T1 - RP2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

DATE STAMP

03.08.2020
18:57
220KV THUAN NAM 12 SS
Customer THANH VINH SOLAR JSC
Consultant DINA CO.LTD
Drawing set TN12_T1+RP2 TRANSFORMER
Stage FINAL
Issue Date 20.04.2020
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
COVER 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER of 612
DATE STAMP
03.08.2020
18:57
Table of Contents
Project Name: 220KV THUAN NAM 12 SS
Job Number : 19138.220TN12
Drawing Set Installation Location Page Number Description
TN12_T1+RP2 TRANSFORMER T1 G A1 COVER
TN12_T1+RP2 TRANSFORMER T1 G G1 SINGLE LINE
TN12_T1+RP2 TRANSFORMER T1 G G2 T1+RP2 LAYOUT
TN12_T1+RP2 TRANSFORMER T1 G G3 TRIP MATRIX
TN12_T1+RP2 TRANSFORMER T1 RP2 1 DC DISTRIBUTION
TN12_T1+RP2 TRANSFORMER T1 RP2 2 HEATING & LIGHTING
TN12_T1+RP2 TRANSFORMER T1 RP2 3 CT/VT INPUT F90
TN12_T1+RP2 TRANSFORMER T1 RP2 4 CT INPUT F87T1
TN12_T1+RP2 TRANSFORMER T1 RP2 5 CT INPUT F87T1
TN12_T1+RP2 TRANSFORMER T1 RP2 6 CT FOR F50 OF J01
TN12_T1+RP2 TRANSFORMER T1 RP2 7 F90 DESCRIPTION
TN12_T1+RP2 TRANSFORMER T1 RP2 8 F87T1 DESCRIPTION
TN12_T1+RP2 TRANSFORMER T1 RP2 9 INPUT OF F90
TN12_T1+RP2 TRANSFORMER T1 RP2 10 INPUT OF F87T2
TN12_T1+RP2 TRANSFORMER T1 RP2 11 INPUT OF F87T2
TN12_T1+RP2 TRANSFORMER T1 RP2 12 INPUT OF F87T2
TN12_T1+RP2 TRANSFORMER T1 RP2 13 SIGNAL INPUT
TN12_T1+RP2 TRANSFORMER T1 RP2 14 SIGNAL OUTPUT
TN12_T1+RP2 TRANSFORMER T1 RP2 15 SIGNAL TRIP OF TRANSFORMER
TN12_T1+RP2 TRANSFORMER T1 RP2 16 SIGNAL ALARM OF TRANSFORMER
TN12_T1+RP2 TRANSFORMER T1 RP2 17 TRANSFORMER TRIP TO F87T2
TN12_T1+RP2 TRANSFORMER T1 RP2 19 FAN CONTROL
TN12_T1+RP2 TRANSFORMER T1 RP2 20 OLTC CONTROL
TN12_T1+RP2 TRANSFORMER T1 RP2 21 RELAY FAIL
TN12_T1+RP2 TRANSFORMER T1 RP2 22 SIGNALS OF MCB
TN12_T1+RP2 TRANSFORMER T1 RP2 23 SIGNALS OF T1+RP1
TN12_T1+RP2 TRANSFORMER T1 RP2 24 TRIP TO LV
TN12_T1+RP2 TRANSFORMER T1 RP2 25 START 50BF OF D00
TN12_T1+RP2 TRANSFORMER T1 RP2 26 T1-RP2 REFERENCE
TN12_T1+RP2 TRANSFORMER T1 RP2 27 TERMINAL OF LIST
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
TABLE OF CONTENTS 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
Drawing Set Installation Location Page Number Description
TN12_T1+RP2 TRANSFORMER T1 RP2 28 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 29 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 30 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 31 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 32 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 33 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 34 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 35 TERMINAL OF LIST
TN12_T1+RP2 TRANSFORMER T1 RP2 36 TERMINAL OF LIST
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
TABLE OF CONTENTS 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page A3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
BILL OF MATERIAL
Project name: 220KV THUAN NAM 12 SS
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
1 F87T1 T1 RP2 /8.1 T60-W03-HKH-F8N-H6C-M8L-P6E-U6D-WXX Transformer Differential Relay GE
2 F90 T1 RP2 /7.2 REG- DA Auto-regulating voltage relay A-EBERLE
3 FAC1 T1 RP2 /2.4 PLS6-C10/2 MCB, AC, 6kA 2poles 10A Eaton
4 FAC2 T1 RP2 /2.5 PLS6-C10/2 MCB, AC, 6kA 2poles 10A Eaton
5 FR1 T1 RP2 /1.4 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
6 FR2 T1 RP2 /1.4 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
7 FS T1 RP2 /1.3 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
