Technical Query

Java LG Project – TSF and Civil Construction Work

TECHNICAL QUERY NO: DATE: PAGE:


AEI-TQE-CVL-0153-0015 11/1/2023 2 pages
CONTRACT NO: 5200000000
CONTRACTOR: PT. ASUKA ENGINEERING INDONESIA
AREA/SUBJECT Cold Box
Full description / justification of Technical Query: No of Attachments:
1 pages

In the coldbox foundation, the bottom rebar is too long so rebar elevation is higher than the T.O.C
foundation, Therefore we propose the addition of concrete.

AFTER BEFORE

Date: / Originator: Date: / Contractor Site Manager:


11/1/2023 – Nuroh Romdhonah 11/1/2023 – Doni Phasa

LINDE verification / response: No of Attachments:

Date: / Linde Project: Date: / LINDE Lead Engineer: