clearance 0.090-0.169
Balancing shaft bearing clearance 0.090-0.169
Adjustments, Clearances and Wear Limits
Wrtsil 20 06 - 3
Part, measuring point Drawing dimension (mm) Normal clear
ance (mm)
Wear limit
(mm)
Maximum Minimum
12 Valve guide diameter assembled 14.088 14.034
Valve stem diameter 14.000 13.982 13.95
Valve stem clearance 0.04-0.10 0.20
Valve seat deviation relative guide
(maximum value)
0.10
Inlet valve seat bore in cylinder head 78.019 78.000
Exhaust valve seat bore in cylinder
head
outer bore
inner bore
78.019
67.019
78.000
67.000

13 Camshaft drive intermediate gear
bearing clearance
axial clearance
0.100-0.187
0.25-0.54
0.22
0.60
Bearing diameter 90.165 90.100
Bearing journal diameter 90.000 89.978
Camshaft driving gear backlash:
Crankshaft gear wheel/large inter
mediate gear wheel
0.10-0.50
Small intermediate gear wheel/cam
shaft gear wheel
0.20-0.37
Base tangent length:
- crankshaft gear wheel, assembled 130.505 130.449
- large intermediate gear wheel 130.283 130.227
- small intermediate gear wheel 84.228 84.172
- camshaft gear wheel 140.331 140.275
14 Valve tappet, diameter 54.970 54.940
Guide diameter 55.030 55.000
Diameter clearance 0.09-0.15
Tappet roller bore diameter 22.021 22.000
Tappet pin diameter 21.993 21.980
Clearance roller pin 0.007-0.041
Rocker arm bearing diameter 50.064 50.025
Bearing journal diameter 50.000 49.984
Bearing clearance 0.025-0.080 0.20
Yoke pin diameter 19.935 19.922
Yoke bore diameter 20.021 20.000
Diameter clearance 0.065-0.099 0.15
16 Nozzle needle lift 0.45 0.55
17 Fuel feed pump backlash: Driving
gear wheel to crankshaft gear wheel
0.24-0.47
Adjustments, Clearances and Wear Limits
06 - 4 Wrtsil 20
Part, measuring point Drawing dimension (mm) Normal clear
ance (mm)
Wear limit
(mm)
Maximum Minimum
18 Lubricating oil pump diameter of shaft 49.92 49.895
Bush hole diameter, assembled 50.045 49.99
Bearing clearance 0.080-0.165 0.20
Axial clearance: 4, 5 and 6L20 0.120-0.230
Axial clearance: 8 and 9L20 0.130-0.220
Backlash for pump gear wheels 0.432-0.736
Backlash for pump gear wheel/inter
mediate gear wheel
0.15-0.48
Intermediate gear, bearing clearance 0.06-0.15
Intermediate gear, axial clearance 0.10-0.20
Backlash for intermediate gear
wheel/crankshaft gear wheel
0.10-0.30
Base tangent length over 2 teeth 43.37 43.258
19 Water pump backlash for driving gear 0.26-0.55
Backlash for sea water pump driving
gear/intermediate gear wheel
0.10-0.40
Backlash for sea water pump inter
mediate gear/crankshaft gear wheel
0.20-0.50
Base tangent length over 4 teeth 53.643 53.563
21 Airstarter pinion wheel backlash 0.89-1.15
22 Driving shaft for governor 22.0 21.987
Bearing for driving shaft 22.058 22.026
Bearing clearance 0.026-0.071
Axial clearance 0.10-0.50
Backlash for driving gear 0.07-0.25
Control shaft 20.000 19.967
Control shaft bearing 20.162 20.110
Clearance 0.110-0.195
Adjustments, Clearances and Wear Limits
Wrtsil 20 06 - 5
Adjustments, Clearances and Wear Limits
06 - 6 Wrtsil 20
07. Tightening Torques and Instructions for
Screw Connections V2
07.1. Tightening torques for screws and nuts V9
Note!
Tightening torques for hydraulically tightened connections are pre
sented in their own section.
In the following sections from A on, the position numbers in the tables
refer to the corresponding figures that represent the main compo
nents of the engine.
Threads and contact faces of nuts and screw heads should be oiled
with lubricating oil unless otherwise stated. Locking fluids are used in
certain cases.
Note!
Do not use Molykote or similar low friction lubricants for any screws
or nuts due to risk of overtensioning.
Warning!
Always tighten to the torque specified in the tables. A loose screw
connection may cause serious damages or human injury.
1 Nm = 0.102 kpm
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 1
Tightening torques
G
H
A
B
C
D E
I
K
J
F
Fig 07-1 200774 V1
We recommend the use of torque measuring tools also when tight
ening other screws and nuts. The following torques apply to screws
of the strength class 8.8 when oiled with lubricating oil or treated with
Loctite.
Screw dimension Width across flats of hexa
gon screws (mm)
Key width of hexagon socket
head screws (mm)
Torque
(Nm) (kpm)
M5 8,5 4 5,4 0,55
M6 10 5 9.5 0.95
M8 13 6 23 2.3
M10 17 8 45 4.6
M12 19 10 80 8.1
M16 24 14 190 19.3
M20 30 17 370 37.5
M24 36 19 640 65
Tightening Torques and Instructions for Screw Connections
07 - 2 Wrtsil 20
07.1.1. A: Crankshaft and flywheel V8
1
3
2
Fig 07-2 200756 V2
Pos. Screw connection Torque (Nm)
1. Crankshaft flange screws (fitted bolts).
Lubricate the contact faces of the screws and holes
with Molykote G-n Plus, the threads with oil.
300
Use the torque multiplier X-4. 91
Crankshaft flange screws (hexagon socket screws).
Lubricate the washers with Molykote G-n Plus, the
threads with oil.
60020
Use the torque multiplier X-4. 182
2. Screws for counterweight, M24 (two counterweights
per crank) Lubricate with engine oil.
48020
Use torque multiplier X-4. 145
3. Screws for the gear rim halves. Apply Loctite 242 on
threads, see section 07.2.
49
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 3
07.1.2. B: Camshaft and intermediate gear V6
1
2
Fig 07-3 200771 V1
Pos. Screw connection Torque (Nm)
1. Screws for housing, apply Loctite 245 25
2. Screws for intermediate gear, 5xM20. Lubricate the
threads and the screw head with oil.
53015
Tightening Torques and Instructions for Screw Connections
07 - 4 Wrtsil 20
07.1.3. C: Valve mechanism and multihousing V8
1
2
6
7
3 4
5
Fig 07-4 200790 V1
Posi
tion
Screw connection Torque (Nm)
1. Screws for valve tappet guide block and injection
pump.
1105
2. Rocker arm console, fastening screws. 2005
3. Fastening screws, cylinder head/multiduct. 80
4. Fastening screws, multiduct/exhaust manifold. 80
5. Multiduct fastening screws with distance sleeves. 80
6. Locking nut for valve clearance adjusting screw. 100
7. Locking nut for valve yoke adjusting screw. 60
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 5
07.1.4. D: Injection pump V7
3 0 4 0 0
1
2
3
4
5
7
6
BOSCH
PFR 1 CY 180V
Fig 07-5 200772 V1
Pos. Screw connection
Torque (Nm)
Bosch
PFR 1 CY 180V
1. Side screw 141
2. Grub screw 141
3. Erosion plug
Apply Loctite 242 on threads, see section 07.2
855
4. Injection pump element fastening screws. 332
Note! Tighten the screws crosswise in steps
Lubricate threads with Molykote G-n plus
0..10..20..33
5. Screw for fuel rack indicator 3,50,5
6. Screws for pressure valve 332
Note! Tighten the screws crosswise in steps
Lubricate threads with Molykote G-n plus
0..10..20..33
7. Vent screw 222
Tightening Torques and Instructions for Screw Connections
07 - 6 Wrtsil 20
07.1.5. E: Fuel injection valve V7
1
2
3
4
5
6
7
Fig 07-6 200779 V1
Position Screw connection Torque (Nm)
1. Injection nozzle cap nut.
Lubricate threads and contact face with Molykote G-n Plus.
27010
2. Screws for protecting sleeve. 25
3. Injection valve fastening nuts, see section 16.4.4. 503
4. Connection piece to nozzle holder, lubricate the connecting piece with oil. 655
5. Injection pipe cap nuts to injection pump, lubricate the nuts with oil. 555
6. Nut for pressure adjustment. 10010
7. Guide screw
Apply Loctite 241 on threads, see Chapter 07: Use of locking fluid.
10+5
Note!
Injection valves of type 1 have an adjusting screw placed at the side
of the valve, while injection valves of type 2 and 3 have an adjusting
screw at top of the valve.
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 7
07.1.6. F: Piston V5
Tightening the piston screw (One screw)
60
1
1. Piston with 1 screw
Fig 07-7 V1
Piston with 1 screw
Posi
tion
Screw connection Torque (Nm)
Angle ()
1. Screw for piston (M18x1.5):
New screw with old or new crown
1. Lubricate threads and contact surfaces with Moly
kote G-N Plus

2. Tighten the screw to 45 Nm
3. Tighten the screw further 90
4. Loosen the screw
5. Tighten the screw again to 45 Nm
6. Tighten the screw further 60+5
7. Check with tightening torque, the screw may not turn
further
130 Nm
Note! When changing piston crown, renew the screw.
Old screw with old crown
1. Lubricate threads and contact surfaces with Moly
kote G-N Plus

2. Tighten the screw to 45 Nm
3. Tighten the screw further 60+5
4. Check with tightening torque, the screw may not turn
further
130 Nm
Tightening Torques and Instructions for Screw Connections
07 - 8 Wrtsil 20
Tightening the piston screw (Two screws)
1
75
65
1. Piston with 2 screws
Fig 07-8 V2
Piston with 2 screws
Posi
tion
Screw connection Torque (Nm)
Angle ()
1. Screws for piston crown (M10):
New screws with old or new crown
1. Lubricate the threads and screw head with engine
oil

2. Tighten screws to 101 Nm
3. Tighten the screws a further 75+5
4. Loosen the screws
5. Tighten the screws again to 101 Nm
6. Tighten the screws further 65+5
7. Check with tightening torque, the screw may not turn 50 Nm
Note! When changing piston crown, renew the screw.
Old screws with old crown
1. Lubricate the threads and screw head with engine
oil

2. Tighten the screws to 101 Nm
3. Tighten the screws further 65+5
4. Check with tightening torque, the screw may not turn
further
50 Nm
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 9
07.1.7. G: Engine driven pumps V6
A
B
3
4
8
2
6
7
5
1
C
A
9
A.Oil pump, B. Water pump, C. Fuel oil pump
Fig 07-9 200770 V4
Tightening Torques and Instructions for Screw Connections
07 - 10 Wrtsil 20
Pos. Screw connection Torque (Nm)
1. Fastening screws for lubricating oil pump driving
gear (connection with four Inbus Plus fastening
screws). The screws are treated with locking com
pound and can be used only once. Replace the
screws with new, treated ones. Only Driloc 201 or
Driloc 211 should be used.
755
2. Fastening screw for impeller of water pump.
Apply Loctite 243 on threads , see section 07.2.
855
3. Fastening screws for water pump driving gear (con
nection with three Inbus Plus fastening screws.).
The screws are treated with locking compound and
can be used only once. Replace the screws with
new, treated ones. Only Driloc 201 or Driloc 211
should be used.
353
4. Fastening screws for fuel oil pump driving gear
(connection with three Inbus Plus fastening
screws.). The screws are treated with locking com
pound and can be used only once. Replace the
screws with new, treated ones. Only Driloc 201 or
Driloc 211 should be used.
353
5. Fastening screw for bearing housing cap.
Apply Loctite 243 on threads , see section 07.2.
9.51
6. Fastening screw for pump body. 25
7. Fastening nut for coupling.
Apply Loctite 243 on threads , see section 07.2.
273
8. Fastening screw for valve cover. 25
9. Fastening torque for oil pump cover 50
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 11
G: Engine driven pumps
A B
1
2
3
A. Prelubricating oil pump Kracht, B. Sea water pump
Fig 07-10 200785 V2
Pos. Screw connection Torque (Nm)
1. Fastenings screws for valve cover. 49
2. Fastenings screws for shaft of intermediate gear. 50
3. Fastening screw for impeller of sea water pump.
Apply Loctite 243 on threads , see section 07.2.
855
Tightening Torques and Instructions for Screw Connections
07 - 12 Wrtsil 20
07.1.8. H: Free end of crankshaft V7
1
Fig 07-11 V1
Posi
tion
Screw connection
Torque (Nm)
1. Screws (M24) for pump driving gear at free end
of crankshaft. Lubricate screws with engine oil.
96020
Use the torque multiplier X-4. 290
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 13
07.1.9. I: Side screws for main bearings and screws
for engine foot V6
1
2
1
1
2
1
Fig 07-12 200777 V1
Pos. Screw connection Torque (Nm)
1. Fastening screws for engine foot. 67050
Use the torque multiplier X-4. 205
2. a) Pretightening of main bearing side screws, apply
Molykote G-n Plus on contact face and engine oil
on screw threads.
365
b) Tightening to full torque of main bearing side
screws.
99050
Use the torque multiplier X-4. 300
Tightening Torques and Instructions for Screw Connections
07 - 14 Wrtsil 20
07.1.10. J : Intermediate gear for balancing shafts V5
1
Fig 07-13 V1
Pos. Screw connection Torque (Nm)
1. Screw, M10x100 8.8, for shaft. 50
1. Screw, M10x100 10.9, for shaft. 67
07.2. Use of locking fluid V1
When using locking fluid (Loctite), clean parts carefully in a degreas
ing fluid and let dry completely before applying locking fluid.
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 15
07.3. Hydraulically tightened connections V2
07.3.1. Pressures for hydraulically tightened
connections V4
Hydraulically tightened connections
2
4 4
1
3
A
VIEW A
Fig 07-14 V1
Note!
Tighten the nuts in two steps according to the table below. .
Pos. Screw connec
tion
Torques
(Nm)
Max. hydraulic pressure (bar)
Tighten
ing of
studs
1st step
Tightening
2nd step
Tightening
Loosening
1. Main bearing
nuts, M36 x 2
10010 300 700 720
2. Connecting rod
nuts, M30 x 2
205 300 550 570
3. Cylinder head
nuts, M36 x 4
10010 300 600 620
4. Camshaft nuts,
M42 x 2
Tighten
by hand
300 560 580
Tightening Torques and Instructions for Screw Connections
07 - 16 Wrtsil 20
Caution!
The screws will be overloaded if the maximum hydraulic pressure is
exceeded.
If it is impossible to turn the nuts, when the maximum hydraulic pres
sure is reached: check for corroded threads; check tool condition and
manometer error.
07.3.2. Maintenance of hydraulic tool set V2
The hydraulic tool set should be stored in a suitable place and corro
sion protected. The set should be regularly checked and worn or
damaged parts replaced. Special attention should be made on fol
lowing components.
Pressure gauge: Regularly calibration checked.
Hydraulic couplings and hoses: Condition check.
Hydraulic pump: Condition check.
Hydraulic cylinder o-ring: Wear and condition check.
Note!
If the hydraulic cylinder o-ring has been exposed outside the cylinder
the oil has to be removed from the cylinder before the cylinder with
the o-ring can be re-installed. To return the o-ring with the oil in the
cylinder will only damage the o-ring.
07.3.2.1. Filling, venting and control of the high pressure
hydraulic tool set V2
The hydraulic tool set consists of a high pressure hand pump with
integrated oil container, hoses fitted with quick-couplings and non-
return valves, cylinders and a pressure gauge mounted on the hand
pump but not connected to the pressure side of the pump.
The components are coupled in series the pressure gauge being the
last component thus securing that every cylinder is fed with the correct
pressure.
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 17
The non-return valves in the hoses are integrated with the quick-cou
plings and are opened by the pins located in the centre of the male
and female parts. If these pins get worn the coupling must be replaced
because of the risk of blocking.
In the high pressure hydraulic tool set it is recommended to use a
special hydraulic oil or in any case an oil with a viscosity of about
2E at 20C.
During the filling of the container of the high pressure pump it is
recommendable to couple the set according to scheme B, Fig
07-15. Before filling, open the release valve (2) and empty the
cylinders (4) by pressing piston and cylinder together. After that,
the container can be filled through the filling plug (1).
After filling, vent the system by pressing in, with a finger, the centre
pin of the female part of the last quick-coupling the coupling being
disconnected from the pressure gauge. Keep on pumping until
airfree oil emerges from the coupling.
Check the pressure gauge of the hydraulic tool set regularly. For
this purpose a comparison pressure gauge can be delivered. This
pressure gauge can be connected to the plug hole (7) the outlet
hose of the pump being connected direct to the pressure gauges.
If, it is necessary to operate with the couplings not completely in
tact, it is advisable to open the air vent screw to assure that the
passage is open to all cylinders before tightening the connection.
Hydraulic cylinder
Hydraulic oil
A B
2 5 7
6 1 3
4
1. Filling plug, 2. Release valve, 3. Pressure hose, 4. Cylinders, 5. Outlet hose,
6. Pressure gauge, 7. Plug hole.
Fig 07-15 200761 V1
Note!
Always connect the last end of the outlet hoses to the pressure gauge.
Tightening Torques and Instructions for Screw Connections
07 - 18 Wrtsil 20
07.3.3. Dismantling hydraulically tightened screw
connections V2
1 Attach distance sleeves and hydraulic cylinders according to Fig
07-15 A. Screw on cylinders by hand.
2 Connect the hoses to the pump and cylinders according to Fig
07-15 B. Open the release valve (2) and screw cylinders in clockwise
direction to expel possible oil.
3 Screw the cylinders in counter-clockwise direction about 3/4 a revo
lution (270), M42x3 (camshaft) about 21/2 revolution (900) other
wise the nut is locked by the cylinder and impossible to loosen.
4 Close the release valve and pump pressure to the stated value.
5 Screw the nut in counter-clockwise direction about half a turn with the
pin.
6 Open the release valve and remove the hydraulic tool set.
7 Screw of the nuts by hand.
07.3.4. Reassembling hydraulically tightened screw
connections V2
1 Screw on nuts and attach distance sleeves. Screw on cylinders by
hand.
2 Connect the hoses to the pump and cylinders. Check that the release
valve is open and screw the cylinders in clockwise direction to expel
possible oil.
3 Close the release valve and pump pressure to the stated value.
4 Screw the nuts in clockwise direction until close contact to face. Use
the pin intended for this purpose and tighten the nut as much as pos
sible without breaking the pin. Keep pressure constant at the stated
value.
5 Open the release valve and remove the hydraulic tool set.
To ensure that the nut will be properly tightened, the pressure can be
raised in two steps. Pump the pressure to 300 bar and screw the nut
in a clockwise direction until in close contact with the face. Increase
the pressure further to the stated pressure, and screw the nut until in
close contact with the face again. This time the nut should move just
a limited angle but approximately the same angle for all nuts of the
same kind.
Tightening Torques and Instructions for Screw Connections
Wrtsil 20 07 - 19
Note!
Before the engine is started, ensure that all screw connections that
have been opened are properly tightened and locked, if necessary.
Tightening Torques and Instructions for Screw Connections
07 - 20 Wrtsil 20
08. Operating Troubles, Emergency
Operation V2
08.1. Troubleshooting V21
For preventive measures, see chapter 03 and chapter 04. Some op
erating troubles require prompt action. Operators should study this
chapter so that they can respond quickly when problems occur.
Trouble
Possible reason
See chapter,
section
1. Crankshaft does not rotate at starting attempt.
a) The turning device is engaged.
NOTE! Engine cannot be started when turning device is engaged.
However, before starting, always check that turning device is disengaged.
11.1, 11.3, 21
b) Starting air pressure too low, shut-off valve on starting air inlet pipe closed. 21
c) Starting air solenoid valve faulty. 21

d) Starting automation outside engine faulty. 03.1.2, 23.1
e) Air starter faulty. 21.1
f) Starting air pressure too high (> 10 bar) starting interlock. 21
2. Crankshaft rotates but there is no ignition
a) Too low speed, see 1 b.
b) Automatic shut down device is not in start position. 23.1

c) Load limit of control shaft or of governor is set at too low a value. Fig 22-1

d) Faulty overspeed trip device solenoid valve. 22.4
e) Governor does not respond. 22.3
f) Some part of fuel control mechanism jamming and prevents fuel admission. 22

g) Fuel and injection system not vented, pipe connections between injection pumps
and injection valves not tightened.
Fig 07-6 , 16.3, 17.3

h) Fuel filter clogged. 17
i) Three-way cock of fuel filter wrongly set, valve in fuel inlet pipe closed, fuel day tank
empty, fuel feed pump not started or faulty.
17
Operating Troubles, Emergency Operation
Wrtsil 20 08 - 1
2. Crankshaft rotates but there is no ignition
j) Very low air and engine temperatures (preheat circulating water!) in connection with
fuel of low ignition quality.
02.1
k) Fuel insufficiently pre-heated or precirculated Fig 02-2, 02.1.7
l) Very low compression pressure. Inlet or exhaust valve jamming in open position.
"Negative" valve clearance (strong blowing noise).
06.1
06.1
m) Faulty governor. 22
3. Engine fires irregularly, some cylinders do not fire at all
a) Jamming valves, inadequate fuel supply, too low temperatures, see 2 f, g, h, j, k, l,
4 d.
b) Injection pump control rack wrongly adjusted. 22.2.1
c) Injection pump faulty (plunger or tappet sticking; delivery valve spring broken, de
livery valve sticking).
16.2

d) Injection valve faulty; nozzle holes clogged. 16.4
e) Piston rings badly worn or damaged; too low compression pressure. 11.4.3
f) In special cases, in engines which have to idle continuously for longer periods (sev
eral hours), for some reason, it is advisable to adjust the rack positions carefully
(reduce rack position on those cylinders having the highest exhaust gas tempera
tures, increase on those cylinders which are not firing). This adjustment should be
done in small steps and the difference between rack positions of the cylinders should
not exceed 1 mm.
4. Engine speed not stable
a) Governor adjustment faulty (normally too low compensation). 22
b) Some part of fuel control mechanism jamming and prevents fuel admission. 22

c) Fuel feed pressure too low. 01.2
d) Water in pre-heated fuel (vapour lock in injection pumps). 02.1.2
e) External loading automation is faulty (for example: Controllable pitch propeller). 23.1
5. Knocks or detonations occur in engine
(if reason cannot be found immediately, stop the engine)
a) Big end bearing clearance too large (loose screws). 06.2, 07.3
b) Valve spring or injection pump tappet spring broken. 12.3
c) Inlet or exhaust valve jamming when open. 12.3
d) Too large valve clearances. 06.1

12.2.5
e) One or more cylinders badly overloaded, see 3 b.
f) Injection pump/valve tappet (multihousing) guide block loose. Fig 07-4 16.1
Operating Troubles, Emergency Operation
08 - 2 Wrtsil 20
5. Knocks or detonations occur in engine
(if reason cannot be found immediately, stop the engine)
g) Initial phase of piston seizure.
h) Insufficient preheating of engine in combination with fuel of low ignition quality. Fig 02-2
j) Fuel injection timing wrong. 13.1.2
6. Dark exhaust gases
a) Late injection (wrongly set camshaft drive). 13.1.2
b) See 3 b, c, d.
c) Engine overloaded (check the positions of the fuel injection pump racks).
d) Unsufficient charge air pressure:
air intake clogged.
turbocharger compressor dirty.
charge air cooler clogged on air side.
turbocharger turbine badly fouled.
NOTE! Engines starting on heavy fuel may smoke if left idling.
Test Records
04.7
04.4
04.9
04.5
7. Engine exhaust gases blue-whitish or grey whitish
a) Excessive lubricating oil consumption due to:
gas blow-by past piston rings.
worn or broken oil scraper rings or worn cylinder liners.
compression rings.
compression rings turned upside-down.
ring scuffing (burning marks on sliding surfaces).
03.3.5, 06.2
b) Blue-white exhaust gases may occasionally occur when engine has been idling for
a lengthy time or at low ambient temperature, or for a short time after starting.
c) Grey white exhaust gases due to water leakage from turbocharger or multiduct.
8. Exhaust gas temperature of all cylinders abnormally high
a) Engine badly overloaded (check injection pump rack positions) Test Records
b) See point 6 d.
c) Charge air temperature too high:
charge air cooler clogged on water side or dirty on air side.
water temperature to air cooler too high, water quantity unsufficient.
engine room temperature abnormally high.
01.2, 15.2, 01.2,
01.3
d) Excessive deposits in cylinder head inlet or exhaust ports. 12.2
e) Exhaust pipe pressure after the turbine is high.
Operating Troubles, Emergency Operation
Wrtsil 20 08 - 3
9. Exhaust gas temperature of one cylinder above normal Test Records
a) Faulty exhaust gas thermometer/sensor. 23.1
b) Exhaust valve:
jamming when open.
"negative" valve clearance.
sealing surface blown by (burned).
12.3
c) Faulty injection valve:
opening pressure much too low.
nozzle needle sticking open.
broken spring.
nozzle cracked.
16.4
d) Late injection. 13.1.2
e) Fuel supply insufficient (filter clogged). 01.2
f) Injection pump faulty, fuel rack sticking in high load position. 16.2

