S.No Description Qty Rate (RS.) Amount (RS.) RXQ12ARY6 - Daikin VRV X 12HP ODU Cooling Only
S.No Description Qty Rate (RS.) Amount (RS.) RXQ12ARY6 - Daikin VRV X 12HP ODU Cooling Only
S.No Description Qty Rate (RS.) Amount (RS.) RXQ12ARY6 - Daikin VRV X 12HP ODU Cooling Only
Total 642,084.00
GST ( 28 % ) 179,783.52
Total with GST 821,868.00
Hope you will find our offer is in line with your requirements and looking forward to receive your valuable order at the earliest. Kindly feel free to contact us for any
clarifications on our quotation.Thanking you and assuring you of our best services at all times. For further clarifications please feel free to contact Mr.Kumaresh –
9845455165.
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
SCHEDULE OF QUANTITY OF LOW SIDE WORK - HVAC SYSTEM VRV APPROX. PIPING MEASUREMENT
6 Lifting & Shifting Charges for all units 1 Lot 3,000.00 3,000.00
Note:
A The prices mentioned herewith are excluding of all taxes
B Charges are extra other then BOQ items.
C Electrical/Civil/Scaffolding /Storage works are excluded.
Note: Stores/Security to be provide by Client.
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Annexure -II - EXCLUDED WORKS & SERVICES
We have not included the following and client as per the requirement of the project shall arrange these:
1 All mansory work/civil works such as supports for the condensing units ,cutting away and making good of walls
floor slabs ,making and closing of trenches etc.
2 Supply & installation of main power supply terminating at each outdoor unit (THREE PHASE) with an isolator for
units above 2.0TR and SINGLE PHASE power supply for units below 2.0TR.
3 Any kind of false ceiling works, boxing works, wooden frame work/carpentry works.
4 Any under deck insulation, false ceiling insulation work.
5 Provision for necessary Drain Points .
6 Protected storage space at site.
7 Power for erection, testing & commissioning of the system.
8 Any kind of dismantling work.
Price for installation work inclusive of all taxes .Any kind of statutory variations or imposition of any taxes and duties shall be to clients account.
4 VALIDITY:
This offer is valid for 15 days from the date of submission .Any kind of statutory
variation shall be to your account .
5 ORDER PLACEMENTFOR EQUIPMENT:
Order for the equipment to be placed on M/S. VINAYAKA HEMAAL SAI ENTERPRISES., Bangalore
6 ORDER PLACEMENT FOR INSTALLATION:
Order for Installation works to be placed on M/S. VINAYAKA HEMAAL SAI ENTERPRISES., Bangalore
7 PAYMENT TERMS FOR INSTALLATION :
75% adavnce along with order, Balance 20% against material delivery at site, Balance 5% against Commissioning.
8 WARRANTY:
12 Months from date of Commissioning or 15 Months from date of VHSE Invoice, Which ever is earlier.
SCHEDULE OF QUANTITY OF LOW SIDE WORK - HVAC SYSTEM VRV APPROX. PIPING MEASUREMENT
6 Lifting & Shifting Charges for all units 1 Lot 2,000.00 2,000.00
We have not included the following and client as per the requirement of
the project shall arrange these:
1 All mansory work/civil works such as supports for the condensing units ,cutting away and making good of walls
floor slabs ,making and closing of trenches etc.
2 Supply & installation of main power supply terminating at each outdoor unit (THREE PHASE) with an isolator for
units above 2.0TR and SINGLE PHASE power supply for units below 2.0TR.
3 Any kind of false ceiling works, boxing works, wooden frame work/carpentry works.
3 PRICE BASIS:
Price for equipment are inclusive of all taxes .
Price for installation work inclusive of all taxes .Any kind of statutory variations or
imposition of any taxes and duties shall be to clients account .
4 VALIDITY:
This offer is valid for 15 days from the date of submission .Any kind of statutory
variation shall be to your account .
8 WARRANTY:
12 Months from date of Commissioning or 15 Months from date of VHSE Invoice,
Which ever is earlier.