VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE

Date: 28 JUN 2021


Site: Mr.Ajay Kumar , Bangalore.

S.NO Description Qty Rate ( Rs.) Amount (Rs.)


1 RXQ12ARY6 - Daikin VRV X 12HP ODU Cooling Only 1 188,046.00 188,046.00
2 FXEQ63 - 2.02TR Daikin VRV Ceiling Mounted One Way Cassette with panel - IDU 3 69,564.00 208,692.00
3 FXEQ50 - 1.06TR Daikin VRV Ceiling Mounted One Way Cassette with panel- IDU 2 69,006.00 138,012.00
4 FXEQ40 - 1.03TR Daikin VRV Ceiling Mounted One Way Cassette with panel- IDU 1 65,534.00 65,534.00
5 Refnet Joint 5 3,200.00 16,000.00
6 Receiver kit 6 2,200.00 13,200.00
7 Remote 6 2,100.00 12,600.00

Total 642,084.00
GST ( 28 % ) 179,783.52
Total with GST 821,868.00

100% advance payment along with work order.

Hope you will find our offer is in line with your requirements and looking forward to receive your valuable order at the earliest. Kindly feel free to contact us for any
clarifications on our quotation.Thanking you and assuring you of our best services at all times. For further clarifications please feel free to contact Mr.Kumaresh –
9845455165.
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE

SCHEDULE OF QUANTITY OF LOW SIDE WORK - HVAC SYSTEM VRV APPROX. PIPING MEASUREMENT

Sl. No. Description Qty Units SUPPLY INSTALLATION

RATE INR AMOUNT INR RATE INR AMOUNT


INR
1 Nitrogen Testing 1 Nos 8,000.00 8,000.00

2 Installation of Indoor units


a) VRV Ceiling Mounted One Way Cassette 6 Nos 2,200.00 13,200.00

3 Refrigerant Copper Piping


Piping material shall Confirm to ASTM B280 Standards
Supply, installation of Harden & soft pipe
refrigerant copper piping connected between evaporator unit &
condenser units covered with 13/19 mm the. Nitrile foam insulation.
(Suction Pipe & Discharge Pipe)
28.6mm with 19 mm thick insulation & Harden Pipe 20 Rmt. 1,600.00 32,000.00 150.00 3,000.00
22.2 mm with 19 mm thick insulation & Harden pipe 4 Rmt. 1,450.00 5,800.00 120.00 480.00
19.1 mm with 13 mm thick insulation & Harden Pipe 4 Rmt. 1,200.00 4,800.00 110.00 440.00
15.9 mm with 13 mm thick insulation & Harden pipe 6 Rmt. 950.00 5,700.00 100.00 600.00
9.5mm with 13 mm thick insulation & Harden pipe 6 Rmt. 850.00 5,100.00 100.00 600.00
15.9 mm with 13 mm thick insulation & soft pipe 57 Rmt. 850.00 48,450.00 75.00 4,275.00
12.7 mm with 13 mm thick insulation & Soft Pipe 47 Rmt. 550.00 25,850.00 90.00 4,230.00
9.5 mm with 13 mm thick insulation & soft pipe 60 Rmt. 750.00 45,000.00 75.00 4,500.00
6.4 mm with 13 mm thick insulation & Soft Pipe 28 Rmt. 450.00 12,600.00 90.00 2,520.00

4 Control Electrical Control Cabling


Supply, installation, testing & commissioning of electrical
control cabling between outdoor and evaporator unit.
a) Control wiring 1.5sq.mm 2 core wire 180 Rmt 95.00 17,100.00 25.00 4,500.00
b) Control wiring 4.0sq.mm 4 core wire 20 Rmt 275.00 5,500.00 25.00 500.00
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
5 Water Distribution Side
Drain Piping

Supply, installation, testing & Commissioning of following sizes 6 mm thick nitrile


rubber foam insulated PVC drain pipes.