10. Exhaust gas temperature of one cylinder below normal
a) Faulty exhaust gas thermometer/sensor. 23.1
b) See 2 f, h, 3 b, c, d.
.
c) Leaky injection pipe or pipe fittings. Fig 07-6
d) When idling, see 3 f.
11. Exhaust gas temperatures very unequal
a) See 9 a, c, e.
b) Too low fuel feed pressure: too small flow through injection pumps.
(see 2 h, i). May cause great load differences between cylinders although injection
pump rack positions are the same.
Warning! Causes high thermal overload in individual cylinders.
01.2
c) See points 2 l, 3 b, c, d, e.
d) When idling, see point 3 f.
e) Exhaust pipe or turbine nozzle ring partly clogged. 15.1.2
12. Lubricating oil pressure lacking or too low 01.2
a) Check the pressure difference indicator. 23.1
b) Faulty pressure gauge, gauge pipe clogged. 23.1
c) Lubricating oil level in oil sump too low. 01.1, 18
d) Lubricating oil pressure control valve out of adjustment or jamming. 18.3
e) Three-way cock of lubricating oil filter wrongly set.
Operating Troubles, Emergency Operation
08 - 4 Wrtsil 20
12. Lubricating oil pressure lacking or too low 01.2
f) Leakage in lubricating oil suction pipe connections. 18
g) Lubricating oil badly diluted with diesel oil, viscosity of oil too low.
02B
02B.1
h) Lubricating oil pipes inside engine loose or broken. 18
13. Too high lubricating oil pressure
a) See 12 b and d.
14. Too high lubricating oil temperature 01.2
a) Faulty thermometer. 23.1
b) Insufficient cooling water flow through oil cooler (faulty pump, air in system, valve
closed), very high raw water temperature.
19
c) Oil cooler clogged, deposits on tubes. 18.4
d) Faulty thermostat valve. 18.5, 19.9
15. Abnormally high cooling water outlet temperature, difference between cooling water
inlet and outlet temperatures too large
01.2
a) One of thermometers faulty. 23.1
b) Circulating water cooler clogged, deposits on tubes. 19
c) Insufficient flow of cooling water through engine (circulating water pump faulty), air
in system, valves closed.
19.8
d) Thermostat valve faulty. 19.9
16. Water in lubricating oil 03.3.1
a) Leaky oil cooler. 18.4
b) Leakage at cylinder liner O-rings (always pressure test when cooling water system
has been drained or cylinder liners have been dismantled).
10.6
c) Faulty lubricating oil separator. See separator instruction book.
d) Leakage at LT cooling connection between engine block and free end cover. 19
17. Water in charge air receiver (escapes through drain pipe in air cooler housing) 15.2.1
a) Leaky air cooler. 15.2
b) Condensation (too low charge air cooling water temperature). Fig 03-1
c) Leakage from multiduct. 20.1
18. Engine looses speed at constant or increased load
a) Engine overloaded, a further increase of fuel supply is prevented by the mechanical
load limiter.
Fig 22-1
b) See 2 c, f, g, h, i.
c) See 4 c, d, 5 g, 19 d.
Operating Troubles, Emergency Operation
Wrtsil 20 08 - 5
19. Engine stops
a) Shortage of fuel, see 2 h, i.
b) Overspeed trip device has tripped. 22.4
c) Automatic stop device has tripped. 23.1
d) Faulty governor or governor drive. 22.3
20. Engine does not stop although stop lever is set in stop position or remote stop signal
is given
a) Injection pump control rack wrongly set, see 3 b.
Trip the overspeed trip device manually. If the engine does not stop immediately,
block fuel supply as near to the engine as possible.
Before restarting the engine, the fault must be located and corrected.
Great risk of overspeed.
b) Faulty stop automation. Stop by means of stop lever. 23.1
c) The engine is driven by generator or propeller or by another engine connected to
same reduction gear.
21. Engine overspeeds and does not stop although overspeed trip device trips
a) Injection pump control rack wrongly set, see 3 b. Load the engine, if possible.
Block fuel supply.
16.2
b) An overspeeding engine is hard to stop. Therefore, regularly check the adjustment
of the control mechanism (the injection pump rack positions).
1) The stop lever being in stop position or the overspeed trip device being tripped
and the speed governor at maximum fuel admission.
2) The stop lever and the overspeed trip being in work position and the speed gov
ernor in stop position.
This control should always be done when the control mechanism or the injection
pumps have been touched.
22.1
08.2. Emergency operation V2
08.2.1. Operation with defective air cooler V7
If the water tubes of an air cooler are defective, the cooling water may
enter the cylinders. If water or water mist flows out of the drain pipe
at the bottom of the cooler housing, check whether it is cooling water
or condensation. If condensation, reduce cooling (see Fig 03-1). If
raw water, stop the engine as soon as possible and fit a spare cooler.
If no spare cooler is available, the following can be done as an emer
gency solution:
Operating Troubles, Emergency Operation
08 - 6 Wrtsil 20
1 Dismantle the cooler for repair and blank off the opening in the charge
air cooler housing. Connect the cooling water supply direct to the lu
bricating oil cooler. Repair the cooler, for example, by plugging the
leaking tubes.
Note!
This will influence on the water flow to the lube oil cooler and the lube
oil temperature will increase.
2 Operating with a partially plugged or removed air cooler. Engine out
put must be limited so that the normal full load exhaust temperatures
are not exceeded.
The turbocharger may surge before the admissible exhaust temper
atures are reached. In such a case, engine load must be reduced
further to avoid continuous surging.
08.2.2. Operation with defective turbocharger V6
See chapter 15., section 15.1.5.
08.2.3. Operation with defective cams V6
If the camshaft piece with damaged cams cannot be removed and
replaced by a new one, the engine can be kept running by the fol
lowing measures:
1 Injection pump cams:
Slight damage:
Set injection pump control rod into zero position and lock it by a wire
around the pump.
Bad damage:
Lock the tappet roller of the injection pump in the upper position. See,
Chapter 16: Injection System.
Caution!
Concerning torsional vibrations and other vibrations. See, Chapter
08: Torsional vibrations and other vibrations.
When operating with a shut-off injection pump over a long period of
time, the valve push rods of the inlet and outlet valves are to be re
moved, and the indicator valve on the respective cylinder is to be
opened once an hour to allow any accumulated oil to escape.
Operating Troubles, Emergency Operation
Wrtsil 20 08 - 7
Caution!
Oil mist escaping from the indicator valve may cause a fire.
With one cylinder out of operation, reduce load to prevent exhaust
temperature of the remaining cylinders from exceeding normal full
load temperatures.
2 Valve cams:
Stop fuel injection to the cylinder concerned. See, Chapter 16: Injec
tion System. Remove the valve push rods and cam followers of the
cylinder. Replace the tubes covering the push rods.
Caution!
Concerning torsional vibrations and other vibrations. See Chapter 08:
Torsional vibrations and other vibrations.
With one cylinder out of operation, reduce load to prevent exhaust
temperatures of the remaining cylinders from exceeding the normal
full load temperatures.
08.2.4. Operation with removed piston and
connecting rod V5
If damage on piston, connecting rod or big end bearing cannot be
repaired, the following can be done to allow emergency operation:
1 Remove the piston and the connecting rod.
2 Cover lubricating oil bore in crank pin with a suitable hose clip, and
secure.
3 Fit completely assembled cylinder head but omit valve push rods.
4 Shut down injection pump. See, Chapter 16: Injection System.
Caution!
Concerning torsional vibrations and other vibrations, see Chapter 08:
Torsional vibrations and other vibrations.
With one cylinder out of operation, reduce load to prevent exhaust
temperature of the remaining cylinders from exceeding normal full
load temperatures.
If the turbocharger surges, reduce load further to avoid continuous
surging.
Operation with piston and connecting rod of one or more cylinders
removed should be performed only in absolute emergency conditions
when there are no other options of proceeding under own power.
Operating Troubles, Emergency Operation
08 - 8 Wrtsil 20
08.2.5. Torsional vibrations and other vibrations V6
When running the engine with one cylinder or more out of operation,
the balance of the engine is disturbed, and severe or even dangerous
vibrations may occur. The vibration conditions are in practice de
pendant on the type of installation, but as general advice it can be
said that when there are cylinders out of order, the following should
be applied.
In installations with variable speed, if possible, the lowest speed
should be used. See section 08.2.4.
Operating Troubles, Emergency Operation
Wrtsil 20 08 - 9
Operating Troubles, Emergency Operation
08 - 10 Wrtsil 20
09. Installation specific data V1
Marine installations
This chapter is reserved for installation-specific data.
The installation-specific data may be found here or in the "Attach
ments" binder.
Installation specific data
Wrtsil 20 09 - 1
Installation specific data
09 - 2 Wrtsil 20
10. Engine Block, Oil Sump and Cylinder
Liner V2
10.1. Engine block and covers V1
The engine block is made of nodular cast iron and cast in one piece.
It has a high rigidity and it is designed for minimum stress concentra
tion and deformation. Part of the cooling water system, including the
jacket water distributing pipes, as well as lubricating oil channels, and
the charge air receiver are integrated in the engine block.
The main bearing caps, which support the underslung crankshaft, are
clamped by two hydraulically tensioned screws from below and two
screws horizontally (one horizontal screw only, for the thrust bearing
cap). The bearing shells are axially guided by lugs to provide correct
assembly. A combined flywheel/thrust bearing is located at the driving
end.
The camshaft bearing bushes are fitted in housings directly machined
in the engine block.
The crankcase covers, as well as other light metal covers, tighten
against the engine block by rubber sealings and four screws each.
On the rear side of the engine, some of the crankcase covers are
equipped with safety valves which relieve the overpressure in case of
a crankcase explosion. The centrifugal oil filter is fixed to one of the
covers. One cover is provided with an oil filling hole.
The end covers are made of cast iron. The covers tighten against the
engine block by means of sealing compound.
The crankcase is furthermore provided with a vent pipe including a
non-return valve. This pipe should be conducted away from the en
gine room.
10.2. Engine feet V2
The engine is provided with four (six) bolted-on feet for its support.
This arrangement provides excellent flexibility for optimisation of the
installation. The feet are made of nodular cast iron.
Data and dimensions
Material: Nodular cast
iron
Weight (machined, dry):
1480 kg (4L20)
2080 kg (6L20)
2650 kg (8L20)
2950 kg (9L20)
Test pressure: 8 bar
Data and dimensions
Material: Nodular cast
iron
Weight: 27.3 kg
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 1
10.3. Oil sump V2
The light, welded oil sump (casted for 4L20) is attached to the engine
block from below and is sealed off by a rubber sealing. Suction pipes
to the lube oil pump and separator, as well as the main lube oil dis
tributing pipe for crankshaft bearings, are incorporated in the oil sump.
An oil dipstick is located in one of the crankcase covers. The oil dip
stick indicates the maximum and minimum limits between which the
oil level may vary. Keep the oil level near the max. mark and never
allow the level to go below the min. mark. The limits apply to the oil
level in a running engine. One side of the dipstick is graduated in
centimetre. This scale can be used when checking the lubricating oil
consumption.
10.4. Main bearings V1
The main bearing is a split type plain bearing of bi-metal type. The
upper bearing shell has an oil groove but the lower bearing shell does
not. The thrust bearing, located in the driving end, is of similar design.
10.4.1. Dismantling of a main bearing V6
1 Remove two crankcase covers on each side of the bearing, on both
sides of the engine .
2 Loosen the side screws on the bearing in question and on both ad
jacent bearings . Use the tool combination 822001, 803001 and
820009, see chapter 05.
3 Loosen the nuts of the main bearing screws on the bearing in ques
tion. Put the distance sleeve 861156 onto one of the main bearing
screws . Insert the pin 861025 into the slot to fix the sleeve. Screw
the hydraulic cylinder 861159 into position. Proceed in same way with
the next main bearing screw. Open the main bearing nuts. See Fig
10-2.
Data and dimensions
Material: Steel plates
Weight: 632 kg (4L20)
4L20 including balancing
shafts
189 kg (6L20)
232 kg (8L20)
269 kg (9L20)
Oil volume: 270 l (4L20)
380 l (6L20)
490 l (8L20)
550 l (9L20)
Data and dimensions
Weight of bearing cap: 22
kg
Engine Block, Oil Sump and Cylinder Liner
10 - 2 Wrtsil 20
Dismantling
Hydraulic oil
1. Screw on cylinder by hand. 2. Connect hoses, open valve. Tighten cylinders
by hand. 3. Screw cylinders 180 counter- clockwise. 4. Close valve, rise pres
sure. 5. Open the nut about half a turn. 6. Open release valve, remove tool.
Fig 10-1 HYD2A V2
4 Remove the hydraulic tool and the distance sleeves.
5 Remove the nuts of the main bearing screws.
6 Unscrew the side screws of the main bearing cap. Unscrew the side
screw from the opposite, rear side. Hold the main bearing cap in place
and unscrew the second side screw on operating side. Lower the
main bearing cap.
7 Remove the lower bearing shell.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 3
Dismantling and assembling of main bearing
861 159
A
B
861 156
861 025
AOperating side, BStraight side.
861 025Pin 861 156Distance sleeve 861 159Hydraulic cylinder.
Fig 10-2 201052 V1
8 Insert the turning tool 851001 into the main bearing journal radial oil
hole, see Fig 10-3. Turn the crankshaft carefully until the bearing shell
has turned 180 and can be removed.
9 Cover the two main bearing journal radial oil holes with tape.
Note!
At least every third main bearing should be in place at the same time
to support the crankshaft.
Engine Block, Oil Sump and Cylinder Liner
10 - 4 Wrtsil 20
Use of turning tool for bearing shell
2
1
1.Upper main bearing shell,2.Turning tool for main bearing (851 001)
Fig 10-3 201053 V1
10.4.2. Inspection of main bearings and journals V5
Clean the bearing shells and check for wear, scoring and other dam
age. If a bearing is worn or damaged, renew both bearing shells and
check the condition of the other bearings.
Wear is settled by measuring the thickness of the lower bearing
shells. For this purpose a ball anvil micrometer can be used. The wear
limit in section 06.2must be applied. If the thickness of lower bearing
shells have not reached the wear limit and the difference in thickness
of all lower bearing shells is maximum 0.03 mm, the shells can be
used again.
Note!
Mark the new bearings with the bearing numbers.
The main bearing journals should be inspected for surface finish.
Damaged journals, i.e. rough surface, scratches, marks of shocks
etc., should be polished. If, after a longer running period, considerably
uneven wear appears, section 06.2, the crankshaft may be reground
and used together with undersized bearing shells.
No scraping or other damage of bearing shells, caps and saddles is
allowed. Burrs should be locally removed, only.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 5
10.4.3. Assembling of main bearing V6
1 Clean the main bearing shells, the cap and the journal very careful
ly.
2 Remove the protecting tape from the journal oil holes. Lubricate the
journal with clean engine oil.
3 Lubricate the bearing surface, back side and end faces of the upper
bearing shell with clean lubricating oil.
Note!
The bearing shell can be completely destroyed (deformed) during the
assembly, if it is not lubricated carefully.
4 Place the end of the bearing shell in the slot between the journal and
the bearing bore, with the lug guiding in the oil groove. Push it by hand
as far as possible (recommended 2/3 of its length).
5 Insert the turning tool 851001 into the main bearing journal radial oil
hole. Turn the crankshaft carefully until the bearing shell has turned
into position. Take care that the bearing shell lug slides into the groove
without being damaged.
Caution!
A bearing shell forced into its place can be completely destroyed due
to deformation.
6 Remove the turning tool.
7 Lubricate the bearing surface, back side and both ends of the lower
bearing shell with clean lubricating oil and place it in the bearing
cap.
8 Clean the contact face between engine block and screw head care
fully from dirt and paint. Lubricate the surface with Molycote G-N Plus.
9 Lift the bearing cap until the side screws, lubricate with engine oil and
screw it by hand. If necessary the main bearing cap can be lifted by
help of the main bearing nuts. Turn the nuts by hand.
10 Screw on the main bearing nuts by hand.
Engine Block, Oil Sump and Cylinder Liner
10 - 6 Wrtsil 20
Reassembling
Hydraulic oil
1. Screw on nuts, attach distance sleeve. Screw on cylinders by hand. 2. Con
nect hoses, open valve. Tighten cylinders by hand. 3. Close the valve and pump
pressure to the stated value. 4. Screw the nuts until close contact to face. 5.
Open the valve and remove tool set.
Fig 10-4 HYD2A V2
11 Pre-tighten the side screws on the operating side to stated torque.
See, chapter 07: Tightening Torques and Instructions for Screw Con
nections.
12 Lift the distance sleeves into position 861156 on the bearing cap nuts
and insert the pins 861025. See, Fig 10-2.
13 Lift the hydraulic tool 861159 into position and proceed with tightening
of the main bearing nuts to stated torque. See, chapter 07: Pressures
for hydraulically tightened connections.
14 Tighten the side screws on the operating side (straight side of bearing
cap) to full torque. See, chapter 07: Tightening torques for screws and
nuts.
15 Tighten the side screws on the opposite, rear side to full torque.
16 Mount the crankcase covers, that was removed.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 7
10.5. Flywheel/thrust bearing V1
10.5.1. Dismantling of flywheel/thrust bearing V4
1 Remove the crankcase covers nearest to the flywheel. Including the
relief valve on the rear crankcase cover.
2 Remove the rear half flywheel end cover then the operating side cov
er.
3 Loosen the thrust bearing cap side screw and adjacent main bearing
side screws. Use the tool combination 822001, 803001 and 820009.
Note!
The thrust bearing has only one side screw.
4 Position the distance sleeves 861156 over the bearing cap nuts.
5 Insert the pin 861025 into the slot to hold the sleeve.
6 Screw on the hydraulic tool 861159.
7 Connect the hoses from the hydraulic cylinders to the high pressure
pump.
8 Open the valve and tighten hydraulic cylinders using a inch drive
ratchet wrench and extension.
9 Rotate the cylinders back 180, anticlockwise.
10 Close the valve and raise the pressure to the stated release pres
sure. See Chapter 07: Tightening Torques and use of Hydraulic Tools
11 Release the nut using the pin 861025 .
12 Open the valve and release the pressure. Remove hydraulic cylin
ders, hydraulic holes, pin and distance sleeves.
13 Remove the thrust bearing cap nuts.
14 Support the thrust bearing cap in place.
15 Remove the side screw using the tool combination 822001.
16 Lower the thrust bearing cap.
17 Remove the lower bearing shell and thrust washers.
18 Insert the turning tool 851001 into the main bearing journal radial oil
hole.
19 Turn the crankshaft using the turning device until the bearing shell
has turned 180 and can be removed.
20 Remove the thrust washers.
Engine Block, Oil Sump and Cylinder Liner
10 - 8 Wrtsil 20
21 Cover the two bearing journal radial oil holes.
10.5.2. Inspection of flywheel/thrust bearings V1
Check the bearing shells in the same way as the main bearing shells.
The thrust washers on the same side have to be replaced in pairs.
10.5.3. Assembling of flywheel-thrust bearing V5
1 Clean the thrust washers, the bearing shells, the cap and the journal
very carefully.
2 Remove the protecting tape from the journal oil holes. Lubricate the
journal with clean engine oil.
3 Lubricate the bearing surface, back side and end faces of the upper
bearing shell with clean lubricating oil. The bearing shell can be com
pletely destroyed (deformed) during the assembly, if it is not lubricated
carefully.
4 Place the end of the bearing shell in the slot between the journal and
the bearing bore. Push it by hand as far as possible (recommended
2/3 of its length).
5 Insert the turning tool 851001 into the main bearing journal radial oil
hole. Turn the crankshaft carefully until the bearing shell has turned
into position.
Caution!
A bearing shell forced into its place can be completely destroyed due
to deformation.
6 Remove the turning tool.
7 Lubricate the running surface, and back side of the upper thrust
washers with clean lubricating oil. Push the washers into position by
hand. To facilitate the mounting of the washers, the crankshaft can
be axially moved in each direction.
8 Lubricate the bearing surface, back side and both ends of the lower
bearing shell with clean lubricating oil and place it in the bearing cap.
9 Lubricate the running surfaces of the lower washers with clean lubri
cating oil. Fix them into position on the guiding pins on the bearing
cap.
10 Lift the bearing cap until the side screws, lubricate with engine oil and
screw it by hand. If necessary the main bearing cap can be lifted by
help of the main bearing nuts. Turn the nuts by hand.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 9
11 Screw on the main bearing nuts by hand.
Reassembling
Hydraulic oil
1. Screw on nuts, attach distance sleeve. Screw on cylinders by hand. 2. Con
nect hoses, open valve. Tighten cylinders by hand. 3. Close the valve and pump
pressure to the stated value. 4. Screw the nuts until close contact to face. 5.
Open the valve and remove tool set.
Fig 10-5 HYD2A V2
12 Pre-tighten the side screws on the operating side to stated torque.
See, chapter 07: Tightening Torques and Instructions for Screw Con
nections.
13 Lift the distance sleeves 861156 into position on the bearing cap nuts
and insert the pins 861025.
14 Lift the hydraulic cylinder 861159 into position and proceed with tight
ening of the main bearing nuts.
15 Tighten the side screws on the operating side. (Straight side of the
bearing cap to full torque) See, chapter 07: Tightening torques for
screws and nuts.
16 Tighten the side screws on the opposite, rear side to full torque. See,
chapter 07: Tightening torques and Instructions for screw connec
tions.
17 Check axial clearance of the crankshaft.
18 Mount the flywheel end cover. The operating side half has to be
mounted first and then the back side half.
19 Mount the cover for the oil pump intermediate gear shaft.
20 Mount all the oil pipes.
21 Mount the oil pump module and check the clearance.
Engine Block, Oil Sump and Cylinder Liner
10 - 10 Wrtsil 20
22 Mount the crankcase covers, flywheel end side covers and rest of the
oil pipes.
10.5.4. Measurement of thrust bearing axial
clearance V1
1 Lubricate the bearings by running the prelubricating pump for a few
minutes.
2 Apply a dial gauge, for instance, against the plane end surface of the
flywheel.
3 Move the crankshaft by a suitable lever in either direction until contact
is established with the thrust bearing.
4 Set the dial gauge at zero.
5 Move the crankshaft in the opposite direction, and read the axial
clearance from the dial gauge.
10.6. Cylinder liner V1
The cylinder liner is made of special, wear resistant, cast iron. The
liner is of the wet type. At the upper part the liners are sealed against
the block metallically, and at the lower part by two O-rings.
To eliminate the risk of bore polishing, the liner is provided with an
anti-polishing-ring at the upper part.
10.6.1. Maintenance of cylinder liner V1
Always when the piston is overhauled, the cylinder liner must be in
spected. Check the bore for wear and other damages. The bore
should be measured at three levels, both along and across the en
gine. If the bore is worn or glazed, the liner has to be honed. A high
lube oil consumption may indicate that the bores are worn or that the
surface of the bores are glazed.
Note!
Ovality of the cylinder liner bore cannot be corrected by honing only.
Data and dimensions
Material: Special grey
cast iron
Weight: 41 kg
Test pressure: 10 bar
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 11
10.6.1.1. Honing of cylinder liner bore V5
The pistons and connecting rods must be removed. Use covers or
plastic film to protect all engine components from the debris which is
caused during the process. Honing residues must be prevented from
falling into the oil sump of the engine. For the honing process the
following instructions are prescribed:
The honing is to be carried out by means of "Plateau honing".
Only ceramic hones with a coarseness of 80 and 400 should be
used. The hones with a coarseness of 80 should be used until the
polished areas in the cylinder liner are over scraping. The hones
with a coarseness of 400 should be used for about 30 strokes to
give the correct surface finish.
The pitch angle of the honing lines in the cross hatch pattern
should be about 30, which is achieved by combining for example
40 strokes/min with a rotational speed of 100 RPM.
Pitch angle
30
Fig 10-6 V1
As coolant a honing oil is preferred, but a light fuel oil 2-15 cSt
could also be used.
After honing, the liner bore should be carefully cleaned by using
a suitable brush, water (preferably hot) and soap or cleaning fluid,
alternatively, light fuel oil. Then dry with a cloth and lubricate with
engine oil for corrosion protection.
Note!
After honing of a cylinder liner, the piston rings have to be replaced
with new ones.
Warning!
After a bore has been honed, follow the running in programme in
chapter 03.
Engine Block, Oil Sump and Cylinder Liner
10 - 12 Wrtsil 20
10.6.2. Removing of cylinder liner V5
It is recommended that the crankshaft is turned to TDC and a piece
of plastic is put straight through the crankcase over the crank pin,
preventing remaining cooling water or dirt to enter the oil sump.
1 Drain the engine cooling water.
2 Remove the cylinder head, see chapter 12
3 Remove the piston with connecting rod, see chapter 11
4 Mount the cylinder liner removing device 836001, according to Fig
10-7.
5 Tension the nut (1) of the pull screw until the liner is held between the
removing device.
6 Lift the liner out of the engine block.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 13
Removing and lifting of cylinder liner
836 001
1
2
1.Nut,2.Distinct mark,836001Extracting and lifting tool for cylinder liner
Fig 10-7 201054 V2
10.6.3. Inspection of cylinder liner V1
Clean the cylinder liner water side. The water side of the cylinder liner
can be cleaned of deposits with a steel wire brush.
10.6.4. Mounting of cylinder liner V6
If more than one cylinder liner have been removed, check that the
liners are installed in the same cylinders as before the overhaul. The
liners are marked with the cylinder numbers.
Engine Block, Oil Sump and Cylinder Liner
10 - 14 Wrtsil 20
1 Check that all guide and contact faces of the engine block and cylinder
liner are clean and intact.
2 Apply High-performance grease paste e.g Gleitmo 805 or similar on
engine block and cylinder liner contact surfaces accordingly to figure.
See Fig 10-9.
3 Mount a new shim for cylinder liner, if specified for the engine. Check
that the new shim has the same thickness as the replaced one. Apply
High-performance grease paste e.g Gleitmo 805 on both sides of the
shim.
4 Mount the lifting device for cylinder liner.
5 Check that the O-ring grooves of the cylinder liner are clean, and in
sert new O-rings.
6 Lubricate the lower O-rings with grease or clean lubricating oil.
7 Lower the liner carefully into the bore of the engine block. When the
lowest O-ring touches the engine block, align the liner so that the mark
on the liner is directed towards the driving end of the engine. Lower
further and press liner into position by hand.
8 Check the inner diameter of the cylinder liner, at the places shown in
picture.
Inner diameter
Fig 10-8 201050 V1
9 Mount the piston with the connecting rod, see chapter 11.
10 Mount the cylinder head, and refill the cooling water system, see
chapter 12.
11 Check the O-ring seals from the crankcase side while circulating
cooling water. Apply 3 bar static pressure.
Engine Block, Oil Sump and Cylinder Liner
Wrtsil 20 10 - 15
Mounting of cylinder liner
1
2
X
2
A
B
1.O-rings,2.Shim for cylinder liner,X.Apply grease paste from A to B
Fig 10-9 201056 V2
Engine Block, Oil Sump and Cylinder Liner
10 - 16 Wrtsil 20
11. Crank Mechanism: Crankshaft,
Connecting Rod, Piston V2
11.1. Crankshaft V3
The crankshaft is forged in one piece and provided with two counter
weights per cylinder. The counterweights are fastened with two
screws each. 4-cylinder engines have either integrated or separate
counterweights.
At the driving end of the engine, the crankshaft is equipped with a V-
ring for sealing the crankcase. The axial clearance is controlled by a
combined flywheel/thrust bearing. A shrink-fitted gear wheel for driv
ing the camshaft is located at the driving end.
The main bearings are described in Chapter 10: Engine Block with
Oil Sump and Cylinder Liner.
At the free end, there is a gear for driving the water pumps and the
lubricating oil pump. Usually, a vibration damper is also installed. The
damper can be either mechanical or viscous. See the instructions for
the vibration damper provided separately, if the engine is equipped
with one. In case there is no vibration damper, a tuning mass is used
instead.
The crankshaft can be turned by a manual turning device operating
the flywheel.
The lubricating oil is supplied through the side screw holes in the en
gine block to the main bearings. The oil flows further from the main
bearing through the bores in the crankshaft to the connecting rod big
end bearing and up in the connecting rod and piston. Due to a special
design of the bores in the crankshaft, the flow to the connecting rod
is intermittent. The oil is forced to flow in one direction only.
11.1.1. Balancing of crankshaft V3
The crankshaft is balanced with counterweights on the crank webs,
two weights per cylinder journal. The counterweights are located by
a guide pin and fastened to the web with two bolts. 4 cylinder engines
have either integrated or separate counterweights.
Data and dimensions
Material: Forged, alloyed
steel
Weight:
1000 kg (8L20)
Data and dimensions
Material: Steel plate
Weight: 21 kg
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 1
Positions of counterweights
A
A-A
7
A
1
1. Guide pin 2. Counter weights.
Fig 11-1 V2
11.1.2. Crankshaft alignment V5
1 Turn crank of the first cylinder near BDC (bottom dead centre) and
attach the crankshaft dial indicator to the centre marks in the two
crank webs. The distance between the indicator and the connecting
rod should be as small as possible.
2 Set indicator at zero.
3 Read deflections when turning crank to the rear side, TDC (top dead
centre), operating side and BDC. Record readings in the measure
ment record WV98V036 "Crankshaft alignment".
Note!
During the alignment procedure the crankshaft should be turned in
the anti-clockwise direction, only.
4 Repeat this procedure with other cylinders.
5 Following limits of misalignment are stated for an engine having nor
mal running temperature (within 5 minutes after running at 60 % load
or higher for 6 h or more):
a) on the same crank
The difference between two diametrically opposed readings must not
exceed 0.07 mm after installing or realigning. Realignment is neces
sary if this limit is exceeded by more than 0.02 mm.
b) on two adjacent cranks
The difference between two corresponding readings must not exceed
0.04 mm. Realignment is necessary if this limit is exceeded, except
for crankpin 1 and 2.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 2 Wrtsil 20
c) when the crank pin of cyl. 1 is at TDC (reading C)
The reading should be negative, max. -0.07 mm (-0.08 mm if flexible
coupling with heavy flywheel e.g. 4L20 engine), if stiff or no coupling
a small positive reading can be accepted max. +0.02.
Before realigning the engine and the driven machinery, a control
measurement of the main bearings should be made.
Note!
In an engine having a normal ambient temperature, the corresponding
values must be based on experiences from the particular installation.
Dial indicator position and reading
B
C
D
E A
I II
0
+
-
107mm
1
1.Punched points,I.Operating side,II.Rear side (as seen from the flywheel end)
Fig 11-2 201153 V1
11.2. Flywheel V2
The steel flywheel is fitted to the crankshaft with four fitted screws and
four normal screws. The correct position of the flywheel is determined
by three smaller screws.
A gear rim is fitted to the flywheel.
A crank angle scale is stamped on flywheel. The scale starts from
zero for the TDC of cylinder 1 and is divided in 360 crank angle. The
TDC is marked for all cylinders.
Data and dimension
Material: Steel plate
Weight: about 350 kg
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 3
The flywheel position indicator is marked with a scale to read the en
gine crank angles, at an accuracy of one (1) degree on the graduation
of the flywheel.
Reading of flywheel indicator
5
4
3
2
1
0
1
2
3
4
5
340
350
0
1
2
5
4
3
2
1
0
1
2
3
4
5
0
350
340
3 5 4
TDC
TDC
1. Flywheel Position indicator 2. TDC 3. Clockwise rotation 4. Flywheel
5. Anticlockwise rotation.
Fig 11-3 V3
11.2.1. Chamfered gear rim V1
The gear rim is chamfered to improve the engagement of the air start
er bendix and thus minimize the starting failures caused by a tooth to
tooth contact.
The chamfering of the gear rim teeth is dependent of the rotating di
rection (clockwise, CW, or counterclockwise, CCW).
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 4 Wrtsil 20
Chamfered gear rim
CCW
CW
A
B
A
B
Fig 11-4 201187 V1
11.2.2. Replacing the gear rim V6
If the gear rim is damaged or worn, it can be replaced without remov
ing the flywheel. Follow the steps given below:
1 Open the screws holding the gear rim and remove the gear rim from
the flywheel.
2 Cut the ring in to the suitable pieces. Ensure that the flywheel is not
damaged during this operation.
3 The spare part gear rim is delivered in two pieces, which can easily
can be mounted on the flywheel. Additional screw holes for the ring
half ends are pre-machined at the factory.
4 Mount the gear rim halves with (2 mm) feeler gauges between the two
split halves and pre-tighten the fastening screws.
5 Measure the base tangent length over 30 teeth or chosen number of
teeth, if no suitable calliper is available. Compare the measured tan
gent length over the split area and tighten the fastening screws to
stated torque. See, chapter 07: Tightening torques for screws and
nuts.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 5
Base tangent length over the number of teeth spanned
W
/k = 317.748
-0.320
-0.640 / 30
1
1. Gear rim half
Fig 11-5 201161 V2
11.3. Turning device V1
The crankshaft can be turned by a manual turning device operating
on the flywheel. The turning device consists of a gear, which is oper
ated with a ratchet. The rotational direction for turning can be reversed
by altering the ratch position of the ratchet.
Note!
The engine must not be started while the turning gear is engaged.
11.4. Connecting rod and piston V1
The connecting rod is of the drop-forged type with H-section shaft.
The big end is of "stepped split line" design and precision serrated at
the mating surfaces. This design offers the maximum crank pin di
ameter but still makes it possible to pull the connecting rod through
the cylinder liner.
The big end bearing shells are, for correct assembling, axially guided
by lugs. The design of the crankshaft enables the use of a non-
grooved upper bearing shell.
The two connecting rod screws are hydraulically tightened.
Data and dimension
Material: Special steel,
drop forged
Weight: 38 kg
Bearing type: Bi-metal
bearing
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 6 Wrtsil 20
The gudgeon pin bearing bush is stepped to give a larger bearing
surface on the more loaded lower side. It is lubricated via bores in the
connecting rod.
The gudgeon pin is of the full floating design, secured axially with
retainer rings. The oil flow from the connecting rod is passed through
the gudgeon pin further up to the piston. The gudgeon pin has shrink
fitted plugs in the ends.
11.4.1. General description of piston V1
The piston is of composite type with a forged steel or a nodular cast
iron skirt and a forged steel crown screwed together. The piston skirt
has a phosphate/graphite overlay.
The piston crown is cooled with lubricating oil by means of the cocktail
shaker effect. The lubricating oil is led from the main bearing, through
the bores in the crankshaft, to the big end bearing, and further through
the bores in the connecting rod, gudgeon pin and piston skirt, up to
the cooling space, from where it is drained back to the oil sump.
The pistons are provided with Wrtsil patented skirt lubricating sys
tem.
The combustion chamber in the top of the piston is deep, preventing
the fuel jets to touch the cylinder liner.
The compression ring grooves are hardened for better wear resist
ance.
Note!
Always handle the pistons with care. Do not damage or remove the
phosphate/graphite overlay.
The piston ring set consists of two compression rings and one spring-
loaded oil control ring. In this three-ring pack, every ring is specially
dimensioned and profiled for the task it has to perform. The top ring
is provided with a special wear resistant coating. The second com
pression ring is chrome-plated. The oil control ring is a spring-loaded,
chrome-plated oil scraper ring.
The side to be upwards of the compression rings is always marked
"TOP".
Data and dimension
Composite piston
Material skirt: Nodular
cast iron or forged steel
Material crown: Forged
steel
Screw: 10.9
Weight: 22 kg
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 7
11.4.2. Removing and dismantling the piston and
connecting rod V5
1 Remove the cylinder head. For instructions, see chapter 12 section
12.2.
a ) Scrape off carbon deposits carefully from the slots of the anti-
polishing ring and around the upper part of the cylinder liner.
b ) Cover the piston top with a cloth or paper pressed tightly (by an
old piston ring) against the cylinder wall to collect the deposits
removed.
2 Remove the anti-polishing ring.
a ) Turn the engine. The piston pushes the anti-polishing ring out.
Use the tool 836002 to extract the ring. Use 836003 to keep the liner
in place during the extracting procedure.
3 Clean the threaded hole in the piston crown. Fasten the lifting tool
832002.
Removing the antipolishing ring
1
2
1. Anti-polishing ring dismantling tool (836002) 2. Cylinder liner holders
(836003)
Fig 11-6 201176 V2
Data and dimension
Weight: 75 kg
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 8 Wrtsil 20
4 Turn the crankshaft about 55 from TDC towards the operating side
for the cylinder concerned. See, Fig 11-7.
5 Lift the distance sleeves 861153 into position on the connecting rod
screws. Screw on the hydraulic tools 861159 with extension pieces
861157.
Note!
Before and after applying the pressure on the hydraulic tool, check
that there is clearance between the distance sleeves and the engine
block. If necessary, turn the crankshaft slightly to get the clearance
for both sleeves.
Dismantling of piston and connecting rod
861 159
861 153
861 159
861 157
832 002
B*
B*
A
AOperating Side 861 153Distance sleeve861 157Extension piece861159Hy
draulic Cylinder832 002Lifting tool for pistonB*Check the clearance
Fig 11-7 201175 V2
6 Connect the hoses of the hydraulic pump, and open the connecting
rod nuts. See, section 07.3.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 9
Dismantling
Hydraulic oil
1. Screw on cylinder by hand. 2. Connect hoses, open valve. Tighten cylinders
by hand. 3. Screw cylinders 180 counter- clockwise. 4. Close valve, rise pres
sure. 5. Open the nut about half a turn. 6. Open release valve, remove tool.
Fig 11-8 HYD2A V2
7 Remove the hydraulic tool and the distance sleeve from the connect
ing rod studs.
8 Open the lower nut and remove the lower stud. Use the stud extract
ing tool 803011. The locking screw of the tool has left-hand threads.
9 Repeat the same procedure as above with the upper nut and stud.
Lift the big end bearing cap together with the bearing shell out of the
engine.
10 To remove the upper big end bearing shell, lift the piston a little. When
lifting the piston, take care not to damage the crank pin or the cylinder
liner wall.
11 Cover the crank pin oil holes with tape.
12 Lift the piston together with the connecting rod out of the engine.
When lifting the piston, take care not to damage the cylinder liner wall.
13 Remove the retainer ring from the gudgeon pin hole in the piston on
the side where the gudgeon pin drawing number is located. Use the
pliers for the retainer ring, 843004.
Note!
Never compress the retainer ring more than necessary to remove it
from the groove.
14 Drive out the gudgeon pin from the opposite side. In low tempera
tures, the gudgeon pin may get stuck. Heating the piston to about
30C for example, in oil.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 10 Wrtsil 20
15 If the rings and grooves require for example cleaning or measuring,
remove the piston rings. Use the pliers 843003. Before removing
them, note the position of the rings to ensure mounting in the same
grooves. The design of the pliers prevents overstressing of the rings.
Using other means may overstress the rings.
11.4.3. Maintaining the piston, piston rings and
connecting rod bearings V5
1 Clean all the parts carefully. Remove the piston rings. Remove carbon
deposits from the piston and piston ring grooves. Special care should
be taken not to damage the piston.
Caution!
Never use emery cloth on the piston skirt.
Cleaning is easier if coked parts are soaked in kerosene or fuel oil.
An efficient carbon solvent such as ARDROX No. 668 or similar
should preferably be used to facilitate cleaning of the piston crown.
When using chemical cleaning agents, take care not to clean piston
skirt with such agents because the phosphate-graphite overlay may
be damaged.
2 Measure the height of the piston ring grooves.
3 Dismantle the composite piston for inspection of mating surfaces be
tween the piston skirt and piston crown. Inspect and clean oil spaces.
See, section 07.1.6
Note!
Always fit new piston rings when a new cylinder liner has been honed
or fitted.
4 Check the gudgeon bearing bush and big end bearing bore.
a ) When measuring the big end bearing bore, tighten the connect
ing rod cap and nuts to the stated pressure.
b ) Determine the bearing shell wear by measuring the thickness.
Use a ball anvil micrometer for this. See the wear limits in Chapter
06: Clearances and wear limits.
c ) When replacing the big end bearing shells, always change both
the upper and the lower bearing shells.
Note!
Mark new bearings with the bearing number.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 11
5 Inspect the piston combustion space visually.
a ) Inspect at regular intervals and/or at every piston overhaul.
b ) Check the combustion space for corrosion or burning marks.
Note!
If marks deeper than 2 mm are found, the piston should be replaced
with new one.
11.4.4. Assembling and mounting of piston and
connecting rod V8
1 Mount the piston on a suitable support.
Note!
Use new screws when fitting new piston crowns. Because of the
manufacturing method, it is not possible to measure the elongation of
the M10 screws used with the two-screw piston crowns. For piston
crown with one screw the measurement can be recorded in meas
urement record 2011V003.
Warning!
If elongation is suspected replace the screws
2 Lubricate the gudgeon pin and insert into the piston from the side
marked with the drawing number. At low temperatures the gudgeon
pin may stick, heating the piston to about 30C in oil will ease pin
fitment.
3 Mount the retainer ring.
Warning!
Never compress the retainer ring more than necessary. If the ring is
loose in its groove fit a new ring.
4 Mount the piston rings using the pliers 843003, position the ring gaps
120 apart.
5 Attach the lifting tool 832002 to the piston crown.
6 Turn the crankshaft to 55 BTDC so that the journal of the cylinder
being worked on faces the operating side crankcase opening.
7 Lift the piston and connecting rod.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 12 Wrtsil 20
8 Lubricate the piston and place the clamp device for piston rings
843002 around the piston rings. Check that the piston rings are cor
rectly positioned in their grooves.
9 Oil all the surfaces of the upper big end bearing shell. Mount the
bearing shell so that the lug fits into its groove in the connecting rod.
Caution!
Use of glue compound on a bearing shell is prohibited.
10 Remove protecting cover from the crank pin oil holes and lubricate
the crank pin with clean engine oil.
11 Lower the piston and connecting rod carefully into the cylinder liner.
Remove the piston ring clamp 843002.
12 Lower the piston further until the connecting rod is placed on the crank
pin.
13 Oil all the surfaces of the lower big end bearing shell. Mount the
bearing shell so that the lug fits into its groove in the bearing cap.
14 Check the bearing shell alignment.
Checking the bearing shell alignment
1 2
1. Incorrectly fitted, 2. Correctly fitted
Fig 11-9 V3
15 Fit the bearing cap.
16 Mount the lower and upper connecting rod screws. Tighten using the
stud remover tool 803011 to the specified torque. See Chapter 07:
Tightening torques and use of hydraulic tools
Note!
Replace the screws every 24,000 operating hours at latest.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
Wrtsil 20 11 - 13
17 Lift the distance sleeves 861153 over the connecting rod nuts and
screw on the hydraulic cylinder 861159 with extension piece
861157.
18 Connect the hoses from the hydraulic cylinders to the high pressure
pump.
19 Open the valve and tighten the hydraulic cylinders using a inch
drive ratchet wrench and extension.
Caution!
Check the clearance between the distance sleeves and the engine
block, before and after applying pressure to the hydraulic tool. If nec
essary turn the crankshaft slightly to get the clearance for both
sleeves.
20 Close the valve, raise the pressure in two steps to the stated pres
sure. See Chapter 07: Tightening torques and use of hydraulic tools.
21 Tighten the nuts using the pin.
22 Open the pump valve and release the pump pressure.
23 Remove the hydraulic cylinders, hydraulic pipes, pin and distance
sleeves.
24 Check that the connecting rod moves axially after tightening.
25 Mount the side covers.
26 Remove lifting yoke and disengage turning device.
27 Mount the anti-polishing ring and cylinder head. See Chapter 12: Re
moving and mounting the cylinder head.
Crank Mechanism: Crankshaft, Connecting Rod, Piston
11 - 14 Wrtsil 20
12. Cylinder Head with Valves V5
The cylinder heads are cast of special-quality grey iron. Each head
includes two inlet valves, two exhaust valves, a centrally located in
jection valve and an indicator valve. The cylinder heads are individ
ually tightened to the cylinder liner with four studs and hydraulically-
tightened nuts. A metallic gasket seals the space between the cylin
der liner and the cylinder head. The combustion air and the exhaust
gas channels are connected to a common multi-duct, which is con
nected to the cylinder head by six screws.
The four screw and box-cone design is a traditional and well-proven
design for cylinder heads. The advantage of four screws is not only
the ease of maintenance but it also allows the design of large and
correctly-designed channels for combustion air and exhaust gases.
In a heavy-fuel engine the correct material temperatures are a crucial
factor to ensure long lifetime of the components being in contact with
combustion gases. Efficient cooling and a rigid design is best ach
ieved with the "double deck" design in which the flame plate is rela
tively thin and the mechanical load is transferred to the strong inter
mediate deck. The most sensitive areas of the cylinder head are
cooled by drilled cooling channels optimized to distribute the water
flow evenly around valves and the centrally-located fuel injector.
The injection valve is described in chapter 16.
Cylinder head assembly
1
12
9 10
2
3
4
5
6
8
11
7
1. Bearing bracket 2. Rocker arm 3. Yoke for valves 4. Yoke for injection valve
5. Cylinder head 6. Rotocap 7. Screws for connection piece 8. Exhaust valve
seat 9. Exhaust valve 10. Inlet valve 11. Inlet valve seat 12. Indicator valve
Fig 12-1 201259 V2
Data and dimensions
Material: Cast grey iron
Tensile strength:
250-300 N/mm
2
Weight: 92 kg
Combustion space
- design pres.: 200 bar
- test pressure: 225 bar
Water space
- test pressure: 10 bar
Operation temperature:
- water return: 95C"
Cylinder Head with Valves
Wrtsil 20 12 - 1
12.1. Functions of the cylinder head drilling V3
The flame plate of the cylinder head is a part of the combustion cham
ber. During combustion, the flame plate is exposed to high pressures
and high temperatures. Combustion air is led from the air receiver
through the multiduct and the cylinder head inlet channel into the cyl
inder. The air flow is governed by two inlet valves in the flame plate.
In a similar way, the exhaust gas is led from the cylinder through the
cylinder head exhaust channel and the multiduct to the exhaust mani
fold. The gas flow is governed by two exhaust valves.
The multi-orifice injection valve and its sleeve are centrally mounted
in the cylinder head. The sleeve holds the injection valve in position
and separates the injection valve from the cooling water.
Each cylinder head is individually cooled by the water flow that enters
the cylinder head from the cylinder jacket through a single bore. There
are drilled cooling passages to the exhaust valve seats. After passing
over the flame plate and the seat rings, the water flows out through a
single bore into the multiduct. The cooling water flows out from the
cylinder head directly to the multiduct. Any air or gas in the cooling
water is vented from the top of the multiduct.
The valve mechanism is lubricated from the lubricating oil system.
The oil is led through a pipe from the valve tappet guide in the multi
housing to the rocker arm bracket. All other flows into the cylinder
head are through drillings.
The controlled leakage from the injection valve is returned through
the protection pipe.
The fuel pipe is also protected against hazardous leaks from the high
pressure connection stud.
12.2. Removing the cylinder head V6
1 Drain the cooling water.
2 Open the indicator valves.
3 Remove the caps of the cylinder head screws.
4 Remove the cylinder head cover.
5 Turn the engine until both the inlet and exhaust valves are closed.
Remove the valve rocker arm bracket and the push rods.
6 Remove the fastening screws of the multiduct.
7 Remove the injection pipe, the fuel leak pipe, and lube oil pipes, where
necessary. Protect all the pipe connections.
Cylinder Head with Valves
12 - 2 Wrtsil 20
8 Put on the distance sleeves 861156 and hydraulic cylinders
861159. Loosen the cylinder head nuts.
Dismantling with hydraulic tools
Hydraulicoil
1. Mount the cylinders by hand. 2. Connect hoses, open valve. Tighten cylinders
by hand. 3. Turn the cylinders 180 counter-clockwise. 4. Close valve, rise
pressure. 5. Open the nut about half a turn. 6. Open release valve, remove tool.
Fig 12-2 HYD V1
9 Remove the cylinder head nuts.
10 Lift off the cylinder head. Use the lifting tool 832004.
Lifting the cylinder head
832 004
832 004 Lifting tool for cylinder head.
Fig 12-3 201255 V1
11 Cover the cylinder opening with a piece of plywood or something
similar.
12 Refit the caps to protect the screw threads.
Cylinder Head with Valves
Wrtsil 20 12 - 3
12.2.1. General maintenance of the cylinder head V5
General maintenance of the cylinder head includes a thorough visual
check, including water cooling spaces. Possible scale formation in
cooling spaces can disturb the cooling effect and therefore it has to
be cleaned, See chapter 02: Fuel, Lubricating Oil, Cooling Water.
Combustion spaces must be inspected carefully for possible wear.
Valve seats and the injection valve sleeve should be inspected for
possible water leakage and replaced if necessary.
Valve guides should be checked and replaced if worn. O-rings must
be replaced with new ones at every overhaul.
The sealing surfaces between the cylinder head and cylinder liner
should be inspected and reconditioned if necessary.
12.2.2. Mounting the cylinder head screws V1
1 Inspect the cylinder head screws for corrosion.
When corrosion pits with a depth of less than 0.1 mm is found,
polish away the pits with a small hand grinder.
If corrosion is deeper than 0.1 mm, change the screw.
Note!
Corrosion depth in threads can be hard to determine. Change the
screws, whenever in doubt.
2 Lubricate the threads of the screw. Use a thin layer of Mobilarma 524
or corresponding corrosion protection agent.
Cylinder Head with Valves
12 - 4 Wrtsil 20
Lubricating the threads of the screw
1
2
3
1. O-ring 2. Compartment filled with Mobilarma 524 3. Threads of the screw
lubricated with Mobilarma 524.
Fig 12-4 V3
3 Mount the screw and tighten to a specified torque.
Caution!
Do not exceed the maximum tightening pressure.
Caution!
Change the cylinder head screws, if the maximum pressure is ex
ceeded when using the hydraulic tool.
4 Fill the compartment between the screw and the engine block with
Mobilarma 524 or corresponding corrosion protection agent.
a ) When filling the corrosion protection agent leave about 2 mm
space between O-ring and corrosion protection.
5 Mount the O-ring.
Note!
Change the O-rings at every piston overhaul.
12.2.3. Mounting the cylinder head V8
1 Clean the sealing surfaces. Fit new cylinder head and multiduct gas
kets.
Cylinder Head with Valves
Wrtsil 20 12 - 5
2 Fit new O-rings to the cooling water jacket and the push rod protecting
pipe.
3 Lubricate the O-ring sealing surfaces with grease or oil.
4 Attach the lifting tool 832004 to the cylinder head.
5 Lift on the cylinder head. Pay special attention to the multiduct gasket,
ensuring that it is intact and correctly mounted.
6 Screw on the cylinder head nuts and tighten by hand.
Note!
Before hydraulically tightening the cylinder head nuts, it is very im
portant to ensure that multiduct sealing surface is properly aligned
with the cylinder head sealing surface. Improper alignment can cause
water leakage into the cylinder.
7 Connect the multiduct, fit the screws and tighten by hand.
8 Put on the distance sleeves 861156, screw on the hydraulic cylin
ders 861159 and proceed with tightening of cylinder head nuts. Tight
ening in two steps is recommended.
Assembling with hydraulic tool
Hydraulicoil
1. Mount the nuts, attach the distance sleeve. Mount the cylinders by hand. 2.
Connect hoses, open valve. 3.Tighten the cylinders by hand. 4. Close the valve
and pump pressure to the stated value. 5. Turn the nuts until close contact to
face. 6. Open the valve. 7. Repeat steps 4, 5 and 6. 8. Remove the tool set.
Fig 12-5 HYD V1
9 Tighten the multiduct screws to the torque stated in 07.1.3.
10 Connect the pipes, the fuel leak pipe, lubricating oil pipes and the
injection pipe.
11 Fit the push rod protecting pipes.
12 Fit the push rod and the rocker arm bracket.
13 Adjust the valve clearance, see section 12.2.5. For clearances, see
section 06.1.
Cylinder Head with Valves
12 - 6 Wrtsil 20
14 Put on the cylinder head cover, remember to put new hose gasket for
the cover. Spot glue the gasket in place using Bostik-glue A3.
15 Apply the protecting caps to the cylinder head screws.
16 Before starting, fill the engine cooling water system. Turn the crank
shaft two revolutions, with the indicator cocks open.
Example Glue points
Fig 12-6 201256 V1
12.2.4. Valve clearance V2
Valve clearances, cold engine:
inlet valves 0.4 mm
exhaust valves 0.8 mm
Note!
Before checking or adjusting valve clearance, allow the engine to cool
for at least a couple of hours and ensure that the automatic start and
the priming pumps are disconnected.
12.2.4.1. Checking the valve clearance V3
1 Remove the cylinder head cover.
2 Turn the crankshaft to TDC at ignition for the cylinder concerned.
3 Using a feeler gauge, check the valve clearance between the contact
surfaces of the yoke and the rocker arm shoe. There should be only
slight resistance when the feeler gauge is slid in and out. If necessary,
adjust according to section 12.2.4
4 Refit the cylinder head cover.
Cylinder Head with Valves
Wrtsil 20 12 - 7
12.2.5. Adjusting valve clearance and yoke V6
Adjusting valve clearance
a b c
2
3
4
1
1. Adjusting screw for rocker arm 2. Counter nut 3. Adjusting screw for valve
yoke 4. Counter nut
Fig 12-7 201258 V1
1 Turn the crankshaft to TDC at ignition for the cylinder concerned.
2 Loosen the counter nuts of the adjusting screws on the rocker arm (2)
and on the yoke (4). Turn the adjusting screws counterclockwise to
provide ample clearance.
3 Press the fixed end of the yoke against the valve stem by pressing
down the adjustable end.
a ) Screw down the adjusting screw (3) until it touches the valve end.
b ) Note the position of the spanner (position a).
c ) Press down the fixed end.
Cylinder Head with Valves
12 - 8 Wrtsil 20
d ) Keep on screwing down while the yoke tilts, until the guide clear
ance is on the other side and the fixed end of the yoke starts lifting
from the valve stem.
e ) Note the position of the spanner (b).
4 Turn the adjusting screw counterclockwise to the middle position "c"
between "a" and "b". Lock the counter nut of the adjusting screw.
5 Put a feeler gauge corresponding to the valve clearance between the
contact surfaces of the yoke and the rocker arm shoe.
a ) Tighten the adjusting screw (1) until the feeler gauge can be
moved to and fro only with slight force.
b ) Hold the adjusting screw, and tighten the counter nut. Check that
the clearance has not changed while tightening.
12.3. Exhaust and inlet valves and seat rings V2
The cylinder head has four valves fitted, two inlet valves and two ex
haust valves. All the valves are made of surface-treated heat resistant
steel. The inlet valves are bigger than the exhaust valves.
The valves move in cast iron guides, which are press fitted in the
cylinder head and can be replaced. The valve guides have an O-ring
(sealing against the valve stem), which is located at the top of the
guide bore.
The valves are provided with one valve spring per valve and valve
rotating devices or valve spring retainers.
The valve seat rings are fitted in the cylinder head for both inlet and
exhaust valves. The exhaust valve seat rings are water cooled and
therefore provided with one or two O-rings per seat.
12.3.1. Dismantling valves V4
1 Fit the tool 846010 according to Fig 12-8.
Data and dimensions
Material:
High quality steel
Diameter
-inlet valve: 73 mm
-exhaust valve: 66 mm
Valve seat ring
Material: High quality
steel
Angle
-inlet seat: 20
-exhaust seat: 30
Cylinder Head with Valves
Wrtsil 20 12 - 9
Tool assembly for dismantling valves
A
A. Fastening screw
Fig 12-8 201252 V1
2 Compress the springs about 15-20 mm with the screw.
3 Knock at the centre of the valve discs with a soft piece of wood, plastic
hammer or similar, so that the valve cotters come loose and can be
removed.
4 Unload the tool.
5 Spring retainers and springs can now be removed.
6 Note the marks on the valves or mark them according to Fig 12-9 so
they can be re-installed into the same guide if they are in good con
dition.
Cylinder Head with Valves
12 - 10 Wrtsil 20
Marking of the valves (view from the underside)
A D
C B
2
1
A. Inlet valve, B. Inlet valve, C. Exhaust valve, D. Exhaust valve
1. Air in, 2. Ex out
Fig 12-9 201254 V1
12.3.2. Checking and reconditioning of valves and
seats V5
1 Clean the valves, seats, ducts and guides as well as the underside of
the cylinder head.
2 Check the wear and erosion on the valve head according to Fig
12-10. The margin width "Y" should be more than 4.5 mm (nominal
5.5 mm) and dimension "Z" should be less than 1 mm. If the values
exceed these limits the valve must be replaced.
Cylinder Head with Valves
Wrtsil 20 12 - 11
Control of burning-off on valve
Z
Y
A
A Burnt area
Fig 12-10 321256 V1
3 Check the sealing faces of the valves and the seats rings. For this
purpose it is recommended to apply a thin layer of fine lapping com
pound to the valve seat and rub the valve slightly against the seat by
hand a few times. If the sealing faces are bright or if there is a coherent
sealing face, grinding is not recommended. If there is slight pitting,
lapping only is recommended. If the pitting extends over nearly the
entire sealing face or, if imperfect sealing is observed, the valve and
the seat should be reground.
Note!
If blow-by has occurred, the O-ring for the corresponding valve seat
ring must be changed. Blow-by increases the temperature and the O-
ring is "burned", which will result in water leakage into the cylinder.
4 Before grinding, check the valve stem clearance. If the clearance is
too large, measure the stem and guide, and change the worn part;
the valve guide can be pressed out. Check the bore in the cylinder
head. When refitting, cooling of the guide with liquid nitrogen is rec
ommended, but pressing in with oil lubrication can also be acceptable.
After fitting, check the guide bore and calibrate, if necessary.
Cylinder Head with Valves
12 - 12 Wrtsil 20
12.3.3. Lapping V5
If slight pits exist on the sealing faces, they can be lapped by hand:
1 Fit the turning tool to the valve.
2 Apply a thin layer of lapping compound to the sealing surface of the
valve; No.1 for coarse lapping, No.3 for fine lapping.
3 Rotate the valve back and forth towards the seat using turning tool
841001. Lift the valve from the seat at intervals while lapping.
4 Remove the smallest possible amount of material, as the sealing
faces have hardened during operation and are valuable. It is not nec
essary to grind off all pits.
5 Clean the valve and the seat carefully after lapping.
12.3.4. Machine grinding V5
If there is deep pitting or other damage, the valve and seat should be
ground by machine.
Note!
The valve should be cooled by water during the grinding.
Valve
min.
Fig 12-11 201257 V2
1 Seat face of the inlet valve: The seat angle of the inlet valve is 20
with a tolerance of 0.05. Minimum allowable inner diameter of
sealing surface after grinding is 52 mm; after that, the valve must be
replaced by a new one.
2 Seat face of the exhaust valve: There are two alternative types of
exhaust valve (Stellit and Nimonic). The seat angle of the exhaust
valve is 30 with a tolerance of -0 - +0.10 (to achieve contact with
Cylinder Head with Valves
Wrtsil 20 12 - 13
the seat ring at the inner edge of the valve seat.) The minimum al
lowable inner diameter of sealing surface after grinding is 48 mm;
after that, the valve must be replaced with a new one.
Seat face of the valves
A
B
2
0