8 HVW T1 RP2 /26.3 JIR-301-M C5 TA(4-20mA) TA2(4-20mA) BK TC Đồng hồ đo nhiệt độ cuộn dây. Shinko/Japan
9 KDC T1 RP2 /1.7 RF-4R 220VDC Fast trip relay Arteche
10 KDC T1 RP2 /1.7 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
11 LVW T1 RP2 /26.4 JIR-301-M C5 TA(4-20mA) TA2(4-20mA) BK TC Đồng hồ đo nhiệt độ cuộn dây. Shinko/Japan
12 OP T1 RP2 /26.6 JIR-301-M C5 TA(4-20mA) TA2(4-20mA) BK TC Đồng hồ đo nhiệt độ dầu Shinko/Japan
13 OT T1 RP2 /26.1 JIR-301-M C5 TA(4-20mA) TA2(4-20mA) BK TC Đồng hồ đo nhiệt độ cuộn dây. Shinko/Japan
14 POL T1 RP2 /26.8 YW1B-M1E11 R Red Push Button IDEC
15 POR T1 RP2 /26.7 YW1B-M1E11 G Green Push Button IDEC
16 SA1 T1 RP2 /16.2 RF-4R Relay fast trip Arteche
17 SA1 T1 RP2 /16.2 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
18 SA2 T1 RP2 /16.2 RF-4R Relay fast trip Arteche
19 SA2 T1 RP2 /16.2 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
20 SA3 T1 RP2 /16.3 RF-4R Relay fast trip Arteche
21 SA3 T1 RP2 /16.3 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
22 SA4 T1 RP2 /16.4 RF-4R Relay fast trip Arteche
23 SA4 T1 RP2 /16.4 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
24 SA5 T1 RP2 /16.6 RF-4R Relay fast trip Arteche
25 SA5 T1 RP2 /16.6 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
26 SA6 T1 RP2 /16.7 RF-4R Relay fast trip Arteche
27 SA6 T1 RP2 /16.7 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
28 SAM-F T1 RP2 /26.4 R601-202_02 (Auto/man) Khóa Auto/Man (2NO, 2NC) Comelectric
29 SAM-O T1 RP2 /26.4 R601-202_02 (Auto/man) Khóa Auto/Man (2NO, 2NC) Comelectric
30 SEM T1 RP2 /26.6 YW1B-V4E11R Stop Emergency Switch IDEC
31 SF1 T1 RP2 /26.1 R601-202_02 (ON/OFF) Khóa 2 vị trí, 2 poles (2NO2NC), ON/OFF Comelectric
32 SF2 T1 RP2 /26.3 R601-202_02 (ON/OFF) Khóa 2 vị trí, 2 poles (2NO2NC), ON/OFF Comelectric
33 SLR-F T1 RP2 /26.1 R601-202_02 (Local/remote) Khóa local/remote (2NO, 2NC) Comelectric
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
34 SLR-O T1 RP2 /26.3 R601-202_02 (Local/remote) Khóa local/remote (2NO, 2NC) Comelectric
35 ST1 T1 RP2 /15.2 RF-4R Relay fast trip Arteche
36 ST1 T1 RP2 /15.2 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
37 ST2 T1 RP2 /15.3 RF-4R Relay fast trip Arteche
38 ST2 T1 RP2 /15.3 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
39 ST3 T1 RP2 /15.3 RF-4R Relay fast trip Arteche
40 ST3 T1 RP2 /15.3 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
41 ST4 T1 RP2 /15.4 RF-4R Relay fast trip Arteche
42 ST4 T1 RP2 /15.4 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
43 ST5 T1 RP2 /15.5 RF-4R Relay fast trip Arteche
44 ST5 T1 RP2 /15.5 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
45 ST6 T1 RP2 /15.6 RF-4R Relay fast trip Arteche
46 ST6 T1 RP2 /15.6 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
47 ST7 T1 RP2 /15.7 RF-4R Relay fast trip Arteche
48 ST7 T1 RP2 /15.7 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
49 ST8 T1 RP2 /15.7 RF-4R Relay fast trip Arteche
50 ST8 T1 RP2 /15.7 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
51 XG1 T1 RP2 /26.6 PMTB14 TEST BLOCK GE
52 XG2 T1 RP2 /26.7 PMTB14 TEST BLOCK GE
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
BILL OF MATERIAL 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page B2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
TUC21 3P
0.5
0.5
TO METER
TO VT J03
T1+RP1
200-400-800/1/1/1/1/1A

P2 5P20
TO F87B
5P20 C650/GE 74 74 74
BCU,25
74 74 74
5P20
86 86
0.5
T60/GE
TO METER
P1 0.5 87T2 49 64 TO #3
51/51 50/51N FR TO CT J01
F650/GE
67/67N 50/50N 51/51N FR
27/59 51/27 74 SOTF
