Set 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Page 1/12

Question Title
1. Fixed fall protection system shall be used for work than greater than ____ above
ground.
2.0 meters
1.0 meters
150 mm
0.5 meters
1/1 point
Question Title
2. What is/are the responsibility of site supervisor in working at height activity?
Apply WAH certificate in PTW system
Prepare the WAH Rescue Plan
Supervise and monitor closely WAH activity at all time
All of the above
0/1 point
Question Title
3. Who shall ensure the engineering design and execution of work including installation
of plants and equipment meet the specification of standards on WAH ad other relevant
standards
Site Management
Site Supervisor
Work Leader
Contract Administrator
1/1 point
Question Title
4. Contractor Management shall be responsible to provide all the resources including
manpower and equipment for WAH activities and meet PETRONAS Carigali
specification and standard.
True
False
1/1 point
Question Title
5. WAH certificate shall be used for all working at height activity when work permit is
being issued
True

Internal
False
1/1 point
Question Title
6. The following is the criteria for triggering the development of rescue Plan for WAH
activity
Working on a temporary (scaffolding) and permanent platform above 6 meters
from a landing point
Constructing, dismantling or preparing temporary platform, rope access facility.
Working at the edge of a location (e.g. edge of trench) where there is a risk of fall to
a lower level
All of the above
1/1 point
Question Title
7. Snatch rescue is ….
A rescue where the casuallyt is slightly raised so that their Fall Arrest Lanyard can
be removed from its anchor and the casualty can be either raised or lowered
A rescue where the casualty is raised to the required extraction location
A rescue where the casually is lowered to the required extraction location
A rescue where the casualty is transferred from one location to another location
whilst in Suspension.
1/1 point
Question Title
8. Ascent rescue is ….
A rescue where the casualty is slightly raised so that their Fall Arrest Lanyard can
be removed from its anchor and the casualty can be either raised or lowered
A rescue where the casually is lowered to the required extraction location
A rescue where the casualty is transferred from one location to another location
whilst in Suspension.
A rescue where the casualty is raised to the required extraction location
0/1 point
Question Title
9. Descent rescue is ….
A rescue where the casualty is transferred from one location to another location
whilst in Suspension.
A rescue where the casuallyt is slightly raised so that their Fall Arrest Lanyard can
be removed from its anchor and the casualty can be either raised or lowered
A rescue where the casualty is raised to the required extraction location

Internal
A rescue where the casually is lowered to the required extraction location
1/1 point
Question Title
10. Cross Haul rescue is ….
A rescue where the casuallyt is slightly raised so that their Fall Arrest Lanyard can
be removed from its anchor and the casualty can be either raised or lowered
A rescue where the casualty is transferred from one location to another location
whilst in Suspension.
A rescue where the casualty is raised to the required extraction location
A rescue where the casually is lowered to the required extraction location
1/1 point

Page 2/12
Question Title
11. The following are general requirement in PETRONAS Carigali PTW system, EXCEPT?
PTW & Certificates recoded in PTW Logbook.
All PTW and Certificates revalidated and tracked to closure.
Specific Job Hazard Analysis (JHA) shall be developed for all PTW application.
None of the above
1/1 point
Question Title
12. Once a PTW is approved, what is the validity period of the Hot Work permit?
1 day (24 hours)
7 days
1 shift
1 month
0/1 point
Question Title
13. Who is responsible to fill in the details for Section 1 to Section 4 in the PTW?
Approving Authority (AA)
Authorised Supervisor (AS)
Approving Authority Representative (AAR)
Applicant/Receiving Authority (RA)
1/1 point
Question Title
14. Who is responsible to specify the frequency of Gas test?