0
,
0
5

3
0

0
,
1

0

A. Inlet, B. Exhaust
Fig 12-12 201262 V1
3 Seat ring for the inlet valve: The seat angle of the inlet valve seat ring
is 20 with a tolerance of 0.05. The seat can be ground until the
outer seat diameter is 78 mm; after that, the ring must be replaced
with a new one.
4 Seat ring for the exhaust valve: The seat angle of the exhaust valve
seat ring is 30 with a tolerance of 0 - +0.10. The seat can be ground
until the valve contact section mark has disappeared. If the section
mark disappears at machining, it is recommended to replace the ring.
Aim to get a contact to the seat ring at the inner edge of the valve
seat.
Exhaust valve seat ring
67,5
30
+0,1
-0
68,6
Fig 12-13 201261 V2
Cylinder Head with Valves
12 - 14 Wrtsil 20
Note!
After grinding, a light lapping is recommended to provide contact be
tween valve and seat.
12.3.5. Change of seat ring
12.3.5.1. Removing the old seat rings with the hydraulic
extractor V5
The seat rings can most conveniently be removed with a special hy
draulic extractor, which can be ordered from the engine manufacturer.
If the extractor is not available, a scrapped valve can be used. See
12.3.5.2.
1 Assemble the extractor according to Fig 12-14. Notice the difference
in assembly for the inlet and exhaust seat.
2 Tension the extractor by tightening the axial screw.
3 Pressurize the extractor to withdraw the seat ring.
4 Open the pump valve to release the pressure, disconnect the hoses
and dismantle the extractor.
Example Removing an old seat ring
A B
Hydraulic oil
834050
837024
834050
837018
861161
A. Inlet, B. Exhaust
Fig 12-14 201263 V1
Cylinder Head with Valves
Wrtsil 20 12 - 15
12.3.5.2. Removing the old valve seat with using the
scrapped valve V3
The seat rings can most conveniently be removed with a special hy
draulic extractor, which can be ordered from the engine manufacturer.
If the extractor is not available, a scrapped valve can be used.
1 Weld a scrapped valve to the seat using electric beam welding. For
ease of welding, machine the valve head to a diameter of 55-60 mm.
Note!
Protect the flame plate and the joint surfaces of the cylinder head
when welding.
2 Press or knock out the ring but be careful not to damage the valve
guide.
12.3.5.2.1. Fitting a new inlet valve seat ring V8
1 Check the bore diameter in the cylinder head. See section 06.2
2 Before fitting the valve seat, chill the seat in liquid nitrogen to -190C,
and ensure that the cylinder head temperature is at least 20C. If liquid
nitrogen is not available, put the seat in a freezer, and heat the entire
cylinder head so that the seat head temperature difference is at least
120C.
Note!
Heat up the entire cylinder head, not only the seat bore.
3 Check the eccentricity of the sealing face in relation to the valve
guide. If it exceeds 0.1 mm, grind the seat surface in a seat grinding
machine.
12.3.5.2.2. Fitting a new exhaust valve seat ring V8
There are two types of exhaust valve seat rings, depending on the
installation.
Exhaust valve seat rings
1.
1
3
.
5
1
1
.
5
2.
1. Exhaust valve seat ring with two O-rings. 2. Exhaust valve seat ring with one
O-ring.
Fig 12-15 201260 V2
Cylinder Head with Valves
12 - 16 Wrtsil 20
Note!
The seat rings are not interchangeable because of different pocket
and seat geometry.
1 Clean the bore carefully with a grit 400 or finer emery cloth.
2 Check the bore diameter in the cylinder head. See, chapter 06: Clear
ances and wear limits at 20C.
3 Cool the seat ring between -20 and -25 C prior to fitting.
Caution!
Temperature lower than -25 C may damage the O-ring(s) during as
sembly.
4 Heat up the entire cylinder head to 100C by means of either steam
or a gas burner. If steam is used it may be easier if the steaming is
done within a closed box.
Note!
It is important that the entire cylinder head is heated up, not only the
seat bore.
5 Mount the O-ring(s) on the cooled valve seat.
6 Apply soap-water solution to lubricate the O-ring(s).
7 If the exhaust valve seat ring is mounted with one O-ring:
Clean with Loctite 7063.
Apply Loctite 620 to the cylinder head. Loctite must only be applied
to the larger bore ( 78) without O-ring. Not to the smaller bore
where the O-ring fits.
For more information about the use of Loctite, see section 12.3.6
8 Mount the exhaust valve seat using one of following methods:
Put the seat rings into a guide bush and press in the seat with a
guided arbor. It is also possible to use a special tool (837032)
which can be ordered from the engine manufacturer.
Insert the seat ring using an old scrapped exhaust valve. Do not
use an exhaust valve which is to be reused. Knock/push on the
valve until the seat ring is correctly seated.
Note!
It is recommended that the exhaust seat O-rings are always replaced
when overhauling the cylinder head.
Note!
Mounting of a exhaust valve seat ring should be done carefully so that
the seat ring is correctly seated.
Cylinder Head with Valves
Wrtsil 20 12 - 17
9 Check the eccentricity of the sealing face in relation to the valve
guide. If it exceeds 0.1 mm, the seat surface should be ground in a
seat grinding machine.
10 Pressure test the cylinder head water side before mounting with a test
pressure of 10 bar. Use pressure test tool (847004 and 847005) for
blocking the water holes of cylinder head.
12.3.6. Use of Loctite products for locking the seats
and centre sleeves V4
1 After the "hot" cylinder head washing, the seat pockets must be
cleaned, with hot water and/or a wet cloth, to remove possible anti-
corrosion chemicals and to achieve a pH value close to pH7.
2 Before assembling the cooled seat, use Loctite 7063 to remove any
frost, dirt or protective chemicals. This neutralizes the surface close
to pH7.
Note!
Power cleaner or similar should not to be used.
3 Apply the Loctite 620 to the surface, to which a sleeve or seat ring is
to be locked. Loctite 620 must be use because of the high temperature
performance. It needs a 1 hour curing time.
Note!
Do not apply Loctite to an O-ring (use soap-water solution).
12.3.7. Reassembling the engine valves V3
1 Check the valve springs. If there is any cracking, corrosion or wear,
fit new springs.
2 Put new seal rings in the valve guides.
3 Lubricate the valve stems with engine oil.
4 Put in the valves and check for free movement.
5 Put on the springs and rotators. Replace the valve rotators if they are
worn or damaged.
6 Compress the springs with the tool set.
7 Put in the valve cotters and unload the springs.
8 Check that the valve cotters fit properly.
Cylinder Head with Valves
12 - 18 Wrtsil 20
9 Check the function of the valve rotators. Mark the valve disc and cyl
inder head with a felt-tip pen and check that the valve moves when
the stem is gently tapped with a mallet.
12.4. Operation and maintenance of the
indicator valve V5
The inside construction of the indicator valve is such that the pressure
in the cylinder tightens it. The valve is designed so that the cylinder
pressure causes the valve to seal. Consequently the force needed to
close the valve is relatively low. The valve cock screw has a left-hand
thread. The opening and closing of the valve is shown inFig 12-15.
Use the special T-wrench808001 to open and close the valve.
Open and close indicator valve
1
2
1. Thread 2. Valve cock screw.
Fig 12-16 321255 V2
1 When starting the engine, Close the indicator valves. Use only a
minimum force that the sealing surfaces seat properly. The cylin
der pressure will push them tightly together.
2 When stopping the engine, open the valves a half turn only. Then
the tightening caused by a temperature decrease cannot have an
effect.
3 When opening the indicator valve for measuring the cylinder pres
sure, use of force must be avoided.
4 When closing the indicator valve after measuring the cylinder
pressure, only a weak torque is needed. A so called "finger torque"
is usually enough.
5 Apply a high temperature lubricant (up to 1000C) to the valve
stem threads when you feel that they are sticking.
Cylinder Head with Valves
Wrtsil 20 12 - 19
Note!
Use the special T-handle wrench to open and close the indicator
valve.
12.4.1. Cylinder firing pressure checking V3
Warning!
The area around a running engine is hazardous and due attention
must be given to rotating parts and hot surfaces. Note that hot, high
pressure gases will be ejected if an indicator valve is opened while
the engine is running.
1 Remove the heat shield from the indicator valve concerned and con
nect the peak pressure indicator. Make sure that it is properly con
nected before opening the indicator valve.
2 Open the indicator valve Read instructions in section 12.4. The valve
is opened by turning the cock anti-clockwise.
3 Check the cylinder pressures. At the same time, note the load of the
engine (the injection pump racks offers an accurate measure of the
engine load).
Note!
The value to be recorded in the data record is (P
av
) which is the aver
age of the peak firing pressures from at least 32 cycles. Cylinder
pressure readings will be practically worthless unless the correspond
ing engine loads are recorded.
Before measuring, adjust the settings of the equipment according to
above. See the instrument manufacturer's instructions for details.
4 Close the indicator valve (see section 12.4) and remove the peak
pressure indicator.
5 Refit the heat shield.
Cylinder Head with Valves
12 - 20 Wrtsil 20
12A. Testing the cylinder tightness V5
Note!
Test the cylinder tightness immediately after the engine has stopped.
A tool can be used to control the cylinder and valve tightness.
1 Turn the appropriate piston to ignition TDC (all valves closed) for the
cylinder concerned.
12A.1. Connecting the tool for Wrtsil 20 V12
1 Connect the tool to the indicator valve in open position.
Testing the cylinder tightness
VASA 32, 848020
WRTSIL 20, 848020
WRTSIL 32, 800064
WRTSIL 34SG, 848020 WRTSIL 32DF, 848020
848 052
848 052
848 061
Fig 12A-1 321260 V1
2 Measure the cylinder tightness. See, section 12A.2.
Testing the cylinder tightness
Wrtsil 20 12A - 1
12A.2. Measurement V3
1 Connect air to the tool with a pressure of 6-7 bar (= normal working
air pressure).
2 Open the valve on the tool and record the pressure.
3 Close the valve.
4 Measure the time (in seconds) it takes for the pressure to drop to 0.5
bar .
If the pressure from the beginning was 6 bar and it takes more
than 10 sec. for the pressure to drop to 0.5 bar, the result is
acceptable.
If the pressure drops directly to 0 bar, it is possible that one or
more valves are sticking or the valve(s) are burnt.
A sticking valve will be indicated by the immobility of the valve
when the engine is turned.
A burnt valve can normally be seen from the exhaust temperature.
If the valve clearance is zero, it will also cause a direct pressure
drop.
Carbon particles that were trapped between the valve and the seat
when the engine was stopped, could also prevent the valve from
closing properly thus causing a direct pressure drop. If this is
suspected, the engine should be run for a few minutes and the test
repeated.
If a blow-by between the cylinder liner and piston is suspected e.g.
due to the fast fouling of filters or high crankcase pressure, it is
best to test all the cylinders and compare the readings.
For example: From a six cylinder engine you get a serial: 12, 17,
15, 4, 19 and 18 seconds.
This shows that cylinder No. 4 is the one where blow-by is to be
suspected.
This conclusion can be verified by listening for leaking sounds in
side crankcase during testing.
If time restrictions only allow the overhaul of one piston, the piston
of the cylinder with the worst blow-by should be dismantled and
inspected. The result of the inspection will give some indication of
the general engine condition.
When testing the cylinder after an overhaul, a rapid pressure drop
can be observed. This is because the pistons have not been run-
in.
Testing the cylinder tightness
12A - 2 Wrtsil 20
Note!
Keep pre-lubricating pump running during test.
Note!
The turning gear should be engaged during test.
In general, the location of leakage can be found by listening when
the air valve is open.
Note!
The general condition of an engine is indicated with the test device,
but the operation data records are more important. Overhaul the en
gine at the recommended intervals; do not wait until a test such as
this indicates a fault.
Testing the cylinder tightness
Wrtsil 20 12A - 3
Testing the cylinder tightness
12A - 4 Wrtsil 20
13. Camshaft Driving Gear V5
The camshaft is driven by the crankshaft through a gearing. The
gearing consists of a gear wheel ring (6), which is press fitted to the
crankshaft, and two intermediate gears (3 and 21) and a camshaft
driving gear (1), seeFig 13-1.
The bearing shafts of the intermediate wheels are journalled in the
engine block. The camshaft driving wheel (1) is fastened between the
end of the camshaft and the extension. For the speed governor drive
a helical gear wheel is located at the end of the camshaft. Lube oil
nozzles provide for lubrication and cooling of the gearing.
The camshaft rotates with half of the engine speed in the same di
rection as the engine.
Camshaft driving gear
1
3
21
6
A
1.Drive gear for camshaft,3.Bigger intermediate gear for camshaft drive,6.Gear
wheel for crankshaft,21.Smaller intermediate gear for camshaft drive
A.Flywheel end
Fig 13-1 201354 V2
Camshaft Driving Gear
Wrtsil 20 13 - 1
13.1. Intermediate gears and camshaft gear V5
The intermediate gear wheels are case hardened. The wheels have
a common shaft and are fixed to each other by a friction connection.
The lubrication for the bearings is arranged through drillings in the
shaft and in the wheels from a distributing pipe.
The basic adjustment of injection timing is done with the gear wheel
(1) for camshaft (Fig 13-4). By loosening the round nut (14) of the
camshaft, the friction connection of the gear wheel to the camshaft is
released. The timing can be adjusted if the crankshaft is rotated in
relation to the camshaft.
Note!
The valves and the pistons will come in contact with each other if the
valve timing is set wrong, which will cause serious damages to the
engine.
13.1.1. Maintenance of camshaft gearing V5
Whenever the opportunity occurs, check the condition of the gears.
Measure tooth backlash and bearing clearances, see section 06.2.
An early detection of any tooth damage can prevent serious damage.
Dismantling with hydraulic tool
Hydraulic oil
1. Screw on cylinders by hand. 2. Connect hoses, open valve. Tighten cylinders
by hand. 3. Screw cylinders about two and half a turn backwards. 4. Close valve,
rise pressure. 5. Open the nut about two and half a turn. 6. Open release valve,
remove tool.
Fig 13-2 HYD2A V2
Camshaft Driving Gear
13 - 2 Wrtsil 20
13.1.2. Basic adjustment of valve timing V7
Basic adjustment of the valve and injection timing is done by changing
the relative position of the camshaft and gearwheel (1). If the position
is changed, the position of the camshaft is changed in relation to the
crankshaft.
Note!
The relative position between the camshaft and crankshaft is adjusted
at the factory and should not be changed unless it is absolutely nec
essary.
1 Remove the camshaft end cover (13).
2 Turn the crankshaft until the position of correct injection timing is
reached.
Reassemble with hydraulic tool
Hydraulic oil
1. Screw on nuts, attach distance sleeve. Screw on cylinders to the bottom by
hand.2. Connect hoses, open valve. Tighten by hand. 3. Close the valve and
pump pressure to the stated value. 4. Screw the nuts until close contact to face.
5. Open the valve and remove tool set.
Fig 13-3 HYD2A V2
3 Install the hydraulic tool 861169 on the screw (12).
4 Loosen the nut using correct hydraulic pressure and turn the crank
shaft. The intermediate and camshaft gear wheel should then rotate
while the camshaft should stand still. See, Chapter 07: Hydraulically
tightened connections.
5 Tighten the screw connection and re-check the injection timing. See,
Chapter 16: Control of fuel injection timing.
6 Remove the hydraulic tool and install the camshaft end cover.
Camshaft Driving Gear
Wrtsil 20 13 - 3
Note!
The round nut (14) of the camshaft is guided against a shoulder in the
gear wheel for governor drive (10). When tightening the camshaft
screw, pay close attention to fix the nut correctly against the guiding
face in order to prevent damaging the parts.
Camshaft driving gear
1
2
A
3
4
5
6
7 8 9
10
11
12
13
14
15
16
17
18
19
20
21
1. Gear wheel for camshaft 2. Extension shaft 3. Intermediate gear wheel
4. Bearing bush 5. Crankshaft 6. Gear wheel for crankshaft 7. Screw
8. Screw 9. Housing 10. Gear wheel for governor drive 11. Extension shaft
12. Screw 13. Cover 14. Screw 15. Guiding pin 16. Screw 17. Screw
18. Shaft 19. Cover 20. Bearing bush 21. Intermediate gear wheel.
A.Indicating mark
Fig 13-4 201353 V1
13.1.3. Removing of camshaft driving gear V5
1 Remove the gearing covers and the adjacent camshaft cover.
Camshaft Driving Gear
13 - 4 Wrtsil 20
2 Turn the crankshaft to TDC at firing for cylinder No. 1.
Dismantling with hydraulic tool
Hydraulic oil
1. Screw on cylinders by hand. 2. Connect hoses, open valve. Tighten cylinders
by hand. 3. Screw cylinders about two and half a turn backwards. 4. Close valve,
rise pressure. 5. Open the nut about two and half a turn. 6. Open release valve,
remove tool.
Fig 13-5 HYD2A V2
3 Remove the governor unit and speed pick-ups.
4 Remove the governor drive cover plate (13) . See Fig 13-4, and dis
connect oil supply pipe.
5 Open the nut (14) and remove the drive gear for the governor (10).
6 Open the screws (7) and remove the complete governor drive as
sembly.
7 Remove the end piece (11).
8 Remove the camshaft gear wheel (1).
9 Remove the intermediate gear wheel cover (19) and spray nozzles.
10 Remove the extension shaft (2).
11 Open the fastening screws (17) and remove the shaft piece (18) and
the small intermediate gear wheel (21).
12 Remove the big intermediate gear wheel (3).
Camshaft Driving Gear
Wrtsil 20 13 - 5
13.1.4. Mounting of the camshaft gearing V7
Note!
Turn the crankshaft to TDC at ignition for cylinder No.1 before pro
ceeding with the job.
1 Lubricate the bearing bushes (4) and (20). See, Fig 13-4.
2 Lift the big intermediate gear wheel (3) into position.
3 Insert the small intermediate gear wheel (21) onto the collar of the big
intermediate gear wheel.
4 Insert the shaft piece (18) and hand tighten the fastening screws
(17).
5 Insert the extension piece (2). Ensure that the indicating mark (Fig
13-4) is visible and is in a horizontal position.
6 Lift the camshaft gear wheel (1) into position. Ensure that the cam
shaft gear wheel is mounted with the deeper side towards the screw
connection.
7 Insert the end piece (11).
8 Insert the housing of the governor drive. Replace the O-ring with a
new one and tighten the screws (7) to stated torque.
9 Insert the gear wheel for governor drive (10) and the screw (12) into
position. Insert and hand tighten the nut (14).
Note!
Insert the nut carefully onto the guiding collar in the gear wheel for
the governor drive before installing the hydraulic tool onto the screw.
10 Tighten the screw (17) for the intermediate gear wheel to stated tor
que.
Camshaft Driving Gear
13 - 6 Wrtsil 20
Reassembling with hydraulic tool
Hydraulic oil
1. Screw on nuts, attach distance sleeve. Screw on cylinders to the bottom by
hand.2. Connect hoses, open valve. Tighten by hand. 3. Close the valve and
pump pressure to the stated value. 4. Screw the nuts until close contact to face.
5. Open the valve and remove tool set.
Fig 13-6 HYD2A V2
11 Lift the hydraulic tool onto the screw and rise the pressure to 300 bar
and tighten the nut.
12 Check the valve timing. See, section 16.2.6.
13 Tighten the nut to the full stated pressure. See, section 07.3.
14 Mount the governor unit and the speed pick-ups.
15 Install the covers for the gearing and the camshaft.
16 Mount all the covers and the oil pipes.
Note!
Check the valve timing before the engine is started.
13.2. Crankshaft gear ring V2
The gear wheel ring (6) is press fitted to the crankshaft. Removing
and mounting the gear ring requires special knowledge and should
be conducted by authorized personnel only.
Camshaft Driving Gear
Wrtsil 20 13 - 7
Camshaft Driving Gear
13 - 8 Wrtsil 20
14. Valve Mechanism and Camshaft V2
14.1. Valve mechanism V7
The valve mechanism transfers the cam motion to the valves. The
valve mechanism consists of piston type valve tappets (2) moving in
a common guide block casing; the multihousing (3), tubular push rods
(6) with ball joints, nodular cast iron rocker arms (8) journalled on a
rocker arm bearing bracket (11), yokes (10) guided by a yoke pin in
the cylinder head.
Valve Mechanism and Camshaft
Wrtsil 20 14 - 1
Valve mechanism
Y
X
1
2
3
4
5
6
7
9
8
10 11
12
13
A
A
A - A
1. Roller pin, 2. Valve tappet, 3. Multihousing, 4. Cover for valve tappet, 5.
Protecting sleeve, 6. Push rod, 7. Retainer ring, 8. Rocker arm, 9. Screw, 10.
Valve yoke, 11. Rocker arm bracket, 12. Screw, 13. Securing screw
X. Without floating bearing bush, Y. With floating bearing bush
Fig 14-1 201458 V2
14.2. Function of valve mechanism V3
The movement of the valve tappets is governed by the cam profile.
The valve tappets transfer the movement through push rods to the
rocker arms. The rocker arms operate the inlet and exhaust valves
through a yoke.
The bracket for the rocker arms is made of nodular cast iron and is
fastened to the cylinder head by two long screws. The steel journal is
press fitted into the bracket. The positioning of the journal is important
for the oil supply to the valve mechanism.
Valve Mechanism and Camshaft
14 - 2 Wrtsil 20
The rocker arms act on the valve yokes, which are guided by an ec
centrically placed yoke pin. To compensate for heat expansion a
clearance must exist between the rocker arm and yoke. All adjust
ments are made on a cold engine, and this work procedure is ex
plained in chapter 12. Each valve yoke operates two valves simulta
neously.
The valve mechanism is lubricated from the main flow with pipe con
nections. All other flows in the cylinder head are through drilled bores.
Oil to the valve yokes passes through the rocker arm bracket in an
intermittent flow controlled by the bore in the rocker arm. Oil will only
flow through the rocker arm when it is in the open-valve position. Oil
which is passed to the yoke lubricates the yoke tappet and by splash
ing through the bores also lubricates the valve rotators. Oil is returned
to the crankcase in a free flow through the protective sleeves of the
push rod.
Note!
The intermittent supply provides a minimal oil flow to the valve mech
anism. The oil flow to a cylinder head with all valves closed is "shut
off". To completely check the oil flow to a cylinder head during pre
lubrication, the engine must be rotated during pre-lubrication.
14.3. Maintenance of valve mechanism V8
Normally, the valve mechanism need no maintenance, but the com
ponents should be checked for damage and wear at the intervals sta
ted in chapter 04. See chapter 06 for adjustments and wear limits. If
the valve mechanism is dismantled, the components should be
marked and later reassembled in the same position to avoid unnec
essary wear.
14.3.1. Dismantling of valve mechanism V8
1 Remove the covers of the valve mechanism and camshaft from the
cylinder concerned.
2 Turn the crankshaft to a position where the valve tappet rollers of the
valves and the injection pump are on the base circle of the cam.
3 Unscrew the screws (9) and remove the rocker arm bearing bracket
from the cylinder head.
4 Remove the retainer rings and rocker arms. To remove the retainer
rings, use pliers 843004.
Valve Mechanism and Camshaft
Wrtsil 20 14 - 3
5 Remove the push rods injection pipe, fuel leak pipes and the protect
ing sleeves.
6 Remove air pipe and lube oil pipes. Loosen the control shaft bracket.
Disconnect the fuel rack.
7 Open the fuel pipe connection between the multi-housings con
cerned. Use circlip pliers to slide the fuel retainer ring to one side.
Move the fuel line connecting sleeves clear of the adjacent fuel pipes.
8 Loosen the fastening screws 12, remove the high pressure connect
ing piece and protecting sleeve. Remove the housing (3).
9 Remove the securing plate. The valve tappets can now be withdrawn.
Before dismantling, mark the parts so that they can be reassembled
in their original positions.
10 The tappet roller and pin can now be separated by depressing the
retainer into the pin and slide out. The tappet should be covered, as
the retainer is under spring loaded tension.
14.3.2. Inspection of valve mechanism parts V5
1 Clean the rocker arm bore and the journal and measure for wear.
When cleaning, pay special attention to the oil holes.
2 Clean and inspect all parts of the valve tappet. When cleaning, pay
special attention to the oil holes.
3 Check for wear by measuring the tappet, the housing bore and the
roller.
4 Change the O-rings of the cover (4) if they are damaged or hard.
14.3.3. Assembling the valve mechanism V9
1 Lubricate the parts of the valve tappet with clean engine oil and as
semble. Observe the marks for correct positioning.
2 Insert the valve tappets into the multi-housing and mount the securing
plate (13).
3 Mount the cover for valve tappet.
4 Mount the complete housing onto the engine and tighten the screws
to the stated torque according to Chapter 07: Tightening Torques and
Instructions for Screw Connections.
5 Connect the fuel pipes between the multi-housings concerned. Move
the fuel line connecting sleeves on the adjacent fuel pipes. Use circlip
pliers to slide the fuel retainer ring into its groove.
Valve Mechanism and Camshaft
14 - 4 Wrtsil 20
6 Connect the air pipe, injection pipe, fuel leak pipes and lube oil
pipes. Mount the control shaft bracket and connect the fuel rack.
7 Grease the O-rings, insert the protecting sleeves (5) and push rods
(6) into the guide block.
8 Mount the yoke. For adjusting the yokes, see section 12.2.5.
9 Lubricate the rocker arm bore and mount the rocker arms (8) on the
bracket.
10 Apply the retainer rings (7) by using pliers 843 004. Check the axial
clearance and free rotation of rocker arms.
11 Mount the rocker arm bracket on the cylinder head and tighten the
screws (9) to the stated torque. See, Chapter 07: Tightening torques
for screws and nuts.
Note!
The rocker arm bracket has to be centred.
12 Check the valve clearance according to Chapter 06: Adjustments.
Mount the covers.
14.4. Camshaft V7
The camshaft is built up of one-cylinder camshaft pieces (1) and sep
arate bearing pieces (2).
The drop forged camshaft pieces have integrated cams, the sliding
surfaces of which are case hardened. The camshaft is driven by the
crankshaft through gears at the driving end of the engine. At this end
the camshaft is provided with a helical gear for driving the speed gov
ernor.
The camshaft has an axial bearing at the driving end. The oil supply
is arranged to the axial bearing from the driving end of the engine.
The camshaft has a bore, through which oil is supplied to every cam
shaft bearing and from there up to the multihousing. The rotational
speed of the camshaft is only half of the engine speed.
Data and dimension
Material: Special steel,
case hardened
Weight: Camshaft piece
14,6 kg
Bearing piece 8,6 kg
Valve Mechanism and Camshaft
Wrtsil 20 14 - 5
Camshaft
1 2 3
6 12 7 8
5
11
10
4
9
11
4
8
13
1. Camshaft piece, 2. Bearing piece, 3. Bearing piece, 4. Screw, 5. Extension
piece, 6. Drive gear, 7. End piece, 8. Screw, 9. Nut, 10. Gear, 10. Guide flange
(ProAct actuator), 11. Guide pin, 12. Cover, 13. Cover.
Fig 14-2 201459 V2
14.4.1. Removing of camshaft piece V9
1 Remove the camshaft covers. See Chapter 16. Remove the rocker
arm brackets and the injection pumps for the cylinders concerned.
Before removing the injection pumps remove the control shaft com
pletely or support it well.
2 Remove the cover 12 from the free end of the camshaft. And also the
cover 13 from the driving end of the camshaft, if necessary.
3 Loosen the nut of the screw 4 or 8 depending on the cylinder con
cerned. Note the position of the camshaft piece, using the hydraulic
tools 861158 and 861169. See Chapter 07 for correct pressure.
Note!
When undoing the camshaft connection the hydraulic jack has to be
turned to the bottom, then undone for two and a half turns. The nut is
to be undone opened for two and half turns and the pressure released
slowly.
4 Separate the camshaft piece concerned from the bearing pieces by
using a suitable lever. Pay attention not to damage the tappet rollers
or camshaft pieces when moving the shaft axially.
5 Remove the screw from the camshaft.
Valve Mechanism and Camshaft
14 - 6 Wrtsil 20
6 Remove the camshaft piece carefully via the camshaft doors.
14.4.2. Mounting of camshaft piece V8
1 Clean and lubricate the camshaft bearing bush and the bearing sur
face of the bearing piece with clean engine oil. Carefully insert the
bearing piece into the bearing housing. Pay attention to the position
of the bearing piece.
2 Insert the guide pins into the bearing piece and fit the snap rings. The
shorter section of each pin should protrude from the bearing piece.Fig
14-2
3 Install the camshaft piece between two bearing pieces and onto the
guiding face of the bearing pieces. Check the position of the guide
pins. Check the position of the guide pins. Insert the M42*3 screw and
pre-tighten it by hand.
4 Move the camshaft pieces axially with a suitable lever. Hand tighten
the nut.
5 Check the injection timing prior to tightening the camshaft driving gear
nut wheel to full torque. See Chapter 16
6 Install the hydraulic tool. Rise the pressure in two steps, first to 300
bar and tighten the nut. Then tighten the nut to a pressure according
to Chapter 7. See Fig 14.3. Note the clearance between the pressure
plate and sensors.
Note!
When tightening the camshaft connection keep the hydraulic jack to
the bottom.
7 Check the valve tappets and rollers carefully. Even slightly damaged
tappet rollers have to be changed.
8 Mount the injection pumps, injection pipes and rocker arms.
9 Mount the covers.
10 Check the valve clearances. See section 12.2.5.
14.5. Camshaft bearings V7
When the camshaft has been removed, the inner diameter of the
bearing bush can be measured in situ, by using a ball anvil microme
ter. The maximum diameter is stated in section 06.2. If the maximum
Valve Mechanism and Camshaft
Wrtsil 20 14 - 7
diameter for one camshaft bearing bush is exceeded, all camshaft
bearing bushes should be replaced. A special tool is available for this
purpose, see Fig 14-3.
14.5.1. Changing of camshaft bearing bush V6
1 Lubricate the new bearing bush with clean oil on the outer surface
and put it on the guide sleeve. The distinct mark must be positioned
downwards and towards the flywheel end.
Note!
The bearing bush without the oil groove can be used only in the cam
shaft bearing bore No.1.
2 Put the thrust discs (1 and 4) and the thrust screw in place. Now
tighten the nut by hand until the new bearing bush meets the old one.
3 Tighten the nut to press out the old bearing bush. Simultaneously
mount the new bearing bush in place.
4 Unscrew the nut and dismantle the tool.
Changing of camshaft bearing bush
9
3 1 4 5 2
8
8
5 4 1 3
9
2
10
A
7
6
1. Thrust disc, 2. Nut, 3. Thrust screw, 4. Thrust disc, 5. Guide sleeve, 6. Oil
hole, 7. Distinct mark, 8. Bearing bush, new, 9. Bearing bush, old, 10. Bore no.
1
A. Bearing bush
Fig 14-3 201455 V2
Valve Mechanism and Camshaft
14 - 8 Wrtsil 20
14.5.2. Changing of camshaft bearing bush No.1 V6
1 Lubricate the new bearing bush with clean oil on the outer surface
and put it on the guide sleeve. The distinct mark must be positioned
downwards and towards the flywheel end. See Fig 14-3.
2 Put the thrust discs (1 and 4) and the thrust screw in place. Now
tighten the nut by hand until the new bearing bush meets the old one.
3 Tighten the nut to press out the old bearing bush. Simultaneously
mount the new bearing bush in place.
4 Unscrew the nut and dismantle the tool.
Valve Mechanism and Camshaft
Wrtsil 20 14 - 9
Valve Mechanism and Camshaft
14 - 10 Wrtsil 20
15. Turbocharging and Air Cooling V1
15.1. Turbocharger V6
The turbocharger utilizes the energy of the engine exhaust gas to feed
more air to the engine, thereby offering advantages such as boosted
engine power output and thriftier fuel consumption.
The exhaust gas discharged from the cylinders of the engine are led
through the exhaust manifold into the turbocharger and accelerated
in the turbine housing before the passages of the turbine wheel. The
turbine rotates at a high speed and turns the compressor wheel
mounted on the same shaft as the turbine wheel. The compressor
takes air, often through a filter, from the engine surroundings and
compresses it to a higher pressure. A higher pressure results in a
higher density of the air which means that a larger amount of air is
forced into the cylinder and correspondingly a larger amount of fuel
can be burnt. This increases the effective pressure during the com
bustion and thus increases the output.
During the compression of the air in the turbocharger, the air is heated
up mainly due to the compression and partly due to losses in the
compression work in the compressor. The hot and compressed air
flows through an air cooler. When the air is cooled, the density of the
air is further increased.
The turbocharger can be divided into two basic sections: The turbine
wheel that is driven by the exhaust gas and the compressor wheel
which forces intake air through the air cooler and into the cylinder.
The turbine wheel is of the radial turbine type, i.e. the gas enters the
turbine axially and leaves it radially. The shaft connecting the turbine
wheel to the compressor wheel is supported by two bearings between
the turbine and compressor wheel. The compressor is of radial type,
i.e. air enters the turbine radially and leaves it axially.
The bearings are lubricated with lubricating oil from the engine lubri
cating system.
The air outlet housing of the turbocharger is connected to the air duct
of the engine through a piece of metal bellows (1), which allows ther
mal expansion of the air duct. The air duct is designed to reduce the
speed of the air in an efficient way before it enters the air cooler. The
air duct is provided with guiding vanes for an equal distribution of air
over the whole air cooler surface. The air duct is fixed in position to
the air cooler housing.
Data and dimensions
Weight (dry):
- TPS 52 230 kg
Material:
- Casings: special cast
iron
- Turbine: special heat
resistance steel
- Compressor: light metal
alloy or titanium alloy
- Bracket: cast iron
Turbocharging and Air Cooling
Wrtsil 20 15 - 1
Caution!
The surfaces of the turbocharger and the air duct are hot.
The exhaust pipes from the engine are also connected to the turbo
charger through metal expansion bellows. The exhaust pipe after the
turbocharger should be arranged according to the installation instruc
tions.
The turbocharger is equipped with cleaning devices for cleaning of
both the compressor and the turbine by water injection.
Turbocharger and charge air cooler assembly
A - A
A
A
A
A
B
C
4 10
2
2
6
7
3
2
6
3
5
7
1
9
8
8
1
1.Bellows, 2.Air cooler,3.Bellows,4.Charge air pipe,5.Cover,6.Air inlet piece,
7.Water connection,8.Drain pipe,9.Air box,10.Diffuser
B.TC at the driving end (LD),C.TC at the free end (LF)
Fig 15-1 201571 V2
Turbocharging and Air Cooling
15 - 2 Wrtsil 20
15.1.1. Turbocharger maintenance V7
Maintenance of the turbocharger is carried out according to the in
structions of the turbocharger manufacturer. It is recommended to use
the service net of the engine manufacturer or the turbocharger man
ufacturer.
Normal overhauls can be carried out without removing the turbo
charger from the engine. When dismantling, remove the protecting
covers . Loosen the exhaust inlet and outlet pipes.
When reassembling, take care that all seals are intact. High temper
ature resistant lubricants are used for exhaust pipe screws.
15.1.2. Water cleaning of the turbine V7
During operation, especially when running on heavy fuel, impurities
in the exhaust gases sticks to the turbine wheel and other compo
nents in the turbocharger exhaust side. A dirty turbine causes higher
temperatures of the exhaust gas and higher stresses of the bearings
due to imbalance.
Practical experiences show that the deposits on the turbine side can
be reduced by periodic cleaning (washing) during operation and the
overhaul periods can be extended.
During long time of operation, periodic water cleaning prevents the
build-up of significant deposits on the turbine blades and nozzle
vanes. This cleaning method does not work on very dirty turbines
which have not been washed regularly.
If the normal water cleaning of the turbine does not effect much on
the exhaust gas temperature level, hard deposits have probably been
built up on the nozzle ring and the turbine blades in the turbocharger
and they have to be cleaned mechanically. For that purpose the rotor
and the nozzle ring have to be removed from the turbocharger.
At water cleaning the water must be injected into the exhaust system
with the engine running at reduced output (see 15.1.3, step 1). The
disadvantages of reducing the output occasionally is not significant
compared with the advantages of cleaning.
The necessary water flow is basically dependent upon the volume of
gas and its temperature. The flow should be adjusted so that the major
part of the water is evaporated and escapes through the exhaust. It
is important that all of the water does not evaporate, since the clean
ing effect is based upon the water solubility of the deposits and the
mechanical effect of the impact of the water drops. Additives or sol
vents must not be used in the cleaning water. The use of salt water
is prohibited.
Turbocharging and Air Cooling
Wrtsil 20 15 - 3
Water cleaning of the turbine
2
A B
1
1
3
4
1. Valve 2. Quick-coupling 3. Flow meter 4. Valve.
A.TC at the driving end, B.TC at the free end
Fig 15-2 201570 V2
Every gas inlet of the charger is equipped with a washing nozzle. The
nozzles are all connected to a common water connection which has
a valve and a quick-coupling. The water flow is controlled by flow
meter (3) to a suitable value, see table below.
Table 15-1 Water cleaning of turbine
Turbocharger size Water flow (l/min)
TPS 48 6
TPS 52 8
TPS 57 10
Cleaning should take place regularly according to chapter 04, Main
tenance Schedule. Depending on the results obtained, the interval
between two washings may be increased or reduced.
Turbocharging and Air Cooling
15 - 4 Wrtsil 20
15.1.3. Turbine cleaning procedure V8
The flow meter enables accurate control of the amount of water in
jected. Before cleaning the turbine, it is advisable to record the below
parameters for later use to assess efficiency of the cleaning; recording
at two or three different loads will give a more accurate evaluation
basis for the influence of the washing.
Charge air pressure
Exhaust gas temperatures after the cylinders
Exhaust gas temperatures before and after the turbocharger, pro
vided that measurement equipment is installed
Turbocharger speed
Engine load
Note!
The charge air pressure is not allowed to drop below 0.2 bar during
the entire washing procedure.
1 Stabilise the temperatures.
a ) For constant speed operated engines run the engine at approx.
25-30% load for 10 minutes. Maintain this load during the entire
washing procedure. Recommended temperature before turbine
should remain between 400C and 450C.
b ) For variable speed operated engines run the engine at approx.
10-15% load (465-530 rpm of nominal 1000 rpm) for 10 mi
nutes. Maintain this load during the entire washing procedure.
Recommended temperature before turbine should remain be
tween 400C and 450C.
2 Open valve (1) to confirm free passage.
3 Connect the water hose to the quick coupling (2) as in Fig 15-2
4 Open the water supply valve (4) before the flow meter (3) and imme
diately adjust the water flow according to the table shown above,
wash 30 seconds. Stop washing by closing the valve (1).
Warning!
Water injection time and the exhaust gas temperatures are to be
carefully observed. Continuous (heavily exceeding 30 seconds) water
flow may cause a failure of the turbocharger. Too high exhaust gas
temperatures (>450C) may result in impermissible thermal stresses.
5 Run the engine for 10 minutes to stabilise the temperatures.
6 Open the 2-way valve and wash for another 30 seconds.
Turbocharging and Air Cooling
Wrtsil 20 15 - 5
7 Run the engine for 10 minutes to stabilise the temperatures.
8 Repeat steps 6 and 7 once more. Washing water should now have
been injected three times.
a ) After the washing, run the engine for 10 minutes at least at
25-30% load to stabilise the temperatures.
If three times washing is not sufficient to clean the turbine (based on
the operating parameters) it is recommended to further perform two
additional washing sequences.
Washing the turbine more than three times also indicates that it is
advisable to shorten the intervals between each cleaning occasion.
15.1.4. Water cleaning of the compressor V7
The compressor can be cleaned during operation by injecting water.
The method is suitable if contamination is not too far advanced. If the
deposit is very heavy and hard, the compressor must be cleaned me
chanically.
The injected water does not act as a solvent. The cleaning effect is
achieved by the physical impact of the drops on the deposit. It is
therefore advisable to use clean water containing no additives either
in the form of solvents or softening agents that could be precipitated
in the compressor and form a deposit.
Regular cleaning of the compressor prevents or delays the formation
of deposit but does not eliminate the need for normal overhauls, for
which the turbocharger has to be completely dismantled.
Through an inlet pipe, pressured air can enter the dosing vessel. The
water is injected to the compressor through the pipe (4), see Fig
15-3 or Fig 15-4 depending on the location of the turbocharger.
The water must be injected while the engine is running and at the
highest possible load, that is, at a high compressor speed.
For an efficient washing, it is important to inject all the water required
within 4-10 seconds. This water quantity is 0.4 dm
3
.
For water injection, the water should first be measured with the meas
uring cup and the same measured water is pressurised later (for ex
ample by charge air). Under no circumstances may the injection noz
zle be connected to the water main flow through tap or a large tank
because this would allow an uncontrolled quantity of water to enter
the turbocharger and the diesel engine.
Turbocharging and Air Cooling
15 - 6 Wrtsil 20
Water cleaning of compressor, TC at the driving end
1
3
6
2
5
4
1. Cover 2. Valve 3. Knob 4. Water pipe 5. Water cup 6. Inlet pipe
Fig 15-3 201568 V2
Water cleaning of compressor, TC at the free end
1
3
2
4
1. Cover 2. Button 3. Knob 4. Water pipe
Fig 15-4 201558 V2
Note!
Clean the compressor (air side) of the turbocharger at as high load
as possible (full rated load).
The cleaning device for the compressor is used as follows:
Turbocharging and Air Cooling
Wrtsil 20 15 - 7
1 Record the charge air pressure, cylinder exhaust gas temperatures,
charger speed, for later use to assess efficiency of the cleaning.
2 Loosen knob (3) and remove cover (1).
3 Fill the vessel with water up to 1 cm below the rim.
4 Re-fit cover (1) and tight screw knob (3).
5 Turn valve (2) or press button (2). This admits compressed air from
the air receiver to the vessel and forces the water through a pipe (4)
to the compressor.
6 Repeat the readings taken in step 1 to compare the efficiency of the
washing. The success of injection can be recognized by the change
in charge air pressure and in the exhaust gas temperature.
Note!
If the injection is not successful, it must not be repeated before ten
minutes.
After injection, the engine should be run loaded for at least five mi
nutes.
15.1.5. Operation with damaged turbocharger V7
In case of a serious breakdown of the turbocharger, if the situation
does not allow the immediate repair or exchange of the turbocharger,
the engine can temporarily be operated up to about 15% of the nom
inal output of the engine with the blanking device fitted.
Caution!
Blocking the rotor is not recommended as it blocks the flow path for
the exhaust gases. Remove the rotor cartridge completely, and fit the
blanking device according to the instructions in the turbocharger man
ual.
Caution!
As the turbocharger is out of function, the thermal load on the engine
components increases. Therefore, observe the exhaust gas temper
atures carefully during the operation with blanked turbocharger.
Note!
The exhaust gas temperatures after the cylinder heads must not ex
ceed 500C.
If the engine is operated for longer periods with exhaust temperatures
close to 500C with the blanked turbocharger, there is a risk of piston
seizure. This is due to the hot temperatures internally the piston (cool
Turbocharging and Air Cooling
15 - 8 Wrtsil 20
ing gallery) causing the lube oil forming deposits in the cooling gallery.
This results in a poorer cooling effect with more thermal expansion of
the piston, one of which in turn can lead to piston seizure.
During operation, also follow closely that the lube oil temperature is
kept at the level of normal operation.
Also other engine components are exposed to the higher thermal
loading.
After the turbocharger rotor cartridge has been removed and the
blanking device fitted according to the instructions in the turbocharger
manual, proceed in the following way:
1 Remove air inlet piece (6) and disconnect the cables for sensors of
the charge air inlet piece. See, Fig 15-1.
2 Make sure that the air entry into the engine is clean and that no foreign
particles can enter the air inlet passage.
3 When the engine is loaded follow carefully that the exhaust gas tem
peratures do not exceed 500C. It is to be noted that the exhaust gas
temperatures will increase by time and that the operator should first
let the temperatures be stabilized at a certain load before the load is
increased to the maximum allowable. The maximum allowable load
in any case is about 15% of the nominal output of the engine.
The engine shall not be operated without the turbocharger in function
for more than 100 hours. If the engine has been in operation with high
thermal load it is recommended the engine supplier is contacted in
order to clarify the need for exchange of components and/or inspec
tions.
15.2. Charge air cooler V9
The charge air cooler is mounted between the air duct and air inlet
piece, see Fig 15-1.
The cooler is of a tube type. The tubes are provided with thin fins to
get a more efficient cooling of the air. The cooling water circulates in
the tubes, while the compressed air passes between the fins on the
outside of the tubes.
The top of the air cooler acts as a venting of the air cooler water side.
Data and dimension
Material
- Tubes: copper alloy
- Water boxes: cast iron
Weight : 160 kg (dry)
Test pressure: 8 bar
(water side)
Turbocharging and Air Cooling
Wrtsil 20 15 - 9
15.2.1. Charge air cooler maintenance V8
1 Condensate from the air is drained through a small hole/pipe (8) at
the bottom of the air cooler, see Fig 15-1. Examine regularly that the
draining pipe is open by checking the air flow when running.
Warning!
If water keeps on dripping or flowing from the draining pipe for a longer
period (unless running all the time in conditions with very high hu
midity) the cooler insert may be leaky and must be dismantled and
pressure tested.
2 At longer stops, the cooler should be either completely filled or com
pletely empty, as a half-filled cooler increases the risk of corrosion. If
there is a risk of sinking water level in the system when the engine is
stopped, drain the cooler completely. Open the air vent screw to avoid
vacuum when draining.
3 Clean and pressure test the cooler at intervals according to Chapter
04: Maintenance Schedule. If the receiver temperature cannot be held
within stipulated values at full load.
4 Always when cleaning, check for corrosion.
15.2.2. Cleaning of charge air cooler air side V1
Cleaning of the air side should be done early enough to avoid forming
of soot and oil on the fins, which form a hard deposit layer that is
difficult to remove, as well as a build-up of products that form sulphuric
acid (condensation) when left on the fins and tubes for some time.
Generally an increase of pressure drop (p) over the cooler with 100
mmH
2
O compared with a new/clean cooler means that the cooler
needs cleaning. The pressure drop should be measured at 100% load
or at least always at the same high load level.
15.2.2.1. Ultrasonic cleaning V1
Cleaning with ultrasonic equipment is recommended as it gives the
best cleaning result.