100-200-400/1/1/1A
5P20 T1+RP2
5P20
0.5
T60/GE
100-200-400/1/1A 87T1 64 50/51
TO #1
5P20 5P20 FR 49 50/51N
Đến #3 T1
Đến #1
REG-DA
TO VT 24kV
90

-2000/1/1A
1200-1600
5P20
5P20 TO J01
TO J01
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SINGLE LINE 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page G1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
BILL OF MATERIAL
2200
TỦ DK-BV SỐ 2 MBA T1+RP2
2100
STT Tên Mô tả Code Số lượng
F87T1 F87T1
2000
1 F87T1 ROLE BẢO VỆ SO LỆCH MBA T60/GE 1
1900
1800 2 F90 ROLE TỰ ĐỘNG ĐIỀU CHỈNH ĐIỆN ÁP REG-DA/A-eberle 1
F90 F90
1700
3 SAM-F, SAM-O KHÓA ĐIỀU KHIỂN FAN, OLTC (auto/man) R601/Comeletric 2
1600
1500
4 SLR,SLR-F KHÓA ĐIỀU KHIỂN LOCAL/REMOTE R601/Comeletric 2
1400
OT HWT LWT OP OT HWT LWT OP 5 SF1, SF2 KHÓA ĐIỀU KHIỂN ON/OFF R601/Comeletric 2
1300
1200
6 SEM NÚT NHẤN DỪNG KHẨN CẤP OLTC YW1B-V4E11R/IDEC 1
1100
SAM-F SAM-O SLR-O SLR-F SF1 SF2 SAM-F SAM-O SLR-O SLR-F SF1 SF2
1000
7 POR, POL NÚT NHẤN TĂNG, GIẨM NẤC OLTC YW1B/IDEC 2
SEM POR POL SEM POR POL
900
8 OT ĐỒNG HỒ ĐO NHIỆT ĐỘ DẦU JIR-301-M/Shinko 1
800
700 9 HWT; LWT ĐỒNG HỒ ĐO NHIỆT ĐỘ CUỘN DÂY JIR-301-M/Shinko 2
600
10 OP ĐỒNG HỒ CHỈ THỊ NẤC PHÂN ÁP JIR-301-M/Shinko 1
500
TB TB TB TB TB TB TB TB TB TB
400 11 TB KHỐI THỬ NGHIỆM ROLE PMTB14/GE 5
300
200
100
000
GHI CHÚ:
- KÍCH THƯỚC: 2200x800x800(HxWxD)
- CẤP BẢO VỆ TỦ: IP41
- VẬT LIỆU CHẾ TẠO TỦ: THÉP DÀY 2mm
- MÀU SƠN VỎ TỦ: RAL7032
- CỬA MỞ MẶT TRƯỚC VÀ MẶT SAU. GÓC MỞ : 140
800 800
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
T1+RP2 LAYOUT 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page G2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
ALL
T1+RP1 D00+RP J01+RP
CB=231+Q0 OTHER
NGUỒN CẤP THIẾT BỊ
220KV
TỦ F861 F862 F87B CB F67
CBs
START
01 02 BẢO VỆ TÊN CHỨC NĂNG TC-1 TC-2 BLOCK 86-1 86-2 START 50BF TRIP
50BF
87T2, 87N x x x x x
x F87T2 T60 50/51, 50N/51N x x x x x
64 x x x x x
67/67N x x x x x
T1+RP1 x F67 F650 50/51, 50/51N x x x x x
50BF x x x x x
x F861 86-1 86-1 x x x
x F862 86-2 86-2 x x x
INTERNAL TRANSFORMER TRIP x x x
87T1, 87N x x x x x
T1+RP2 x F87T1 T60 50/51, 50N/51N x x x x x
64 x x x x x
87B x x x x
D00+RP F87B B90
50BF 2nd STAGE TO OTHER BAY x x x x x x x
67/67N,50/51, 50/51N (22kV) x x
J01+RP F67 F650
50BF(22kV) x
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
TRIP MATRIX 220KV THUAN NAM 12 SS + G
Job Number Drawing set Page G3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:58
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
DC DISTRIBUTION 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 1
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
HEATING & LIGHTING 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 2
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
CT/VT INPUT F90 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 3
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
CT INPUT F87T1 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 4
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
CT INPUT F87T1 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 5
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
CT FOR F50 OF J01 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 6
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
F90 DESCRIPTION 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 7
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
18:59
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
F87T1 DESCRIPTION 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 8
