OHSE Project HIRA - Fencing Work - R 00
OHSE Project HIRA - Fencing Work - R 00
OHSE Project HIRA - Fencing Work - R 00
The existence of
Slight health effect /injury /
legislation/regulatio
2 little damage to property (Can 2 Once in month 2 Heard in offices outside 2 NO No Significance
ns has no influence
be recovered in 2 days.)
on significance
Incident happened in
Minor health (illness) effect /
3 3 Once in a week 3 our organization / 3
injury (Keeps person away
company 2-3 times in a
from work 2-3 days.) year.
Risk Evaluation
LOW: MODERATE: HIGH:
IMPACT RISK UPTO 30 IMPACT RISK 31 TO 60 IMPACT RISK 61 & ABOVE
Note:
1 In the event Severity is 5 or the legislation is 'NO'- irrespective of overall low score the Risk is always high.
IMPACT
EXPOSOURE EXISTING ACTION MEASURE FOR RISK CONTROL
SEVERITY LEGISLATION RISK
SR NO. ACTIVITY HAZARDS ASSOCIATED RISK FREQUENCY PROBABLITY P CONTROL RISK LEVEL ( please provide the second level document title and number from
S E L IN PLACE OHSE master list of documents for each activity )
(SxExP)
1. A risk assessment must be completed for lifting heavy
and bulky loads that present a risk of injury.
2. High shelves for light items only.
3. Training in lifting techniques should be provided for
anyone who undertakes the lifting of heavy loads.
Format No. L004-OHS-Atn-Fr-004/Rev02/May2015
4. Obtained daily general work permit prior to start the
work.
Format No. L010-OHS-GP-Fr-010/Rev03/Feb2019
1. Improper access 1. Back pain 5. Proper and required PPE i.e. safety helmet, safety shoes
2. Over load 2. Body pains with steel toe, dotted hand gloves, clear Safety goggle,
Manual Material Handling of 3. Wet floor 3. Sprains Full body safety belt if required etc.
1 2 2 2 No 8 YES Low
heavy/bulky objects 4. Falling of Materials 4. Temporary Disabilities. Format No. K005-OHS-PP-Ch-007/Rev03/Jan2016
5. Spinal cord injuries 6. Access should be cleared from any obstruction
6. Body part injury Format No. K006-OHS-HK-Ch-008/Rev02/Jan2016
7. Stringent supervision to be provided
8. Sufficient man power to be provided of as per load .