15.2.2.2. Chemical cleaning V1
We recommend chemical cleaning of the air side, while cooler is re
moved, see section 15.2.3.
Turbocharging and Air Cooling
15 - 10 Wrtsil 20
15.2.2.3. Recommended detergents V1
The instructions and handling guidelines provided by the manufac
turer of the detergent in question should always be observed when
using the chemical.
Recommended cleaning detergents
Supplier Product designation
Basol Ltd. Basol 77
Clensol Ltd. Industrial Clegris
Drew Ameroid Marine Division
Ashland Chemical Company
One Drew Plaza
Boonton, NJ 07005, USA
Ameroid ACC-9
Henkel KGaA
Dsseldorf
P3-Grato 90
Houseman Ltd
The Priory, Burnham
Slough SL1 7LS, UK
Cooltreat 651
Maritech AB
Box 143
S-29122 Kristianstad, Sweden
H.D. Powder
W.1.H.D.S. phenol
Nalco Chemical Company
One Nalco Centre
Naperville, Illinois
60566-1024 USA
Nalfleet ACC
Nalfleet Marine Chemicals
PO Box 11
Winnington Avenue, Northwich
Cheshire, CW8 4DX, UK
Nalfleet ACC
Vecom Holding BV
PO Box 27
3140 AA Maassluis, Holland
Vecom B-85
15.2.3. Cleaning of air cooler insert V9
Cleaning of the water and air side heat exchange surfaces is imper
ative for a long and trouble free operation of the engine and must be
done at regular intervals.
Turbocharging and Air Cooling
Wrtsil 20 15 - 11
1 Remove the shield plates.
2 Remove the water connection and pipes when the cooling water is
drained. Disconnect the cables for sensors of the charge air cooler
assembly.
3 Apply the lifting tool 833002 and check location of the lifting eye bolt
(LD/LF/4L/5L).
4 Loosen the fastening screws of the air inlet piece (1) from the engine
block. Observe that two screws are inside of the air inlet piece.
5 Remove the remaining cooler flange screws. On the LD-engine: Open
the cover (5) and remove the fastening screws of the air cooler inside
of the air box (9), Fig 15-1.
6 Lift of the air cooler (3), air inlet piece (1) and water connection (2)
assembly. On the LF-engine: The diffuser (4) may also be removed
at the same time to make removal and mounting of the air cooler as
sembly easier.
Lifting of the air cooler assembly
LD LF
4L/5L
2
10
6
7
7
2
833 002 833 002
A B
C
1
2
2
3
3
4
A.TC at the driving end (LD), B.TC at the free end (LF), C.Location of the lifting
eye bolt.
1. Air inlet piece 2. Water connection 3. Air cooler 4. Diffuser
Fig 15-5 201572 V4
7 Remove the air inlet piece and water connection from the air cooler.
8 Clean the air side of the cooler by immersing it in a chemical cleaning
bath for at least 24 hours. We recommend that cleaning tank should
be equipped with perforated pipes on the bottom for the best cleaning
effect, see Fig 15-6. During cleaning, steam or pressurized air should
Turbocharging and Air Cooling
15 - 12 Wrtsil 20
be connected to the pipes to get a good circulation. When cleaning is
completed, the cooler should be flushed by applying a powerful water
jet.
Note!
If the water jet attacks the cooling tubes vertically, i.e. in parallel to
the fins, a pressure of 120 bar is suitable to be applied at a distance
of two meters from the fin surface.
Caution!
Wrong use of water jet may cause damage to the fins, which results
in an increased pressure drop over the air cooler.
9 Clean the water side by detaching the headers from the cooler bun
dle. Immerse the tube bundle into a chemical cleaning bath for at least
24 hours. Upon completion, follow the recommendations given for the
air side.
10 Check the gaskets before reassembling the water connection.
11 Apply sealing compound to the sealing faces. See, section of the
spare parts catalogue for charge air cooler assembly.
12 Mount the air cooler assembly on the engine.
13 Vent the cooler and check the tightness when starting up.
Air cooler cleaning tank
A
1
2
A.Steam of air
1. Perforated pipes 2. Cooler insert
Fig 15-6 201565 V1
Turbocharging and Air Cooling
Wrtsil 20 15 - 13
Turbocharging and Air Cooling
15 - 14 Wrtsil 20
16. Injection System V3
16.1. Injection pump V8
The engine is fitted with one injection pump per cylinder. The injection
pump is located in a "multihousing". The multihousing incorporates:
A housing for the injection pump element,
A fuel supply channel along the whole engine,
A fuel return channel from each injection pump,
Guides for the valve tappets,
A lubricating oil supply to the valve mechanism.
The multi-housing concept permits a reliable and compact design. It
eliminates fuel and oil piping and generally simplifies maintenance.
The injection pumps are one-cylinder pumps with built-in roller tap
pets. The valve tappets are integrated in the same multihousing. The
return fuel is drained at atmospheric pressure, through the integrated
channel, back to the low pressure fuel circuit. .
Each injection pump is equipped with an emergency stop cylinder that
is coupled to an electro-pneumatic overspeed prevention system.
16.1.1. Function of injection pump V10
The injection pump supplies pressurized fuel to the injection nozzle.
It has a mechanism to regulate the fuel supply according to the engine
speed and load. The pumps are controlled by the governor.
The plunger Fig 16-1, is pushed up by the camshaft via the roller tap
pet and pulled back by the tappet spring, reciprocates in the element
on a predetermined stroke to feed fuel under pressure.
The plunger also controls the amount of fuel injected by adjusting the
position of the helical edge relative to the discharge port. The plunger
has an obliquely cut groove (lead) on its side. When the plunger is at
the lowest position or bottom dead centre, fuel flows through the inlet
port into the element bore. Rotation of the camshaft moves the plung
er up. When the top edge of the plunger step is lined up with the ports,
the plunger begins to compress the fuel. As the plunger rises further,
the helix is eventually exposed to the discharge ports and the pres
surized fuel is delivered through the lead to the ports. When the helix
is no longer exposed to the discharge port, the supply is cut off. By
Data and dimensions
Multihousing:
- material: special cast
iron
- weight: 25 kg
Injection pump element:
- weight: 4.5 kg
Injection press: 1500 bar
Plunger: coated
Delivery valve
opening press.: 22 2 bar
Constant pressure valve,
opens when the pressure
difference is: 120 10 bar
Injection System
Wrtsil 20 16 - 1
rotating the plunger, it is possible to alter the proportion of stroke dur
ing which the helix is exposed to the port. Thus the amount of fuel
delivered during each plunger stroke can be controlled. The length of
stroke during which fuel is delivered is called the effective stroke and
is regulated by the fuel governor via the fuel racks. The fuel racks are
meshed with the control sleeve which in turn is attached to the plung
er. A linear movement of the racks is thus converted to a rotation of
the plunger.
The element is of a mono-block design with integrated fuel delivery
valve and constant pressure valve. The ports are of a special design
to prevent cavitation.
The delivery valve, provided at the top of the element, performs the
function of discharging the pressurized fuel to the injection pipe. The
fuel compressed to a high pressure by the plunger forces the delivery
valve to open. Once the effective stroke of the plunger ends, the de
livery valve is brought back to its original position by the spring and
blocks the fuel path, thereby preventing counter-flow of the fuel.
After the effective stroke, the fuel is drawn back through the constant
pressure valve from the high pressure injection pipe to instantly lower
the residual pressure between the delivery valve and the nozzle. This
draw-back effect improves the termination of an injection on the noz
zle and prevents after injection dripping, and improves injection reg
ularity by preparing the line for the next injection.
The multihousing is provided with two erosion plugs, which can easily
be replaced when necessary.
16.2. Maintenance of injection pump V8
We recommend that the engine is run with light fuel for 5 minutes
before overhauling the injection pump. During maintenance utmost
cleanliness must be observed. It is unnecessary to remove the control
shaft unless every injection pump is to be removed. When the injec
tion pump is dismantled, the components should be marked so that
to avoid unnecessary wear, they can later be reassembled in the
same position.
16.2.1. Removal of injection pump V9
1 Shut off the fuel supply to the engine and stop the prelubricating
pump.
2 Remove the covers of the valve mechanism and camshaft from the
cylinder concerned.
Injection System
16 - 2 Wrtsil 20
3 Turn the crankshaft to a position where the valve tappet rollers of the
valves and the injection pump are on the base circle of the cam.
4 Remove the rocker arms block, pushrods and the protecting pipes.
5 Remove the injection, fuel leak and lube oil pipes where necessary.
Disconnect the fuel rack if necessary remove control shaft.
6 Undo the fuel pipe connections between the multihousings con
cerned. Use circlip pliers to slide the fuel retainer ring to one side.
Move the fuel line connecting sleeves clear of the adjacent fuel pipes.
See Fig 16-1.
7 Cover immediately all openings with tape or plugs to prevent dirt from
entering the system.
8 Loosen the flange nuts and lift off the pump.
9 Cover the bore in the engine block.
16.2.2. Mounting of injection pump V14
1 Check and clean the pump. Also clean the plane and the bores of the
engine block.
2 Check the O-rings of the insert part and lubricate with vaseline or
engine oil. Check that the fuel cam is not in the lifting position.
3 Fit the pump and tighten the screws for the flange to the stated tor
que. See Chapter 07,Fig 07-4and Fig 07-5.
4 Remove tape and plugs from all openings. Check that the exhaust
and inlet cams are not in the lifting position.
5 Fit the protecting pipes, push rods, rocker arms bracket and adjust
the valve clearances. See Chapter 12, Fig 12-7. Assemble necessary
pipes.
6 Close the fuel pipe connections between the multihousings con
cerned. Use circlip pliers to slide the fuel retainer ring.
7 Assemble the injection pipe and tighten nuts to rated torque. See
Chapter 07.
8 Check that the fuel rack moves freely.
9 Connect the fuel rack to the control shaft. Assemble the control shaft
if removed.
10 Rotate the control shaft and check that all pumps follow the shaft
movement. Check the fuel rack position of all pumps, see Chapter 22.
11 Open fuel supply to the engine. Vent the fuel system according to the
instructions in Chapter 17. The injection pump is provided with a
venting plug.
Injection System
Wrtsil 20 16 - 3
12 Mount the covers.
Injection pump
B
B
10 A
16
17
3
11
7
5
8
9
2
15
19
12
14
4
20
6
1
18
13
21
1. Tappet pin. 2. Tappet. 3. Plug. 4. Retaining ring. 5. Sleeve. 6. O-ring.
7. Spring. 8. Spring plate. 9. Fuel rack. 10. Fuel delivery valve/Constant
pressure valve. 11. Pump element. 12. Screw. 13. Erosion plug. 14. Plung
er. 15. Control sleeve. 16. Spring. 17. Pin. 18. Tappet roller. 19. Guide
screw. 20. Seal ring/O-ring. 21. Alternative Design.
Fig 16-1 201668 V2
16.2.3. Removal of injection pump element V10
Most maintenance operations can be done without removing the mul
tihousing from the engine. We recommend that the engine is run with
light fuel for 5 minutes before overhauling the injection pump. During
maintenance utmost cleanliness must be observed.
Injection System
16 - 4 Wrtsil 20
1 Shut off fuel supply to the engine and stop the prelubricating pump.
Open the covers.
2 Remove the injection, fuel leak and lube oil pipes where necessary.
Disconnect the fuel rack.
3 Cover immediately all openings with tape or plugs to prevent dirt from
entering the system.
4 Turn the crankshaft so that the injection pump tappet is in the bottom
position and the roller resting on the base circle of the cam.
5 Loosen the flange screws until they are free from the threads.
6 Mount the extracting tool 846022 so that the tool flange is against the
screw heads. Tighten the nut until the element is held by the tool.
7 Lift the pump element.
8 Remove the extracting tool.
9 Remove the plug and remove the fuel rack.
10 Remove the plunger by turning it about 90 using the tool 846023.
11 Cover the opening in the multihousing immediately with clean cloth.
Note!
The delivery valve must only be serviced by authorized personnel.
16.2.4. Changing of plunger sealing rings V9
Note!
The sealing rings must always be renewed if they are removed from
the groove on the plunger.
1 Remove the old rings, by cutting them off without damaging the
plunger surface.
2 Place the protecting sleeve (846026) on top of the plunger to cover
the sharp edges of the helix.
3 Lightly lubricate the protecting sleeve, O-ring, sealing ring and the
plunger with light fuel oil.
Injection System
Wrtsil 20 16 - 5
Sealing ring assembly and calibration of rings
846 028
846 027
846 026
20
846026. Protecting sleeve 846027. Application rod 846028. Calibrating sleeve
20. O-ring / Seal ring
Fig 16-2 201669 V2
4 Push the O-ring with the application rod (846027) over the protecting
sleeve, down along the plunger and place it by hand in the groove.
5 Push the sealing ring with the application rod over the protecting
sleeve, down along the plunger and place it by hand in the groove.
6 Remove the protecting sleeve. Use the test sleeve (846028) to check
that the seals are correctly fitted in the groove.
16.2.5. Mounting of injection pump element V9
1 Check and clean the element.
2 Fit new O-rings and lubricate.
3 Clean the housing. Pay special attention to the O-ring sealing surfa
ces.
4 Insert the plunger. Control sleeve with the tool 846023.
5 Check that the control sleeve is in correct position. Mount the fuel rack
and plug . Check that the fuel rack moves freely.
6 Assemble the element into the housing. Be careful when connecting
the plunger into the element.
7 Tighten the fastening screws diagonally in steps to the stated tor
que. See, Chapter 07: Tightening torques and use of hydraulic tools.
Injection System
16 - 6 Wrtsil 20
8 Check that the fuel rack moves freely.
9 Rotate the control shaft. Check that all pumps follow the shaft move
ment and check the fuel rack positions of all pumps, see Chapter 22:
Control mechanism.
10 Remove the protecting tapes or plugs. Connect the pipes and the
injection pipe. Tighten the nuts to torque.
11 Open the fuel supply to the engine. Vent the fuel system according to
the instructions in Chapter 17: Fuel system.
16.2.6. Control of fuel injection timing V10
For normal adjustment of injection timing the prelift can be measured
mechanically by a special tool 869001.
Control of fuel injection timing is necessary only if major components
have been changed, for example, the camshaft intermediate gear or
one or more camshaft pieces.
1 Remove the camshaft cover at the cylinder in question.
2 Turn the crankshaft until the pump tappet roller is on the basic circle
of the camshaft. Approximately 20 before the ignition TDC.
3 Mount the checking tool 869001 and adjust the dial indicator tool
848041 to zero.
4 Turn the flywheel in the rotating direction until the tappet rises 7
mm.
5 Read the flywheel position. If the position is according to test records,
go to step 13.
6 Remove the camshaft end cover. Install the hydraulic tool 861169 on
the screw, see Chapter 13: Basic adjustment of valve timing.
7 Loosen the nut by using correct hydraulic pressure. See, Chapter 07:
Hydraulically tightened connections and release the pressure.
8 Turn the flywheel to the correct position.
9 Tighten the screw connection.
10 Turn the crankshaft until the pump tappet is on the basic circle.
11 Adjust the gauge to zero.
12 Turn the flywheel in the rotating direction until the tappet lifts up to 7
mm. Check the position of the flywheel.
13 Unmount the checking tool.
14 Reassemble the cover of the intermediate gears.
15 Reassemble the camshaft cover.
Injection System
Wrtsil 20 16 - 7
Note!
Changing of the camshaft gear position will affect all cylinders.
Checking of injection timing
1
2
3
5
4
1. Tappet roller 2. Tappet 3. Camshaft 4. Dial indicator 5. Injection timing
tool
Fig 16-3 201663 V2
16.2.7. Injection pump overhaul V8
The multihousing should be removed from the engine and properly
cleaned.
Note!
The element cylinder, plunger and delivery valve assembly are
matched and they must be kept together during the overhaul.
1 It is recommended that the pump is firmly held in a vice while it is
being dismantled.
2 Remove the injection pump element. See, Chapter 16: Removal of
injection pump element.
3 Renew sealing rings on the injection pump plunger. See, Chapter 16:
Changing of plunger sealing rings.
4 Turn the pump up side down.
5 Support the roller tappet with the tool 846016 and unscrew the guiding
screw. See,Fig 16-1.
6 Release the spring tension and remove the tool.
Injection System
16 - 8 Wrtsil 20
7 The roller tappet and the spring can now be removed.
8 Remove the spring plate and control sleeve.
9 Depress the roller pin locking pin and withdraw the roller pin. Cover
the locking pin as it is under spring loaded.
10 As the valve tappet is also fitted into the multihousing, we recommend
that it is checked at the same time.
11 Wash the components in absolutely clean diesel oil and lubricate the
internal parts with engine oil. Pay special attention to the grooves and
bores for leak fuel and lubricating oil. Clean protective latex gloves
should be worn when handling components.
12 Normally, further dismantling is not necessary. Ensure that the com
ponents from different pumps are not mixed together, where appro
priate apply identifying marks. The components must be protected
against rust, and in particular, avoid touching the plunger running
surfaces with bare fingers.
13 Lubricate the roller and roller pin before assembling them.
14 Renew the sealing ring. Insert the control sleeve and the spring plate
into the housing.
15 Lubricate the tappet roller. Assemble it into the housing together with
the spring.
16 Support the tappet roller with the tool 846016 by keeping the slot for
guiding screw in the correct position.
17 Depress the tappet roller until the slot is aligned with the hole.
18 Screw in and tighten the guiding screw to stated torque. See, Chapter
07: Tightening Torques and Instructions for Screw Connections.
19 Turn the pump and assemble the injection pump element. See, Chap
ter 16: Mounting of injection pump element.
20 Unless the pump is immediately mounted on the engine, it must be
well oiled and protected by a plastic cover or similar. The fuel ports
and injection line connection must always be protected by plugs or
tape.
16.3. Injection line V8
The injection line consists of two parts, the connection piece, which
is screwed sideways into the nozzle holder, and the injection pipe.
Injection System
Wrtsil 20 16 - 9
The connection piece seals with plain metallic surfaces which are to
be checked before mounting. Always tighten the connection piece to
correct torque before mounting the injection pipe; even if only the in
jection pipe has been removed, because the connection piece may
have been inadvertently loosened when the pipe was unscrewed.
The injection pipe is covered by a shield to protect the engine envi
ronment from fuel leaks. The injection pipes are delivered complete
with connection nuts assembled. When assembling the high pressure
pipe, the connection piece should be held with a tool.Always tighten
the connections to the correct torque.
Protect dismantled injection line components against dirt and rust.
16.3.1. Checking the tightening of injection pipe
connections V3
When a new or overhauled engine has been running for 50 hours and
while the engine is hot, re-check the tightness of the fuel pipe con
nections.
Warning!
Fuel that leaks, spills or sprays onto hot surfaces can cause fires.
Warning!
A high pressure fuel oil spray from any broken or leaking injection pipe
may cause serious injuries.
Injection System
16 - 10 Wrtsil 20
Tightening of injection pipe connections
1
2
806009
820008
1./2. Injection pipe cap nut, 806009. Crowfoot wrench, 820008. Torque wrench.
Fig 16-4 V1
1 Open and remove the Hot Box covers.
2 Tighten the cap nuts of injection pipe to specified torque. Use the
crowfoot wrench (806009) with a torque wrench (820008) and check
the tightening of injection pipe cap nuts.
3 Repeat the above procedure with the remaining injection pipes.
4 Mount the Hot Box covers after checking the tightening of all injection
pipes.
5 Check for leaks after starting the engine.
16.4. Injection valve V8
The injection valve is centrally located in the cylinder head and in
cludes the nozzle holder (6) and the nozzle (1), seeFig 16-5. The fuel
enters the nozzle holder from the side through a connection piece
screwed into the nozzle holder.
The nozzles receive high pressure fuel from the injection pipe and
inject this fuel into the combustion chamber as a very fine spray. The
pressure at which the nozzle operates can be corrected by turning
the adjusting screw (8) in the injection valve.
Data and dimension
Orifices: 8 pcs
Orifice dia.: 0.38 mm
Angle: 148
Opening press: 450 bar
Injection System
Wrtsil 20 16 - 11
Injection valve
9
8 11
1
2
3
4
5
6
7
12
13 10 14
1. Nozzle, 2. Nozzle nut, 3. Dowel pin, 4. Push rod, 5. Spring, 6. Injection valve
housing, 7. Thrust bolt, 8. Adjusting screw, 9. Nut, 10. O-ring, 11. Protecting
sleeve, 12. Connection piece, 13. O-ring, 14. Injection pipe
Fig 16-5 201665 V1
16.4.1. Removing of injection valve V12
1 Remove the cylinder head cover.
2 Remove the injection pipe.
3 Remove the rocker arms.
4 Unscrew the connection piece and loosen the protecting sleeve if
necessary.
5 Remove the fastening nuts of the injection valve.
6 Lift out the injection valve by using tool 846024.
7 Protect the fuel inlet hole of the injection valve and the bore in the
cylinder head.
Injection System
16 - 12 Wrtsil 20
16.4.2. Overhauling of injection valve V13
1 Inspect the nozzle immediately after removing the injection valve from
the engine. Carbon deposits (trumpets) may indicate that the nozzle
is in poor condition, or the spring is broken. Clean outside of the noz
zle with a brass wire brush. Don't use steel wire brush.
2 Check the function and condition of the nozzle, that is, the opening
pressure and seat tightness. It is recommended to use a pneumatic
fuel valve test pump (864012) in order to judge spray characteristics
with realistic pumping rates. It is recommended to use an oil mist
separator (864018) with the test device to avoid unnecessary health
hazards. Optionally a hand pump tester (864012) with an accumulator
device can be used for checking the nozzle function and condition.
Note!
The detailed instructions of using the pneumatic fuel valve test pump
(864012) are delivered with the pump.
Caution!
Use the injector testing device only in a well ventilated place, pref
erably with a suction line close to the test device.
3 Put the holder tool for injection valve (846030) in a screw vice. Insert
the injection valve into the tool with nozzle downwards.
4 Remove the nozzle from the holder by turning the injection valve
housing counter-clockwise until the cap nut is loosen. Keep the nozzle
together with the holder body, don't let it follow up with the nut. If there
is coke between the nozzle and the nut, the dowel pins may break
and damage the nozzle. To avoid this, knock on the nozzle, using a
piece of pipe to keep it towards the holder. Never knock directly on
the nozzle tip. Be careful not to drop the nozzle.
5 Check the nozzle needle movement which may vary as follows:
needle completely free
needle free to move within the normal lifting range
needle is sticking
The needle must not be removed by force because this often results
in complete jamming. Unless it can be easily removed, immerse the
nozzle in lubricating oil and heat oil to 150 - 200C. Normally, the
needle can be removed from a hot nozzle.
Injection System
Wrtsil 20 16 - 13
Maximum needle lift of nozzle, removing of nozzle from holder
B
A
A.Nozzle needle lift,B.Accepted wear for the sealing face of nozzle holder
Fig 16-6 201666 V1
6 Clean the components. If possible, use a chemical carbon dissolving
solution. If there is no such available, immerse the details in clean fuel
oil, white spirit or similar to soak carbon. Then clean the components
carefully by tools included in the tool set. Do not use steel wire brush
es or hard tools. Clean the nozzle orifices with needles provided for
this purpose. After cleaning, rinse the details to remove carbon resi
dues and dirt particles. Before inserting the needle in the nozzle body,
immerse the components in clean fuel oil or special oil for injection
systems. Seat surfaces, sliding surfaces (needle shaft) and sealing
faces against the nozzle holder should be carefully checked.
7 Clean the nozzle holder and the cap nut carefully. If necessary, dis
mantle the nozzle holder to clean all details. Check the nozzle spring.
8 Check the high pressure sealing faces of the nozzle holder. That is,
the contact face to nozzle and the bottom of the fuel inlet hole.
9 Check maximum needle lift of nozzle, that is, sum of measures A and
B. If the wear B exceeds 0.10 mm, the nozzle holder can be sent to
the engine manufacturer for reconditioning. If nozzle needle lift is out
of the value stated in Chapter 06: Clearances and wear limits (at
20C), the nozzle should be replaced by a new one
10 Reassemble the injection valve. Tighten the cap nut to the torque
given in Chapter 07: Tightening torques for screws and nuts.
Injection System
16 - 14 Wrtsil 20
11 Connect the injection valve to the test pump 864012 . Use connection
piece 167003 from the engine to connect injection valve to the test
pump. Pump to expel air. Shut the manometer valve and pump rapidly
to blow dirt out of the nozzle orifices. Place a dry paper under the
nozzle and give the pump a quick blow. Note fuel spray uniformity.
Note!
Ensure hands are not in the path of the spray jets.
12 Check the opening pressure:
open manometer valve,
pump slowly and watch manometer to note the opening pressure.
if the opening pressure is not rising to the stated pressure then
adjust by turning the adjusting screw clockwise.
Adjusting of opening pressure
8
9
8.Adjusting screw 9.Nut
Fig 16-7 V1
13 Place a dry paper under the nozzle and give the pump a quick
blow. Note fuel spray uniformity. If the spray is uniform, adjust the
opening pressure to the stated value and check once more the spray
uniformity.
Injection System
Wrtsil 20 16 - 15
14 Check the needle seat tightness:
increase pressure to a value 20 bar below the stated opening
pressure,
keep pressure constant for 10 seconds and check that no fuel
drops occur on the nozzle tip. A slight dampness may be accept
able.
15 Check the needle spindle tightness:
pump until pressure is 20 bar below the stated opening pressure,
measure time for a pressure drop of 50 bar. If the time is below 3
seconds, it indicates worn nozzle and it must be replaced by a new
one. A time longer than 20 seconds indicates fouled needle, and
the nozzle must be cleaned.
16 If the tests according to step 10 to 14 give satisfactory results the
injection valve can be re-installed in the engine. Otherwise, replace
the nozzle by a new one.
17 If leakage occurs on the high pressure sealing surfaces, the damaged
part should be replaced by a new one or reconditioned.
18 If nozzles or injection valves are to be stored, they should be treated
with corrosion protecting oil. The nozzle and fuel connection must be
protected by plugs or tape.
16.4.3. Mounting of injection valve V9
1 Check that the bottom surface of the bore in the cylinder head is
clean. If necessary, clean or lap the surface by the tool 841020. If
lapping is necessary, the cylinder head must be lifted off. For lapping,
a steel washer and fine lapping compound is used. The injection valve
seals directly to the bottom of the cylinder head bore.
2 Put new O-rings on the injection valve. Lubricate the injection valve
with engine oil or vaseline.
3 Fit the injection valve into the cylinder head bore but do not tighten
the nuts.
4 If the protection piece has been removed, fit new O-rings onto both
the protection piece and the connection piece . Mount the protection
piece onto the connection piece.
5 Screw in the protecting sleeve on the connection piece if it has been
removed. Screw in the connection piece by hand. Tighten to correct
torque. Tighten the protecting sleeve screws.
6 Mount the injection pipe and tighten the cap nuts to torque.
Injection System
16 - 16 Wrtsil 20
7 Before tightening the fastening nuts of the injection valve, let the valve
to stay in the cylinder head bore for 30 minutes to allow the temper
atures to equalize.
8 Finally tighten the nuts with using a torque wrench in the following
steps:
a Both nuts to 20 Nm
b Both nuts to 30 Nm
c Both nuts to 40 Nm
d Both nuts to final torque 503 Nm
9 Mount the rocker arms.
10 Mount the covers.
16.5. Pneumatic overspeed trip device V9
The pneumatic overspeed trip device is mounted on the multihousing
and acts directly on the fuel rack. If the overspeed trip device is acti
vated, pressurised air acts on a piston in a cylinder mounted on the
multihousing. The piston forces the fuel rack to a "no fuel" position.
The force of the overspeed trip device is stronger than the torsion
spring in the regulating mechanism. For maintenance of the pneu
matic overspeed trip device, see section 22.4.
Pneumatic overspeed trip device
3
2 1
4
1. Cylinder, 2. Piston, 3. O-ring, 4. Fuel rack
Fig 16-8 201662 V1
Injection System
Wrtsil 20 16 - 17
Injection System
16 - 18 Wrtsil 20
17. Fuel System V6
The engine is designed for continuous heavy fuel duty. The main en
gine as well as the auxiliary engine can be started and stopped on
heavy fuel provided that the fuel is heated to operating temperature
and the jacket water preheated to described temperature.
As the fuel treatment system before the engine can vary widely from
one installation to another, this system is not described in detail in this
manual. See separate instructions. Normally a fuel feed pump deliv
ers the correct flow to the engine through a filter. The correct pressure
in the engine system is maintained with an adjustable throttle valve.
It is of great importance that the fuel treatment before the engine is
done properly. The filtration of the fuel directly influences on the life
time of the injection pumps and other components in the injection line
and hence the performance of the engine.
Fuel system
3 0 4 0 0 3 0 4 0 0
FUEL OIL
101 102 103
5 2
3
4 1
1.Adjustable orifice 2.Pressure switch 3.Pressure gauge 4.Alarm for broken in
jection pipe 5.Damper 101.Fuel inlet 102.Fuel return 103.Leak fuel drain, clean
fuel.
Fig 17-1 201752 V2
A pressure gauge (3) on the instrument panel indicates the fuel inlet
pressure. A pressure switch (2) for low fuel pressure is connected to
the automatic alarm system.
Fuel System
Wrtsil 20 17 - 1
Fuel leaking from injection pumps and injection valves is collected in
a separate enclosed system. Thus this fuel can be reused. A special
module for automatic handling of this fuel back to the system can be
delivered on request.
A separate pipe system leading from the top level of the engine block
collects waste oil, fuel and water arising, for example, when over
hauling cylinder heads.
The high pressure system, with injection pump and injection valve, is
described in chapter 16.
17.1. Fuel oil safety filter V2
During the first start up of the installation, a fuel oil safety filter (run
ning-in filter) should be installed in the fuel system just before the
engine. The purpose with this filter is to protect the fuel system during
the first running hours. This filter should be used for max 50 h.
If the fuel system before the engine is opened later, it is recommended
that this filter is used for a few hours again.
17.2. Fuel system maintenance V6
When working with the fuel system, always observe utmost cleanli
ness. Pipes, tanks and the fuel treatment equipment, such as pumps,
filters, heaters and viscosimeters, included in the engine delivery
should be carefully cleaned before use.
The fuel should always be separated. It is recommended to fit an au
tomatic filter in the fuel treatment system.
Always vent the system after reassembly, see section 17.3.
For maintenance of the fuel treatment equipment not mounted on the
engine, see separate instructions.
17.3. Venting the system V6
Open the air vent screws on the injection pumps. Start the fuel feed
pump if the static pressure from the day tank is not sufficient.
Always vent the filters after changing cartridges in the filter.
Fuel System
17 - 2 Wrtsil 20
18. Lubricating Oil System V9
Normally, a wet sump system is used, but also dry sump systems can
be used.
The engine is provided with a lubricating oil pump (3) directly driven
by the pump gear at the free end of the crankshaft. It is possible to
connect an electrically driven stand-by pump in parallel if needed. The
pump sucks oil from the engine oil sump and forces it through the
lubricating oil cooler (6) equipped with a thermostat valve (5) regu
lating the oil temperature, through the lubricating oil main filter (7) to
the main distributing channel in the engine block, and via side screw
bores to the main bearings.
Lube oil system
1
2
4
3
5
a
6
7
9
11
12
8
14 13
10
1. Centrifugal filter, 2. Prelubricating oil pump, 3. Lube oil pump, 4. Pressure
regulating valve, 5. Thermostatic valve, 6. Lube oil cooler, 7. Lube oil filter, 8.
Pressure gauge, 9. Oil dipstick, 10. Camshaft bearings, 11. Gudgeon pins, 12.
Rocker arm bearings, 13. Lube oil pipe to T/C, 14. Lube oil pipe from T/C, a. If
dry sump.
Fig 18-1 201863 V1
Lubricating Oil System
Wrtsil 20 18 - 1
Part of the oil flows through the bores in the crankshaft to the big end
bearings and further through the connecting rod to the gudgeon pins
(11), piston skirt lubricating and piston cooling spaces. Oil is led
through separate pipes to other lubricating points, like camshaft bear
ings (10), fuel pump and valve tappets and valves, rocker arm bear
ings (12) and valve mechanism gear wheel bearings, and to oil noz
zles for lubricating and cooling.
The electrically driven prelubricating pump is a gear type pump equip
ped with an overflow valve. The pump is connected in parallel to the
engine driven lubricating oil pump.
The pump is used for:
filling of the diesel engine lubricating oil system before starting,
e.g. when the engine has been out of operation for a long time,
continuous prelubrication of a stopped diesel engine through
which fuel oil is circulating,
continuous prelubrication of stopped diesel engine(s) in a multi-
engine installation always when one of the engines is running.
The pressure in the distributing pipe is regulated by a pressure control
valve (4) on the pump. The pressure can be adjusted by means of a
set screw on the control valve. It is very important to keep the correct
pressure in order to provide efficient lubrication of bearings and cool
ing of pistons. Normally, the pressure stays constant after having
been adjusted to the correct value.
The pressure can rise above the nominal value when starting with
cold oil but will return to the normal value when the oil is heated. A
pressure gauge (8) on the instrument panel indicates the lubricating
oil pressure before the engine (in the engine distributing pipe). The
system includes three pressure switches for low lubricating oil pres
sure, two connected to the automatic alarm system and one for lower
pressure to the automatic stop system (see chapter chapter 23, sec
tion 23.1).
The temperature can be checked from thermometers before and after
the oil cooler (chapter 01., section 01.2). A temperature switch for high
lubricating oil temperature is connected to the automatic alarm sys
tem (see chapter chapter 23, section 23.1).
The speed governor has its own oil systems, see separate instruction
books.
The oil filling opening and oil dipstick (9) is located at the middle of
the engine.
Connections for a separator are provided on the oil sump at the free
end of the engine.
Lubricating Oil System
18 - 2 Wrtsil 20
18.1. Maintenance of oil system V4
Use only high quality oils approved by the engine manufacturer ac
cording to chapter 02, 02B.1.
Always maintain sufficient quantity of oil in the system. The oil dipstick
indicates the maximum and minimum limits between which the oil
level may vary. Keep the oil level near the maximum mark and never
allow the level to go below the minimum mark. The limits apply to the
oil level in a running engine. Add maximum 10% new oil at a time (see
chapter 02, 02B.1). One side of the dipstick is graduated in centime
ters. This scale can be used when checking the lubricating oil con
sumption.
Change oil regularly at intervals determined in maintenance schedule
from the installation concerned, see chapter 04 and 02, section
02.2.2. While the oil is still warm, drain the oil system, as well as the
oil cooler and filter. Clean the crankcase and the oil sump with proper
rags (not cotton waste). Clean the main filter and the centrifugal filter.
Centrifuging of the oil is recommended, especially when using heavy
fuels, see chapter 02, section 02.2.2.
Caution!
Utmost cleanliness should be observed when treating the lubricating
oil system. Dirt, metal particles and similar may cause serious bearing
damage. When dismantling pipes or details from the system, cover
all openings with blank gaskets, tape or clean rags. When storing and
transporting oil, take care to prevent dirt and foreign matters from en
tering the oil. When refilling oil, use a screen.
18.2. Lubricating oil pump V6
Lubricating oil pump is a gear type pump. The pump housing has an
integrated pressure regulating/safety valve. Five identical sleeve
bearings are used. External lubrication is not required. The cover is
sealed with a glue compound.
Lubricating Oil System
Wrtsil 20 18 - 3
Lube oil pump
A-A
8,9L20
4,5,6L20
A
A
3 3
3
1
2
3
3
4
3
1
6
9
9
7
8
2
3
3
4
5
1. Drive gear 2. Frictional rings 3. Screw 4. Pressure plate 5. Bearings
lubrication grooves 6. Spacer 7. Sleeve 8. Sleeve 9. Bearing bush.
Fig 18-2 201864 V2
18.2.1. Removing of lubricating oil pump V5
1 Drain the oil sump.
Lubricating Oil System
18 - 4 Wrtsil 20
2 Remove the suction pipe connection between the oil sump and the
lubricating oil pump.
3 Remove the oil pump connection and fastening screws of the lubri
cating pump.
4 Remove the lubricating oil pump using extraction screws.
5 Protect connections with suitable plugs, clean plastic or similar ma
terial.
Lubricating Oil System
Wrtsil 20 18 - 5
Lube oil pump
A-A
8,9L20
4,5,6L20
A
A
3 3
3
1
2
3
3
4
3
1
6
9
9
7
8
2
3
3
4
5
1. Drive gear 2. Frictional rings 3. Screw 4. Pressure plate 5. Bearings
lubrication grooves 6. Spacer 7. Sleeve 8. Sleeve 9. Bearing bush.
Fig 18-3 201864 V2
Lubricating Oil System
18 - 6 Wrtsil 20
18.2.2. Dismantling of lubricating oil pump V5
1 Remove and inspect the regulating valve. See, chapter 18: Lubricat
ing oil pressure, regulating valve and safety valve.
2 Remove the pressure plate (4) by loosening the fastening screws
(3).
3 Pull out the gear wheel (1) without using any tool. If the gear wheel
does not come loose, a few strokes with a non-recoiling hammer will
help. (The friction ring elements come loose together with the gear
wheel).
Warning!
Using an extractor may damage the shaft (axial scratches).
18.2.3. Inspecting the lubricating oil pump V5
1 Check all parts for wear and replace worn parts. See, chapter 06:
Clearances and wear limits at 20C.
2 Remove worn bearings with a suitable mandrel from the cover by
machining.
3 Mount new bearings (freezing is recommended) so that the bearings
are 3 mm below the sleeve and housing level. Ensure that the bearing
lubrication grooves (5) slide into the right position. See, Fig 18-3.
4 Check the bearing diameter after mounting. Check the gear wheel
axial clearance, See chapter 06: Clearances and wear limits (at
20C).
18.2.4. Assembling the lubricating oil pump V6
1 Clean all the details carefully before assembling.
2 Clean and oil all the contact surfaces before installing the gear
wheel.
3 Reinstall the friction ring elements (3).
Note!
Reinstall the friction ring elements exactly as shown in below figure.
The friction ring elements should fall easily in place and must not jam.
Lubricating Oil System
Wrtsil 20 18 - 7
Mounting the gear wheel
4
3
2
1
1. Pressure plate 2. Screw 3. Frictional rings 4. Drive gear.
Fig 18-4 201855 V3
4 Reinstall the pressure plate.
5 Tighten the screws a little and check that the gear wheel is in the right
position.
6 Tighten the screws to torque. See,chapter 07.
7 If the gear wheel (4) has been changed, check the backlash after
removing the cover.
8 Mount the pump covers.
Note!
After applying the sealant to the housing, the sleeves (7,8), see Fig
18-3 must be pressed along with the cover for the last 5 mm of as
sembly.
9 Mount the pipes.
18.2.5. Mounting of lubricating oil pump V3
1 Clean all sealing surfaces carefully and apply sealing compound to
the sealing faces.
2 Mount the lubricating oil pump.
3 Mount the suction pipe connection between the oil sump and the lu
bricating oil pump.
4 Mount the oil pump connection.
5 Tighten all fastening screws to stated torque, see chapter 07.
6 Connect all necessary pipe connections.
Lubricating Oil System
18 - 8 Wrtsil 20
18.3. Lubricating oil pressure regulating valve
and safety valve V4
The pressure regulating valve, is integrated in the lubricating oil pump
house and regulates the oil pressure before the engine by returning
the surplus oil direct from the pressure side of the pump to the crank
case.
Pressure regulating valve
X
1
2
3
4
5
6
X
1.Ball for safety valve,2.Sealing ring,3.Regulating piston,4. Spring,5.Spring
holder, 6. Adjusting screw
Fig 18-5 201876 V2
A pipe is connected to the engine distributing channel, where the
pressure is kept constant if the engine is running at constant speed.
This pressure actuates the regulating piston (3) and the spring (4) is
tensioned to balance this force at the required pressure. Thus the
pressure is kept constant in the distributing channel, irrespective of
the pressure in the pressure side of the pump and of the pressure
drop in the system. By tensioning the spring a higher oil pressure is
obtained (if too low).
If, for some reason, the pressure should increase strongly in the pres
sure pipe, e.g. due to clogged system, the ball (1) will open and admit
oil to pass to the regulating piston (3). This serves as a safety valve.
18.3.1. Maintenance of the valves V5
1 Dismantle all moving parts. Check them for wear and replace worn or
damaged parts by new ones.
2 Clean the valve carefully.
3 Check that no details are jamming while reassembling and with the
oil pump cover mounted to the pump housing.
Lubricating Oil System
Wrtsil 20 18 - 9
18.3.2. Adjusting of the lubricating oil pressure V4
1 Loosen the counter nut on the adjusting screw.
2 Slowly turn the adjustment screw (6) until the pressure reaches the
value mentioned in chapter 01, section 01.1., (can be seen from the
engine's local pressure gauge).
3 Tighten the counter nut.
4 Check the pressure.
18.4. Lubricating oil cooler V5
The cooler is of the brazed plate type. The plate cooler consists of a
number of heat transfer plates brazed together into one unit with no
seals.
Lube oil cooler
C
A B
7
4
5
5
4
1 1
3
3 2
2
2
6
7
6
1.Plate heat exchanger, 2.Automatic filter, 3.Oil module, 4.Cover for LT-water
therm. valve, 5.Cover for lube oil therm. valve, 6.Drain plug for oil, 7.Drain plug
for LT-water.
A. TC at the driving end, B. TC at the free end, C. Viewed from underside.
Fig 18-6 201873 V2
Lubricating Oil System
18 - 10 Wrtsil 20
18.4.1. Maintenance of lubricating oil cooler V5
1 Clean and test the cooler by hydraulic pressure. Follow the intervals
given in chapter 04. Cleaning is also needed if the lubricating oil tem
perature tends to rise abnormally.
2 Clean the water side by removing the cooler from the engine.
3 Always when cleaning, check for corrosion and test by hydraulic pres
sure.
Caution!
If water leakage to the lubricating oil is suspected, the heat exchanger
must be pressure tested and/or changed.
18.4.2. Disassembling and assembling of cooler
18.4.2.1. Disassembling of cooler V6
1 Open the drain valve.
2 Drain the oil module.
Caution!
Be careful when removing the plate heat exchanger! Despite the
draining there will always be left a small amount of lube oil and water.
3 Drain the water side as much as necessary.
4 Remove the heat shield and pipes, if necessary.
5 Loosen the plate heat exchanger fastening screws.
6 Remove the plate heat exchanger from the oil module.
18.4.2.2. Assembling of cooler V6
1 Check cleanliness and scratches on all sealing surfaces.
2 Mount the O-rings on the oil module. Always use new O-rings.
3 Mount the plate heat exchanger on the oil module.
4 Tighten the plate heat exchanger fastening screws.
5 Reinstall the heat shield and pipes, if necessary.
Lubricating Oil System
Wrtsil 20 18 - 11
18.4.3. Cleaning of oil side V4
Fouling of the oil side is normally insignificant. On the other hand,
possible fouling will influence the cooler efficiency very strongly.
Due to the design, the heat exchanger cannot be cleaned mechani
cally from the inside. Slight fouling can be removed by blowing steam
through the oil connection of the heat exchanger.
If the amount of dirt is considerable, use chemical cleaning solutions
available on the market:
Alkaline degreasing agents:
Suitable for normal degreasing, however, not effective for heavy
greases, sludge and oil coke. Requires high temperature. Always
pour degreasing agent slowly into hot water, never the contrary. Rinse
carefully with water after treatment.
Hydrocarbon solvents:
Include the whole range from light petroleum solutions to chlorinated
hydrocarbons, e.g. thrichlorethylene. These products should be han
dled with care as they are often extremely volatile, toxic and/or nar
cotic.
Solvent emulsions:
Heavy fouling, e.g. oil coke, can often be dissolved only by using
these solutions. Several brands are available on the market.
Note!
Follow the manufacturer's instructions to achieve the best results.
18.4.4. Cleaning of water side V6
The cleaning should be carried out so that it does not damage the
natural protective layer on the heat exchanger. A tool has been de
veloped for this purpose, see Fig 18-7.
If the deposit in the plates is hard, e.g. calcium carbonate, it can be
removed chemically by using commercial agents. After this treatment
the heat exchanger should be rinsed and, if necessary, treated with
a solution neutralising the residual washing agents. Otherwise, follow
the manufacturer's instructions.
Lubricating Oil System
18 - 12 Wrtsil 20
18.4.4.1. Cleaning the plate heat exchanger V3
Cleaning method for plate heat exchanger, 845 005
1
2
3
4
5
1. Circulating water pump (845 006) 2. Lifting bracket (845 007) 3. Joint flange
(845 009) 4. Hexagon socket screw 5. Plate heat exchanger
Fig 18-7 V1
1 Fit the lifting brackets.
2 Remove the screws that fasten the plate heat exchanger. Pull the
plate heat exchanger onto the lifting brackets.
3 Connect the circulating water pump to the plate heat exchanger with
the joint flanges.
4 Circulate cleaning fluid through the plate heat exchanger until it is
clean.
5 After cleaning.
a ) Circulate fresh oil through the plate heat exchanger.
b ) Test at a pressure of 8 bar and reassemble.
18.5. Thermostatic valve V4
The oil system is provided with a fixed thermostatic valve fitted in the
lube oil module.
Lubricating Oil System
Wrtsil 20 18 - 13
Thermostatic valve for oil system
A-A
A A
A A
B
C
6
1 2
4
5
7
2
3
1 2
3
1.Lubricating oil module,2.Cover,3.Drain plug,4.Screw (M6),5.Holder,6.O-ring,
7.Element
A-A.Section,B.Viewed from underside TC at the driving end,C.Viewed from un
derside TC at the free end
Fig 18-8 201874 V1
The Fig 18-9 shows the valve in a closed position (right). When the
temperature exceeds the nominal value, the contents of the elements
expands and forces the valve unit towards the seat, thus passing part
of the oil through the cooler. This movement continues until the right
temperature of the mixed oil is obtained. If the cooler becomes dirty,
the temperature will rise a few degrees, which is quite normal, be
cause the valve needs a certain temperature rise for a certain opening
to increase the oil flow through the cooler.
Lubricating Oil System
18 - 14 Wrtsil 20
Oil flow in temperature control valve
1 2
D D
B
A A
C
A.From pump,B.From cooler,C.To cooler,D.To engine
1.Warm oil,2.Cold oil
Fig 18-9 201868 V1
18.5.1. Maintaining the thermostatic valve V6
Normally, no service is required. A very low or very high oil temper
ature may depend on a defective thermostat. However, in the most of
the cases, when the temperature is too high it depends on a dirty
cooler.
1 Drain the oil module.