Drain piping with insulation.10 MM thickness


a. 32mm dia 10 Rmt 225.00 2,250.00 50.00 500.00

6 Lifting & Shifting Charges for all units 1 Lot 3,000.00 3,000.00

7 Gas tap up 1 Lot 10,000.00 10,000.00 2,000.00 2,000.00

8 Transport charges 1 Lot 7,000.00 7,000.00

9 Installation, Testing & Commissioning of entire system 1 Lot 12,000.00 12,000.00

10 Core cutting 10 Nos 950.00 9,500.00

11 M.S Stand Angle (outdoor unit) 1 Nos 3,500.00 3,500.00

Basic Amount 220,150.00 84,345.00


Basic Amount + Installation 304,495.00
GST 18% 54,809.10
TOTAL 359,305.00

Note:
A The prices mentioned herewith are excluding of all taxes
B Charges are extra other then BOQ items.
C Electrical/Civil/Scaffolding /Storage works are excluded.
Note: Stores/Security to be provide by Client.
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Annexure -II - EXCLUDED WORKS & SERVICES
We have not included the following and client as per the requirement of the project shall arrange these:
1 All mansory work/civil works such as supports for the condensing units ,cutting away and making good of walls
floor slabs ,making and closing of trenches etc.
2 Supply & installation of main power supply terminating at each outdoor unit (THREE PHASE) with an isolator for
units above 2.0TR and SINGLE PHASE power supply for units below 2.0TR.
3 Any kind of false ceiling works, boxing works, wooden frame work/carpentry works.
4 Any under deck insulation, false ceiling insulation work.
5 Provision for necessary Drain Points .
6 Protected storage space at site.
7 Power for erection, testing & commissioning of the system.
8 Any kind of dismantling work.

ANNEXURE III - TERMS & CONDITIONS


1 PAYMENT TERMS FOR EQUIPMENT:
100% advance along with Purchase Order.
2 DELIVERY PERIOD OF EQUIPMENT:
We shall be able to deliver the machines within 2~3 weeks from the date of confirmed order.
3 PRICE BASIS:
Price for equipment are inclusive of all taxes .

Price for installation work inclusive of all taxes .Any kind of statutory variations or imposition of any taxes and duties shall be to clients account.
4 VALIDITY:
This offer is valid for 15 days from the date of submission .Any kind of statutory
variation shall be to your account .
5 ORDER PLACEMENTFOR EQUIPMENT:
Order for the equipment to be placed on M/S. VINAYAKA HEMAAL SAI ENTERPRISES., Bangalore
6 ORDER PLACEMENT FOR INSTALLATION:
Order for Installation works to be placed on M/S. VINAYAKA HEMAAL SAI ENTERPRISES., Bangalore
7 PAYMENT TERMS FOR INSTALLATION :
75% adavnce along with order, Balance 20% against material delivery at site, Balance 5% against Commissioning.
8 WARRANTY:
12 Months from date of Commissioning or 15 Months from date of VHSE Invoice, Which ever is earlier.

SYSTEM GENERATED QUOTATION SIGNATURE NOT REQUIRED


VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Date: 27 FEB 2021
Site: Mr.Viswanathan, Bangalore

SCHEDULE OF QUANTITY OF LOW SIDE WORK - HVAC SYSTEM VRV APPROX. PIPING MEASUREMENT

Sl. Description Qty Units SUPPLY INSTALLATION


No.

RATE INR AMOUNT INR RATE INR AMOUNT INR


1 Nitrogen Testing 1 Nos 4,000.00 4,000.00

2 Installation of INDOOR units


a) VRV Highwall Split AC 3 Nos 1,800.00 5,400.00

3 Refrigerant Copper Piping


Piping material shall Confirm to ASTM B280 Standards
Supply, installation of Harden & soft pipe
refrigerant copper piping connected between evaporator unit &
condenser units covered with 13/19 mm the. Nitrile foam insulation.
(Suction Pipe & Discharge Pipe)
9.5 mm with 8 mm thick insulation 6 Rmt. 550.00 3,300.00 110.00 660.00
15.9 mm with 10 mm thick insulation 4 Rmt. 900.00 3,600.00 120.00 480.00
19.1 mm with 10 mm thick insulation 4 Rmt. 900.00 3,600.00 120.00 480.00
12.7 mm with 8 mm thick insulation 13 Rmt. 900.00 11,700.00 120.00 1,560.00
6.4 mm with 8 mm thick insulation 13 Rmt. 900.00 11,700.00 120.00 1,560.00

