Forward and Backward
Scheduling
Backward scheduling begins with the
due date and schedules the final
operation first (Catering a banquet,
scheduling surgery)
Schedule is produced by working
backwards though the processes
Resources may not be available to
accomplish the schedule
Now Due
Dat
OM Session 9: Benzin Dahal
e 6
Forward and Backward
Scheduling
Backward scheduling begins with
the due date and schedules the
final operation first
he s are
Schedule eisapproduced proac rade-oby ff working
n th es lo p at d
backwards
Oft e
d to dethough
v e
ch e duthe
le an processes
o m bine as ib le s tes
c
Resources en a fe may d
a
unot be available to
e d
et we e r
b c u stom
accomplish the schedule
Now Due
Dat
OM Session 9: Benzin Dahal
e 7
Different Processes/
Different Approaches
Forward-looking
Process-focused
schedules MRP due
facilities
dates
Finite capacity scheduling
Work cells
Forward-looking
schedules MRP due
dates
Detailed schedule done
Repetitive facilities using work cell
priority rules (kanban)
Forward-looking schedule with
a balanced line
Product-focused Pull techniques for scheduling
facilities (JIT+kanban)
Control Files
Track the actual progress made against
the plan
OM Session 9: Benzin Dahal 11
Loading Jobs
Assign jobs so that costs, idle time, or
completion time are minimized
Two forms of loading
Capacity oriented
Assigning specific jobs to work
centers
1. Correcting performances
2. Increasing capacity
3. Increasing or reducing input to
the work center
• Expert
systems Setups and
run time
• Simulation
models
Theory of Constraints