OHSE Project HIRA - Fencing Work - R 01
OHSE Project HIRA - Fencing Work - R 01
OHSE Project HIRA - Fencing Work - R 01
The existence of
Slight health effect /injury /
legislation/regulatio
2 little damage to property (Can 2 Once in month 2 Heard in offices outside 2 NO No Significance
ns has no influence
be recovered in 2 days.)
on significance
Incident happened in
Minor health (illness) effect /
3 3 Once in a week 3 our organization / 3
injury (Keeps person away
company 2-3 times in a
from work 2-3 days.) year.
Risk Evaluation
LOW: MODERATE: HIGH:
IMPACT RISK UPTO 30 IMPACT RISK 31 TO 60 IMPACT RISK 61 & ABOVE
Note:
1 In the event Severity is 5 or the legislation is 'NO'- irrespective of overall low score the Risk is always high.
IMPACT
EXPOSOURE EXISTING
SEVERITY LEGISLATION RISK
SR NO. ACTIVITY HAZARDS ASSOCIATED RISK FREQUENCY PROBABLITY P CONTROL RISK LEVEL
S L
E IN PLACE
(SxExP)
1. Improper access
2. Lone worker near grass area 1. Body injury
3. Untrained worker
4. Snake bite 2. Back pain
5. Hot engine parts 3. Fatality
6. Rotating machinery 4. Burn injury
Grass cutting by grass cutting 5. Cut/Lacerations
1
machine & tools
7. Overturning of machine by worker
6. Hand arm vibration/full body 5 3 3 No 45 Yes High
8. Vibration
vibration
9. Flying grass parts 7. Eye injury
10. Defective tools/machine 8. Cut/Amputation
11. Loose cloths 9. Serious injury
12. Non use of PPE's
1. Improper access
2. Over load 1. Back pain
3. Wet floor 2. Body pains
4. Falling of Materials 3. Sprains
Manual Material Handling of
2 5. Sharp edges 4. Temporary Disabilities. 2 2 2 No 8 YES Low
heavy/bulky objects
6. Untrained workers 5. Spinal cord injuries
7. Not uses of PPE's 6. Body part injury
7. Cut injury
1. Falling of materials .
2. Unskilled workers
3. Lone worker near grass area
4. Snake bite 1. Back pain
5. Non uses of PPE's 2. Body pains
Concrete breaking by chipper 6. Underground utilities 3. Body part injury
machine / concrete drill (like live cable, water pipeline, gas 4. Electrocution
4 5 3 3 No 45 Yes High
machine ( Portable power pipeline) 5. Hearing problem
Tools) 7. Noise 6. Hand arm vibration/full
8. Vibration body vibration
9. Defective power tools 7. Fatality
10. Loose and damaged electrical
wires and plug top
Audit Comments
1. A risk assessment must be completed for lifting heavy and bulky loads that present a
risk of injury.
2. High shelves for light items only.
3. Training in lifting techniques should be provided for anyone who undertakes the lifting
of heavy loads.
Format No. L004-OHS-Atn-Fr-004/Rev02/May2015
4. Obtained daily general work permit prior to start the work.
Format No. L010-OHS-GP-Fr-010/Rev03/Feb2019
5. Proper and required PPE i.e. safety helmet, safety shoes with steel toe, dotted hand
gloves, clear Safety goggle, Full body safety belt if required etc.
Format No. K005-OHS-PP-Ch-007/Rev03/Jan2016
6. Access should be cleared from any obstruction
Format No. K006-OHS-HK-Ch-008/Rev02/Jan2016
7. Stringent supervision to be provided
8. Sufficient man power to be provided of as per load .
1. Obtained daily general work permit from prior to start the work. Format No. L010-
OHS-GP-Fr-010/Rev03/Feb2019
2.Ensure electrical safety joint inspection checklist should be filled by the contractor once
in a week Format No. K012-OHS-EW-Ch-014/Rev02/Jan2016
1. HOT work permit to be obtained before start work. Format No. L016-OHS-HoP-Fr-
016/Rev04/Feb2019
2. Supply to be taken from ELCB board 30 mA (Format
NoK012-OHS-EW-Ch-014/Rev02/Jan2016
3. Welding m/c to be check as per check list. Format No.
K048-OHS-WM-Ch-49/Rev00/May 2019
4. Cylinder store area separate and marked
5. Use industrial lighter for ignition
6. Follow gas cylinder inspection check list Format No. K034-OHS-GC-Ch-35/Rev00/May
2019
7. Proper supervision to be provided from site supervisor
1. Obtained daily general work permit from prior to start the work. Format No. L010-
OHS-GP-Fr-010/Rev03/Feb2019
2.Ensure electrical safety joint inspection checklist should be filled by the contractor once
in a week Format No. K012-OHS-EW-Ch-014/Rev02/Jan2016