Internal
Approving Authority (AA)
Authorised Supervisor (AS)
Approving Authority Representative (AAR)
Applicant/Receiving Authority (RA)
1/1 point
Question Title
15. Ideally, where and when is the Toolbox meeting to be conducted?
Control room area before the permit being approved.
Worksite meeting after the PTW approve and before the work start
Worksite during work activity
Control room after work being suspended.
1/1 point
Question Title
16. After the PTW has been approved by the Approving Authority (AA), what is the
purpose of the joint site (JSV) inspection which is performed by the Approving
Authority Representative (AAR) and Work Leader (WL)?
To implement all the precautions, control and recovery barrier that being specified
in the JHA for the ongoing work, since the PTW already approved by the AA.
To stop the work if it is unsafe and not meeting the requirements in the approved
PTW.
To verify the site preparation in term of compliance to the precaution, control and
recovery barrier as specified in the approved PTW/JHA/Certificates to ensure the site is
safe, prior to commencement of the work.
To discuss with the workers at site if the work can be performed safely, and to add
any additional work activity that required to be perform under the same permit.
1/1 point
Question Title
17. Once PTW is completely filled up, what is the sequence of signatures that need to be
obtained in Section 7 when seeking PTW approval?
AA - AS - RA
RA - AS - AA
RA - AA - AS
AS - AA - RA
1/1 point
Question Title
18. Based on the bellow description, what is NOT Cold Work?

Internal
Any activity or use of equipment which have the potential to generate incentive
sparks or other ignition sources, e.g. welding, flame cutting, grinding, taking photograph
with camera with flash.
Any activity or use of equipment which do not have potential to generate sparks e.g.
erecting/dismantling of scaffolding, cold cutting
Temporary bypass of safety devices to allow certain work to proceed without
causing unnecessary disruption to the system.
Any activity in the confined space that required gas testing to be perform at a
specific interval or continuously.
1/1 point
Question Title
19. Name the THREE (3) ISOLATION CERTIFICATES associated with PETRONAS Carigali
PTW system?
I. Radiation Isotope Certificate
II. Physical Isolation Certificate
III. Process Isolation Certificate
IV. Radiation Certificate
V. Electrical Isolation Certificate
I, II, III
I, II & IV
I, III & IV
II, IV & V
1/1 point
Question Title
20. Once a PTW is approved, what is the validity period of the Cold Work permit?
1 day (24 hours)
1 shift (8 12 hours)
7 days
1 month
1/1 point

Page 3/12
Question Title
21. In Section 6 of the PTW, who shall Identify parties to be communicated on the PTW
requirements
Applicant
Subject Matter Expert
Approving Authority
Receiving Authority

Internal
1/1 point
Question Title
22. Who is responsible to endorse all supporting certificates and ensure all relevant
document are attached with PTW?
Approving Authority (AA)
Approving Authority Representative (AAR)
Work Leader (WL)
Authorized Supervisor (AS)
1/1 point
Question Title
23. Who is delegated to approve & endorse PTWs on remote locations in the absence of
Approving Authority (AA) and Authorized Supervisor (AS)?
Approving Authority Representative (AAR)
Work Leader (WL)
Work Team Member
None of the above
0/1 point
Question Title
24. Can an Applicant/Receiving Authority (RA) become Approving Authority
Representative (AAR) for the same PTW?
Yes
No
1/1 point
Question Title
25. Under the PTW Inspection and Assurance, who is responsible to conduct PTW
Quarterly Assurance?
Asset HSE Department
AA and/or AS
Asset Production Department or Division Project Head
SHO and/or AAR
0/1 point
Question Title
26. As part of the PTW Inspection and Assurance, what is the minimum number of
issued PTWs to be audited?
5% of issued PTW
10% of issued PTW

Internal
20% of issued PTW
50% of issued PTW
1/1 point
Question Title
27. In the event that non-conformities or new hazards are found after work commenced,
the correct action shall be:
I. Permit shall be suspended and activity stopped.
II. Only resume after rectification/site conditions is safe and subsequent approval
from AA obtained
III. Continue with the activity and record in the operation log
IV. Remove the hazards and make safe the area
IV only
I, II, III
I, II, IV
I, II, III, IV
1/1 point
Question Title
28. After the work is completed the following is/are shall be perform?
Restored site to normal condition and good housekeeping.
Verify worksite and sign-off PTW if condition is satisfactory.
AA shall sign-off PTW for work completion and permit hand-back (closure).
All of the above
1/1 point
Question Title
29. The same PTW may be used for the following day, if the following conditions are
meet?
I. New Work Leader assigned for the work
II. Work site conditions are the same
III. All workers involved has been briefed on JHA & PTW form contents
IV. Required signatures are in place.
I, II
I, II, III
I, III, IV
II, III, IV
1/1 point
Question Title
30. The following are type of certificates that can be standalone without PTW, EXCEPT?
Excavation Certificates

