GIANT-DOC-ALFE-DRAWING-L109-SK-K10.1L.R1-Giant Template

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SKETCH DRAWING NOTES:

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.


APPROVED
FOR 2. ALL WEIGHTS AND IN t (METRIC TONNES) UNLESS OTHERWISE
CONSTRUCTION LOAD DISTRIBUTION CALCULATION STATED.
INITIALS: IDVDATE: 2024.03.18 3. CLIENT REFERENCE DRAWINGS:
125 Te

4. WEIGHT & COG INFORMATION SUPPLIED BY CLIENT.


125 Te

REFERENCE DOC. NO.:


K52055-60-11-CS-217CE011_R1_[SK-K10.1]
20083

43040
TECHNICAL NOTES:

41152
14182 5901
R2 R1 1. CRANE ON STEEL MATS TO REDUCE THE GROUND BEARING
3053 PRESSURE.

1621
2. LIFTING PLAN IS FOR REVIEW.
3. WIND SPEED LIMIT DURING LIFTING MUST NOT EXCEED 9.8m/s.
95t SK-K01 4. TAG LINES MUST BE ATTACHED TO ITEM FOR LOAD CONTROL.
5. WEATHER CHECK IS A MUST BEFORE DOING LIFTING.

72108 MR1 = 0 But R1+ R2 = 95Te


R2(20083) - 95Te (5901) = 0
.0m

.0m

m
R1 = 95Te - R2

T 84.0
NGHT 84

NGHT 84
R2 = 95Te (5901) / 20083 R1 = 95Te - 28Te

86248
LENGH
R2 = 28Te Therefore R1 = 67Te 6023

15545
BOOM LE

BOOM LE
125 Te

eT 521

125 Te
eT 521

125 Te
125 Te

BOOM
MA

MA

MA
ST

ST

ST
TAG LINES

17134

52900
LEN

LEN

LEN
m
5.5
.5m

T3
GH

GH

GH
35

GH
HT
T3

T3

T3
28327

N
NG

35163
LE
9.0

9.0

9.0
LE

28050
OM
m

m
OM

BO
BO

12693
125 Te
83

83

80
REFERENCE PHOTO
125 Te
.2

.2

.1
°

°
9588
5336
0.00 mm

500
12300 18000 13200 12300 11000

1390
15000 13000 15000 15000 13000 15000 17500
FOUNDATION

ELEVATION VIEW - PICKING AND SLEW ELEVATION VIEW - SLEW ELEVATION VIEW - LANDING
1-INTPR1-4

90°
SK-P50B 606811E54E 606811E54F

606311V50EA 606311V50EB

606811E54D 606811E54G

29961
1-INTPR1-3

606811E54C 606811E54H
16567
REFERENCE POINT
TAIL CRANE
1-INTPR1

(E+41884,N+23600)
16322
2-PR1-2

DELIVERY
1-INTPR1-2

DEMAG AC7002-PR1

POSITION
606811E54B 606811E54I
1-INTPR1-1

MAIN CRANE TAIL CRANE


Reference point
(E+39893,N-57925)
2-PR1-1

REFERENCE POINT Reference point


(E+39440,N-2867)
1-PR4-6

(E+37089,N+7219)
60702301 607022F01 607021F01
2-PR1-G
2-PR1-H

2-PR1-D

2-PR1-C
2-PR1-E

2-PR1-B

2-PR1-A

INLET
2-PR1-F

INLET
1-BUA-10

1-BUA-F

1-BUA-12

606811E54A 606811E54J
1-BUA-E

Reference point Reference point

180 WIRE SLING 6.0m X


(E+35745,N+4669) (E+36184,N+2609)
1-BUA-11

7468

ENDLESS SLING /
1-BUA-9

0 42°
2-APUA-G
2-APUA-H

2-APUA-D

2-APUA-C
2-APUA-K

2-APUA-E

2-APUA-B

2-APUA-A
2-APUA-F
2-APUA-J

150000
2Nos. 80T CAPACITY
1-BUA-G
1-BUA-H

1-PR4-5

600
GROMMET 12.0M O/L X
2-APUA-2

EACH
1-BUA-8

6000

35° 2NOS. 157T CAPACITY

0
606811S14 Hold

2-APUA
EACH
1-BUA-7

606711E41B Reference point


(E+26818,N-61043)
2-APUA-1

REFERENCE POINT
SK-P51A (E+26200,N+4850)
1-PR4-4

2-APUB-2
1-BUA-B

1-BUA-A

SK-P51B&C
1-BUA-6

601511E70
20

3800

Reference point 609511V80A


(E+25275,N+13977) 609511V80B 2-APUB
REFERENCE POINT
13

(E+20093,N-49150)
SHACKLE X 4Nos. 85t
1-BUA-5

606711E41A Reference point


2-APUB-1

(E+21388,N-51568)
2-PR3-2

105ton, 25.3m
CAPACITY EACH
21066
2-APUB-C
2-APUB-E

2-APUB-D
1-PR4-3

SHACKLE X 4Nos. 125t


2-APUB-B

2-APUB-A
2-APUB-F

90°
70ton, 16.5m

2400 2-PR3
R13

601711V37E
inlet
40 ton, 13m 90° 0°
Reference point
(E+16988,N-46283)
CAPACITY EACH
2-PR3-1

605521E76B 606921V32E 606921E31A

SPREADER BAR X
125 Te
1-BUA-4

outlet 601521S04

2-PR3-B

2-PR3-A

eT 5

Te
125
21

606921V32
10072

inlet
5.0m X 144t
000

605521E76A 10.5 ton, 5.3m


95 ton, 28.5m

R1 606711V41A REFERENCE POINT


2-PR4-6

(E+10328,N-15150)