4 Control Electrical Control Cabling


Supply, installation, testing & commissioning of electrical
control cabling between outdoor and evaporator unit.
a) Control wiring 1.5sq.mm 2 core wire 50 Rmt 95.00 4,750.00 25.00 1,250.00
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
5 WATER DISTRIBUTION SIDE
DRAIN PIPING
Supply, installation, testing & Commissioning of following sizes 6 mm thick
nitrile rubber foam insulated PVC drain pipes.
Drain piping with insulation.10 MM thickness
a. 32mm dia 15 Rmt 175.00 2,625.00 27.00 405.00

6 Lifting & Shifting Charges for all units 1 Lot 2,000.00 2,000.00

7 Gas tap up 1 Lot 5,000.00 5,000.00 1,500.00 1,500.00

8 Transport charges 1 Lot 1,000.00 1,000.00

9 Installation, Testing & Commissioning of entire system 4 Lot 3,000.00 12,000.00

10 Core cutting 6 Nos 750.00 4,500.00

Basic Amount 46,275.00 36,795.00


Basic Amount + Installation 83,070.00
GST 18% 14,952.70
TOTAL 98,023.00
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Note:
A The prices mentioned herewith are excluding of all taxes
B Charges are extra other then BOQ items.
C Electrical/Civil/Scaffolding /Storage works are excluded.

Note: Stores/Security to be provide by Client.


VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Date: 27 FEB 2021
Site: Mr. Viswanathan, Bangalore .

Annexure -II - EXCLUDED WORKS & SERVICES

We have not included the following and client as per the requirement of
the project shall arrange these:

1 All mansory work/civil works such as supports for the condensing units ,cutting away and making good of walls
floor slabs ,making and closing of trenches etc.

2 Supply & installation of main power supply terminating at each outdoor unit (THREE PHASE) with an isolator for
units above 2.0TR and SINGLE PHASE power supply for units below 2.0TR.

3 Any kind of false ceiling works, boxing works, wooden frame work/carpentry works.

4 Any under deck insulation, false ceiling insulation work.

5 Provision for necessary Drain Points .

6 Protected storage space at site.

7 Power for erection, testing & commissioning of the system.

8 Any kind of dismantling work.


VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
Date:27 FEB 2021
Site: Mr. Viswanathan, Bangalore .

ANNEXURE III - TERMS & CONDITIONS

1 PAYMENT TERMS FOR EQUIPMENT:


100% advance along with Purchase Order.

2 DELIVERY PERIOD OF EQUIPMENT:


We shall be able to deliver the machines within 2~3 weeks from the date of
confirmed order.

3 PRICE BASIS:
Price for equipment are inclusive of all taxes .

Price for installation work inclusive of all taxes .Any kind of statutory variations or
imposition of any taxes and duties shall be to clients account .

4 VALIDITY:
This offer is valid for 15 days from the date of submission .Any kind of statutory
variation shall be to your account .

5 ORDER PLACEMENTFOR EQUIPMENT:


Order for the equipment to be placed on
M/S. VINAYAKA HEMAAL SAI ENTERPRISES. , Bangalore

6 ORDER PLACEMENT FOR INSTALLATION:


Order for Installation works to be placed on
M/S. VINAYAKA HEMAAL SAI ENTERPRISES, Bangalore
VINAYAKA HEMAAL SAI ENTERPRISES, BANGALORE
7 PAYMENT TERMS FOR INSTALLATION :
75% adavnce along with order
Balance 20% against material delivery at site
Balance 5% against Commissioning

8 WARRANTY:
12 Months from date of Commissioning or 15 Months from date of VHSE Invoice,
Which ever is earlier.