Internal
Safety System Bypass/Override Certificate
Physical Isolation Certificate
Vehicle Entry Certificate
1/1 point

Page 4/12
Question Title
31. The following is the typical hazard in Confined Space EXCEPT
Biological hazards
Flammability
Weather hazards
Oxygen deficiency/enrichment
1/1 point
Question Title
32. Can an AGT stop the work in Confined Space?
YES, anyone can stop the activities if it not safe to proceed with the activities.
NO, only AA can stop Confined Space activities
NO, because it will delayed the completion date
NO, because he is not the supervisor of the activities.
1/1 point
Question Title
33. Who is responsible to record the Gas Test results?
Authorised Gas Tester (AGT)
Authorized Entrant
Standby Person
Rescue Team
1/1 point
Question Title
34. The rescue team members need to attend Confined Space Entry training, because
they need to know the hazard associated with entering a confined space.
True
False
0/1 point
Question Title
35. Who should fill in the daily health declaration form?

Internal
Authorized Supervisor (AS)
Approving Authority (AA)
Authorized Entrant
Standby Person
1/1 point
Question Title
36. What is TENORM?
Technical Enhanced Natural Organic Radioactive Metals
Technologically Enhanced Naturally Occurring Radioactive Materials
Technically Enhanced Natural Occurrence Radioactive Materials
Technically Enhanced Non Organic Radiation Materials
1/1 point
Question Title
37. What is the definition of Confined Space Entry?
I. Not intended as regular workplace
II. Has restricted means of entry/exit
III. Large enough, so configured that a worker can bodily enter and perform assigned
work
IV. At atmospheric pressure during occupancy
I and II
II, III and IV
II and IV
I, II, III and IV
0/1 point
Question Title
38. What is the depth of excavation considered as Confined Space?
1.5 meters
15 meters
0.15 meters
150 mm
1/1 point
Question Title
39. What is the importance of Confined Space Entry procedure?
To specify the allowable period/time in Confined Space
To specify the tool and equipment involved in Confined Space Entry
To highlight the allowable width and height of Confined Space

Internal
To highlight the precautions of safe entry and working in Confined Space
1/1 point
Question Title
40. The following is the responsibility of Standby Person EXCEPT
Maintain and monitor the list of authorised entrants.
Ensure readiness of rescue equipment.
Maintain continuous monitoring and shall remain at the entry point at all time.
Maintain constant communication with the entrants.
1/1 point

Page 5/12
Question Title
41. What is the correct sequence of the main step in confined space entry procedures?
I. Check condition of entry
II. Work completion and housekeeping
III. Closed the certificates and PTW
IV. Working in the confined space
V. Equipment Preparation
I - II - III - IV - V
I - III - II - V - IV
IV - II - III - I - V
V - I - IV - II - III
1/1 point
Question Title
42. What authorized entrants have to do prior entering the Confined Space?
Fill in the health declaration form
Drink a lot of water
Prepare rescue equipment
Approve the Cold or Hot Work Permit
1/1 point
Question Title
43. What are the TWO (2) responsibilities of Work Leader (WL)/Entry Supervisor (ES)?
I. Supervise the CSE activities
II. Approve the Permit to Work (PTW) including the associated certificates for
Confined Space related work activities
III. Withdraw the permit if the gas level is deemed unsafe.
IV. Brief the entry team on the PTW requirement, Job Hazard Analysis (JHA) and
emergency procedures

