240 Preventive Check Sheet of Tube Bending Machine Re
240 Preventive Check Sheet of Tube Bending Machine Re
240 Preventive Check Sheet of Tube Bending Machine Re
1 Clean the Machine C Dust Dust free Clean Leads to B/D Cloth Operator
Inform to
2 To check the oil level in tank L I Level Gauge Above min. level Leads to B/D Visual Operator
maintenance
Inform to
4 To check oil leakage at all joints, seals I Leakage No Leakage Leads to B/D Visual Operator
maintenance
Visual &
5 Door of electrical panel & junction box I Fully closed Fully closed Closed Leads to B/D Operator
Hand
10
11
Name
Shift Operator (Sign.) :
Sign.
Name
Shift Engineer (Sign.) :
Sign.
Name
HOD (Sign.) :
Sign.
JCME/LM/F/028/01
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
4 To apply grease on the toggle and pins Grease pump Greasing done
To check the lub. Oil level in the pump and top up (top
5 Level gauge High level
up quantity to be recorded)
9 Check all the wires for any loose connections By tester/screw driver No looseness
10 To check the limit switch & sensor working status By operating Should be interlocked
11
12
13
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/029/01
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
6 Check the gap in bend pinion & rack By Filler gauge,spanner < 1MM
8 Check the gap in push gear & rail By Filler gauge,spanner <0.5 MM
9 Check the play in clamp slide,toggle and pin By Filler gauge,spanner No play
11 To check any abnormal sound from motor and pump Visually/Hearing No abnormal sound
19
20
21
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/030/01
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
5 To check setting and movement of pressure control gauge Pressure meter & movement Calibrated
14 Lubricate motor shaft coupling with grease. By Manual Grease Gun Greasing done
18
19
20
21
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/031/01
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)