2 Remove the cover (2), the holder of the element (5), and then the
thermostatic element. Use screws (M8) for extracting the holder of the
element.
Lubricating Oil System
Wrtsil 20 18 - 15
Extracting of the thermostatic element
1
1. M8*>=25mm.
Fig 18-10 201877 V4
3 Check the element by heating it slowly in water. Check at which tem
peratures the element starts opening and is fully open. The values
can be found on the thermostatic element or in chapter 01, the lower
value of the lube oil temperature is the opening temperature and the
higher value is for the fully open valve.
4 Change the defective element. Check O-rings and change, if neces
sary. Apply sealing compound to the sealing faces between the cover
(2) and the oil module.
18.6. Centrifugal filter V5
A centrifugal filter is mounted in the flush oil line from the automatic
filter. The purpose of the centrifugal filter is to remove the particles
from the oil that has flushed the automatic filter.
The filter comprises a body (1) containing a cover (2) on which a dy
namically balanced rotor assembly (3) is free to rotate. The rotor as
sembly rotates when oil from the jet pipe hits the rotor wheel.
Lubricating Oil System
18 - 16 Wrtsil 20
Centrifugal filter
B
A
6
7
5
1
3
2
4
8
9
1.Filter body assembly,2.Filter cover assembly,3.Rotor assembly,4.Band
clamp,5.O-ring,6.Safety ring,7.Screw,8.Sight glass9.Isolating valve
A. Crankcase, B.Flushing oil inlet
Fig 18-11 201883 V1
18.6.1. Cleaning the centrifugal filter V7
It is very important to clean the filter at regular intervals, see chapter
04, ensuring that the thickness of the dirt deposit inside the rotor does
not exceed approximately 35 mm.
Note!
If it is found that the filter has collected the maximum quantity of dirt
at the recommended cleaning intervals, it should be cleaned more
frequently.
Clean the filter as follows, stop the flow of oil to the centrifuge by either
stopping the engine or positioning the isolating valve on the side of
the centrifuge to the "SERVICE" position. Ensure the centrifuge has
come to a complete stop before proceeding, observe through sight
glass window.
1 Slacken off filter cover band clamp (4), and remove it.
Lubricating Oil System
Wrtsil 20 18 - 17
Warning!
Do not remove band clamp while centrifuge is running.
2 Lift off filter cover assembly (2).
a ) Check top bearing for wear or damage.
b ) Examine O-ring (5) for damage and renew, if necessary.
3 Slacken the screws retaining the safety ring and rotate anti-clockwise
to remove.
4 Lift the rotor assembly and allow oil to drain from the rotor assembly,
before removing it from the filter body.
a ) Remove rotor assembly with care to ensure that the lower bear
ing, pelton wheel and drive tube assembly are not damaged.
5 Secure the rotor assembly and unscrew the rotor cover nut. This will
separate the rotor cover from the rotor body.
6 Remove sludge from the inside of the rotor cover and body with a
spatula or a suitable shaped piece of wood and wipe clean.
7 Clean the rotor components using a suitable cleaning fluid and dis
card the paper insert.
a ) Ensure that all rotor components including the four nozzles lo
cated in the rotor body, are thoroughly cleaned with brass wire
and free from debris.
8 Examine the rotor assembly O-ring for damage and renew if neces
sary.
9 Fit a new paper insert into the rotor body and locate the stand tube in
the rotor body.
10 Reassemble the rotor by sliding the rotor cover over the paper insert
in the rotor body. Tighten the rotor cover nut to a torque of 20 Nm.
11 Examine the lower journal bearing in the filter body for signs of dam
age or wear. Replace it, if necessary.
12 Re-assemble the rotor assembly into the filter body.
a ) Ensure that the lower journal bearings, Pelton wheel and drive
tube assembly are not damaged.
13 Replace the safety ring, (if necessary) and tighten the screws to se
cure the ring.
Lubricating Oil System
18 - 18 Wrtsil 20
14 Examine the centrifuge body O-ring and ball bearing in the filter cover
for signs of wear or damage. Renew, if necessary.
15 Replace the filter cover assembly, (if necessary) ensuring the spigot
on the top of the rotor engages smoothly in the ball bearing housed
in the filter cover. Slide the cover firmly down locating it on the flange
of the filter body.
16 Replace the band clamp, (if necessary) and tighten both bolts to a
torque of 6-8 Nm. Note the band clamp must be securely fitted during
operation of the centrifuge.
17 Reposition the isolating valve, on the side of the centrifuge, in the
"ON" position. Observe that the centrifuge rotor is turning through the
sight glass in the filter cover. If the rotor is not turning ensure that the
filter cover is seated on the filter body correctly, the ball bearing freely
rotates and that the band clamp bolts are tightened to the correct tor
que.
18 Check all joints for leaks and for any excessive vibrations, with the
centrifuge running. Take remedial action if necessary.
18.7. Prelubricating pump V6
The pump is of the gear type, driven by an electric motor. The pump
is provided with an adjustable pressure control valve. The pressure
should be limited to the max. value, about 2 bar, by unscrewing the
adjusting screw to the end position in order to prevent the electric
motor from being overloaded when running with very cold oil.
Lubricating Oil System
Wrtsil 20 18 - 19
Prelubricating pump
1 3
2 4
18
2 2
1. Electric motor, 2. Flexible coupling, 3. Prelubricating pump, 4. Pressure reg
ulating valve
Fig 18-12 V1
Note!
Be careful when adjusting the pressure by unscrewing the adjusting
screw the spring or oil may come out.
Caution!
Do not run the prelubricating oil pump when the engine is running,
otherwise the shaft seal will be damaged due to overheating.
Some installations are provided with a special electrical motor. With
this special motor it is possible to use a pneumatic tool for prelubri
cating of the engine in the event of a "cold ship".
18.7.1. Maintenance of prelubricating pump V5
See the manual of the manufacturer. Normally, no regular mainte
nance is required. After three to six years the shaft seal may have to
be replaced due to ageing. Low leakage rates are essential to the
functioning of the slide ring sealing. The slide ring sealing should be
renewed if the leakage rate increases.
Lubricating Oil System
18 - 20 Wrtsil 20
Take care not to damage the sealing ring faces. A slight scratch may
disturb the sealing function. Avoid touching sealing faces with fingers.
Lubricating Oil System
Wrtsil 20 18 - 21
Lubricating Oil System
18 - 22 Wrtsil 20
18N. Lubricating oil automatic filter V5
The filter is a full flow filter, that is, the whole oil flow passes through
the filter.
Lube oil filter
9
2
14
11
3
1
4
13
12
2
16
15
6
5
7
8
10
B
A
17
1. Turbine 2. Filter candle 3. Central Connection tube 4. Safety filter 5. Gear
unit 6. Gear 7. Flushing bush 8. Screw plug 9. Cover plate 10. Overflow
valve 11. Screw plug 12. Coupling pipe 13. Cover 14. End plate 15. Filter
plate 16. Flushing arm, bottom 17. Flushing arm, top.
A. Inlet, B. Flushing oil outlet.
Fig 18N-1 20AP1810 V1
The arrows in Fig 18N-1 show the flow through the filters.
Lubricating oil automatic filter
Wrtsil 20 18N - 1
At first, the oil flows through the inlet flange and turbine to the bottom
end of the filter candles; a partial stream of about 50% is passed
through the central connection tube to the top end of the filter candles.
This means that the oil flows through the filter candles at both ends
from the inside outwards and most of the dirt particles are retained in
the inside of the candles. The oil filtered in this way now passes
through the safety filter to the filter outlet.
The flow energy drives the turbine installed in the inlet flange. The
high speed of the turbine is reduced by the worm gear unit and gear
to the lower speed required for turning the flushing arms (16, 17).
The individual filter candles are now connected successively to the
atmosphere by means of continuously rotating flushing arms (16, 17)
and the flushing bush.
Flow during back-flushing, from outside of the candles to the inside
through flushing arms in to the flushing line.The resultant turbulent
stream in the longitudinal direction of the filter candles (cross-flow
back flushing) and the counter flow back-flushing through the filter
candles result in a particularly effective and lasting back-flushing ac
tion.
The lower pressure in the interior of the filter candles during the back-
flushing operation (connected with the centrifugal filter) and the higher
pressure (operating pressure) outside the filter candles produce a
counter-flow through the mesh from the clean filter side through the
dirty filter side to the centrifugal filter.
Should for any reason the filter candles no longer be adequately
cleaned, the overflow valves (10) are opened at a differential pressure
of 2 bar upwards. The oil is filtered only through the safety filter.
However, before this situation arises, the installed LO differential
pressure switch PDS243 emits an alarm, at 1.5 bar differential pres
sure, to the alarm system. At the same time the visual differential
pressure indicator (located after the LO-filter) becomes red. The
cause must now be localized and remedied.
The filter may only be operated in this emergency condition for a short
time (opened overflow valves and differential pressure alarm). Pro
longed operation in this mode can result in damage to downstream
components.
The overflow valves are closed under normal operating conditions,
even during start-up at lower fluid temperatures.
18N.1. Maintenance of automatic filter V3
Even automatic filters must be inspected and maintained regularly.
Lubricating oil automatic filter
18N - 2 Wrtsil 20
It is extremely important to remember that in spite of constant back-
flushing the mesh may become clogged over the course of time, de
pending on the quality of the oil.
For trouble-free operation, carry out the following during mainte
nance:
1 Check the filter and connections for leakages.
2 Conduct a visual inspection of all filter candles once a year.
Note!
Should a higher differential pressure occur before an inspection is
scheduled, all the filter candles and the safety filter must be checked
and, if necessary, cleaned or replaced.
A highly contaminated safety filter is a sign of prolonged operation
with defective or clogged filter candles and consequently (from a dif
ferential pressure of 2 bar upwards) opened overflow valves.
It is imperative to check these components.
3 Check the ease of movement of the worm gear unit, the turbine, in
cluding gear during flushing arms (16, 17). To do this, the cover and
the complete filter element pack must be removed.
4 Replace damaged or hard O-rings. It is advisable to replace all static
seals when inspecting and overhauling.
18N.1.1. Filter candles inspection and cleaning V4
1 Drain the filter, open the screw plug (11) and (8).
Note!
Do not refill the system with the drained oil because it is very dirty.
2 Remove the cover by opening the nuts.
3 Pull the entire filter element including flushing arm (16, 17) and gear
out of the housing.
Note!
Make sure that the exposed gear is not damaged.
4 Remove the top flushing arm (17) and the upper cover plate.
5 Remove the end plate by unscrewing the screws.
6 The filter candles and safety filter can now be removed.
7 Place the filter candles and the safety filter in a suitable cleaner or
diesel oil. Maximum soaking time is 24 hours.
Lubricating oil automatic filter
Wrtsil 20 18N - 3
8 After immersing clean them from the outside inwards using high pres
sure.
Ensure that the filter candles are cleaned at a pressure of maxi
mum 60 bar and with the cleaning nozzle at a distance of not less
than 20cm.
To get a optimal cleaning effect it is recommended to use the spe
cial high-pressure cleaning unit (Part No. 471345) and cleaner
(Part No.471346).
When cleaning, hold the filter candles such that the dirt drains out
slowly.
9 Clean the parts and the overflow valves. Replace worn parts if nec
essary.
10 Mount the safety filter and the end plate. Note the position of the
guiding pin.
11 Before the filter candles are installed, they must be visually inspected
and damaged candles replaced with new ones.
Note!
Defective filter candles must not be reused.
12 Mount the filter candles in position with the chamfered end towards
the bottom flushing arm. Before installation of the entire filter element,
check the ease of motion of the flushing facility. The bottom flushing
arm (16) must not grind against the bottom filter plate
13 Push the entire filter element into the housing. By slightly turning, the
coupling pipe, the gear is forced into the drive pinion of the gear unit .
Re-assemble the filter in the reverse sequence to that described
above.
Lubricating oil automatic filter
18N - 4 Wrtsil 20
19. Cooling Water System V5
The engine is cooled by a closed circuit cooling water system, divided
into a high temperature circuit (HT) and a low temperature circuit (LT).
The cooling water is cooled in a separate central cooler.
Cooling water system
1
2
3 4
5 6
8 7
9
10 11
12 13 14 15
1.Lube oil cooler 2.LT-thermostat valve 3Central cooler 4.Water pump 5.Pre
heater 6,Preheating water pump 7.HT-water pump 8.LT-water pump 9.Charge
air cooler 10.HT-thermostat valve 11.Expansion tank 12.Water box 13.Vent pip
ing from multiduct 14.HT-water pressure gauge 15.LT-water pressure gauge
Fig 19-1 201968 V1
19.1. HT circuit V5
The HT circuit cools the cylinders and cylinder heads.
Cooling Water System
Wrtsil 20 19 - 1
A centrifugal pump (7)circulates the water through the HT circuit.
From the pump the water flows to the distributing duct, cast in the
engine block. From the distributing ducts the water flows to the cylin
der water jackets, further through connection pieces to the cylinder
heads where it is forced by the intermediate deck to flow along the
flame plate, around the nozzle and the exhaust valve seats, efficiently
cooling all these components. From the cylinder head the water flows
through the multiduct to the collecting duct, further to the temperature
control valve maintaining the temperature at the right level.
19.2. Venting and pressure control of HT circuit V6
For venting the system a venting pipe from the multiducts are con
nected to a box (12). From this box the vent pipe leads to the expan
sion tank (11) from which the expansion pipe is connected to the inlet
pipe of the pumps (7 and 8), see Fig 19-1. A static pressure of 0.7 -
1.5 bar is required before the pumps. If the expansion tank cannot be
located high enough to provide this pressure, the system is to be
pressurized.
19.3. LT circuit V6
The LT circuit consists of a charge air cooler (9) and a lube oil cooler
(1) through which a pump (8) of similar design as the HT pump, cir
culates the water. The circuit temperature is controlled by a temper
ature control valve (2) maintaining about the same LT circuit temper
ature on different load levels. The necessary cooling is gained from
the central cooler (3), see Fig 19-1. The system outside the engine
can vary from one installation to another.
19.4. Relief valve and venting of LT circuit V5
The LT circuit is provided with a relief valve (2), see Fig 19-2 , to
prevent over pressure in the system. It is located on the top of air
cooler (4) and equipped with the overflow pipe (1). A pressure of 5
bar is required to open the relief valve.
The LT-water circuit is continuously vented through a vent pipe (3),
connected to the expansion tank.
Cooling Water System
19 - 2 Wrtsil 20
Relief valve
4
1
3
2
1.Overflow pipe,2.Non-return valve, 3.Venting pipe,4.Air cooler.
Fig 19-2 201974 V1
19.5. Preheating of cooling water system V5
For preheating of the circuit, a heater circuit with the pump (6) and
heater (5) are connected in the HT circuit before the engine. The non-
return valves in the engine circuit force the water to flow in the right
direction.
Before start, the HT circuit is heated up to 60 - 80C by a separate
heater. This is of utmost importance when starting and idling on heavy
fuel.
Cooling Water System
Wrtsil 20 19 - 3
19.6. Monitoring the cooling water system V11
Local thermometers:
HT before and after engine,
LT before charge air cooler,
LT before lube oil cooler,
LT after lube oil cooler.
The temperatures mentioned in chapter 01: section 01.2, should not
be exceeded.
Manometers (14) and (15) on the instrument panel indicate HT and
LT pressures after the pumps. The pressures depend on the speed
and the installation. Guidance values, see chapter 01:section 01.2.
The HT water outlet after the engine is provided with a temperature
sensor for control, alarm and a stop switch. Main engines are provided
with alarm switches for low HT and LT pressure.
For further information, see chapter 23.1.
19.7. Maintenance of cooling water system V1
The installation - including expansion, venting, preheating, pressur
izing - should be carried out strictly according to the instructions of the
engine manufacturer to obtain correct and troublefree service.
The cooling water should be treated according to the recommenda
tions in chapter 02., section 02.3, to prevent corrosion and deposits.
If risk of frost occurs, drain all cooling water spaces. Avoid changing
the cooling water. Save the discharged water and use it again.
Remember to mount the plug and open the cooling water connections
before the engine is started again.
19.7.1. Cleaning of cooling water system V4
In completely closed systems the fouling will be minimal if the cooling
water is treated according to the instructions in chapter 02, section
02.3. Depending on the cooling water quality and the efficiency of the
treatment, the cooling water spaces will foul more or less over the
course of time. Deposits on cylinder liners, cylinder heads and cooler
stacks should be removed as they may disturb the heat transfer to the
cooling water and thus cause serious damage.
Cooling Water System
19 - 4 Wrtsil 20
The need of cleaning should be examined, especially during the first
year of operation. This may be done by overhauling a cylinder liner
and checking for fouling and deposits on the liner and block.
The deposits can be of the most various structures and consistences.
In principle, they can be removed mechanically and/or chemically as
described below. More detailed instructions for cleaning of coolers
are stated in chapter 18, section 18.4.
a) Mechanical cleaning
A great deal of the deposits consists of loose sludge and solid parti
cles which can be brushed and rinsed off with water.
On places where the accessability is good, e.g. cylinder liners, me
chanical cleaning of considerably harder deposits is efficient.
In some cases it is advisable to combine chemical cleaning with a
subsequent mechanical cleaning as the deposits may have dissolved
during the chemical treatment without having come loose.
b) Chemical cleaning
Narrow water spaces (e.g. cylinder heads, coolers) can be cleaned
chemically. At times, degreasing of the water spaces may be neces
sary if the deposits seem to be greasy (see chapter 18, section 18.4).
Deposits consisting of primarily limestone can be easily removed
when treated with an acid solution. On the contrary, deposits con
sisting of calcium sulphate and silicates may be hard to remove
chemically. The treatment may, however, have a certain dissolving
effect which enables the deposits to be brushed off if there is only
access.
On the market there are a lot of suitable agents on acid base (supplied
e.g. by the companies mentioned in chapter 02, section 02.3).
The cleaning agents should contain additives (inhibitors) to prevent
corrosion of the metal surfaces. Always follow the manufacturer's in
structions to obtain the best result.
After treatment, rinse carefully to remove cleaning agent residuals.
Brush surfaces, if possible. Rinse again with water and further with a
sodium carbonate solution (washing soda) of 5 % to neutralize pos
sible acid residuals.
19.8. Water pump V5
The water pump is a centrifugal pump and is driven by the gear
mechanism at the free end of the engine. The shaft is made of acid
resistant steel, the impeller (6) and the remaining details of cast iron.
Cooling Water System
Wrtsil 20 19 - 5
The shaft is mounted in two ball bearings (8) and (10), which are lu
bricated by splash oil entering through the opening in the bearing
housing. The shaft seal (16) prevents the oil from leaking out and, at
the same time, dirt and leak water from entering.
The gear wheel (12) is fastened to the shaft by conical ring elements
(13). When the screws (14) are tightened, the rings exert a pressure
between the gear wheel and the shaft. Due to the friction, the power
from the gear wheel is transmitted to the pump shaft.
The water side of the pump is provided with a mechanical shaft seal.
The ring (4) rotates along with the shaft and seals against it with the
O-ring. The spring presses the rotating ring against a fixed ring (3)
which seals against the housing with the O-ring (7). Possible leak-off
water or lubricating oil from the sealing can flow out through an open
ing (18).
Cooling water pump
5
6
7
18
4
3
2
1
8 9
16
10 11
12
13
14
15
17
1.Cover clamp, 2.O-ring, 3.Fixed ring, 4.Shaft sealing, 5.Screw, 6.Impeller, 7.O-
ring, 8.Bearing, 9.Shaft, 10.Bearing, 11.Bearing retainer, 12.Drive gear,
13.Friction rings, 14.Screw, 15.Pressure plate, 16.Seal, 17.O-ring, 18."Telltale"
hole.
Fig 19-3 201951 V1
Cooling Water System
19 - 6 Wrtsil 20
19.8.1. Maintenance of water pump V4
Normal maintenance operations, like removal of impeller or replacing
the mechanical seal, can be done without removing the complete
pump from the engine.
Check the pump at intervals according to the recommendations in
chapter 04. or, if water and oil leakage occurs, immediately.
Check that the "telltale" hole (18) is open every now and then.
19.8.2. Dismantling and reassembling the impeller V2
1 Remove the volute casing by loosening the clamp (1) and the fasten
ing screws.
2 Loosen the impeller fastening screw (5).
3 Pull out the impeller using an extractor 837026.
4 Tighten the screw to torque, while reassembling the impeller. See,
chapter 07: Tightening torques for screws and nuts.
5 When reinstalling the volute casing, check that the O-ring (2) and non-
return valve O-rings on the engine block are intact and in position.
Check that the volute casing is in position.
6 Mount the clamp and tighten the screws.
19.8.3. Disassembling and assembling of mechanical
shaft seal V5
1 Remove the impeller according to section 19.8.2.
2 Carefully dismantle all seal details. Sealing rings are very fragile.
3 Take particular care not to damage sealing surfaces as a slight
scratch may disturb the sealing function.
4 Replace the complete seal if it is leaky or if sealing faces are corroded,
uneven or worn. Avoid touching the sealing faces with fingers.
Warning!
Do not use mineral oil when fitting the seal. Use liquid soap or water.
Some of the Seal Components are manufactured from a rubber which
is not suitable for use with Hydrocarbon oils.
Any discolouration or bloom on the rubber components of this seal
will not in any way adversely affect its operation.
Cooling Water System
Wrtsil 20 19 - 7
5 Note that the seal is independent of the direction of rotation.
6 Reassemble the details in proper order. Install the impeller according
to section 19.8.2. Do not forget the thin washer between the spring
and the O-ring.
19.8.4. Replacing of bearings and shaft seal V5
1 Remove the pump from the engine.
2 Disassemble the impeller and mechanical seal according to section
19.8.2 and 19.8.3.
3 Loosen the screws (14) and remove the pressure plate (15).
4 Pull off the gear wheel without using any tool. If the gear wheel does
not come loose, a few strokes with a non-recoiling hammer will help.
(The friction ring elements (13) come loose together with the gear
wheel).
Warning!
Using an extractor will only damage the shaft (axial scratches).
5 Loosen the bearing retainer (11) and drive out the shaft and bear
ing.
6 Check the seal (16) and the bearings for wear and damage. If the seal
is leaking, knock it out using a suitable brass piece.
7 Remove the bearings. Press the bearing by its inner ring with a suit
able pipe.
8 Inspect the shaft for wear and damage.
9 Oil the new seal and insert it by pressing against the shoulder.
10 Oil the collar and press the bearing in by its inner ring with a suitable
pipe. See, Fig 19-4.
11 Turn the shaft according to Fig 19-4.
12 Turn the housing and oil the outer surfaces of the bearings. Press the
shaft into the housing by both the inner and outer ring of the bearing
with a suitable pipe.
Cooling Water System
19 - 8 Wrtsil 20
Mounting of bearings
1 2 3
2 1
F
F F
A B C
1, 2, 3 Pipes
Fig 19-4 321956 V2
13 Fit the bearing retainer (11) and lock the screws with lock wire or
locking compound.
14 Before reinstalling the gear wheel, all contact surfaces should be
cleaned and oiled.
Mounting of gear wheel to water pump
14 15
11
12 13
11.Bearing retainer,12.Drive gear,13.Friction rings,14.Screw,15.Pressure plate
Fig 19-5 201976 V1
15 Reinstall the gear wheel and the friction ring elements (13). The fric
tion ring elements should fall easily in place and must not jam.
16 Reinstall the pressure plate (15).
Cooling Water System
Wrtsil 20 19 - 9
17 Tighten the screws a little and check that the gear wheel is in the right
position.
18 Tighten the screws to torque according to Chapter 07: Tightening
Torques and Instructions for Screw Connections.
19 Assemble the impeller and the mechanical seal according to instruc
tion section 19.8.2 and 19.8.3.
19.9. Temperature control system V5
The LT circuit is provided with a fixed thermostatic valve fitted in the
lube oil cooler.
In some engines, the LT circuit can bee provided with a fixed blind
flange fitted in the lube oil cooler. Then the water passes directly into
the cooler even if the temperature is low.
The HT circuit is provided with a fixed thermostatic valve that is either
mounted inside the bracket of the connecting box or is integrated in
the turbocharger. This helps to maintain the HT outlet water temper
ature. For operation temperatures, see Chapter 01: Recommended
operating data.
19.9.1. LT and HT thermostatic valve V5
The thermostatic valve is equipped with positive three-way valve ac
tion in which the water is positively made to flow in the direction re
quired. When the engine is started up and is cold, the thermostatic
valve causes all of the water to be positively bypassed back into the
engine, thus providing the quickest warm-up period possible. After
warm up, the correct amount of water is bypassed and automatically
mixed with the cold water returning from the heat exchanger or other
cooling device to produce the desired water outlet temperature. If ever
required, the thermostatic valve will shut off positively on the bypass
line for maximum cooling. The three-way action of the valve allows a
constant water flow through the pump and engine at all times with no
pump restriction when the engine is cold.
Cooling Water System
19 - 10 Wrtsil 20
Water flow in temperature control valve
A
1 2
A
B
CC
1.Warm engine,2.Cold engine
A.From engine,B.By-pass,C.To cooler
Fig 19-6 201971 V1
No adjustments are ever required on the thermostatic valve. The
temperature is specified at the factory. The temperature can be
changed only by changing temperature element assemblies which is
easily accomplished by unscrewing the housing. The valve is entirely
self-contained, and there are no external bulbs or lines to become
damaged or broken. There are no packing glands to tighten and no
parts to oil.
The power creating medium utilizes the expansion of the element
contents,Fig 19-7, Fig 19-8 or Fig 19-9, which remains in a semi-solid
form and is highly sensitive to temperature changes.
Most of the expansion takes place during the melting period of ap
proximately two minutes over a temperature change of approximately
8.5C.
The thermostatic valve is provided with two elements. Since flow is
diverted either to bypass or heat exchanger, failure of an element
would cause no change in pressure drop.
The contents of the elements has an almost infinite force when heated
and is positively sealed. When the elements are heated, this force is
transmitted to the piston thus moving the sliding valve towards the
seat to the bypass closed position. This force is opposed by a high
spring force, which moves the sliding valve to the heat exchanger
closed position when the elements are cooled. The high force avail
able on heating is the basis of the fail safe feature in which failure of
the element would cause the engine to run cold.
Cooling Water System
Wrtsil 20 19 - 11
LT thermostatic valve
A-A
a
b
A A
A A
6
1 2
4
5
7
2
3
1 2 3
a. Viewed from underside TC at the driving end, b. Viewed from underside TC
at the free end.
1. Lubricating oil module, 2. Cover, 3. Drain plug, 4. Screw, 5. Holder, 6. O-ring,
7. Thermostatic element.
Fig 19-7 201975 V1
Cooling Water System
19 - 12 Wrtsil 20
HT thermostatic valve, TC at the driving end
1
8
7
2
2
4
5
6
3
A-A
A A
1. Connecting box, 2. Cover, 3. Bracket for connecting box, 4. Screw, 5. Holder,
6. Screw, 7. Element, 8. O-ring.
Fig 19-8 201972 V2
HT thermostatic valve, TC at the free end
5
1 2 2 3
5 4 6
7
1.Flange for thermostat,2.Thermostat element,3.O-ring,4.Screw,5.Bush for
thermostat,6. Bracket for turbocharger,7.O-ring
Fig 19-9 201954 V2
Cooling Water System
Wrtsil 20 19 - 13
19.9.2. Maintaining the temperature control system V7
Normally, no service is required. Very low or high water temperature
could indicate a malfunctioning thermostat or damaged O-rings.
1 Drain the cooling water circuit.
2 Remove the elements by removing the cover (2) and the holder of the
element (5). See, Fig 19-7 and Fig 19-8 (TC at the driving end). Use
screws (M8) for extracting the holder of element.
3 Check the element by removing the flange of the thermostat (1). See,
Fig 19-8 (TC at the free end). Use the extractor tool (837 027) to re
move the bush (5) of the thermostat.
4 Change the defective element by heating it slowly in water. Check the
temperature at which the element starts opening and is fully open.
Correct value is mentioned on the thermostatic element or see, chap
ter 01: Main Data, Operating Data and General Design. Lower value
of water temperature indicates opening temperature and the higher
for fully open valve.
5 Change the defective element. Check the O-rings and replace, if nec
essary. Apply sealing compound to the sealing faces between the
cover (2) and the bracket, see Fig 19-7 and Fig 19-8.
Extracting of the thermostatic element
1
1. M8* >=25mm.
Fig 19-10 201877 V4
Cooling Water System
19 - 14 Wrtsil 20
20. Exhaust System
20.1. Exhaust manifold V6
The exhaust manifold is fitted between the cylinder head and the tur
bocharger. The manifold consists of the multiducts (3) and the ex
haust pipes (2) with expansion bellows (1). The manifold is enclosed
into an insulating box of sandwich design.
The turbocharging concept is a specific type of pulse charging, which
is superior for sudden load application and frequent load variations.
The exhaust gases are directed into exhaust pipes, which leads the
exhaust gases to the turbocharger. The exhaust gases are dis
charged from each cylinder during the period when the other cylinders
have the exhaust valve closed. This give an equal flow of gases to
the turbocharger without any disturbing gas pulses to the other cyl
inders connected to the common pipe.
The multiduct, between the cylinder head and the exhaust pipes, acts
as a bracket for the whole exhaust manifold, including the insulation
box. The multiduct is cooled by the cooling water discharging from the
cylinder head. The multiducts are vented through a venting pipe that
runs along the engine. The cooling water flows through the multiduct
down to the HT-water channel in the engine block. The multiduct also
connects the air receiver in the engine block with the inlet air channel
in the cylinder head. All the surfaces, engine block/multiduct, cylinder
head/ multiduct and exhaust pipes/multiduct are sealed off.
Exhaust manifold (example)
1 2 3
4
1. Bellow, 2. Exhaust gas pipe, 3. Multiduct, 4. Support
Fig 20-1 202054 V1
The multiduct is rigidly attached to the cylinder head and engine block.
Data and dimension
Multiduct
Material: Nodular cast
iron
Weight: 8 kg
Test pressure: 10 bar
(water side)
Exhaust pipes
Material: Special, heat
resistant alloy nodular
cast iron
Bellows
Multiply design
Material: Heat resistant
steel
Exhaust System
Wrtsil 20 20 - 1
The exhaust manifold sections are made from alloy nodular cast iron.
Each cylinder is joined to the manifold via an individual junction piece.
The sections are interconnected with multi-ply metal bellows that ab
sorb the heat expansion.
Note!
Check the condition of supports (4) at least once a year. Replace if
necessary.
The complete exhaust system is enclosed by an insulation box, built
up from sandwich steel sheet.
Caution!
The surface of the insulation box is hot.
Sensors for the remote measuring of exhaust gas temperatures are
fitted at each cylinder and after the turbocharger. An optional sensor
may also be fitted before the turbo.
Cross Section of Exhaust System
8
5
3
10
6 7
4
9
3. Multiduct, 4. Support, 5. Upper protecting panel, 6. Lower protecting panel,
7. Bracket, 8. Insert sleeve, 9. Screw, 10. Distance piece
Fig 20-2 202055 V1
20.1.1. Changing the expansion bellows V2
1 Remove necessary sheets on the insulation box.
Exhaust System
20 - 2 Wrtsil 20
2 Remove the screws and remove the expansion bellows.
3 Check that the exhaust pipe flanges are parallel. Position it on the
same centre line to avoid lateral forces on the bellows.
4 Mount the new expansion bellows and tighten the screws.
Note!
The flow direction is marked with an arrow.
5 Examine the supports (4) for damage. Replace with new ones, if nec
essary.
6 Mount necessary sheets and other parts.
Exhaust System
Wrtsil 20 20 - 3
Exhaust System
20 - 4 Wrtsil 20
21. Starting Air System V15
The engine is started with compressed air of max. 10 bar. Minimum
pressure required is 7.5 bar with the engine at operating temperature.
A pressure gauge (3) mounted on the instrument panel indicates the
pressure after the pressure reducing valve (2).
The air starter is controlled by solenoid valves (5,6) and start blocking
valve (7).
As a precaution the engine cannot be started when the turning gear
is engaged. Control air to the air starter is led through a blocking valve
(7), mechanically blocked when the turning gear is engaged, thus
preventing start.
Starting Air System
Wrtsil 20 21 - 1
Starting air system
STARTING AIR
301
3
2
5
4
7
1
6
1.Air starter,2.Pressure reducing valve,3.Gauge for starting air,4.Safety valve,
5.Solenoid valve (5/2),6.Starter control valve,7.Start blocking valve
301.Starting air inlet
Fig 21-1 202160 V2
21.1. Starting device, turbine air starter V16
The engine is provided with a turbine-type air starter. It is an air-op
erated, two-stage-turbine-driven, and pre-engaged starter drive, de
signed for operation with compressed air only. No lubrication is re
quired in the supply air system.
Data and dimensions
Type: Turbine driven air
starter
acting on the flywheel
Weight: 20 kg
Air pressure: 8 bar
Starting Air System
21 - 2 Wrtsil 20
The air starter can be grouped into:
Integral relay valve
Turbine Housing
Gearbox Housing
Bendix Drive
When the engine has reached a speed of 115 RPM, the current is cut
off by a relay in the electronic speed measuring system, and the air
starter is automatically disengaged.
In emergency situations (current failure or malfunctioning of control
devices), the air starter can be started with a manually-operated
valve. This causes the automatic disengage control of the air starter
to be out of operation. Hence, to avoid any overspeed of the air starter,
the valve must be closed when the engines starts.
Warning!
Do not operate the starter with compressed air unless it is properly
attached to the engine and engages the flywheel.
A valve prevents starting when the turning device is engaged (as well
as emergency starting by means of a valve).
21.1.1. Disassembly of starter V15
Mark each section of the starter for reference during assembly. Do
not disassemble the starter any further than necessary to replace a
worn or damaged part. Mark the turbine rotor and note its direction of
rotation.
Have a complete set of O-rings, seals, screws and other hardware
available for assembly.
21.1.2. Cleaning and inspection of starter V15
1 Degrease all metal parts except bearings and the starter drive using
commercially approved solvents.
2 Dry parts thoroughly.
Caution!
Never wash bendix assembly or bearings in cleaning solvents. It is
recommended bearings be replaced with new parts.
3 Clean aluminium parts using a cleaning solution and soak for five mi
nutes. Remove the parts, rinse in hot water and dry thoroughly.
Starting Air System
Wrtsil 20 21 - 3
4 Clean corroded steel parts with commercially approved stripper.
5 Clean corroded aluminium parts using a cleaning solution. Immerse
the parts in a chromic-nitric-phosphoric acid pickle solution. Rinse
with hot water and dry thoroughly.
6 Check for acceptable condition of parts.
7 Check all threaded parts for galled, crossed, stripped, or broken
threads.
8 Check all parts for cracks, corrosion, distortion, scoring or general
damage.
9 Check all bearing bores for wear and scoring. Bearing bores must be
free of scoring lines.
10 Check the gear teeth and turbine housing ring gear for wear. Check
for spalling, fretting, surface flaking, chipping, splitting, and corrosion.
If wear is apparent, check the gear teeth dimensions.
21.1.3. Assembly of starter V16
Always press the inner race of ball bearings when installing onto a
shaft. Always press the outer race of ball bearings when installing into
a housing. The rotor retention screw must be replaced each time the
turbine rotor is removed. All parts should be degreased and aluminum
parts cleaned. For overhaul, all parts are included in the overhaul kit
should be replaced.
All screw threads are treated at the factory with a fastener retention
compound. Every screw, 1/4 inch diameter or larger, must have a
drop of Loctite 290 applied to the threads before being re-used,
screws smaller than 1/4 inch diameter must have a drop of Loctite
222 applied to the threads.
21.2. Starting air vessel and piping V2
An oil and water separator as well as a non-return valve should be
located in the feed pipe, between the compressor and the starting air
vessel. At the lowest position of the piping there should be a drain
valve. Immediately before the starting air system, a non-return valve
and a blow-off valve are mounted.
Drain the starting air vessel from condensate through the drain valve
before starting.
Starting Air System
21 - 4 Wrtsil 20
The piping between the air vessels and the engines should be care
fully cleaned when installing. Also later on they should be kept free
from dirt, oil and condensate.
The starting air vessels should be inspected and cleaned regularly. If
possible, they should then be coated with a suitable anti-corrosive
agent. Let them dry long enough.
At the same time, inspect the valves of the starting air vessels. Too
strong tightening may result in damages on the seats, which in turn
cause leakage. Leaky and worn valves, including safety valves,
should be reground. Test the safety valves with pressure.
21.3. Pneumatic system V15
The engine is equipped with a pneumatic system which controls the
following functions by means of a solenoid valves:
Start of engine
Stopping of engine
Overspeed Protection
Control of Air Waste Gate
The staring system includes pressure reducing valve (2) and safety
valve (4). Pressure reducing valve maintains the air pressure at cor
rect level and safety valve ensures the pressure is at safe level for the
air starter. The air starter is controlled by a solenoid valve (5) and
blocking valve (7).
Starting Air System
Wrtsil 20 21 - 5
Pneumatic system
11
3
12
8
11
10
10
2
4
1
6
5
7
9
9
1. Air starter 2. Pressure reducing valve 3. Gauge for starting air 4. Safety
valve 5. Solenoid valve 6. Starter control valve 7. Start blocking valve
8. Shut-off valve 9. Pneumatic stop cylinders 10. Main stop valve 11. Air
container 12. Solenoid valve
Fig 21-2 202161 V1
The system includes an air container (11) and a non-return solenoid
valve which ensures that the pressure in the system doesn't drop in
case of low feed pressure. Fig 21-3 shows the solenoid valve. The
solenoid valves can also be operated manually.
The pneumatic overspeed trip devices (9), described in detail in
Chapter 22: Electro-pneumatic overspeed trip device, are controlled
by a main stop valve (10). It is actuated by solenoid valve on an elec
tric signal from the speed monitoring system, where by the engine
stops.
The solenoid valve is able to function as a local stop.
Note!
When the engine is running, the air supply to the engine must always
be open.
Starting Air System
21 - 6 Wrtsil 20
21.4. Maintaining the pneumatic system V16
The system is built up from high quality components. It usually re
quires no other maintenance than the draining of condensed water
from the vessel (11). The system function should however be checked
regularly.
Note!
Regularly check the pressure after the pressure reducing valve (2).
Solenoid valve:In case of a fault in the electric function of the valve,
test the mechanical function of the valve by pushing the button (1) ,
see Fig 21-3. Should there be a mechanical malfunction, open the
valve and inspect the following:
Check that the bores (2) and (3) and their seats are open and the
gasket (4) is intact. Change the valve if it does not function after
cleaning.
Water draining valve: Clean the valve if there is any disturbance. The
valve can temporarily be disconnected by closing the main shut off
valve for overspeed system.
Pressure reducing valve: The pressure reducing valve requires no
maintenance. If there is problem, change the valve.
Pneumatic components
A
1 4
2
3
B
C
A:Airflow direction, B:Solenoid valve, C:Pressure reducing valve.
1. Button 2. Bore 3. Bore 4. Gasket.
Fig 21-3 V1
Starting Air System
Wrtsil 20 21 - 7
Starting Air System
21 - 8 Wrtsil 20
22. Control Mechanism V3
During normal operation the engine speed is controlled by a governor
(1) which regulates the injected fuel quantity to correspond with the
load and engine speed.
The regulation movement is transferred to the control shaft (10)
through a adjustable link rod (2).
The movement from the control shaft, to the injection pump fuel racks
(16), is transferred through the regulating lever (6) and the spring (7).
The torsion spring (5) enables the control shaft and, consequently,
the other fuel racks to be moved to a stop position, even if one of the
racks has jammed. In the same way the torsion spring (7) enables the
regulating shaft to be moved towards fuel-on position, even if an in
jection pump has jammed in a no-fuel position. This feature can be of
importance in an emergency situation.
The engine can be stopped by means of the stop lever (17). When
the stop lever is moved to stop position, the lever (18) actuates the
lever (9) forcing the regulating shaft to stop position.
The engine is provided with an electro-pneumatic device with tripping
speed about 15 % above the nominal speed. The electro-pneumatic
device moves every fuel rack to a no-fuel position by means of a
pneumatic cylinder on every injection pump. The cylinder actuates
direct on the fuel rack. The electro-pneumatic device can also be trip
ped manually, see section 22.4.
When starting, the governor will automatically limit the movement of
the regulating shaft to a suitable value.
The speed governor is provided with a stop solenoid by which the
engine can be stopped remotely. The solenoid is also connected to
the electro-pneumatic overspeed protection system and to the auto
matic stop system, which stops the engine at too low lubricating oil
pressure, too high circulating water temperature, or at any other de
sired function.
22.1. Maintaining the control mechanism V4
Warning!
Pay attention to the functioning of the system. Any defect in the sys
tem may result in over speeding of the engine and it may not be able
to take the load.
Control Mechanism
Wrtsil 20 22 - 1
1 Clean and lubricate the racks, the bearings and the ball joints regu
larly with lubricating oil. Ensure that the system works with minimal
friction.
2 Check the clearance of all connections. The total clearance may cor
respond to 0.5 mm (maximum) of injection pump fuel rack positions.
3 Check the adjustment of the system regularly. For recommendations
on adjustment of the system, see Chapter 4. For adjustment of stop
position, overspeed trip devices and starting fuel limiter, see Chapter
22 : Checking and adjusting the fuel rack position.
4 Check that all the accessories are installed in the right position when
reassembling the system. Ensure that all nuts are tightened to the
right torque. Ensure locking elements like pins, retainer rings and
locking plates are in the right position.
22.2. Check and adjustment
22.2.1. Checking and adjusting the fuel rack position V5
1 Checking the fuel rack position.
a ) Set the governor lever in the maximum fuel position and the stop
lever in the stop position.
b ) Check that the fuel rack position of all injection pumps is maxi
mum 3 mm.
Control Mechanism
22 - 2 Wrtsil 20
Control mechanism
3 0 4 0
A
A
A - A
C
B
2
3
1
4
15
5 6 7
8
9
11
12
12
2
16
10
17
18
19
20
21
22
14
13
1. Governor. 2. Adjustable link rod. 3. Governor lever. 4. Screw. 5. Spring.
6. Lever for injection pump. 7. Spring. 8. Bearing housing. 9. Lever.
10. Control shaft. 11. Load limiter. 12. Lever. 13. Adjusting screw. 14. Ad
justing screw. 15. Adjusting screw. 16. Fuel rack. 17. Stop lever. 18. Lever
for stop lever. 19. Stop position. 20. Working position. 21. View B. 22. View
C.
Fig 22-1 202257 V3
2 Adjusting the fuel rack position.
a ) Set the stop lever to the stop position. Check that the lever (18)
is in proper contact with the lever (9). A small torque can be set
from the governor, too much torque will twist the shaft unneces
sarily.
Control Mechanism
Wrtsil 20 22 - 3
b ) Adjust the fuel rack position according to the table below by ad
justing the screws (15).
Engine configuration Fuel rack position
(mm)
Turbocharger at the free end (LF) 3
Turbocharger at the driving end (LD) 1
Note!
If changing the governor, see Chapter 22 : Speed governor.
22.2.2. Checking electro-pneumatic overspeed trip
device V3
1 Check of stop position
Set the stop lever in the work position and the terminal shaft lever
in the max. fuel position.
Release the overspeed trip device manually.
Check that the fuel rack positions is less than 3 mm.
2 Adjustment of stop position
The electro-pneumatic overspeed trip device requires no adjust
ment.
If a fuel rack position of less than 3 mm cannot be obtained, check
for wear.
3 Check and adjustment of tripping speed
See section 22.4.2.
Control Mechanism
22 - 4 Wrtsil 20
Electro-pneumatic overspeed trip device
3
2 1
4
1. Cylinder, 2.Piston, 3.O-ring , 4.Fuel rack
Fig 22-2 202251 V2
22.3. Speed governor V1
The engine can be equipped with various governor alternatives de
pending on the kind of application. Concerning the governor itself, see
the attached governor instruction book.
22.3.1. Hydraulic governor drive V1
The governor is driven by a separate drive unit, which, in turn, is driven
by the camshaft through helical gears. The governor is fastened to
this drive unit and connected to the drive shaft through a serrated
connection. The serrated coupling sleeve is secured with spring pins.
The governor, with drive, can thus be removed and mounted as a unit
or the governor can be changed without removing the drive unit.
Pressure oil is led, through drillings in the bracket, to the bearings and
to a nozzle for lubricating the gears.
Data and dimensions
Governor: Mechanical-
hydraulic type
Weight: 19 kg
Control Mechanism
Wrtsil 20 22 - 5
Check at recommended intervals:
radial and axial clearances of bearings,
gear clearance,
oil drillings and nozzle to be open,
serrated coupling sleeve to be firmly fastened to the shaft,
serrations of coupling sleeve and governor drive shaft for wear.
Change worn parts.
22.3.2. Removing the governor V4
1 Loosen the terminal shaft lever (3) and the governor electrical con
nection.
2 Open the governor fastening screws (4). Pull the governor vertically
upwards. Ensure that the governor does not fall or rest on its driving
shaft, see Fig 22-1.
22.3.3. Mounting of governor V5
When mounting the governor, proceed as follows:
1 Put the fuel rack and governor in a position according to Fig 22-4.
Governor terminal shaft position
10
0
20
30
4
0
EUROPA 2231-1G WOODWARD 3161 WOODWARD UG-A
I N C R
E
A
S
E
F
U
E
L

