FOR THE
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference
1 GENERAL QUALITY CONTROL SYSTEM REQUIREMENTS
(a) The QCS is documented in detail in a QC Manual that addresses all
requirements of the applicable Code Section and includes:
(i) a cover sheet that contains the company name, physical address,
and a brief description of the program scope(s) as it will appear on
the requested Certificate(s) of Authorization.
(NOTE: The cover sheet may also contain the effective date of the QC Manual, mailing address, phone
number or other information desired by the certificate holder or applicant.)
(ii) a brief description of the products being fabricated and/or work
being accomplished under the Code or work the Certificate Holder
wishes to accomplish under the code, including applicability of the
QCS to shop activities, field activities, or both.
(iii) a Table of Contents page which includes each section by subject,
number and revision number (as applicable).
2 STATEMENT OF AUTHORITY AND RESPONSIBILITY
(a) The Statement of Authority and Responsibility shall include the following:
(i) A statement that all work carried out by the applicant meets all
applicable Code and Jurisdictional requirements.
(ii) The authority and responsibility of those in charge of the QCS are
clearly established and documented.
(iii) Persons performing QC functions have sufficient and well-defined
responsibility, the authority and the organizational freedom to identify
QC problems and to initiate, recommend, and provide solutions,
including stop work orders if further processing would result in a non-
conformance with the applicable Code section.
(iv) A statement that all disagreements in the implementation of the QCS
is referred for resolution to a higher authority in the company.
(v) The Statement of Authority and Responsibility is signed and dated by
a senior company official responsible for Code activities (i.e.
President, Vice President, Plant Manager, etc.)
3 MANUAL CONTROL
(a) Manual revision control system (i.e. is the QC Manual revised by page or
by section, are the controls clearly described?)
(b) The title of the individuals responsible for revising the QC Manual.
(c) The title of the individual responsible for reviewing current TSSA Code
Adoption Document, new ASME/CSA Code Editions and making any
required changes to the QC Manual within six months from the new
Edition issue date.
(d) Provision for review and approval of the QC Manual to maintain it is
current.
(e) Provision for submittal of the QC Manual revisions to the TSSA
Representative for acceptance prior to implementation including timely
update of all copies to reflect approved revisions.
(f) In the case where the QC Manual exists in more than one language, at
lease one version is in English and identified as the authoritative version.
In the case where the QC Manual exists in languages other than English,
a statement by the C of A holder that the translation is correct shall be
provided.
(NOTE: A glossary of terms is desirable from the standpoint of clarity and if abbreviated titles
of personnel and control documents are used throughout the QC Manual.)
(g) Provision for distribution of the revised QC Manual (controlled or
uncontrolled), including hard copy and/or electronic controls.
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference
4 ORGANIZATION
(a) An organization chart showing the relationship between management,
engineering, purchasing, manufacturing, production, field assembly, field
construction, inspection, and quality control (as applicable) exists and
reflects the actual organization.
(NOTE: The purpose of this chart is to identify and associate the various organizational groups with the
particular function for which they are responsible. The Code does not intend to encroach on the right to
establish or alter whatever form of organization considered to be appropriate for Code work.)
5 DRAWINGS, DESIGN CALCULATIONS AND SPECIFICATION CONTROL
(a) Controls exist which assure that the latest applicable drawings, design
calculations, specifications and instructions required by Code, as well as
authorized changes, are used for manufacture, assembly, examinations,
inspections and testing. Controls include provisions for:
(i) The title of the individual responsible for the preparation of the
design calculations and drawings produced internally (where
applicable).
(ii) The title of the individual responsible for reviewing and approving
drawings, calculations and specifications prepared internally or
supplied by the customer, to ensure Code compliance to the latest
Code (approval by signature and date on all applicable documents).
(iii) The title of the individual responsible for computer aided design
calculations and drawings. A detailed description of how this is
verified to ensure the correct output has been obtained (where
applicable).
(iv) The title of the individual responsible to ensure computer program
revisions have been made within 6 months of Code revision
changes. The verification process that ensures the revised program
is producing the correct output is described (where applicable).
(v) The title of the individual responsible for the design registration with
the appropriate jurisdictional authority and filing the registered
designs upon request shall be described.
(vi) The title of the individual responsible for the distribution of drawings,
calculations, specifications, and the removal of all obsolete
drawings, calculations and specifications.
6 MATERIAL CONTROL
(a) Controls exist to assure that the material received is properly identified
and has the correct documentation, including Statutory Declarations,
material test reports and/or certificates of compliance to satisfy Code
requirements, as applicable.
(b) The material control system ensures that only accepted material is
issued for Code construction.
(c) If substitution of materials is allowed, the applicable controls of this
activity are documented, including designation of the individual
authorized to approve substitutions.
(d) The title of the individual responsible for performing a receiving
inspection of Code materials.
(e) Information to be provided to the individual receiving materials
concerning characteristics of the material to be checked is documented.
(f) Controls exists for the handling of materials that are found to be non-
conforming at receiving inspection.
(g) Measures have been established and documented to assure the proper
marking, handling, and storage of materials, including welding/brazing
material.
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference
12 HEAT TREATMENT
(a) Controls are in place to assure that heat treatment is completed as
required by the applicable Code.
(b) Measures are established to assure the proper placement of
thermocouples and the use of charts.
(c) When heat treatment is subcontracted, measures are established to
assure that the procedures are followed and that heat treatment charts
are provided.
(d) The title of the individual responsible for maintaining traceability of the
item being heat treated when sent to the subcontracted facility.
(e) Documentation is provided to the AI for assurance that all heat treatment
requirements have been met.
13 CALIBRATION OF MEASURING AND TEST EQUIPMENT
(a) Controls exist for the calibration of examination, measuring, and test
equipment used in fulfillment of applicable Code requirements.
(b) Measures are established to ensure that:
(i) Calibration records are maintained and that status indicators are
used to indicate the current calibration status of the equipment.
(ii) Calibration equipment is maintained in good condition, checked for
signs of damage, and removed from service if found defective.
(iii) A calibration frequency is established and maintained, and results
are traceable to National Standards.
(iv) When calibrations are performed in-house, the title of the individual
responsible is identified and procedures are established.
(c) For brazed refrigeration (only) in accordance with CSA B52 and ASME
B31.5, the calibration of pressure gauges is not required if the two-gauge
method is used for pressure testing of piping systems.
14 RECORDS RETENTION
(a) The manufacturer or assembler shall maintain the documents outlined
below for a period as required by the Code of Construction (as
applicable):
(i) Piping Systems Installation and Test Data Reports, including Partial
Data Reports
(ii) Registered drawings
(iii) Design calculations
(iv) Checklists, process sheets, travelers, repair reports, etc.
(v) Material test reports and/or material certifications
(vi) Statutory Declarations
(vii) Welding Procedure Specifications/Brazing Procedure Specifications
and Procedure Qualification Records
(viii) Welder Qualification Records for each welder or Brazing
Qualification Records for each brazer
(ix) Non-Destructive Examination reports
(x) Repair procedures and records
(xi) Heat treatment records and test results
(xii) Non-conformances and dispositions
(xiii) Pressure test records
(xiv) Any other applicable documentation
15 THE AUTHORIZED INSPECTOR
(a) All required inspections are to be performed by the AIA of Record (the
AIA in Ontario is the TSSA).
(b) A controlled copy of the QC Manual is available to the AI at the plant or
construction site where Code activities are being carried out.
Quality Program
No. Quality Element and Sub-Elements Yes No N/A
Reference