Internal
II and III
II and IV
I and IV
1/1 point
Question Title
44. What does AGT need to do when the level of gas is unsafe during work in progress?
Withdraw the work permit and stop the activities immediately
Turn on the ventilator immediately
Continuously monitor the level and site continue with the activities
Informed the level to the entry supervisor only
1/1 point
Question Title
45. Who determine the frequency of gas testing?
Laboratory Technician
Authorised Supervisor
Approving Authority
Authorised Entrants
1/1 point
Question Title
46. What is the role of contractor in executing activities in Confined Space Entry?
Obtain all available information regarding confined space hazards and entry
information from the OIM/Terminal Manager/CSR.
Discuss the confined space entry work plan with CSR/AS.
Inform the OIM/Terminal Manager/CSR on any hazards confronted or created
during the entry operation in confined space, through a debriefing.
All of the above
0/1 point
Question Title
47. Workers are allowed to enter Confined Space WITHOUT BREATHING APPRATUS
(BA) when LEL is …..
Less than 50%
More than 1 %
Less than 1%
More than 19.5%
1/1 point

Internal
Question Title
48. Prior to opening vessel manhole in Confined Space, what is the requirement?
I. Depressurization
II. Draining/flushing
III. Purging
IV. Gas testing
I and II
I, III and IV
I, II, III and IV
IV only
0/1 point
Question Title
49. What is the main purpose of conducting risk assessment before entering Confined
Space?
To ensure meeting the key performance indicator requirements in managing safe
operations
To ensure risk are managed to ALARP by correct identification of hazards and
implementation of required control and recovery measures.
To ensure the project can be completed in a shortest time possible
To meet the world class standard in managing the contractor and reducing the
operation cost.
1/1 point
Question Title
50. A threshold limit value consisting of the average airborne concentration of the
substance over a specified time limit, usually a normal 8 hours work day and a 40 hour
work week is known as?
Time Weighted Average (TWA)
Permissible Exposure Limit
Lethal Concentration
Minimum Exposure Concentration
1/1 point

Page 6/12
Question Title
51. For any alarm enforcement or bypassing, i.e. Alarm Shelving, Alarm Suppression,
Alarm Silencing or Alarm off (AOF), SSBOC shall be raised to manage the situation.
True
False
1/1 point

Internal
Question Title
52. The validity of the SSBOC including extension by weekly validating is __________ and
the maximum cumulative bypass shall not exceed __________.
7 days, 12 weeks
48 weeks, 3 months
4 weeks, 12 weeks
48 weeks, 1 year.
1/1 point
Question Title
53. As part of documentation of Bypass of SCPD, all SSBOC shall be retained for at least
______ whereas SSBOC related to any incident shall be kept ____________.
1 year, throughout the duration of the facility.
3 years, 10 years
5 years, until the facility is shutdown
years, 7 years.
1/1 point
Question Title
54. The Subject Matter Expert (SME) is the person who is knowledgeable in his
specialized discipline (senior engineer) and is responsible to conduct the below
activities; EXCEPT
Risk assessment
Implementing precautions
Identifying the required alternative controls
Review the risk assessment
1/1 point
Question Title
55. Who is responsible to verify and endorse the risk assessment for SSBOC?
Technical Authority (TA)
Approving Authority
General Helper
Applicant
0/1 point
Question Title
56. As per communication of Bypass of SCPD, for standalone SSBOC - the original copy
of the SSBOC shall be kept at _______ for tracking purposes?
SHO office

Internal
Work site
Switch room
Control room
1/1 point
Question Title
57. On approval of SSBOC, the level of AA shall be based on the duration of the bypass,
for bypass for more than 1 days up to 7 days, the _____________ shall approve the
certificates.
OIM/equivalent
Head of Asset or equivalent
Field Manager or equivalent
VP Malaysia Asset
0/1 point
Question Title
58. The following are samples of supporting document that shall be attached to the
SSBOC EXCEPT
Risk Assessment Report
P & ID
Radioactive Certificate
Safe Operating Limit (SOL)
1/1 point
Question Title
59. The following are examples of SCPD EXCEPT
Pressure gauge
Pressure Safety Valve
Fire and gas detector
Process Control Safeguarding Instrument
1/1 point
Question Title
60. ___________ shall be responsible for planning and execution of Bypass of SCPD and
carrying out of the precautionary measures?
Approving Authority
Applicant/SSBOC Initiator
Technical Authority
Authorised Supervisor
1/1 point

