INTRODUCTION
LIGHTING SYSTEM
PROJECT MANAGMENT
• Auto Cad.
• E- Tools – Lighting Calculation, Voltage Drop Calculation etc
It’s an evergreen field with potential engineering requirement throughout the year.
Syllabus
I. ELECTRICAL DESIGN Engineering System:-
Types Of Protection For Hazardous Area ,Zone /Division Classification , ,Hazardous source
List Preparation ,Certification of Hazardous Area Equipment ,Marking of Equipment
Nameplates ,Hazardous Area Drawings/Layouts Preparation
• Cable Selection and Sizing and cable laying methods in electrical design
Data Sheet Preparation, IS 7098 & IEC 60502 ,Cable Sizing for high & low voltage, Cable
Schedule & Drum Schedule ,Cable Interconnection Schedule.
Preparation of BOQ, Price Break up, online bidding, Terms & Conditions ,Commercial
Terms, LC, ABG, PBG, Proforma, LD etc., , Delivery terms FOR, FOB, Ex-works,
FFR,RMR etc., CST, Excise Duties, ST, VAT & Insurance
MQP, QAP & ITP, TPI, Witness, Hold Points , Type Test, Routine Test, Acceptance Tests,
Performance Tests, IS & IEC clauses ,Inspection Request Form ,Stage inspection / Final
Inspection ,Internal Tests, Laboratory TC, Material TC,FIR, IRN & DCC
Key SLD ,Detailed SLD ,Lighting system SLD ,Small power SLD ,Metering and Control
diagram
Introduction ,Block Diagram ,Typical Schematics for Motor Feeder ,Typical Schematics for
Power Feeder ,Typical Schematics for Transformer Feeder
ETAP Software
Project Settings,
One-Line Diagram,
EPC projects