Mobile Application Test Summary Report

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Parameter Details

Test Summary Report Identifier: Report Reference Number: WA-TSR-2023-001


The testing process for the WhatsApp application was conducted
to ensure its reliability, functionality, and security. Key objectives
Summary:
included identifying defects, assessing performance, and ensuring
usability.
- No major discrepancies were encountered during testing.
- Minor issues related to UI layout on specific devices were observed
Variances:
and reported.
- One rare instance of message delivery delay was noted and reported.

- Performance: The application performed well under varying network


conditions and device specifications.
- Usability: The user interface was found to be intuitive, and user
Comprehensive Assessment:
experience was generally positive.
- Security: No significant security vulnerabilities were detected during
testing.
- Pass/Fail Status:
- Pass: 95% of test cases passed successfully.
- Fail: 5% of test cases failed due to UI layout issues.
- Defect Metrics:
Summary of Results: - Total Defects: 3 (1 critical, 2 minor)
- Defect Resolution Time: Average 3 days
- Performance Benchmarks:
- Average Message Delivery Time: 0.5 seconds
- Application Launch Time: 1.2 seconds
- Effectiveness: The testing process effectively identified and reported
defects, ensuring a stable application release.
- Efficiency: Testing was conducted efficiently, with rapid defect
resolution.
Evaluation:
- Strengths: Robust test coverage, timely defect reporting, and reliable
performance.
- Areas for Improvement: Enhanced compatibility testing for diverse
devices and more rigorous security testing.
- Test Planning:
- Define Test Scope
- Create Test Cases
- Test Execution:
- Functional Testing
- Performance Testing
- Usability Testing
Summary of Activities:
- Security Testing
- Defect Reporting:
- Monitor and Report Defects
- Verify Defect Fixes
- Test Closure:
- Test Summary Report Preparation
- Stakeholder Sign-off
- Stakeholder Sign-off on Test Plan
Approvals: - Stakeholder Sign-off on Test Summary Report
- Management Approval for Application Release

You might also like