Internal
Page 7/12
Question Title
61. Who is responsible to verify site implementation is in accordance to the Energy
Isolation requirement?
Head of Production
Approving Authority (AA)
Authorised Supervisor (AS)
Authorised Competent Person/Authorised Person (ACP/AP)
0/1 point
Question Title
62. If the maintenance of the SCPD or its components do not affect the protection
system but would change in the philosophy of the overall operation/protection system,
what is the correct action to be taken?
Apply Energy Isolation Certificate
Apply PTW only for the maintenance
Apply SSBOC for the bypass.
Raise MOC for the
changes
1/1 point
Question Title
63. A bypass due to faulty / prolong and DOES NOT pose imminent or immediate
adverse impact to HSE and/or production
Accidental Bypass
Allowed Bypass
Normal Bypass
Emergency Bypass
1/1 point
Question Title
64. Monitoring and verify of bypassing of SCPD and checking of site log, bypass tag and
displayed of SSBOC certificate shall be conducted?
Daily
Weekly
Monthly
Annually
1/1 point
Question Title

Internal
65. The general sequence/step of bypassing of SCPD will be?
I. Record and implement the mitigations/precautions
II. Raised the SSBOC
III. Obtain endorsement and approval of the SSBOC
IV. Conduct Risk Assessment V. Normalization and closed the SSBOC
I - II - III - IV - V
II - IV - III - I - V
II - III - IV - V - I
V - II - III - IV - I
0/1 point
Question Title
66. All equipment that to be bypass during operations shall be managed with safety
system bypass override certificates (SSBOC).
True
False
1/1 point
Question Title
67. Who is responsible to approve the Physical Isolation Certificate (PIC), Electrical
Isolation Certificate (EIC) and Radiation Certificate (RC)?
Offshore Installation Manager/Terminal Superintendent
Maintenance Supervisor
Company Site representative
Senior Instrument Technicians
1/1 point
Question Title
68. What is the primary method of Physical Isolation?
Positive Isolation
Rack Out
Switch Off
Shutdown Valve
1/1 point
Question Title
69. The following is the example of Positive Isolation in Physical Isolation
Shut Down Valves (SDV)
Spool/valve removal
Single Valve Isolation (SVI)
Blind/spade isolation

Internal
0/1 point
Question Title
70. ”PTW is approved prior to the approval of isolation certificates” is the statement
True or False?
True
False
0/1 point

Page 8/12
Question Title
71. What is the definition of Energy Isolation?
Removal of an equipment, pipeline or process system, carried out in a correct
manner to prevent accidental or inadvertent use of the equipment.
Re-energize of an equipment, pipeline or process system, carried out in a correct
manner.
Removal of an energy source from an equipment, pipeline or process system,
carried out in a correct manner to prevent accidental or inadvertent re-energisation of
the energy source
Installation of LOTO on an equipment, pipeline or process system to indicate it is
safe to work on.
1/1 point
Question Title
72. Who is responsible to approve the Limit of Electrical Access (LoEA) Certificate?
AP/ACP
RPO/RPS
RA
AA
1/1 point
Question Title
73. The following are the methods of Physical Isolation, EXCEPT?
Single Valve Isolation
Rack out
Double block and bleed
Positive Isolation
1/1 point
Question Title

Internal
74. The status of LOTO at each isolation point shall be filled up in which section of the
Positive Isolation Certificate (PIC)?
Section 1
Section 5
Section 10
Section 12
1/1 point
Question Title
75. A secure box capable of holding the keys from lockout devices used to render
isolation points in a system inoperable. Equipped with a visible means of observing the
keys inside and has provision to be secured by additional locks. Is known as?
Key Boxes
Padlock Boxes
Lockout Boxes
Tag out Boxes
1/1 point
Question Title
76. Closure of two block valves in series, with an intermediate bleed valve which is
vented to a safe location to atmosphere, flare header or to drain vessel where no back
pressure accumulate, is known as?
Single valve Isolation
Double Block and bleed
Positive Isolation
Blinding/Spading Isolation
1/1 point
Question Title
77. “Prior to test run, all affected parties shall surrender PTW to the Approving
Authority (AA) and stop work”. Is the statement True or False?
True
False
1/1 point
Question Title
78. Who is responsible to witness during de-isolation of the circuit breaker or ionising
radiation source?
Approving Authority (AA)
Approving Authority Representative (AAR)
Authorised Supervisor (AS)

Internal
Operation personnel
0/1 point
Question Title
79. Based on the valve lineup in the diagram below, to achieve Double Block and Bleed
(DBB) isolation - which valve needs to be closed and opened?

