Electrician Competency.
Electrician PPE’s.
Electrician Hand Tools.
Electrical Testing Devices.
Electrical Operated Power Tools.
Project -Electrical Infra Layout.
SLD.(Single Line Diagram)
Legal Comply.(DG, Transformer CTE & CTO from CEIG)
DG Installation Safety Procedures.
Transformer Installation Safety Procedures.
UG Cable Laying safety Procedures.
Cable Joint Fixing & Removing Procedures.
Overhead Cable Laying Safety Procedures.
Temp. Electrical Cable Laying Safety Procedures.
Earth Pit Installation Safety Procedures.
Area Lighting Installation Safety Procedures.(Portable & Fixed Lights)
Lux Measuring During Night Work.
LOTO (Lock Out Tag Out )Procedures.
Electrical Inspection Checklist & Tagging.
Electrical Safety Signs and Posters.
Improvement Tracker.
Electrician Competency.
Electrician Qualification:
-Valid licensee/Permit issued from state govt.
Authority's.(Wireman)
-Education is Minimum12th pass.
-Work experience is must at least 2 to 3 years in
industrial electrical works.
First Second
Intrusion Protection Moisture Protection
Digit Digit
0 No protection. 0 No protection.
Protected against solid objects over 50mm, Protected against vertically falling
1 e.g. accidental touch by hands.
1 drops of water, e.g. condensation.
Protected against solid objects over 12mm, Protected against direct sprays of water
2 e.g. fingers.
2 up to 15 degrees from the vertical.
Protected against solid objects over 2.5mm, Protected against direct sprays of water
3 e.g. tools & wires. 3 up to 60 degrees from the vertical.
Protected against solid objects over 1mm, e.g. Protected against water splashed from
4 wires & nails.
4 all directions, limited ingress permitted.
For Transformer
Required Documents:
Invoice copy.
Kwh.(Power Calculator for Transformer.)
(Each DG set shall be tested Ambient Air, Noise Level and stack Height Level Prior to use)
Site Project Manager to apply application form duly filled and signed by himself in
coordination with Legal comply team at HO (HO Hr)
Site Project Manager & HOD (Electrical) has to take follow-Up till receipt of certificate
from CEIG.
Electrical HOD will be coordinate to the site electrician to prepare required documents
& provision as per req. ( layout, Work load Calculator) at site level.
DG Installation Procedures.
DG Inspection Checklist.
Panel Board/ Distribution board Inspection checklist.
ELCB/RCCB/RCBO Inspection checklist.
Earth Pit testing report.
Power Tools Inspection Checklist.
SOP.
Site electrician maintain the proper records of all electrical installation at site.
Electrician should be inspect & tag it to the all electrical asset for safe use.
Standard inspection checklist to be use for inspections of all electrical assts.
All inspected asset should be tagging as per the monthly COLOR Coding.
JAN/MAY/SEPT
FEB/JUNE/OCT
MAR/JULY/NOV
APR/AUG/DEC
Safety Sign board
Improvement Steps.
Level 1 Level 2
Electrician Gumboot, Jacket & Gloves
SLD for DG & Panel.
Electrical Line Tester
DG Installation Procedures.
Cable Live Detector
Panel installation Procedures.
Project Electrical Infra Layout
Earthling Pit procedures.
LOTO kit.
ELCB & Earth Pit Testing.
Cable Hangar.
Legal Comply Tracker.(CTE /CTO) , Power Tools Selection & Use.
Ambient air, Noise & Stack Level)
Cable Marker.
Telescopic cable lay stick.
IP Rating DB & all Electrical installation technical
specification. Level 4
Level 3
UG Cable procedures. Rubber Mat IS Marked.
Portable lights stand & color code.(Yellow) Fire Stand
Electrical cable stand & color code.(Yellow) Safety Sign Board
Utility pole & color code(Brown). Earth Pit Cover
Spill Kit. Lightening arrestor.
Electricity is silent , Invisible, and potentially fatal, so it deserves the utmost
respect .Never ever take electricity for granted, and never assume a circuit is dead.