PROJECT NAME:CONSTRUCTION OF 380 KV DC OHTL IN

QIDDIYA AREA – 4400012358


ELEMENT 5.20a
PLANNED JOB OBSERVATION PLAN(SCHEDULE)

OBSERVER'S NAME: IBRAHIM ALI CONTRACTOR: ALHAIDER


IQBAL YEAR: 2021
MUSTAFA

FREQUENCY OF PLANNED JOB OBSERVATIONS

Planned Job Observations must be carried out at intervals not exceeding six months. Each person must be observed every four months in respect of
each hazardous job performed during that period e.g.

LIST OF CRITICAL JOBS PERFORMED IN THIS DEPARTMENT/SECTION:

1. Soil investigation 6. Installation of insolator 11. 16.

2. Auguring 7. Clipping and sagging 12. 17.

3. Tower ground assembly 8. OPGW paying out 13. 18.

4. Tower Erection 9. OPGW clipping 14. 19.

5. Conductor paying out 10. 15. 20.

NAMES MONTHS J F M A M J J A S O N D

JOB NO. 4
SK SAMIUL
DATE 7

JOB NO. 3
DULA SK MAHIM
DATE 11

JOB NO. 2
VINOD YADAV
DATE 24

JOB NO. 1
RAJU DAS
DATE 15

JOB NO. 6
MUSTAFA ALI
DATE 19

JOB NO. 7
MD Kalam
DATE 20

JOB NO. 8
NAZIR AHMAD
DATE 23

JOB NO. 5
SHAH ALAM ISHTIYAK
DATE 17

JOB NO. 9
PASHUPATI MAGDAITA
DATE 12

JOB NO. 3
KHALED KHALEFA
DATE 15

JOB NO.

DATE

REMEMBER: Use the Written Safe Work Procedure to guide you during the observation.

Prepared By: _____________________ Signature:_________________ Date:_________________

Site Manager: ____________________ Signature:_________________ Date:_________________

Page 1 of 1 Rev.2 [08April-2019] Projects Business Unit