Fed From ANECO COMMONAL TRANSFORMER ADRESS : BRGY.6 CABADBARAN CITY AGUSAN DEL NORTE
REVISIONS TRANSFORMER DETAILS
Location FUEL STATION BUILDING TYPE: START FUEL STATION CONNECTED EQUIPMENT TO TRANSFORMER
LIGHTING OUTLET #SWITCH # C.O VOLT AMPERE LOAD
OVER CURRENT
PROTECTION
CONDUCTORS mm², Cu-B/W CONDUIT SPEC VOLTAGE DROP COMPUTATION TOTAL LOAD DF. KVA 8.5
DEMAND FACTOR
SPECIAL OUTLET
EQUIPMENT TOTAL
LED ( 50watts )
CIRCUIT
LOAD DESCRIPTION VA
PRIMARY VOLTAGE L-L 415 DF KVA
1 GANG
3GANG
2GANG
2GANG
NO.
TOTAL
3WAY
(V) ØAB ØBC ØCA 3Ø AT AF P KAIC SIZE TYPE Ώ/305m SIZE (Φ) TYPE GRD WIRE VD %VD REMARKS
1 C1 0.30 1 1 100% 0.3 0.3
TRANSFORMER IMPEDANCE 5%
C1 Lighting Outlet 10 0 10 2 2 0 75 300.0 230 1.30 15 50 2 10 2w-#2.00 THHN 3.26 20mm PVC/IMC 2w-#2.00 2.09 0.91 SAFE 2 C2 0.85 1 1 100% 0.85 0.9
C2 Lighting Outlet 0 17 17 2 6 1 0 98 850.0 230 3.70 15 50 2 10 2w-#3.50 THHN 2.05 20mm PVC/IMC 2w-#3.50 4.87 2.12 SAFE
C3 Convenience Outlet 2 1 2 120 720.0 230 3.13 20 50 2 10 2w-#3.50 THHN 2.05 20mm PVC/IMC 2w-#3.50 5.05 2.20 SAFE
SIZE OF TRANSFORMER 37.5KVA 3 C3 0.72 1 1 100% 0.72 0.7
C4 1 HP ACU 0 1 20 80% 1180.0 230 5.13 30 50 2 10 2w-#5.50 THHN 1.26 20mm PVC/IMC 1w-#5.50 0.85 0.37 SAFE
C5 1.5 HP (DISPENSER 1) 0 1 45 1565.0 230 6.80 30 50 2 10 2w-#5.50 THHN 1.26 20mm PVC/IMC 1w-#5.50 2.53 1.10 SAFE TRANSFORMER EFFECIENCY @ FULL LOAD 98.36% 4 C4 1.18 0.8 1 100% 1.18 1.5
C6 1.5 HP (DISPENSER 1) 0 1 50 1565.0 230 6.80 30 50 2 10 2w-#5.50 THHN 1.26 20mm PVC/IMC 1w-#5.50 2.81 1.22 SAFE
5 C5 1.56 0.8 1 100% 1.56 2.0
C7 1000 LIGHTING OUTLET PYLON 0 1 30 1000.0 230 4.35 15 50 2 10 2w-#2.00 THHN 3.26 20mm PVC/IMC 1w-#2.00 2.79 1.21 SAFE
TRANSFORMER EFFECIENCY @ 1/4 LOAD 97.24%
C8 SPARE 6 C6 1.56 0.8 1 100% 1.56 2.0
TOTAL 10 17 27 2 30 0.8 7,180 230 31.2 0.0 0.0 0.0 60 60 2 10 2w-#14.00 THHN 0.51 25mm PVC 1x5.50 THHN 3.13 1.36 SAFE
PRIMARY AND 7 C7 1 0.8 1 100% 1 1.3
Item # Computations PEC -Gen. Reference provisions Main : 75AT/100AF/2POLE/1-PHASE ACB PROVIDE PROTECTION ON TRANSFORMER
Feeder Size Computations: PEC2017, Part#1, Art. 2.15, Section 2.15.1.2 (a) p50 Connected Load: 7,180.0 SECONDARY SIDE
1
Wire Ampacity Size = Total load current +25% Largest load current FLA = 31.2A+25%(17) Demand Load Factor - 80% Demand Factor : 80% TOTAL LOAD (KVA) 8.5
Wire Ampacity= 35.45A Diversity Factor - 1
230V TYPE OF PROTECTION ON ON PRIMARY AND CIRCUIT
Load Growth Factor - 20% in 15 years Volts :
FUSE TOTAL LOAD (DF) 100%
2 Therefore as per ampacity above use: 2 wire - #14.00mm2 THHN Copper Wire +5.50THHN Grnd. Wire PEC2017,Part#1, Table B-3.10.2.6 (B)(16) p.174 SECONDARY SIDE BREAKER
Main Kaic : 10KAIC
PEC2017 Table 10.1.1.8 Conductor Properties p.941
TOTAL LOAD DF ( KVA) 8.5
3 25mm dia. RSC Conduit Pipe
PER-UNIT METHOD : LINE-TO-LINE FAULT @230V - FAULT X1 PRIMARY PHASE CURRENT 52 AMP C6 30 2-5.50MM² (12AWG) THHN WIRE 40 6.8 SAFE