Valve 1: Closed, Valve 2: Closed, Valve 3: Open


Valve 1: Closed, Valve 2: Open, Valve 3: Open
Valve 1: Open, Valve 2: Closed, Valve 3: Closed
Valve 1: Closed, Valve 2: Open , Valve 3: Open
1/1 point
Question Title
80. The following are the criteria of Single Valve Isolation (SVI) EXCEPT
Shall have a reliable seal and shall be tested
Shall be allowable in cases where positive isolation may be compromised and the
consequence of such event is acceptable
Non-return valves (NRV) and flow control valves (FCV) can be used
Closing several valves in series in the absence of a bleed or vent
1/1 point

Internal
Page 9/12
Question Title
81. Should the Specific Worksite in JHA be the same as in PTW?
True
False
0/1 point
Question Title
82. One of the sources of input for JHA development can be obtained from Direct
Observation. What are the advantages of Direct Observation?
I. Can immediately recognize potential accident performing the work
II. Can promote sharing of experience and knowledge about accident.
III. Can relate the work with actual environment or conditions, hence specific method
can be applied accordingly.
IV. Preliminary prepared JHA can be used from previous work activities.
I
I & IV
I, II & III
IV only
1/1 point
Question Title
83. Who are the signatories to approve the JHA?
Authorised Gas Tester (AGT)
Authorised Supervisor
Standby Person
Work Leader
1/1 point
Question Title
84. Following are the conditions which require a need to review and update of JHA?
I. Change in job scope
II. After an incident related to job & findings arising from incident investigation
III. Unforeseen hazards/barriers
IV. Change in date
I & II
II &III
I, II & III
I, II, III, IV
1/1 point
Question Title

Internal
85. When is the JHA to be briefed and communicated to the workers?
During PTW application
After PTW approval and during toolbox meeting
During the execution of job/activity
Upon completion of the job/activity
1/1 point
Question Title
86. In principle, what is the requirement of job steps to be filled in the JHA?
Avoid making the breakdown of steps so detailed that it becomes unnecessarily
long.
Avoid making the breakdown of steps so broad that it does not include basic steps.
If the work consist of too many steps (more than 15 steps) break the work into two
or more.
All of the above
1/1 point
Question Title
87. Who is responsible to implement JHA system and ensure JHA is reviewed and
approved?
Head of Production
OIM/TS/Base Manager
Production Supervisor/Maintenance Supervisor (PS/MS)
Work Leader
0/1 point
Question Title
88. In the development of JHA, the ___________ of potential impact of each potential hazard
to PEAR shall be defined clearly.
formation
identification
creation
selection
1/1 point
Question Title
89. What is PEAR representing in assessing the potential impact of hazard release in
developing a Job Hazard Analysis?
People, Equipment, Asset & Reputation
People, Environment, Asset & Reputation

Internal
Process, Environment, Accountability & Reliability
Preventability, Equality, Availability & Reliability
1/1 point
Question Title
90. What is the advantage of having a JHA before executing the job?
I. Potential hazards related to the job task are identified
II. Required control are identified to manage the risk
III. Cost of activity can be reduced
IV. Required recovery barriers are identified to manage the risks
I & II
I, II & IV
I, II, III
II & IV
1/1 point

Page 10/12
Question Title
91. Before the JHA and PTW have been approved, the WL shall communicate the JHA to
all the work team members during Pre-Job or Toolbox Meeting and shall be signed by all
work team members
True
False
0/1 point
Question Title
92. As part of JHA update and audit, what is the retention period of the JHA if there is no
incident?
1 year
3 years
5 years
7 years
1/1 point
Question Title
93. Who should attend the JHA certification as part of the PTW system training?
All personnel
JHA signatories
Labor or worker performing the work
Office base Contractor Management