0
10
1 1
1
1. Position indicator of governor.
Fig 22-3 202258 V2
2 The lever for governor must be assembled in a position according to
Fig 22-4.
3 Fit the link rod (2) between the levers and lock the adjustment.
4 Check according to section 22.2.1.
Control Mechanism
22 - 6 Wrtsil 20
Governor shaft settings
A
3
B
2
16
( 76 )
10
12
26 5 (Woodward)
18 5 (Europa)
2. Adjustable link rod, 3. Lever for governor, 10. Control shaft, 12. Lever
A: Governor shaft, B: Engine block
Fig 22-4 202259 V2
Table 22-2 Governor basic settings
Governor type Fuel rack (mm) Governor indicator
FD LD
3161 6 3 7.2
UG-A 6 3 1.7
Europa 2231-IG 6 3 2
22.4. Electro-pneumatic overspeed trip device V16
See Fig 22-4 Electro-pneumatic overspeed trip device.
The overspeed trip device is controlled electronically . Air pressure of
maximum 30 bar is used as an operating medium. The tripping speed
is 15 % above the nominal speed.
The three-way solenoid valve (10, Fig 21-2,) receives the stop signal
for overspeed from the electronic speed measuring system. See
chapter 21. section 21.3. The solenoid valve is also connected to the
stop system.
Control Mechanism
Wrtsil 20 22 - 7
When the solenoid valve opens, air is fed into the three-way valve that
conveys pressurized air to the cylinders (9, Fig 21-2.) Each injection
pump has one cylinder. The piston of the air cylinder actuates the pin
on the fuel rack moving it to the stop position.
The stop signal is normally energized for the time required to stop the
engine completely. When de-energized, the air is evacuated through
the three-way valve.
The solenoid valve (10)Fig 21-2 can also be operated manually.
22.4.1. Check and adjustment of stop position V3
1 Check of stop position
Set the stop lever in the work position and the terminal shaft lever
in the max. fuel position.
Release the overspeed trip device manually.
Check that the fuel rack positions are less than 3 mm.
2 Adjustment of stop position
The electro-pneumatic overspeed trip device requires no adjust
ment.
If a fuel rack position is more than 3 mm, check for wear.
22.4.2. Check of tripping speed V1
Check the tripping speed at idle by increasing the engine speed above
the nominal speed by slowly bending the lever (12) with a suitable
wrench in direction from the engine. When the nominal speed is
reached and exceeded, the governor begins to decrease the fuel set
ting, i.e. the control shaft must be bended against the governor force.
Warning!
Do not increase the engine speed by more than 60 RPM above the
tripping speed.
The tripping speed should be 15 % above the nominal speed, see
chapter 06., section 06.1.
22.4.3. Adjustment of tripping speed V8
Adjustments will be made in the box of the electronic speed measur
ing system, see instructions for speed measuring system, 23.
Control Mechanism
22 - 8 Wrtsil 20
22.4.4. Maintenance V1
1 Three-way solenoid valve
If the solenoid is out of order, replace it by a new one.
If the valve does not move, clean all channels. Check the valve
piston.
If air is leaking to the cylinders, change the sealings.
2 Air cylinder, Fig 22-2 .
Check for wear.
Check the tightness of the piston. Replace sealings by new ones,
if necessary. Take care not to deform the teflon ring outside the
O-ring.
Lubricate the sealings and piston with lubricating oil.
Check that the piston does not stick.
Control Mechanism
Wrtsil 20 22 - 9
Control Mechanism
22 - 10 Wrtsil 20
23. Instrumentation and Automation
23.1. UNIC automation system V9
The UNIC automation system is an embedded engine management
system. The system has a modular design. Some parts and functions
in the configuration are optional depending on application. The sys
tem is specifically designed to handle the demanding environment of
marine engines. Special attention has been paid to temperature and
vibration endurance in this rugged design. This compact system can
be directly mounted on the engine as there are no dispersed external
cabinets or panels. The engine can therefore be delivered fully tested
from factory. The number of inputs and outputs are determined to
optimally suit this application. The galvanic signal isolation is also
made to match these needs.
There are three different versions of the UNIC automation system
namely: UNIC C1, C2 and C3. The type of automation system used
depends on the automation level.
UNIC C1 Automation System
This engine is equipped with UNIC C1 automation system.
The system is a combination of the traditional approach of point-to-
point wiring of sensor signals to an external alarm system, and a
modern system handling fundamental engine safety and engine
speed control.
Most sensors on UNIC C1 engines (see installation specific diagrams
for details) are connected directly to the external system for remote
alarm & safety handling. Sensor signals used for local indication are
also wired to the LCP.
Instrumentation and Automation
Wrtsil 20 23 - 1
Overview of UNIC C1 system
2
3
4
1
1. Local control panel 2. Engine safety module 3. Main control module
4. Power distribution module.
Fig 23-1 V4
The UNIC automation system consists of the following major parts:
Local Control Panel (LCP): Contains push buttons for local engine
control, as well as two graphical displays.
Main Control Module (MCM): Handles all the start/stop
management and speed/load control functions of the engine. This
module is an optional for engines having mechanical governors.
Engine Safety Module (ESM): Handles fundamental engine
safety, and is the interface to the shutdown devices and some local
instruments.
Power Distribution Module (PDM): Handles fusing, power
distribution, earth fault monitoring and EMC filtration in the system.
It provides two fully redundant 24 VDC supplies to all modules,
sensors and control devices. Common rail engines also have two
redundant 110 VDC supplies for the injector drivers.
Instrumentation and Automation
23 - 2 Wrtsil 20
The system is handles the following major tasks and functions:
Provides a local interface to the operator, including a local display
indicating all important engine measurements, an hour counter
and a local control panel.
Interfaces & converts all sensors and control signals to the
external systems.
Handles the fundamental engine safety (alarms, shutdowns,
emergency stops, load reductions) including fully hardwired
shutdowns for engine overspeed (redundant), lube oil pressure,
cooling water temperature and external shutdowns.
A high performance electronic speed/load controller with various
operating modes (optional).
23.2. Mechanical design V10
The UNIC system is designed to meet very high targets on reliability.
This includes special measures for redundancy, fault tolerance as
well as mechanical and electrical design.
UNIC sensors and actuators are designed to be reliable, easy to
service and to calibrate. Flying lead design is introduced (wherever
possible) to avoid failure prone connectors.
Sensor with flying lead design
Fig 23-2 V1

Only screened dedicated Teflon insulated cables for the demanding
engine environment are used on the engines. These well protected
point-to-point cables provide the most reliable solution, as they en
sure good protection against electrical disturbances, high mechanical
strength as well as good protection against chemicals and tempera
ture.
Instrumentation and Automation
Wrtsil 20 23 - 3
23.3. Parts of the UNIC System
23.3.1. Local control panel V17
The Local control panel (LCP) is a resilient electrical cabinet mounted
on the front side of the engine. This panel is the local interface to start
and stop the engine, and also to view engine measurements. The
LCP consists of the following switches and buttons: a mode selector
switch, a start button, an emergency stop button and a reset button,
along with WIP-1*, a graphical display screen, and WIP-2*, a bar-
graph display screen.
Connecting box of UNIC C1
1
2
3 4
1. WIP-2* 2. WIP-1* 3. Emergency stop button 4. WCP-1*
Fig 23-3 V1
Instrumentation and Automation
23 - 4 Wrtsil 20
23.3.1.1. WIP-1* and WIP-2* displays V4
WIP-1* & WIP-2* displays
Fig 23-4 V1
The WIP-1* display has indications of the following
measurements:
- Engine speed, a graphical relative indication of 0...120% and
a numerical 4-digit indication.
- Turbocharger speed A-bank, a numerical 3-digit indication.
- Turbocharger speed B-bank, (if V-engine) a numerical 3-digit
indication.
- Hour counter, a 5-digit numerical indication.
Bar graph indications for:
- Lube oil pressure, 0...10 bar.
- HT water temperature, 30...120 C.
On WIP-1* there is a triangle symbol with a !-sign inside. The light for
this symbol indicates a failure either in the PDM, MCM, ESM or
WIP-2*. Also a binary output Engine control system, minor alarm will
activate in this situation.
Instrumentation and Automation
Wrtsil 20 23 - 5
Note!
Some additional graphical symbols are appearing on WIP-1*, but
these are not used in UNIC-C1 application.
The WIP-2* display has bar graph indications of the following
measurements.
- Fuel oil pressure, 0...16 bar
- Starting air pressure, 0...16 bar
- Control air pressure, 0...40 bar
- Charge air pressure, 0...6 bar
- HT water pressure, 0...6 bar
- LT water pressure, 0...6 bar
Additionally there is a 4-digit numerical indication of the exhaust gas
temperature (range 0...750 C) for each bank (cylinder selectable with
selector switch). This is utilised only in marine applications.
On this display there is also pressure indications in PSI (in brackets)
and the exhaust gas temperatures can either be displayed in C or
F.
Normal values are represented with green colour in the bar graphs
left of the measurement value, while abnormal values first turn yellow,
then red. Abnormal values will create an alarm in the external alarm
and monitoring system, as the same sensor signals as used in
WIP-2*, in most cases are looped to the external alarm system.
Note!
In case of a sensor failure or sensor signal wire break, the lowest LED
element in the bar-graph will flash. In case the sensor or the wiring
provides an over-current, the highest LED element will flash.
23.3.1.2. Switches and buttons V15
Below a description of the switches and buttons used in the LCP.
Instrumentation and Automation
23 - 6 Wrtsil 20
Control buttons and switches on the LCP
HS724 HS721 HS722 HS725 HS726
Fig 23-5 V3
Note!
On power plant engines, this control panel only comprises an emer
gency stop button.
HS724 Engine mode selector switch
This mode selector switch has the following four positions:
Local: Local control of engine start and stop enabled.
Remote: Remote control of engine start and stop enabled.
Blocked: Starting is electrically blocked (both local- and remote
start).
Blow: When the selector is in this position, it is possible to perform
a "blow" (an engine rotation check with indicator cocks open) when
pressing the local start button. The engine will not start (fuel shaft
limited to zero), only the starting air valve will be activated while
pressing the start button in this situation.
HS721 Start button By pressing this button, the engine will be
started locally. A lamp in the button will turn on (green colour),
when the engine is ready for start.
Note!
In case the mode selector HS724 is in remote, blocked or blow posi
tion, the local start signal is disabled.
HS722 Stop button By pressing this button, the engine will be
stopped locally.

Note!
In case the mode selector HS724 is in remote position, the local stop
signal is disabled. A re-start after a manually activated stop, will not
require a reset.
Instrumentation and Automation
Wrtsil 20 23 - 7

HS725 Shutdown reset button In case an automatic shutdown or
emergency stop has occurred, the shutdown circuit will latch.
When the engine has stopped, a reset of this circuit can be
performed by pressing this button. When a reset is necessary,
blue light will turn on in the button.
Note!
Before a reset and a re-start is performed, the reason for the auto
matic protective action must carefully be checked.
HS723 Emergency stop button (not visible in Fig 23-5) By pressing
this button, the engine will instantly shut down. The signal from the
button goes directly to the Engine Safety Module (ESM) which
activates the el. pneumatic stop solenoids, and also informs the
MCM to enter shutdown mode i.e. to set the fuel shaft to zero
position. The push button position is latching, and it needs to be
turned to release. The emergency stop function in ESM & MCM is
also latching, and after the rotation speed has reached zero level,
this latch can only be reset by pressing the reset button. The
emergency stop button is mounted separately from the other
buttons and switches.
HS726 Exhaust gas temperature selector switch With this selector
switch it can be selected, for which cylinder the exhaust gas
temperature will be indicated on the display.
23.3.2. Main control module (MCM) V17
This module is an optional part of the system, in case of use of me
chanical governors
The MCM module is a versatile, configurable microprocessor based
control- and data acquisition module. It has a variety of analogue and
digital measuring channels, as well as a number of analogue and bi
nary outputs. The module is designed for mounting directly on the
engine. Engine mounting allows the engine to be delivered fully tested
from factory, and also allowing a faster commissioning.
Instrumentation and Automation
23 - 8 Wrtsil 20
MCM module
Fig 23-6 V1
The CPU used in MCM is a high-performance Motorola PowerPC
MPC561 controller. The module itself contains diagnostic features on
internal system integrity (like memory checksums, CPU watchdog,
system temperature) as well as advanced I/O checks based on signal
processing, like open/short circuit detection and sensor diagnostics.
In addition, depending on application, also other application specific
diagnostics is available. The max. current consumption of MCM (all
outputs energised) is 2 A, while the idle comsumption is less than 200
mA.
There are four hardware controlled green LEDs in the MCM. In Table
1 below the functions behind these LEDs are explained:
Table 1.Usage of hardware controlled LEDs in MCM.
LED marking Description
PWR1 24V Indicates state of power supply 1 input.
PWR2 24V Indicates state of power supply 2 input.
SYS 24V Indicates state of power supply to module logics and microprocessor.
SENS 24V Indicates state of power supply output used for module's I/O.
The MCM has one two-colour diagnostic LED (right-most in row,
marked "DIAG"), which is used to indicate the execution state. The
function behind this LED is given in Table 2.
Table 2: Usage of the software controlled two-colour LED in MCM.
Red Yellow Execution in Description
OFF OFF Undefined (boot
phase)
No software is running.
ON OFF Bootloader 1 Bootloader 1 is running and waiting for connection.
Flash OFF Bootloader 1 Bootloader 1 has established connection with tool.
Instrumentation and Automation
Wrtsil 20 23 - 9
Red Yellow Execution in Description
OFF ON Bootloader 2 Bootloader 2 is running and is waiting for connection. Also in case of
software lock-up.
Alt w/ yel
low
Alt w/ red Bootloader 2 Bootloader 2 cannot find application; waiting for connection.
OFF Flash Bootloader 2 Bootloader 2 has established connection with tool. Application soft
ware running.
The MCM module handles the following main tasks in the UNIC sys
tem:
Speed/load control
Timing track control*
Note!
* Only on engines with separate timing rack.
23.3.2.1. Speed controller V6
The main task of the MCM module is acting as the speed controller
for the engine. The speed controller functionality is fully embedded in
the module, and optimised to suit Wrtsil power plant engines as
well as ship genset- and main engine applications. On engines equip
ped with the UNIC system, the module supports various sub-modes,
needed for various types of applications, see section 23.4.1.1.
To meet high robustness demands (e.g. in case of to signal failures
or other disturbance), the UNIC system will always be capable to op
erate in droop mode, if premises for other modes are not met. In order
to meet high demands in terms of reliability, two speed sensors are
simultaneously used by the controller. If one speed sensor fails, the
operation will be uninterrupted.
Speed controller parameters are verified and if necessary changed
at the test run facilities at the engine maker, i.e. parameters do nor
mally not have to be changed at the installation. However, in case
some changes are necessary, a separate service tool needs to be
connected to the module. Downloaded settings are permanently stor
ed in the module's flash memory, and are not lost at a power failure.
See section 23.4.1.1, for detailed information about the speed con
troller functionality.
23.3.2.2. In/out signals V3
The UNIC-C1 system has a number of binary input- and output sig
nals used for control and information purposes. Safety-critical input
signals must externally be furnished with 22 k termination (end-)
resistors for wire break detection. See the wiring diagram for wiring
details. All binary output signals from the MCM are connected via in
Instrumentation and Automation
23 - 10 Wrtsil 20
ternal opto-couplers, for galvanic isolation and protection of the en
gine-built electronic module. Binary outputs from switches/buttons
and the ESM module are connected directly.
23.3.2.3. Binary Inputs V3
The UNIC-C1 system is equipped with the following binary input sig
nals:
OS7302 Remote start
If no start blocking is active that is the generating set is in stand-by
mode and output "IS872 Engine ready for start" is active, the activa
tion of this input (closed contact) initiates a start of the generating set.
The input is activated for minimum 0.5 seconds, after this the start
process continues by itself. The input is disabled when the HS724
blow/blocked/local/remote switch is in blow, blocked and local posi
tion.
OS7304 Remote stop
Activation of this input (closed contact) initiates an immediate stop of
the generating set. When the generating set has reached zero speed
(+ a short delay), the system automatically enters stand-by mode and
"IS872 Engine ready for start" output is set high. The engine can now
be restarted without performing a reset. The input is disabled when
the HS724 blow/blocked/local/remote switch on the engine is in blow-,
blocked- and local position. As shutdown mode has higher priority
than start mode, simultaneous activation of start and stop (remotely
or locally) results in a stop.
OS7305 External shutdown 4 (emergency stop)
Activation of this input (closed contact) initiates an instant shutdown
of the generating set. This shutdown is a latching function, and re
quires a reset. The input is in parallel with the local emergency stop
button. The external contact must be equipped with a 22 k resistor
for wire break monitoring. An emergency stop is not overridden by
any position of the HS724 blow/blocked/local/remote switch. As
emergency stop mode has the highest priority, activation of any other
command simultaneously is overruled, if this input is activated.
OS7309 External shutdown 1 (from switchboard)
Activation of this input (closed contact) initiates an instant shutdown
of the generating set. This shutdown is a latching function, and re
quires a reset.
OS7312 External start blocking 1
A start is prevented, if this input is activated (open contact).
OS163 Speed increase
Instrumentation and Automation
Wrtsil 20 23 - 11
Activation of this input (closed contact) ramps up the speed reference
of the internal speed controller. During parallel running in droop mode,
the activation of this input leads to a gradual increase of the gener
ating set load. The same input is also used during synchronization.
OS164 Speed decrease
Activation of this input (closed contact) ramps down the speed refer
ence of the internal speed controller. During parallel running in droop
mode, the activation of this input leads to a gradual decrease of the
generating set load. The same input is also used during synchroni
zation.
23.3.2.4. Binary Outputs V7
The UNIC-C1 system is equipped with the following binary output
signals:
IS181 Speed switch 1 ("engine running")
This speed switch is a signal, from the ESM module and activates
(contact closes) at 40% of rated speed. It represents the "engine run
ning" level, and gives this information to systems and devices external
to the generating set. Contact rating: 110 VDC / 0.5 A.
IS1741/IS1742 Overspeed shutdown status
IS2011 Lube oil pressure shutdown status
This alarm signal informs that the generating set has shut down due
to low engine lube oil pressure. The signal derives input from a switch
in the ESM module. The contact is open in case of Lube oil pressure
shutdown. Contact rating: 60 VDC / 0.3 A.
CV223 Pre-lubrication pump control
This control signal is a potential free,optically coupled, output signal
which is active (closed contact) in the stop and stand-by mode. After
a delay (same delay as alarm-blocking), it de-activates at start-up
when the rotational speed reaches the run mode level (300 rpm). A
LED on the opto-coupler indicates that the contact is closed. Contact
rating: 30 VDC / 2 A or 250 VDC / 0.4 A.
HS724 Local/remote indication
This status signal indicates whether the mode switch HS724 local/
remote/blocked/ blow on the local control panel is in remote position
or local/blocked/blow position. The changeover contact is configured
in such a way, that the local position contact is closed for local, and
the remote position contact is closed for remote. It is not possible to
remote start and stop the generating set, if the switch is in local,
blocked or blow position. A shutdown is however always possible
through the OS7305 External shutdown 4 (emergency stop) input.
IS7602 Stop/shutdown 1 status
Instrumentation and Automation
23 - 12 Wrtsil 20
This status signal is a potential free opto-couple output signal used
to inform that a stop, shutdown or emergency stop is active, and that
the generating set has shut down. The contact opens if there is a stop/
shutdown. A LED on the opto-coupler indicates when the contact is
closed. The signal is used to let external systems & devices know if
the generating set is running or not. Contact rating: 30 VDC / 2A.
IS4011 HT temperature shutdown status
This alarm signal indicates that the generating set has shut down due
to high engine HT water temperature. The signal derives input from
a switch in the ESM module. The contact is open in case of HT water
temperature shutdown. Contact rating: 60 VDC / 0.3 A.
OS441 Pre-heater control
This control signal is a potential free,optically coupled, output signal
which is active (closed contact) in the stop and stand-by mode. After
a delay (same delay as alarm-blocking), it de-activates at start-up
when the rotational speed reaches the run mode level (300 rpm). A
LED on the opto-coupler indicates that the contact is closed. Contact
rating: 30 VDC / 2 A or 250 VDC / 0.4 A.
IS780 Alarm blocking
This blocking signal is active (closed contact) in stop and stand-by
mode. It de-activates at generating set start when the rotational speed
reaches run mode level (300 rpm) after a delay. Contact rating: 24
VDC / 0.2 A.
IS7305 External shutdown 4 status (emergency stop status)
This status signal informs that the generating set has been shut down
by the safety system on activation of the remote or local emergency
stop button. Contact open if there is an external shutdown. Contact
rating: 60 VDC / 0.3 A.
IB7324 Shutdown status
This status signal informs that the generating set has been automat
ically shut down by the safety system. Contact open if there is a shut
down. The signal is used by external systems in ships. Contact rating:
60 VDC / 0.3 A.
IS872 Engine ready for start
This status signal is a potential free opto-couple output signal used
to inform that the generating set is ready for start, that is, it is in stand-
by mode. The contact is closed if the engine is ready, and no start
blockings is active. A LED on the opto-coupler indicates when the
contact is closed. Contact rating: 30 VDC / 2 A.
IS875 Start failure
NS881 Engine control system, minor alarm
NS886 Engine control system, major failure
Instrumentation and Automation
Wrtsil 20 23 - 13
This alarm signal informs that there is a major problem (causing a
generating set shutdown). The signal derives input from the MCM
module. It activates only in case of a system related failure.
The reasons for a major failure are:
MCM module failure.
Dual power supply failure to the MCM or to the actuator driver.
Actuator major failure.
Dual speed sensor failure.
Contact open in case of major failure. Contact rating: 24 VDC / 0.2 A.
23.3.3. Engine instrumentation V1
The following standard set of sensors and solenoids for monitoring,
alarm and safety are mounted on the engine. The location of the sen
sors and the solenoids are shown below.
Table 23-3 Standard sensors
Standard sensors Code
Fuel oil pressure, engine inlet PT101
Lube oil pressure, engine inlet PT201
Lube oil pressure, engine inlet PTZ201
Starting air pressure, engine inlet PT301
Control air pressure, engine inlet PT311
HT Water pressure, jacket inlet PT401
LT Water pressure, CAC inlet PT471
Lube oil pressure, TC inlet (main
engines only)
PT271
Charge air pressure, engine inlet PT601
Charge air pressure, engine inlet PT601-2
Fuel oil temperature, engine inlet TE101
Lube oil temperature, engine inlet TE201
Lube oil temperature, TC outlet (main
engines only)
TE272
HT Water temperature, jacket inlet TE401
HT Water temperature, engine outlet TE402
HT Water temperature, engine outlet TEZ402
LT Water temperature, CAC inlet TE471
LT water temperature, LOC outlet TE482
Exhaust gas temperature, after each
cylinder
TE5011A..
Instrumentation and Automation
23 - 14 Wrtsil 20
Standard sensors Code
Exhaust gas temperature, TC inlet TE511
Exhaust gas temperature, TC outlet TE517
Charge air temperature, engine inlet TE601
Fuel rack position GT165
Engine speed 1 ST173
Engine speed 2 ST174
Engine speed, primary ST196P
Engine speed, secondary ST196S
Tubocharger speed SE518
Fuel oil injection pipe leakage LS103-A
Lube oil low level in oil sump LS204
Lube oil filter pressure difference PDT243
Stop lever in stop position GS171
Turning gear position GS792
Table 23-4 Control solenoids
Control solenoids Code
Start fuel limiter (If forward acting
RE2231)
CV151
Governor stop solenoid (If RE2231) CV152
Stop solenoid 1 CV153-1
Stop solenoid 2 CV153-2
VIC control solenoid CV381
Starting solenoid CV321
Charge air limiter, valve 1 CV657-1
Charge air limiter, valve 2 CV657-2
Table 23-5 Optional sensors
Optional sensors Code
Lube oil temperature, engine outlet TE202
Lube oil temperature, LOC outlet TE232
LT water temperature, CAC outlet TE472
Air temperature, TC inlet TE600
Charge air temperature, CAC inlet TE621
Crankcase pressure PT700
Fuel oil filter pressure differential
switch
PDS113
Fuel oil standby pump switch PS110
Instrumentation and Automation
Wrtsil 20 23 - 15
Optional sensors Code
Lube oil press switch, standby pump PS210
HT water press switch, standby pump PS410
LT water press switch, standby pump PS460
Sensors location for UNIC C1 (TC at free end), operating side
ST196S
ST174
# PDS113
TE101
TE401
#3 PSZ401
CV161
GS166 #3
CV153-1
CV153-2
PT700 #2
GT165
GS171
1 2 3 4
TE5011A... *
ST173
ST196P
PT101
PS110 #4
PT401
PS410 #4
GS792
CV321
PT301
TE 700#....*
#2 TE600
#2 TE621
SE518
LS103A
TE402
TEZ402
#) Optional, #2) FAKS/CBM-option, #3) If main engine, #4) Stand by pump op
tions, *) Depending on cylinder configuration.
Fig 23-7 V1
Instrumentation and Automation
23 - 16 Wrtsil 20
Sensors location for UNIC C1 (TC at free end), rear side and driving
end
TE272 #3
#2 TE232
PT601-2
TE601
PT601
TE511TE517
TE482
#2 TE202
LS204
PS460 #4
PT271 #3
PT471
TE471 #2 TE472
PDT243
PT201
PTZ201
PS210 #4
TE201
PT311
#2) FAKS/CBM-option, #3) If main engine, #4) Stand by pump options,*) De
pending on cylinder configuration.
Fig 23-8 V1
Instrumentation and Automation
Wrtsil 20 23 - 17
Sensors location for UNIC C1 (TC at driving end), operating side
ST196P
ST196S
ST173
ST174
PT271#3
TE621#2
GS171
GS166
TE401
TE101
#4 PS410
# PDS113
TE402,
TEZ402
#3
TE5011A...*
GT165
#5CV381
#2PT700
#2TE600
CV161
GS792
CV321
PT301
TE700#...*
SE518
LS103A
CV153-2
CV153-1
#) Optional, #2) FAKS/CBM-option, #3) If main engine, #4) Stand by pump op
tions,*) Depending on cylinder configuration,#5)If VIC (Variable inlet valve).
Fig 23-9 V1
Instrumentation and Automation
23 - 18 Wrtsil 20
Sensors location for UNIC C1 (TC at driving end), rear side and
driving end
TE601
#6 CV657
TE511
TE517
#3 TE272
#2 TE202
TE201
#2 TE472
LS204
PT471
#4 PS460
PT601-2
PT601
TE471
TE482
PSZ401 #3
PS110 #4
PT401
PT311
PT101
PDT243
#4 PS210
PT201
PTZ201
#2) FAKS/CBM-option, #3) If main engine, #4) Stand by pump options,*) De
pending on cylinder configuration,#6)If AWG (Air waste gate).
Fig 23-10 V1
Even if the above mentioned sensors are considered as standard the
amount and type of sensors can in special cases vary, depending on
the needs for various installations. The actual set of sensors and other
electrical equipment mounted on the engine, as well as alarm, load
reduction and shutdown set points, can be found in the installation
specific documentation. See, Chapter 09: Specific Installation data.
23.3.4. Engine Safety Module ESM V3
The ESM (Engine Safety Module) module handles the fundamental
engine safety, but also a number of speed measuring functions and
it feeds these signals to dedicated instruments. The ESM is also the
interface to the engine shutdown devices and local instruments and
the module constitutes also the major signal interface to external sys
tems of the engine.
Instrumentation and Automation
Wrtsil 20 23 - 19
The ESM module design is largely redundant, based on hardwired
logic and design meeting the strongest safety regulation. All adjust
ments are performed with DIP-switches and trimmers i.e. the module
needs no programming for application set-up.
The ESM module is located behind a window in the engine cabinet,
which makes it possible to view all the status LED's of this module
without opening the cabinet door.
ESM module
Fig 23-11 V1
Instrumentation and Automation
23 - 20 Wrtsil 20
Front panel of ESM
Fig 23-12 V1
1.Fuses for power supply.2.LED indications for function of module.
3.Connectors (inputs/outputs).
Instrumentation and Automation
Wrtsil 20 23 - 21
23.3.4.1. ESM power supply V2
ESM internal power supply principle
Primary
power
supply,
X11:1-3
Secondary
power
supply,
X12:1-3
24 V
+5 V
-5 V
+3,3 V
24 V
+5 V
-5 V
+3,3 V
24 V
+5 V
-5 V
+3,3 V
24 V
+5 V
-5 V
+3,3 V
Supply 1
failure
Supply 2
failure
Supply 3 or 4
failure
Power supply 1
for main logic
Power supply 2
for stop circuit 2
Power supply 3
for isolated engine
speed output
Power supply 4
for isolated TC
speed outputs
Failure
detection
Failure
detection
Failure
detection
24 V
+5 V
-5 V
+24 V
24 V
+5 V
-5 V
+24 V
24 V
+5 V
-5 V
+24 V
24 V
+5 V
-5 V
+24 V
Failure
detection
Main supply
failure
Failure
detection
Backup supply
failure
F1
F2
F3
Fig 23-13 V3
Instrumentation and Automation
23 - 22 Wrtsil 20
To ensure that the module is functional in all situations, full redun
dancy is achieved by combining the double incoming power supplies
to the module.
Supply failure detection:
- Failure on any supply activates ESM alarm output.
- Supply failures are detected on:
Primary, (Power supply 1).
Secondary, (Power supply 2).
Power supply 1-4, (internal power supplies).
LED indications (green) provided:
- Power 1, (primary).
- Power 2, (secondary).
- Fuses 1-3, (internal supplies).
Fuse values for ESM:
- F1 = 3,15 AT
- F2 = 3,15 AT
- F3 = 0,25 AT
Instrumentation and Automation
Wrtsil 20 23 - 23
23.3.4.2. Speed measuring and speed switches V18
Speed measuring and overspeed protection principle
Engine
speed
sensor 1,
X13:1-3
f / U
Sensor 1
failure
detection
Engine
speed
sensor 2,
X14:1-3
f / U
Sensor 2
failure
detection
Overspeed
trip circuit 1,
115%
Overspeed 1
Compare &
fail detection
Max select
Overspeed
trip circuit 2,
115%
Overspeed 2
Engine speed
output 1,
X27:7-8
U / I
Engine speed
output 2,
X28:7-8
Internal speed
signal
Power supply 2
Engine speed
pulse,
X27:1-2
f // f
Overspeed 1
SD status,
X25:5-6
Overspeed 2
SHD status,
X25:7-8
Speed diff.
failure
Speed sensor
2 failure
Speed sensor
1 failure
Power supply 3
U // I or U
Fig 23-14 V1
The engine speed is measured with two independent speed sensors
(see section 23.3.4.3) with separate supply circuits and with separate
sensor failure detection circuits. The sensors are of inductive prox
imity PNP-type. The frequency from the speed sensors are converted
into analogue voltages proportional to the rotational speed. The volt
age signals are used to trig the internal overspeed trip circuits in ESM.
Both overspeed limits are fixed to 115 % of rated engine speed.