Line Data One Line Diagram Impedance Diagram Calculations C7 15 2-2.00MM² (14AWG) THHN WIRE 25 4.35 SAFE
SECONDARY LINE VOLTAGE 230 VOLT MAIN 60 2-14.00MM² (14AWG) THHN WIRE 75 31.2 SAFE
ANECO Data Fault at X1 10,000kVA Base SECONDARY PHASE VOLTAGE 133 VOLT
25,000kVA PUR PUX VIII) VOLTAGE DROP COMPUTATIONS
Basic VD formula for 1Phase System
3phase Source Step#1: Pux(3Ф) = 10,000/25000 SECONDARY PHASE CURRENT 21.33 AMP >> Voltage Drop (VD) = 200% x L x Rw x Itotal
SLGF Amps= = 0.4 Where:
S.C. kVA Step#2: Pux(1Ф) = 2 x 0.4 SECONDARY LINE CURRENT 21.33 AMP L = Length of the Service Drop Aneco Feeder=30mtrs
= 0.8 0.8000 Rw =Resistance of the Conductor wire (from PEC-1 , 2017, Table 10.1.1.8 page941)
SIZE OF CIRCUIT BREAKER AS PER (NEC 450.3 ) Rw#14.00mm2 Copper= 0.51Ώ/305m
Step#3 Pux = (1.22)(10000)/(100)(50)
Pux = (1.22)(10000)/(20)(50) 2.4400 Rw#14.00mm2 Aluminum= 0.808Ώ/305m
SIZE OF CIRCUIT BREAKER ON PRIMARY SIDE 125 AMP I-total = Total Load Amps of the System From Schedule of Loads section#4
Step#4 Pur = (0.7625)(10000)/(100)(50)
Thus Itotal= 31.2 Amps
Pur = (1.22)(10000)/(20)(50) 1.525 SIZE OF FUSE ON PRIMARY SIDE 125 AMP To solve the VD of the Main Feeder Service Drop
ANECO Step#5 PUX= 2(0.00008)(10000) VD(copper)= 200% x (20m) x (0.809Ώ/305m) x 32.2
COMMONAL (1000) (0.230)2 SIZE OF CIRCUIT BREAKER ON SECONDARY SIDE 110 AMP 2.1 volts
SERVICE PUX = 0.030245747 0.0302 VOLTAGE REGULATION %= 3.1/230Volts x 100%
TRANSFORMER Step#6 PUX = 2(25/1000)x 0.064x (10000) SIZE OF FUSE ON SECONDARY SIDE 110 AMP = 0.91 %
1x50kVA (1000) (0.230)2 VD(Aluminum)= 200% x (20m) x (0.808Ώ/305m) x 32.2
Single Phase PUX = 0.604914934 0.6049 TRANSFORMER LOSSES 3.4 volts
VOLTAGE REGULATION %= 3.4/230Volts x 100%
%X= 1.22 Step#7 PUR = 2(25/1000)x 0.49x (10000) =
TOTAL LOSSES AT FULL LOAD 610 WATT 1.5 %
%R= 0.7625 (1000) (0.230)2
%Z= 0.02 PUR = 4.631379962 4.6314
TOTAL LOSSES AT 1/4 FULL LOAD 240 WATT
X/R ratio: 1.6 TOTAL PUR and PUX= 6.15638 3.875161
as per table 1.3 Step#8 PUZ= ((6.15638)2 + (3.875161)2 )1/2 FULL LOAD COPPER LOSS 394 WATT
Service Drop/F PUZ= 7.2744681
2w-#14.00mm2THHN Cu CORE LOSS 216 WATT
I-sc LL @230V,1Ф = 10,000/ (0.230)x(7.27446819)
Fault at X1 = 5976.8 Amps
MAIN ACB = 6.0 kA
60AT/60AF I-sc total = 6.0 kA
23OV/1Ø Therefore use:
10kAIC ICCR rating 10 kAIC
FROM THE OFFICE OF: NO. SEAL PROJECT TITLE APPROVED PER PLAN AND SPECIFICATIONS CAD BY: SHEET CONTENT: SHEET NO
PRC REG. SCHEDULE OF LOADS
SHORT CIRCUIT ANALYSIS
VALIDITY VOLTAGE DROP CALCULATION
PTR
NO. AS-BUILT PLAN OF START FUEL STATION PETER T. MONTAUS TRANSFORMER DETAILS
CONNECTED EQUIPMENT TO
E
PROFESSIONAL ELECTRICAL ENGINEER DATE
OWNER
TRANSFORMER 25
PLACE
TN
NO. LOCATION:BRGY.SORIANO,CABADBARAN CITY AGUSAN DEL NORTE ADDRESS: BRGY.SORIANO,CABADBARAN CITY AGUSAN DEL NORTE