Sykes CP100i – Basic Pump Build & Service Manual
Impeller Clearances
Front Rear
Min (mm) Max (mm) Min (mm) Max (mm)
0.45 0.65 0.50 0.65
2. Swipe extra grease until the cavity is approximately one third full.
3. Do not under any circumstances completely fill the cavity as this may cause the
bearing to overheat.
Special Note:
Front Bearing Lip Seal to be reversed, so excess grease will release into bearing
frame cavity rather than to outside of bearing frame (engine adaptor side).
Page 3
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Mechanical Seal
BEFORE FITTING THE SEAL ENSURE SHAFT/SLEEVE IS CLEAN AND FREE FROM BURRS AND SHARP EDGES.
APPLY LIGHT OIL TO THE SHAFT/SLEEVE AND SEAL O-RING (ITEM 7). DO NOT USE HEAVY GREASE OR SILICON BASED LUBRICANT.
ENSURE SEAL GRUB SCREWS (ITEM 8) ARE NOT PROTRUDING BEYOND THE INSIDE DIAMETER OF THE SEAL RETAINER (ITEM 5).
CHECK SEAL FACE IS CLEAN AND FREE OF DEBRIS (ITEMS 2/3).
ENSURE THE SEAL UNIT IS PRESSED SQUARELY AND EVENLY OVER THE SHAFT. MAKE SURE IT IS HOME HARD BACK AGAINST THE COLLAR SHOULDER.
TIGHTEN GRUBS SCREWS (ITEM 8) EVENLY TO SECURE SEAL IN POSITION.
CHECK PUMP REAR WEARPLATE FOR BURRS AND SHARP EDGES. LUBRICATE SEAT O RING (ITEM 9) AND POSITION IN REAR WEAR PLATE O RING GROOVE.
CHECK SEAL SEAT (ITEM 1) IS CLEAN AND FREE OF DEBRIS. LOCATE IN REAR WEAR PLATE AND SECURE WITH CIRCLIP (ITEM 10).
LIGHTLY SMEAR STATIONARY SEAL FACE WITH CLEAN LIGHT OIL.
SEAL TENSION IS AUTOMATICALLY OBTAINED WHEN THE REAR WEAR PLATE IS FITTED.
FILL SEAL OIL CHAMBER WITH LIGHT OIL S.E.A. 20/20 AND CHECK ASSEMBLY ROTATES FREELY.
Page 4
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Torque Ratings
Sykes Group uses the following bolts and studs in their pump builds and it is
recommended to use the following torque settings
Page 5
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
2 SERVICE INFORMATION
Ensure that the safety information, warnings and the instruction are read and
understood before performing any maintenance procedures.
Follow the minor and major maintenance schedule outlined in Sykes Maintenance
Schedule. Use the service hours or calendar time, whichever occurs first, in order
to determine the maintenance intervals.
Sykes Group Pty Ltd uses the latest technology and highest quality components to
produce its pumps. Sykes Group recommends only using genuine Sykes parts.
Use the correct mechanical seal coolant, pump bearing lubricant as specified in
standard pump build & service manual.
Personnel at Sykes have been trained to provide expert service and parts support.
Some of the maintenance procedures requires special tools or must be completed
by qualified personnel.
If the pump is operated in ambient temperatures below -180C or above 380C and /
or under severe conditions, perform maintenance at shorter intervals.
Severe services includes the following conditions; high temperatures, continuous
high loads, vibration and dusty conditions.
Page 6
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Ancillaries
1 Check non return valve
2 Change non return valve seat/flap
3 Check vacuum gauge
4 Change vacuum gauge
5 Check pressure gauge
6 Change pressure gauge
7 Check gear box butterfly valve
8 Change gear box butterfly valve
9 Check all oil, water and air hose's condition
10 Check condition of hose coupling o-rings
11 Check for all mounting bolts, skid, chassis
12 Check shut down operations engine and pump
13 All guarding
14 For diesel servicing and panel operational checks. See relevant manuals.
= Daily Check
= Minor Service
= Major Service
= As Required
Notes:
1 Ancillaries are not included in major service schedule / pricing, please contact Sykes for assistance
2 Please refer to Service Schedule for detailed parts, service checks and labour information
3 Follow minor and major schedules outlined in Sykes Service Schedule. Use the service hours or
calendar time, whichever occurs first, in order to determine the maintenance intervals.
4 0 0
If the pump is operated in ambient temperatures below -18 C or above 38 C and / or under severe conditions, perform maintenance at shorter
intervals. Severe services includes the following conditions; high temperatures, continuous high loads, vibration and dusty conditions.
Page 7
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Grease Point
Grease Relief
Nipple
Notes:
Page 8
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Operating Conditions:
Ambient Temperature 20 0C
Humidity / Dust Moderate
Vibration Moderate
Load Moderate
!WARNING!
Page 9
Sykes Group Pty Ltd Spare Parts & Service 24 hours: 1800 131950
Website: www.sykesgroup.com
Sykes CP100i – Basic Pump Build & Service Manual
Operating Conditions:
Ambient Temperature 40 0C
Humidity / Dust High
Vibration High
Load Heavy
!WARNING!