75 90°

4500 CAPACITY
eT 521

125 Te

outlet 59 ton, 17.3m

00
606711V41E
1-PR4-2

125 Te

REFERENCE POINT
125 Te 125 Te

(E+13597,N+16049) 90°

SPREADER BAR X
REFERENCE POINT
1-BUA-3

ENDLESS SLING /
Reference point P30 PUMP
(E+6301,N+27845) (E+9719,N+24477) 1-PR4 0° 2-PR4
1-BUA-2

10.5 ton, 5.4m 125 Te


96 ton, 24.5m 125 Te 606521V30 606921V30E

4.5m X 300t
2-INTPR2-D

2-INTPR2-B

2-INTPR2-A

GROMMET 12.0M O/L X


1-BUA-1

2-PR4-5

90° 606711V41B
Hold 606711V41E
inlet/outlet inlet/outlet
2-INTPR2-2

10.5 ton, 4.9m

CAPACITY 2NOS. 50T CAPACITY


1-PR4-1
1-BUA-D

1-BUA-C

606811V51
1-BUA-A

0° REFERENCE POINT
7722
1-PR4-B

1-PR4-A

2-INTPR2 (E+11805,N-36067) Reference point


2-INTPR2-1

606811V51EA 606811V51EB
Upper:66 ton, 15.1m
Lower:173 ton, 33.9m
(E+4925,N-40537)

EACH
R15
1-PR3-B

1-PR3-A

601511S04
2-INTPR2-C
2-INTPR2-E
2-INTPR2-F

Reference point
85ton, 22.4m 80 ton, 22.4m
1-PR3-2

6000
(E+3105,N-2867) 90°

Reference point 270° MATS DIMENSION (6mX1.0m)


1-APUB-E


1-APUB-D

1-APUB-C

1-APUB-A
1-APUB-F

(E+1300,N+24700) Hold
1-PR3
000

2-PR4-4
1-APUB-B
1-PR3-1

GBP UNDERMATS = LOAD*2.0m / 6m


6 ton, 2m
RETURN
G3/4"

ENDLESS SLING /
DELIVERY
G3/4"

606811E51 606922V32 606921E31B


1-APUB-2

REFERENCE POINT
(E+1510,N-35700)
601721V37E
2325 2075
8000

Reference point
(E-1295,N+2418)

1-APUB
REFERENCE POINT
(E+1928,N-8568) GROMMET 16.0M O/L GBP UNDERMATS = (58.61t*2.0m)/6m= 19.5t/sq.m
606921V32E X 4NOS. 112.8T
REFERENCE MAIN CRANE
601521E70
1-APUB-1

CAPACITY EACH
2-PR4-3

Reference point
1-APUA-2

(E-6725,N+11893)

POINT
Hold

6000 LIEBHERR LR1800-1.0


2-INTPR3-2

1-APUA 2024.06.19 1 IDV RIGGING CHANGE AT MAIN AND TAIL LIFT CRANE
2-INTPR3-1

2024.03.22 0 IDV FOR REVIEW


1-APUA-1

Skid Base Point


(E=-10857 N=-56783)

DATE REV. DRAW CHK. APP DESCRIPTION


2-INTPR3-C
2-INTPR3-B

2-INTPR3-A

SHACKLE X 4Nos. 85t


2-PR4-2
1-APUA-G
1-APUA-H

1-APUA-D

1-APUA-C
1-APUA-K

1-APUA-E

1-APUA-B

1-APUA-A
1-APUA-F
1-APUA-J

Reference point PROJECT TITLE: CLIENT:


1-PR6-B

(E-15905,N-12225)
WARM

CAPACITY EACH
1-PR6-A
1-PR6-2

REFERENCE POINT
1-PR1-G

Reference point

TSMC F20 PROJECT


1-PR1-2

(E-16705,N+11126) (E-6916,N-50629)
COLD
1-PR1-F

1-PR1-E

607011F01

8119
606821S14

13382
Hold
1-PR1-D

1-PR1-C

REFERENCE POINT
1-PR1-B

(E-15907,N-48200)
607012F01
1-PR6-1

REFERENCE POINT Reference point


1-PR1-A

(E-19347,N-46283)
(E-18815,N-30414)
1-PR1-1

Reference point

DRAWING TITLE:
COLD
2-PR4-1

1-PR1 (E-20136,N-5014) REFERENCE POINT


607013F01 (E-21529,N-20285)
LFU Cold box WARM
2-PR4-B

2-PR4-A

110t,18.4m
609511V84
LIFTING AND INSTALLATION
FOR SK-K10.1L
1-PR2
Giant Heavy Machinery Service Corporation 佳運重機械工程股份有限公司
1-PR2-F

PROJECT NUMBER: 9F-2,No.21 Huanke 1st Rd., Zhubei City


1-PR2-2

Taiwan (R.O.C.) 新竹縣竹北市環科一路21號9F-2


1-PR2-E

RIGGING ARRANGEMENT GIANT-DOC-ALFE-DRAWING Tel. +886 3 559 1177 giant-project.com.tw


1-PR2-C

PLAN VIEW - PICKING, SLEW AND LANDING DRAWING NUMBER: REVISION SCALE (A3) SHEET
1-PR2-B

1-PR2-1
1-PR2-A

L109 1 N.T.S. 1 OF 1

You might also like