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
INPUT OF F90 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 9
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
INPUT OF F87T2 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 10
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
INPUT OF F87T2 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 11
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
INPUT OF F87T2 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 12
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNAL INPUT 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 13
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNAL OUTPUT 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 14
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:00
Revision Description Date Name Date Name Project Name = T1
Drawn
SIGNAL TO FR 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 14A
Checked 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
7 7 7 7 7 7 7 7
3 3 3 3 3 3 3 3
11 11 11 11 11 11 11 11
8 8 8 8 8 8 8 8
4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12
9 9 9 9 9 9 9 9
5 5 5 5 5 5 5 5
13 13 13 13 13 13 13 13
10 10 10 10 10 10 10 10
6 6 6 6 6 6 6 6
14 14 14 14 14 14 14 14
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNAL TRIP OF TRANSFORMER
220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 15
Checked 20.04.2020 THANG.NV 19138.220TN12TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
7 7 7 7 7 7
3 3 3 3 3 3
11 11 11 11 11 11
8 8 8 8 8 8
4 4 4 4 4 4
12 12 12 12 12 12
9 9 9 9 9 9
5 5 5 5 5 5
13 13 13 13 13 13
10 10 10 10 10 10
6 6 6 6 6 6
14 14 14 14 14 14
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNAL ALARM OF 220KV THUAN NAM 12 SS + RP2
TRANSFORMER Job Number Drawing set Page 16
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
TRANSFORMER TRIP TO F87T2 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 17
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
FAN REMOTE FAN 1 CONTROL FAN AUTO/MAN FAN 2 CONTROL
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
FAN CONTROL 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 19
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
OLTC CONTROL 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 20
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:01
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
RELAY FAIL 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 21
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:02
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNALS OF MCB 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 22
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:02
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
SIGNALS OF T1+RP1 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 23
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:02
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
TRIP TO LV 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 24
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:02
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
START 50BF OF D00 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 25
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER
DATE STAMP
03.08.2020
19:02
WR WR WR WR
Revision Description Date Name Date Name Project Name = T1
Drawn 15.03.2020 MAN.NT
T1-RP2 REFERENCE 220KV THUAN NAM 12 SS + RP2
Job Number Drawing set Page 26
Checked 20.04.2020 THANG.NV 19138.220TN12 TN12_T1+RP2 TRANSFORMER

You might also like