Failure detection:
Frequencies of the two speed measuring channels are compared
to each other. A speed differential failure is triggered when the
difference between the speed signals is greater than 5 %. Speed
differential failure indication is disabled if rotational speed < speed
Instrumentation and Automation
23 - 24 Wrtsil 20
switch 1. The higher speed value (if different) is used as an internal
speed signal for controlling the analogue outputs and the speed
switches.
Short circuit detection.
Wire break detection.
Sensor failure and speed differential failure trigs ESM alarm output
after 2 s delay, if failure remains.
Speed outputs:
Engine speed output 1 (0-10 VDC or 4-20 mA depending of ESM
type) is connected to external systems. The signal is galvanically
isolated and short circuit proof.
Engine speed output 2 ( 4-20 mA) is used internally for local
indication (in WIP-1*).
Overspeed shutdown:
Trigging point for overspeed shutdown 1 is 115 % of rated engine
speed.
Trigging point for overspeed shutdown 2 is also 115 % of rated
engine speed.
Driver outputs Stop solenoid 1 and Stop solenoid 2 activate the
two stop solenoids CV153-1 and CV153-2. Stop solenoid 2 is only
activated in case of emergency stop/overspeed.
LED indications provided:
Speed sensor 1 failure, yellow.
Speed sensor 2 failure, yellow.
Speed differential failure, yellow.
Speed pulse 1, green.
Speed pulse 2, green.
Speed switch 1 ("engine running"), green.
Overspeed shutdown 1, red.
Overspeed shutdown 2, red.
Status/control outputs provided:
Speed switch 1 is used as "engine running" information, and is
part of the external interface of the engine. The same internal
switch also controls the hour counter.
Speed switch 2 has configurable switching level and is also part
of the external interface of the engine.
The two overspeed status switches IS1741 and IS1742 are
connected in series external to ESM, and are part of the binary
output signals of the engine.
Instrumentation and Automation
Wrtsil 20 23 - 25
23.3.4.3. ESM speed sensor V4
The rotational speed of the generating set is measured with a touch
free inductive PNP-type proximity sensor. A 24 V DC current is sup
plied to the sensor from the ESM. The third pin of the sensor gives
the speed proportional pulse train output. The pulse output voltage
level varies between two fixed levels: 0 V DC and 24 V DC.
The electronics of the M12x1 flying lead sensor is resin-moulded into
a tubular housing of nickel plated brass.
a ) Mounting the sensor: Turn the engine until the top of a cog is visible
in the sensor mounting hole. Carefully screw in the sensor by hand.
Unscrew it approximately 1.5 revolutions for a sensing gap of 2.00.5
mm, and tighten the counter nut well with a spanner.
Note!
Do not run the engine while the sensor is being adjusted.
Engine speed sensor
2.0 0.5 mm
24VDC
1
2
3
1. Black 2. Brown 3. Blue.
Fig 23-15 V2
23.3.4.4. Stop and shutdown signals V20
Lubricating oil pressure
A dedicated safety sensor (PTZ201 lubricating oil pressure) is con
nected to the ESM to activate the shutdown if the lubricating oil pres
sure is low. This analogue sensor (separate from the one connected
to external systems) shuts down the engine at predefined pressure
and delay set-points in the ESM.
Set-points for low lubricating oil pressure shutdown:
2.0 bar
2 seconds (delay)
If a sensor failure is detected, the shutdown is blocked and the sensor
failure is indicated.
Instrumentation and Automation
23 - 26 Wrtsil 20
Provided sensor failure detection:
Sensor failure indicated when the signal is out of range (<3.5 mA
or >20.5 mA).
ESM alarm output activates after 2 seconds, if the failure remains.
Provided LED indications:
Lubricating oil pressure sensor failure, yellow.
Lubricating oil pressure shutdown, red.
Lubricating oil pressure start blocking, red
Provided status outputs:
LO oil pressure shutdown status is part of the external signal
interface of the engine.
Oil pressure start-block is part of the external signal interface of
the engine.
HT water temperature
Dedicated safety sensors (TEZ402 HT water temperature, jacket out
let) are connected to the ESM to activate the shutdown, if the HT water
temperature is too high. The PT-100 signals of these analogue sen
sors are converted into internal voltage signals at the input stages in
the ESM, and are used for further processing. A 4-20 mA output de
rived from the higher of these signals is used for local indication of the
HT water temperature on the WIP-1*.
Set-point for high HT water temperature shutdown:
110 C
Note!
In main engines in ship installations, this shutdown is disabled, and
load reduction is initiated on the basis of another sensor signal in the
external system of the engine.
Provided sensor failure detection:
Sensor failure indicated when the signal is out of range.
ESM alarm output activates after 2 seconds, if the failure remains.
If a sensor failure is detected, the shutdown is blocked and the
sensor failure is indicated.
Provided LED indications:
HT water temperature sensor failure, yellow.
HT water temperature shutdown, red.
Provided status output:
HT temperature shutdown status is part of the external signal
interface of the engine.
Instrumentation and Automation
Wrtsil 20 23 - 27

23.3.4.5. Shutdown reset V7
There is a Shutdown reset input on ESM, and this is connected in
parallel with the reset input of MCM (if used). Reset has to be pressed
after all automatic shutdowns, as all shutdowns are latching in UNIC
system. A reset will release this latch, and a start of the engine is
possible to perform. Reset does however not override shutdown sig
nals that are still active. The ESM reset input is disabled when rota
tional speed is more than 2 % of rated speed.
LED indication provided:
Shutdown reset, yellow.
23.3.4.6. Other ESM inputs/outputs V17
The following additional inputs are used in the ESM:
Stop 1 is activated by the MCM (if used) or by the local and remote
stop signals. Activation of this input keeps the primary electro-
pneumatic stop solenoid and the governor stop solenoid
energized, and the engine shuts down. This input is latching, that
is, activated until a predefined delay has elapsed, or until the reset
is pressed. A red LED indicates that the Stop 1 input is activated.
In this situation, an external status signal, the binary output Stop
status is activated.
Stop 2 is activated by the LCP during an engine blow situation.
Activation of this input keeps the primary electro-pneumatic stop
solenoid and the governor stop solenoid energized during the blow
procedure, to secure that the engine does not start. This input is
non-latching , that is, reset is not necessary after the blow. A red
LED indicates that the Stop 2 input is activated. In this situation,
an external status signal, the binary output Shutdown status is not
activated.
Main controller shutdown is activated by the MCM (if used) in case
of an automatically generated shutdown. Activation of this input
keeps the primary electro-pneumatic stop solenoid and the
governor stop solenoid energized, and the engine shuts down.
This input is latching, that is, reset is required to release the
shutdown. Signal interruption failure detection (using a 22 k
resistor) is provided between the two modules. LED indicators for
Main controller shutdown (red) and Main controller shutdown
failure (yellow) are provided.
External shutdown 2 is connected to the external safety system.
Activation of this input keeps the primary electro-pneumatic stop
solenoid energized, and the engine shuts down. This input is
latching, that is, reset is required to release the shutdown. A signal
interruption failure detection (using a 22 k resistor in marine
Instrumentation and Automation
23 - 28 Wrtsil 20
configurations) is provided between the two modules. LED
indicators for External shutdown 2 (red) and External shutdown 2
failure (yellow) are provided.
External shutdown 4 is connected to an external emergency stop
signal, and the signal is in parallel with the local HS723 Emergency
stop button. Activation of this input keeps both electro-pneumatic
stop solenoid and the governor stop solenoid energized, and the
engine will shut down. This input is latching, that is, reset is
required to release the shutdown. Signal interruption failure
detection (using a 22 k resistor in marine configurations) is
provided between the module and the external emergency stop
button. LED indicators for External shutdown 4 (red) and External
shutdown 4 failure (yellow) are provided.
The following additional outputs are used in the ESM:

Stop status activates when the manual stop is activated.
Shutdown status activates in case any ESM initiated shutdown or
the External shutdown 4 input is activated.
Stop/shutdown status 1 activates when the manual stop has been
activated, or in case any ESM-initiated shutdown or an external
shutdown input is activated.
External shutdown status 2 activates in case the External
shutdown 2 input is activated.
External shutdown status 4 output in the ESM activates in case
the External shutdown 4 (emergency stop) input is activated.
23.3.5. Power distribution module (PDM) V20
The power supply of the engine is set up according to overview
scheme below.

Instrumentation and Automation
Wrtsil 20 23 - 29
Power supply and distribution principle
External system
(Ship or power plant)
Off-engine
equipment
Engine mounted equipment
Main
supply
Backup
supply
External system
- Main power supply
- Backup power supply
Off-engine equipment
- DC/DC converter
- AC/DC converter
- Galvanic isolation
PDM
- EMC filter
- Overvoltage protection
- Transient suppressors
- Over-current protection (fuses)
- Power failure detection
- Earth fault detection
Engine
Fig 23-16 442381 V1

The PDM's (Power Distribution Module's) purpose is used to distrib
ute the power supply to all electronic equipment on the engine. The
module handles filtering of the power supplies, protection against
over-voltage and voltage transients and monitoring of earth faults.
The whole power supply system is floating in respect to ground (PE)
(providing that the both external supplies are isolated). PDM is sup
plied with two supplies which are redundant. Only the supply to the
fuel rack speed actuator's driver is by-passing the PDM, all other
consumers are connected through this module.
The following features are provided in PDM:
Monitoring of voltages
Short circuit protection
EMC filter
Over-voltage protection
Transient suppressors
Power failure detection
Earth fault detection
Reverse polarity protection
Instrumentation and Automation
23 - 30 Wrtsil 20
PDM module
Fig 23-17 V1

Internally, the PDM is designed in the following principal way.

Principal internal design of PDM
E F D *
E F D *
B U S
B U S
A U X 1 & 2
P S S 1
2 4 VD C
P S S 2
2 4 VD C
= vo lta g e m o n ito rin g p o in t
E F D *
E F D *
B U S 1
B U S 2
A U X 1 & 2
P S S 1
2 4 VD C
P S S 2
2 4 VD C
= vo lta g e m o n ito rin g p o in t
*) when EFD not handled by external supply
Fig 23-18 V1

Instrumentation and Automation
Wrtsil 20 23 - 31
LED indications are provided for the input supply voltages, for the
fuses and for earth fault monitoring.
Input voltages are monitored and if the supply voltage drops below
18VDC, the PDM alarm output is activated. The LED indication
corresponding to the input with the low voltage is then turned off.
Each fuse has an individual (green) LED. The LED will turn off if
the fuse has blown.
An earth fault is indicated with LED indications, positive line failure
and negative line failure separately. The earth fault detection
alarm level is adjustable between 3 k - 300 k with a 10-step
rotational switch. The earth fault detection can also be turned off
with this switch. A time delay for the activation of the earth fault is
selectable between 0 - 128 seconds with a 9-step rotational
switch.

Fuse sizes are:
BUS 1: 10A
BUS 2: 10A
AUX 1: 10A
AUX 2: 10A
The PDM has the following failure outputs:
1 x potential free output for general failure
1 x potential free output for earth fault
The failure outputs are open when active, meaning that total power
failure also will result in an alarm.
23.4. Functionality of the UNIC
23.4.1. Speed controller
23.4.1.1. Speed controller V17
In the speed control algorithm the speed reference is compared with
the measured engine speed. The difference between these signals
constitutes the input to a PID-controller. The regulation output of the
MCM controller will accordingly change, to sustain the reference level.
Instrumentation and Automation
23 - 32 Wrtsil 20
This output will set the position request of the fuel actuator, i.e. control
the diesel fuel rack position. The fuel actuator can either be an electro-
hydraulic actuator or a full-electric actuator
23.4.1.2. Dynamics V2
The PID-controller uses different sets of dynamic parameters for op
eration under acceleration, under no-load conditions and under load
ing conditions, to obtain optimal stability at all times. The PID settings
are speed dependent for start acceleration and for open circuit break
er/clutch conditions, and load/speed dependent when the engine is
loaded. A special speed deviation dependent feature is also provided,
to minimise large speed fluctuations. The proportional gain is speed
deviation mapped, for more aggressive control in case of large devi
ations from the reference speed.
23.4.1.3. Limiters V3
The three available limiters are the following:
A start fuel limiter is active during the engine start, up to a rotational
speed level of 20 rpm below the rated speed. The start fuel limiter
settings in this 8-point table are speed-dependent, and the limiter
works in combination with a speed reference ramp used at engine
start. The acceleration ramp is set for an optimal acceleration rate.
A charge air pressure limiter (8-point map) can be used to reduce
over-fuelling and black smoke at load steps at low engine load
levels. At low load levels, this feature also improves the load
acceptance of the engine.
A load-dependent fuel limiter can be used to set an envelope of
maximum fuelling at various engine loads. This feature improves
the load acceptance of the engine, but it is also used as a limiter
for the maximum load output.
23.4.2. Synchronizing/clutch-in V1
23.4.2.1. Genset V1
When the engine is started, it initially operates in CB open control
mode. The speed accelerates up to idle speed, and thereafter (when
OS176 Idle select input is low) ramps up to rated speed. When the
engine speed reaches rated speed, an external device (synchronizer)
activates the synchronization. Commands from this synchroniser unit
activate the two binary inputs OS163 Speed increase and OS164
Speed decrease to obtain the requested speed level. The speed ref
erence can be altered between a pre-determined min. and max.
Instrumentation and Automation
Wrtsil 20 23 - 33
speed reference level by using these inputs, thus the internal speed
reference is in this way biased so that the generator frequency exactly
will match the plant frequency.
When the two frequencies are totally matched (in addition also the
phase matching and the generator voltage level must match), the
generator breaker can be closed. Alternatively an analogue syn
chronizer can be used (connected to the dedicated input OS160 An
alogue synchronizer). This input is used for synchronization, if binary
input OS160 analogue synchronizer enable is set true.
Step mode is active when INC/DEC pulse mode selector is set true
INC pulses
DEC pulses
Time
Engine speed reference
E
n
g
i
n
e

s
p
e
e
d

r
e
f
e
r
e
n
c
e
Pulse step size
Fig 23-19 V1
Instrumentation and Automation
23 - 34 Wrtsil 20
Ramping mode is active when INC/DEC pulse mode selector is set
false
INC pulses
DEC pulses
Time
Engine speed reference
E
n
g
i
n
e

s
p
e
e
d

r
e
f
e
r
e
n
c
e
Ramp rate
Fig 23-20 V1
There are two ways to affect the speed reference with these binary
inputs. If ramp mode is configured true (default), the speed reference
will be ramped as long as one of these inputs is high. If step mode is
configured true, the speed reference is affected a pre-determined
step each time one of these input signals is set high (flank trigged).
23.4.2.2. Main Engines V2
Main engines on ship installations are using an analogue speed ref
erence signal instead of the above described OS163 Speed increase
and OS164 Speed decrease inputs. When input OS7325 Analogue
speed ref. select is activated, the MCM speed controller will use the
reference signal OT190 Analogue speed reference. The internal
speed reference will be ramped up and down according to the level
of this signal. Max. and min. speed are predefined (configurable).
Instrumentation and Automation
Wrtsil 20 23 - 35
If input OS7326 Fixed speed select is activated, the speed will (re
gardless of other input signals) be ramped up or down to a pre-de
termined fixed speed level. Further synchronisation/clutch-in can then
be performed from this level by using inputs OS163 Speed increase
and OS164 Speed decrease.
Clutching the first engine
Time
Idle Speed
Clutch in speed
+Clutch
in speed
window
-Clutch
in speed
window
E
n
g
i
n
e

s
p
e
e
d

r
e
f
e
r
e
n
c
e
Fig 23-21 V1
Clutching the second engine
Fig 23-22 V2
Instrumentation and Automation
23 - 36 Wrtsil 20
Speed goal reference during start sequence, depending on pre-set of
binary inputs.
Time
OS7601 Clutch-in requested
OS7321 Fixed speed ref select
OS7325 Analogue speed ref select
OS176 Idle speed
Depending of status:
S
t
a
r
t

r
a
m
p
i
n
g
Fixed speed
Clutch in speed
Analogue speed
Rated speed
Idle speed
Idle speed
E
n
g
i
n
e

s
p
e
e
d
Fig 23-23 V1
23.4.3. Engine loading, general V2
When the generator breaker or clutch is closed, the engine is oper
ated in droop mode, kWmode or isochronous load sharing mode, pri
marily depending of the pre-selection of the OS7328 kW control en
able and OS7329 Isochronous load sharing enable inputs. The kW
and isochronous load sharing modes require that the system to vital
parts is functional, if important signals are missing or not communi
cated, the functionality will automatically switch over to droop mode.
23.4.4. kW control mode V20
In kW control mode, the control loop is a true load control loop where
the engine speed is only used for safety purposes. An internal load
reference is compared to the measured engine load (UT793 Gener
ator load input signal). The error is the input to a PID controller for the
load control loop.
The output of the controller determines the position of the fuel rack,
and thus the output is set to sustain the load reference level
kW control mode is used particularly on power plant engines. This
control mode is activated when the input OS7328 kW control ena
ble is activated and the GS798 Generator breaker status and GS799
Grid breaker status inputs are both closed. The kW control mode has
most benefits in base load applications where the grid frequency sta
Instrumentation and Automation
Wrtsil 20 23 - 37
bility is low. The engine load does not fluctuate according to the fre
quency in the same way as if it would do in speed control mode with
droop.
kW control mode
0 100 % 50
1
2
3
4
6
5
1. Engine speed (rpm) 2. Engine load (%) 3. Operating area for true kW control
4. Operating point with old load reference 5. Operating point after ramping to
new load reference 6. Grid frequency
Fig 23-24 V2
If the grid frequency is not within a predefined speed window, or if the
UT793 Generator load signal fails, the control mode automatically
trips to droop mode. The speed reference is updated continuously by
the speed control loop in kW control, which means that if a trip occurs,
the transfer is almost bumpless. By toggling the OS7328 kW control
enable input, kW mode is restored, providing that all enabling condi
tions are met.
When entering this mode from CB open control mode, the load ref
erence is initially set to a predefined base level. This is done to avoid
risk of reverse power of the genset when entering this mode from the
CB open control mode. The internal load reference is then ramped up
to the externally given reference OT795 kW reference with a prede
fined ramp rate.
Instrumentation and Automation
23 - 38 Wrtsil 20
Relative base load reference
3
1
1
2
2
4
5
6
11
8
7
9
10
1. Engine load reference 2. Time 3. Gen CB is closed 4. Engine load
reference 5. Engine load reference is started to ramp to goal reference
6. Relative base load is set to engine load reference 7. OS7321, Engine unload
8. Gen CB open command is set active 9. Engine load reference 10. Engine
load 11. Relative trip load
Fig 23-25 V4
When input OS7321 Engine unload is activated, the load reference
target is set to a base load level, and the load reference is ramped
down according to a predefined unload ramp rate. When reaching this
level, the OS7602 Gen. breaker open command output goes high
(engine disconnected) and CB open control sub-mode is entered.
Instrumentation and Automation
Wrtsil 20 23 - 39
In kW control mode, the controller uses dedicated load-dependent
PID settings.
23.4.5. Droop mode V8
When two or more engines are operating in parallel, some kind of load
sharing must be provided. Load sharing means that each engine will
contribute equally to the total power demand, and it ensures that load
changes are absorbed evenly by the engines in operation.
Droop control is a basic load sharing method, by which parallel run
ning engines share the load by decreasing their internal speed refer
ence proportionally to an increase in load. No communication or sig
nalling is needed between the engines in this mode. The droop value
is normally set to 4 %, but the setting can if necessary be changed.
Too low droop value means that the load can potentially start oscil
lating between the engines. Too high droop value means that the
plant's frequency decreases more steeply with the load level.
Droop mode
1. Operating Point
Before load change
2. Operating point
after load change
3. Operating point
after correction
Nominal net frequency
Droop curve
Engine load
100
[%]
50
0
Ref. correction
Speed reference
[rpm]
Fig 23-26 V1
Load sharing based on droop, means that the power management
system (PMS) may after major load changes have to compensate the
effect derived from the droop slope. Therefore, this system should
under such conditions activate the OS163 Speed increase or the
OS164 Speed decrease input of UNIC system (in so called cascade
control) to compensate for the droop slope i.e. to ensure that the bus
frequency is kept within a certain window regardless of net load level.
The PMS system must however have a control dead-band imple
mented, allowing for an uneven load or frequency drift of 1... 2 %.
Instrumentation and Automation
23 - 40 Wrtsil 20
External system compensates the negative effect derived from Droop slope
P
I
D
SPEED CONTROL
REFERENCE
SPEED
ACTUAL
SPEED
SPEED PICK-UP
ERROR
ACTUATOR
ACTUATOR
DRIVER
-
+
P
I
D
SPEED CONTROL
REFERENCE
SPEED
ACTUAL
SPEED
SPEED PICK-UP
ERROR
ACTUATOR
ACTUATOR
DRIVER
-
+
Plant net Load
Plant net frequency
Frequency is biased by increase/decrease pulses (influences the controllers speed reference)
PLC/
PMS
Fig 23-27 V1
In droop mode the load of the engine is ramped up by setting the
OS163 Speed increase input high. The internal speed reference in
UNIC increases with a pre-defined rate (the rate of change is config
urable), and this determines thereby the loading rate. Increase com
mands are used until the load level of this engine is equal to other
sets running in parallel. In other words, the OS163 Speed increase
and OS164 Speed decrease inputs shall not only be used for bus
frequency compensation, but also for biasing the load between the
engines.
Instrumentation and Automation
Wrtsil 20 23 - 41
Ramp control in droop mode
INC pulses
INC pulses
DEC pulses
DEC pulses
Pulse step size
Engine
speed reference
Engine
speed reference
E
n
g
i
n
e

s
p
e
e
d

r
e
f
e
r
e
n
c
e
E
n
g
i
n
e

s
p
e
e
d

r
e
f
e
r
e
n
c
e
Time Time
Fig 23-28 V1
When it is intended to shut an engine down, the engine load can in
the corresponding way be decreased, by activating the OS164 Speed
decrease input. When the load has reached a low level, the generator
breaker can be opened, and the engine be shut down.
Droop mode can also be used on larger grids, but this is not recom
mended (particularly if the grid frequency has high variations) due to
the risk of engine overload. Droop mode is also a backup mode to kW
control mode and isochronous load sharing mode, if conditions to
keep the engines in these modes of some reason are not fulfilled.
23.4.6. Isochronous load sharing mode (optional) V3
An engine operating in isochronous load sharing mode, will keep the
speed at the speed reference, regardless of the load level of the sys
tem. Engines operating in isochronous mode need to have the same
relative speed reference for load sharing.
In generator engines, the speed reference is initially always rated
speed. In propulsion engines the speed reference is set according to
the analogue speed reference from the propulsion system controller.
Instrumentation and Automation
23 - 42 Wrtsil 20
Operating point diagram
Speed reference
[rpm]
Engine load
[%]
0 100 50
Operating point
before load change
Operating point
after load change
Nominal net frequence
& speed reference
Fig 23-29 V1
Two or more main engines running in parallel (analogue speed ref.
selected is true on at least one engine) will monitor the speed refer
ence of the engines which have analogue speed reference selected
true (over the LS-CAN load sharing bus), and (if several) select the
highest one for all engines. The speed reference can only be adjusted
between the end levels lowest analogue set speed ref. and highest
analogue set speed ref. If fixed speed is selected on one of the en
gines running in parallel, all the other engines are switched to follow
the speed reference of this engine. Now the speed of the system can
be increased/decreased using the OS163 Speed increase and
OS164 Speed decrease inputs or OT160 Analogue synchronizer on
the engine switched to fixed speed. If one engine has the OS7326
Fixed speed select input set high, this engine will be master for the
other engines running in this mode.
A pre-defined ramp rate is used, to ramp to fixed speed (if the OS7326
Fixed speed select input us used) before the OS163/OS164 inputs
will affect the speed reference. The speed reference can only be ad
justed between a pre-defined min. and max. level.
Load sharing in isochronous load sharing mode is provided with com
munication over LS-CAN. Each engine monitors the relative load itself
and of the other engines connected to the same electrical compart
ment, and calculates a relative system load. The unit compares its
own relative load with the relative system load, and biases its internal
speed reference, until the two loads are equal.
Always when a new engine is connected to the load sharing com
partment it should be softly uploaded. In order to provide soft upload
ing of an engine in isochronous load sharing mode a pre-defined ramp
rate is used. The value of the engine specific load sharing ramp is
Instrumentation and Automation
Wrtsil 20 23 - 43
zero during normal isochronous load sharing operation, i.e. when the
relative load of the engines on the load sharing bus is equal. Unload
ing of an engine running in isochronous load sharing mode is ach
ieved by setting the input OS7321 Engine unloading high. When the
input is activated the unloading is performed by ramping down the
engine load similarly to the uploading case. When the relative engine
load reaches a pre-defined trip level, the binary output OS7602 Gen
erator breaker open cmd, and OS7603 De-clutch will go high, and the
engine will thereby be disconnected.
Ramping of LS ramp during uploading
ramping of LS ramp during uploading of engine in isochronous
load sharing mode
OS7327, emergency
loading rate
engine added to
isochronous group
L
S

r
a
m
p
OS7321, engine
unload
time
0
plant load
Load sharing gain
u
p
lo
a
d
ra
m
p
ra
te
e
m
e
r
g
e
n
c
y

u
p
l
o
a
d
r
a
m
p
r
a
t
e
the LS ramp affects directly the
load sharing error, in order to
achieve soft uploading
global speed
reference
load sharing
error
local speed
reference
Fig 23-30 V1
Instrumentation and Automation
23 - 44 Wrtsil 20
Ramping of LS ramp during unloading
ramping of LS ramp during unloading of engine in isochronous
load sharing mode
L
S

r
a
m
p
OS7321, engine
unload
OS7327, emergency
loading rate
time
plant load - trip load
Load sharing gain
u
n
lo
a
d
r
a
m
p
r
a
te
e
m
e
r
g
e
n
c
y

u
n
l
o
a
d
r
a
m
p
r
a
t
e
the LS ramp affects directly the
load sharing error, in order to
achieve soft unloading
0
global speed
reference
load sharing
error
local speed
reference
Fig 23-31 V1
Load sharing bias is provided, if it is desired to run some of the en
gines on the same electrical compartment on a constantly different
relative load compared to the other engines. This is achieved by using
the IT796 Asymmetric load sharing bias input.
In isochronous load sharing mode, the controller will use dedicated
load & speed depended PID settings.
23.4.7. Backup governor (optional) V2
In some mechanical main propulsion engine applications a mechan
ical backup governor is provided. Should the MCM speed controller
have a dual power supply loss or otherwise fail, the mechanical back
up governor will automatically take over. This mechanical governor
will however only provide fundamental speed governing in droop,
while special dynamic features and control modes will not be provi
ded.
Instrumentation and Automation
Wrtsil 20 23 - 45
Instrumentation and Automation
23 - 46 Wrtsil 20

You might also like