PROJECT 39 DETAILS OF CONNECTED LOAD/MAX.

DEMAND PROJECT LOCATION


DB NO. DB-UPS PRO: FALAJ AL MUAALA MEDICAL CENTER EXTENSION FALAJ AL MUALLA, UM ALQUWAIN, UAE
FEED FROM SMDB-G OWNER : UNITED ARAB EMIRATES PRESEDENTIAL COURT DB LOCATION
RATING OF INCOMER 40 ATP CONSULTANT : URBANISM PLANNING ARCHTICTURE ELEC.ROOM-G.F
CONNECTED LOADS / POINTS LOAD / CIRCUIT / WATTS REMARKS
RATING OF INCOMER

ECC WIRE SIZE mm2


CCT WIRE SIZE mm2
MCB RTG. IN AMPS.

WATTS PER UNIT


RATING OF ELCB

TOTAL POINT
CONDUIT MM

AIR CURTAINS
HAND DRYER
CIR. NO.
SL. NO.

ISOLATORS
M.DUMPER
STRIP LGT
SPOT LIG
LED LGT

EX FAN
ROOM / AREA

13AS/O

PUMP
FCU
VAV
LGT

WH

CU
R Y B

1 B1 20 4.0 4.0 20 NEPHROLOGY -BHU 2 2 200 400

2 B2 20 4.0 4.0 20 PLEBOTOMY - BHU 2 2 200 400


40A/2P 30mA ELCB-1
40A SP+N INTERGRAL ISOLATER

3 B3 20 4.0 4.0 20 CARDIOLOGY - BHU 2 2 200 400

4 B4 20 4.0 4.0 20 ISOLATION ROOM - 1 - BHU 2 2 200 400

5 B5 20 4.0 4.0 20 DIALYSIS BAY - 1 - BHU 2 2 200 400

6 B6 20 4.0 4.0 20 INTERNAL MEDICINE - BHU 2 2 200 400

7 B7 20 4.0 4.0 20 DIALYSIS BAY - 2 - BHU 2 2 200 400


40A/2P 30mA ELCB-2

8 B8 20 4.0 4.0 20 DIALYSIS BAY - 3 - BHU 2 2 200 400

9 B9 20 4.0 4.0 20 DIALYSIS BAY - 4 - BHU 2 2 200 400

10 B10 20 4.0 4.0 20 DIALYSIS BAY - 5 - BHU 2 2 200 400

11 B11 20 4.0 4.0 20 DIALYSIS BAY - 6 - BHU 2 2 200 400

12 B12 20 4.0 4.0 20 ISOLATION ROOM - 2 - BHU 2 2 200 400

13 B13 20 4.0 4.0 20 FACP 1 1 400 400


40A/2P 100mA
ELCB-3

14 B14 20 4.0 4.0 20 EMERGANCY LIGHT - PANEL 1 1 400 400

15 B15 20 4.0 4.0 20 IDF RAK 1 1 400 400

6000

CABLE SIZE : 4C x 10 mm2/ XLPE / SWA / PVC +1C x 6 mm2/ PVC Y/G WIRE MAX. CURRENT (A) TOTAL CONNECTED LOAD SUMMARY LOADS IN (W) 6000

31.250 SUMMARY LOADS IN (KW) 6.000


Vd (Voltage drop from table) 2.7672 mv/A/km CABLE SIZE (mm2) Vd (Voltage drop for cable from table) ( mv/A/km )

IL (max.current) 31.25 A 10 (4x10) = 4 (4x16) = 2.5 (4x25) = 1.65 (4x35) = 1.15 (4x50) = 0.87 (4x70) = 0.6

L (length) 10 M NUMBER. OF CABLE (4x95) = 0.45 (4x120) = 0.37 (4x150) = 0.3 (4x185) = 0.26 (4x240) = 0.21 (4x300) = 0.19