Internal
1/1 point
Question Title
94. In developing JHA, what type of document can be used as a reference?
Cause and Effect Matrix (CEM)
Hazard and Effect Register
Matrix of Permitted Operations (MOPO)
Piping and Instrumentation Diagram (P&ID)
1/1 point
Question Title
95. What is the correct hierarchy of control in identifying control barrier when
developing a JHA?
Engineering Control - Substitute - Eliminate - Administrative Control - PPE
Eliminate - Substitute - Engineering Control - Administrative Control - PPE
PPE - Administrative Control - Engineering - Substitute - Control Eliminate
Administrative Control - PPE - Eliminate - Engineering Control - Substitute
1/1 point
Question Title
96. The person who leads work crew to carries out the work is called the ‘Work Leader”.
Verify the statement.
True
False
1/1 point
Question Title
97. Name the relevant parties to be involved in the JHA Development?
Work Leader
Operation Representative
HSE personnel
All of the above
1/1 point
Question Title
98. How long is the validity of JHA Certification training??
1 year
2 years
3 years
4 years

Internal
1/1 point
Question Title
99. In general the following is/are the criteria to be part of JHA development team?
Have the required knowledge, skills and experiences in tasks being assessed.
Confirm the steps described for the tasks are adequate and in the right sequence.
Generate ideas in identifying potential hazards from the tasks and relevant control
and recovery measures to reduce the likelihood on an incident/accident occurring.
All of the above
1/1 point
Question Title
100. Who is responsible to communicate and brief the approved JHA to the Work Team
member during Pre-Job or Toolbox meeting?
Approving Authority
Approving Authority Representative
Work Leader
General Manager
1/1 point

Page 11/12
Question Title
101. What is the intent of the slogan “No work is so urgent that we cannot take time to
do it safely”?
Do not take short cut.
One HSE, take action!
Design it right, construct it right, operate it right, maintain it right.
1/1 point
Question Title
102. What are the categories of human failures?
Errors and Violations
Zones 0, 1 & 2
Tier 2 & 3
1/1 point
Question Title
103. What are the two categories of errors?
Zones 1 & 2
Skill based errors and mistakes

Internal
Tiers 1 & 2
1/1 point
Question Title
104. What are the two types of mistakes?
Memory failure and attention failure
Rule based mistakes and knowledge based mistakes
Failed control and failed defense
1/1 point
Question Title
105. Which one is the best description for “lapse of memory”?
Lapses cause an individual to forget to carry out an action
Intended action not appropriate for the circumstances
Conflict between job and personal goals
1/1 point
Question Title
106. Which one is the best description for “rule based mistake”?
An individual behavior is based on remembered rules or familiar procedures
It is a natural human tendency to take path of least effort
A memory failure which leads to omission / repetition of a planned action
1/1 point
Question Title
107. What is “violation”?
The action or act of complying with a wish or command
Deliberate deviations from rules, procedures, instructions and regulations
A mark of disgrace associated with a particular circumstance, quality, or person
1/1 point
Question Title
108. How can routine violations be reduced?
Roll out new procedures with minimal communication to workers
Terminate junior workers to optimize manpower and reduce the probability of
violations
Increase monitoring to detect violation, increase workers’ acceptance of the
procedures, explain relevance of the procedures to workers and improve ergonomics /
design factors
1/1 point

Internal
Question Title
109. Which one is the best description for “exceptional violation”?
When to solve a problem, an individual feel he need to complete the task even
though he is not competent to do it
When to solve a problem, an individual feel he need to break a rule even though he
is aware that he will be taking a risk
When to solve a problem, an individual feel that the ownership of the task rests
upon others and not to himself
1/1 point
Question Title
110. What is PCSB’s HSE expectation from its employees and contractors?
Employees and contractors to adhere to HSE policy during emergency only
Employees and contractors to adhere to HSE policy at all times
Employees and contractors to adhere to HSE policy during audits only
1/1 point

Internal

You might also like